CN109629509A - A kind of gravity type concrete block quay wall relieving slab mounting process - Google Patents

A kind of gravity type concrete block quay wall relieving slab mounting process Download PDF

Info

Publication number
CN109629509A
CN109629509A CN201811549617.3A CN201811549617A CN109629509A CN 109629509 A CN109629509 A CN 109629509A CN 201811549617 A CN201811549617 A CN 201811549617A CN 109629509 A CN109629509 A CN 109629509A
Authority
CN
China
Prior art keywords
relieving slab
rib body
throwing
square
relieving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811549617.3A
Other languages
Chinese (zh)
Inventor
张文海
贾会杰
窦艳军
张天宇
李代亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201811549617.3A priority Critical patent/CN109629509A/en
Publication of CN109629509A publication Critical patent/CN109629509A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The present invention provides a kind of gravity type concrete block quay wall relieving slab mounting process, the specific steps are as follows: slings relieving slab using crane ship and forward direction is mounted at the top of the square constructed and finished, the forward position of relieving slab is made to lean out the extra large side of square;Rib body throwing ship carries out the construction of rib body throwing, throwing to relieving slab elevation of top in square land side;Anti- excavation construction is carried out using rib body of the excavator to step 2 throwing, it is anti-to dig to relieving slab elevation of bottom;Relieving slab is sling using crane ship and is installed to design with regard to position, gravity type concrete block quay wall relieving slab installs.When relieving slab being installed using present invention process, relieving slab is popped one's head in extra large side and is installed, Construction Comparison test is demodulated with tradition and live practical operation is analyzed, it avoids because relieving slab forward position is by rib body and anti-excavation construction mechanical impact is influenced presentation quality the case where, construction quality has been effectively ensured, construction technology is simplified simultaneously, saves the construction time.

Description

A kind of gravity type concrete block quay wall relieving slab mounting process
Technical field
The present invention relates to concrete block quay wall construction technology technical fields more particularly to a kind of gravity type concrete block quay wall relieving slab to pacify Dress technique.
Background technique
Prolong lower section when as shown in Figure 1, rib body being backfilled in order to prevent after relieving slab and forms cavity, previous gravity type square code Head relieving slab mounting process is all made of first reversed installation, and ship rests in relieving slab forward position and carries out harbour rear rib after reversed installation Then body backfill construction, and it is high to be backfilled to relieving slab top mark digs rib body is counter to relieving slab bottom surface absolute altitude again, then carries out relieving slab Installation is demodulated, although which solves below relieving slab tail portion empty situation occurs, guarantees harbour monolithic stability, still After relieving slab is reversely installed, rib body throwing and anti-relieving slab forward position when digging are by block stone and mechanical different degrees of destruction, seriously Presentation quality is influenced, it is unobvious using Anticollision Measures effect.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of gravity type concrete block quay wall relieving slab mounting process is provided.
The present invention to achieve the above object, using following technical scheme:
A kind of gravity type concrete block quay wall relieving slab mounting process, the specific steps are as follows:
Step 1, relieving slab pre-installation:
Relieving slab is sling using crane ship and forward direction is mounted at the top of the square constructed and finished, before making relieving slab Along the extra large side 1.5-2.5m for leaning out square;
Step 2, the construction of rib body throwing:
Rib body throwing ship carries out the construction of rib body throwing in square land side, relieving slab and rear land in pre-installation completion On be respectively set two hawsers, rib body throwing ship position and throw rib body between square and land by hinge cable, throws It is filled to relieving slab elevation of top;
Step 3, the anti-excavation construction of rib body:
Anti- excavation construction is carried out using rib body of the excavator to step 2 throwing, it is anti-to dig to relieving slab elevation of bottom;
Step 4, relieving slab accurate adjustment installation:
Relieving slab is sling using crane ship and moves 1.5-2.5m to land side, installation to design is with regard to position, gravity type side Block unloading platform used in dock installs.
Preferably, installation process using positioning leans out the distance of square with forward position of the measuring instrument to relieving slab in step 1 It measures.
Preferably, measuring instrument is total station or GPS measuring instrument.
Preferably, top being extended to after relieving slab after step 1 pre-installation, anticollision bed course is set.
Preferably, in step 2 the quality of the rib body of throwing within the scope of 10-100kg.
Preferably, the anti-excavation construction of rib body of step 3 is successively carried out from land to square.
The beneficial effects of the present invention are: relieving slab is popped one's head in extra large side and is installed when relieving slab being installed using present invention process, Construction Comparison test is demodulated with tradition and live practical operation is analyzed, and is avoided and is applied because of relieving slab forward position by rib body and anti-dig Work mechanical impact and the case where influence presentation quality, construction quality has been effectively ensured, while simplifying construction technology, has saved and apply Between working hour.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of traditional handicraft relieving slab pre-installation;
Fig. 2 is the structural schematic diagram of relieving slab of the present invention pre-installation;
Fig. 3 is the structural schematic diagram that relieving slab of the present invention is installed;
In figure: 1- square;2- relieving slab;3- rib body;
It is described in detail below with reference to the embodiment of the present invention referring to attached drawing.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
A kind of gravity type concrete block quay wall relieving slab mounting process, the specific steps are as follows:
Step 1, relieving slab pre-installation:
Relieving slab 2 is sling using crane ship and forward direction is mounted on 1 top of square constructed and finished, makes relieving slab 2 Forward position lean out the extra large side 1.5-2.5m of square 1;
Step 2, the construction of rib body throwing:
3 throwing ship of rib body carries out the construction of 3 throwing of rib body in 1 land side of square, relieving slab 2 and rear in pre-installation completion Two hawsers are respectively set in land, and 3 throwing ship of rib body position by hinge cable and rib body 3 is thrown square 1 and land Between, throwing to 2 elevation of top of relieving slab;
Step 3, the anti-excavation construction of rib body:
Anti- excavation construction is carried out using rib body 3 of the excavator to step 2 throwing, it is anti-to dig to 2 elevation of bottom of relieving slab;
Step 4, relieving slab accurate adjustment installation:
Relieving slab 2 is sling using crane ship and moves 1.5-2.5m to land side, installation to design is with regard to position, gravity type side 1 unloading platform used in dock 2 of block installs.
Preferably, in step 1 installation process using positioning with forward position of the measuring instrument to relieving slab 2 lean out square 1 away from From measuring.
Preferably, measuring instrument is total station or GPS measuring instrument.
Preferably, top being extended to after relieving slab 2 after step 1 pre-installation, anticollision bed course is set.
Preferably, in step 2 the quality of the rib body 3 of throwing within the scope of 10-100kg.
Preferably, the anti-excavation construction of rib body 3 of step 3 is successively carried out from land to square 1.
When relieving slab 2 being installed using present invention process, relieving slab 2 is popped one's head in extra large side and is installed, constructed through being demodulated with tradition Comparative test and live practical operation analysis, avoid shadow due to 2 forward position of relieving slab is by rib body 3 and anti-excavation construction mechanical impact The case where ringing presentation quality, has been effectively ensured construction quality, while simplifying construction technology, has saved the construction time.
Embodiment one
A kind of gravity type concrete block quay wall relieving slab mounting process, the specific steps are as follows:
Step 1, relieving slab pre-installation:
Relieving slab 2 is sling using crane ship and forward direction is mounted on 1 top of square constructed and finished, makes relieving slab 2 Forward position lean out the extra large side 1.5m of square 1;
Step 2, the construction of rib body throwing:
3 throwing ship of rib body carries out the construction of 3 throwing of rib body in 1 land side of square, relieving slab 2 and rear in pre-installation completion Two hawsers are respectively set in land, and 3 throwing ship of rib body position by hinge cable and rib body 3 is thrown square 1 and land Between, throwing to 2 elevation of top of relieving slab;
Step 3, the anti-excavation construction of rib body:
Anti- excavation construction is carried out using rib body 3 of the excavator to step 2 throwing, it is anti-to dig to 2 elevation of bottom of relieving slab;
Step 4, relieving slab accurate adjustment installation:
Relieving slab 2 is sling using crane ship and moves 1.5m to land side, installation to design is with regard to position, gravity type square 1 Unloading platform used in dock 2 installs.
Preferably, in step 1 installation process using positioning with forward position of the measuring instrument to relieving slab 2 lean out square 1 away from From measuring.
Preferably, top being extended to after relieving slab 2 after step 1 pre-installation, anticollision bed course is set.
Preferably, in step 2 the quality of the rib body 3 of throwing within the scope of 10-50kg.
Preferably, the anti-excavation construction of rib body 3 of step 3 is successively carried out from land to square 1.
Embodiment two
A kind of gravity type concrete block quay wall relieving slab mounting process, the specific steps are as follows:
Step 1, relieving slab pre-installation:
Relieving slab 2 is sling using crane ship and forward direction is mounted on 1 top of square constructed and finished, makes relieving slab 2 Forward position lean out the extra large side 2.5m of square 1;
Step 2, the construction of rib body throwing:
3 throwing ship of rib body carries out the construction of 3 throwing of rib body in 1 land side of square, relieving slab 2 and rear in pre-installation completion Two hawsers are respectively set in land, and 3 throwing ship of rib body position by hinge cable and rib body 3 is thrown square 1 and land Between, throwing to 2 elevation of top of relieving slab;
Step 3, the anti-excavation construction of rib body:
Anti- excavation construction is carried out using rib body 3 of the excavator to step 2 throwing, it is anti-to dig to 2 elevation of bottom of relieving slab;
Step 4, relieving slab accurate adjustment installation:
Relieving slab 2 is sling using crane ship and moves 2.5m to land side, installation to design is with regard to position, gravity type square 1 Unloading platform used in dock 2 installs.
Preferably, in step 1 installation process using positioning with forward position of the measuring instrument to relieving slab 2 lean out square 1 away from From measuring.
Preferably, measuring instrument is total station or GPS measuring instrument.
Preferably, in step 2 the quality of the rib body 3 of throwing within the scope of 50-100kg.
Preferably, the anti-excavation construction of rib body 3 of step 3 is successively carried out from land to square 1.
Embodiment three
A kind of gravity type concrete block quay wall relieving slab mounting process, the specific steps are as follows:
Step 1, relieving slab pre-installation:
Relieving slab 2 is sling using crane ship and forward direction is mounted on 1 top of square constructed and finished, makes relieving slab 2 Forward position lean out the extra large side 2m of square 1;
Step 2, the construction of rib body throwing:
3 throwing ship of rib body carries out the construction of 3 throwing of rib body in 1 land side of square, relieving slab 2 and rear in pre-installation completion Two hawsers are respectively set in land, and 3 throwing ship of rib body position by hinge cable and rib body 3 is thrown square 1 and land Between, throwing to 2 elevation of top of relieving slab;
Step 3, the anti-excavation construction of rib body:
Anti- excavation construction is carried out using rib body 3 of the excavator to step 2 throwing, it is anti-to dig to 2 elevation of bottom of relieving slab;
Step 4, relieving slab accurate adjustment installation:
Relieving slab 2 to be sling using crane ship and to the mobile 2m in land side, installation to design is with regard to position, and 1 yard of gravity type square Head relieving slab 2 installs.
Preferably, in step 1 installation process using positioning with forward position of the measuring instrument to relieving slab 2 lean out square 1 away from From measuring.
Preferably, measuring instrument is total station or GPS measuring instrument.
Preferably, top being extended to after relieving slab 2 after step 1 pre-installation, anticollision bed course is set.
Preferably, in step 2 the quality of the rib body 3 of throwing within the scope of 30-80kg.
The present invention is exemplarily described above in conjunction with specific embodiment, it is clear that the present invention implements not by upper The limitation of mode is stated, as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved straight It scoops out for other occasions, it is within the scope of the present invention.

Claims (6)

1. a kind of gravity type concrete block quay wall relieving slab mounting process, which is characterized in that specific step is as follows:
Step 1, relieving slab pre-installation:
Relieving slab is sling using crane ship and forward direction is mounted at the top of the square constructed and finished, visits the forward position of relieving slab The extra large side 1.5-2.5m of square out;
Step 2, the construction of rib body throwing:
Rib body throwing ship carries out the construction of rib body throwing in square land side, relieving slab and rear land point in pre-installation completion Not She Zhi two hawsers, rib body throwing ship by hinge cable carry out position and rib body is thrown between square and land, throwing is extremely Relieving slab elevation of top;
Step 3, the anti-excavation construction of rib body:
Anti- excavation construction is carried out using rib body of the excavator to step 2 throwing, it is anti-to dig to relieving slab elevation of bottom;
Step 4, relieving slab accurate adjustment installation:
Relieving slab is sling using crane ship and moves 1.5-2.5m to land side, installation to design is with regard to position, gravity type square code Head relieving slab installs.
2. gravity type concrete block quay wall relieving slab mounting process according to claim 1, which is characterized in that installed in step 1 Process is measured using positioning with the distance that forward position of the measuring instrument to relieving slab leans out square.
3. gravity type concrete block quay wall relieving slab mounting process according to claim 2, which is characterized in that measuring instrument is complete It stands instrument or GPS measuring instrument.
4. gravity type concrete block quay wall relieving slab mounting process according to claim 1, which is characterized in that step 1 pre-installation After extended to after relieving slab top be arranged anticollision bed course.
5. gravity type concrete block quay wall relieving slab mounting process according to claim 1, which is characterized in that throwing in step 2 Rib body quality within the scope of 10-100kg.
6. gravity type concrete block quay wall relieving slab mounting process according to claim 1, which is characterized in that the rib body of step 3 Anti- excavation construction is successively carried out from land to square.
CN201811549617.3A 2018-12-18 2018-12-18 A kind of gravity type concrete block quay wall relieving slab mounting process Withdrawn CN109629509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811549617.3A CN109629509A (en) 2018-12-18 2018-12-18 A kind of gravity type concrete block quay wall relieving slab mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811549617.3A CN109629509A (en) 2018-12-18 2018-12-18 A kind of gravity type concrete block quay wall relieving slab mounting process

Publications (1)

Publication Number Publication Date
CN109629509A true CN109629509A (en) 2019-04-16

Family

ID=66075107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811549617.3A Withdrawn CN109629509A (en) 2018-12-18 2018-12-18 A kind of gravity type concrete block quay wall relieving slab mounting process

Country Status (1)

Country Link
CN (1) CN109629509A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114750266A (en) * 2022-03-28 2022-07-15 中交第四航务工程局有限公司 Construction method of square outer side template system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203247538U (en) * 2013-04-07 2013-10-23 中交第一航务工程勘察设计院有限公司 Anchor-pulling type gravity type square wharf
CN106149624A (en) * 2015-04-27 2016-11-23 中交第三航务工程勘察设计院有限公司 A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203247538U (en) * 2013-04-07 2013-10-23 中交第一航务工程勘察设计院有限公司 Anchor-pulling type gravity type square wharf
CN106149624A (en) * 2015-04-27 2016-11-23 中交第三航务工程勘察设计院有限公司 A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114750266A (en) * 2022-03-28 2022-07-15 中交第四航务工程局有限公司 Construction method of square outer side template system
CN114750266B (en) * 2022-03-28 2023-12-08 中交第四航务工程局有限公司 Construction method of square outside formwork system

Similar Documents

Publication Publication Date Title
CN101482409B (en) Rock fissure direction and obliquity measuring method
CN109339054A (en) A kind of oblique chute jackstone technique
CN105570534B (en) Shallow overburden push pipe controls the equipment and construction method of ground structure deformation
CN109629509A (en) A kind of gravity type concrete block quay wall relieving slab mounting process
CN209143030U (en) A kind of oblique chute stone dumper
CN110158634A (en) Construction system and construction method for offshore wind farm steel-pipe pile band hammer staking out pile sinking
CN114353924B (en) On-line weighing method for materials in hydraulic excavator bucket
CN203414080U (en) Large-section tunnel CRD (Cross Diaphragm) layered excavating spatial effect monitoring device
CN103924574B (en) Rubble leveling device
CN207904918U (en) A kind of drilled pile casing locating rack
CN203270585U (en) Riprap leveling device
CN103983148A (en) Full-automatic blast hole setting-out method for tunnel smooth surface blasting
WO2024037120A1 (en) Precise positioning system for hydraulic impact hammer
CN104443334B (en) A kind of all-rotation device Accessory Members high accuracy installation method
CN208748525U (en) Swing shifting specific purpose tool
CN202323914U (en) Center fixed type sedimentation plate
CN209372191U (en) A kind of bedding liter slurry operation level gauging instrument
CN204694193U (en) For the specific purpose tool that water conservancy cyclone sand settling mouth is measured
CN209215325U (en) A kind of lysimeter group of the underground water buried depth of measuring and calculating suitable for crop growth
CN206888545U (en) A kind of interim stud location regulating system
CN209197630U (en) A kind of anchor pole drawing group experiment displacement measurement system
CN208530801U (en) A kind of positioning device being installed on hull
CN208328939U (en) Shore protection jackstone operation platform
CN106945783A (en) Portable multi-beam depth sounder basic matrix erecting device
CN106948370A (en) Cavity pocketed ocean foundation structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190416