CN109613939A - 一种防溜桩的桩体内气压调节装置 - Google Patents
一种防溜桩的桩体内气压调节装置 Download PDFInfo
- Publication number
- CN109613939A CN109613939A CN201910034477.4A CN201910034477A CN109613939A CN 109613939 A CN109613939 A CN 109613939A CN 201910034477 A CN201910034477 A CN 201910034477A CN 109613939 A CN109613939 A CN 109613939A
- Authority
- CN
- China
- Prior art keywords
- pile
- steel
- stake
- outlet valve
- controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D16/00—Control of fluid pressure
- G05D16/20—Control of fluid pressure characterised by the use of electric means
- G05D16/2006—Control of fluid pressure characterised by the use of electric means with direct action of electric energy on controlling means
- G05D16/2013—Control of fluid pressure characterised by the use of electric means with direct action of electric energy on controlling means using throttling means as controlling means
- G05D16/2026—Control of fluid pressure characterised by the use of electric means with direct action of electric energy on controlling means using throttling means as controlling means with a plurality of throttling means
- G05D16/2033—Control of fluid pressure characterised by the use of electric means with direct action of electric energy on controlling means using throttling means as controlling means with a plurality of throttling means the plurality of throttling means being arranged in series
Landscapes
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明提供了一种防溜桩的桩体内气压调节装置,包括安装在钢管桩桩头的桩帽、进气阀门、出气阀门、速度应变计、连接线材和控制器;所述进气阀门和所述出气阀门设置在所述桩帽上,进气阀门和出气阀门通过所述连接线材与所述控制器电连;所述速度应变计设置在所述桩帽的下端,并通过所述连接线材与所述控制器电连,用于检测钢管桩的运动速度;当速度应变计检测到钢管桩的运动速度加快,钢管桩溜桩,控制器电动控制出气阀门关闭,进气阀门打开并向钢管桩桩身内打入气体;当速度应变计检测到钢管桩溜桩停止时,控制器电动控制出气阀门打开,进气阀门停止打气,钢管桩桩体内气压恢复平衡,至此通过调节桩体内气压完成防止溜桩。
Description
技术领域
本发明涉及海洋平台桩基础领域,具体涉及一种防溜桩的桩体内气压调节装置。
背景技术
海洋平台作为提供生产与生活设施于一体的构筑物,集运输、钻井、施工、观测、导航于一身。其桩基施工一般使用大直径超长钢管桩,通过液压打桩锤将管桩沿导管打入海底土层。然而打桩过程中,当钢管桩遇到海洋土层中的软弱土层中时,由于桩端阻力与桩侧摩擦阻力减小,经常会发生溜桩现象。溜桩不仅影响成桩质量与桩基承载力,而且还会使桩的实际贯入度与桩基的设计高程产生较大误差,还会对成桩质量造成影响。而目前海洋风电领域还未有能有效预防溜桩的装置。
发明内容
针对上述现有技术问题,本发明提供了一种防溜桩的桩体内气压调节装置,该装置可以通过调节桩体内气压,预防钢管桩贯入软黏土层时发生溜桩,从而提高桩基承载力,保证成桩质量,且可循环使用,工程实用性强,经济技术可行。
本发明采用以下的技术方案:
一种防溜桩的桩体内气压调节装置,包括安装在钢管桩桩头的桩帽、进气阀门、出气阀门、速度应变计、连接线材和控制器;所述进气阀门和所述出气阀门设置在所述桩帽上,进气阀门和出气阀门通过所述连接线材与所述控制器电连;所述速度应变计设置在所述桩帽的下端,并通过所述连接线材与所述控制器电连,用于检测钢管桩的运动速度;
当速度应变计检测到钢管桩的运动速度加快,钢管桩溜桩,控制器电动控制出气阀门关闭,进气阀门打开并向钢管桩桩身内打入气体;
当速度应变计检测到钢管桩溜桩停止时,控制器电动控制出气阀门打开,进气阀门停止打气,钢管桩桩体内气压恢复平衡,至此通过调节桩体内气压完成防止溜桩。
进一步地,所述进气阀门与所述出气阀门在所述桩帽上呈相互左右对称设置。
进一步地,所述控制器上设有进气阀门指示灯和出气阀门指示灯。
本发明的工作原理是:
一种防溜桩的桩体内气压调节装置,通过桩帽将钢管桩桩体形成一个密闭的空间,再通过进气阀门与出气阀门调节桩体内的气压,钢管桩发生溜桩时,钢管桩的运动速度加快,当速度应变计检测到钢管桩发生溜桩时,打桩锤停止工作,出气阀门关闭,进气阀门打开并向桩身内打入气体,此时桩体内气体压强增大,给桩体一个向上的力平衡自身重力,从而抑制钢管桩发生溜桩,当速度应变计检测到溜桩停止时,出气阀门打开,进气阀门停止打气,桩体内气压恢复平衡,打桩工作继续进行。
本发明具有的有益效果是:
可以通过调节桩体内气压,预防钢管桩贯入软黏土层时发生溜桩,从而提高桩基承载力,保证成桩质量,且可以循环使用,工程实用性强,经济技术可行。
附图说明
图1为一种防溜桩的桩体内气压调节装置的结构示意图;
图2为一种防溜桩的桩体内气压调节装置的桩帽的内部结构示意图;
图3为一种防溜桩的桩体内气压调节装置的施工示意图。
其中,1-桩帽;2-进气阀门;3-出气阀门;4-速度应变计;5-连接线材;6-控制器;7-进气阀门指示灯;8-出气阀门指示灯;9-钢管桩;10-打桩锤。
具体实施方式
下面结合附图对本发明进行具体的说明:
结合图1至图3,一种防溜桩的桩体内气压调节装置,包括安装在钢管桩桩头的桩帽1、进气阀门2、出气阀门3、速度应变计4、连接线材5和控制器6;所述进气阀门2和所述出气阀门3设置在所述桩帽1上,进气阀门2和出气阀门3通过所述连接线材5与所述控制器6电连;所述速度应变计4设置在所述桩帽1的下端,并通过所述连接线材5与所述控制器6电连,用于检测钢管桩9的运动速度;
当速度应变计4检测到钢管桩9的运动速度加快,钢管桩9溜桩,控制器6电动控制出气阀门3关闭,进气阀门2打开并向钢管桩9桩身内打入气体;
当速度应变计4检测到钢管桩9溜桩停止时,控制器6电动控制出气阀门3打开,进气阀门2停止打气,钢管桩9桩体内气压恢复平衡,至此通过调节桩体内气压完成防止溜桩。
进一步地,所述进气阀门2与所述出气阀门3在所述桩帽1上呈相互左右对称设置。
进一步地,所述控制器6上设有进气阀门指示灯7和出气阀门指示灯8。
施工时:首先根据施工设计要求,将速度应变计4安装在钢管桩9桩身上,再将钢管桩9安装在导向架上,在桩身上端固定好本装置的桩帽1,再通过连接线材5将速度应变计4与桩帽1相连,以及控制器6与桩帽1之间的连接,之后打桩锤10开始打桩,此时进气阀门2和出气阀门3呈打开状态;
当钢管桩9打入软弱土层时,钢管桩9会发生溜桩,速度应变计4检测到钢管桩9的下沉速度大于正常速度,打桩锤10立即停止打桩,此时控制器6控制出气阀门2关闭,进气阀门3开始工作,同时控制进气阀门指示灯7亮起,出气阀门指示灯8灭,开始向桩体内部打入气体,增强桩身内的气体压强,从而抑制钢管桩9溜桩;
当速度应变计4检测到溜桩停止时,控制器6电动控制出气阀门3打开,进气阀门2停止打气,同时控制器6控制其上的出气阀门指示灯8亮起,进气阀门指示灯8灭,打桩工作继续进行。
当然,上述说明并非是对本发明的限制,本发明也并不仅限于上述举例,本技术领域的技术人员在本发明的实质范围内所做出的变化、改型、添加或替换,也应属于本发明的保护范围。
Claims (3)
1.一种防溜桩的桩体内气压调节装置,其特征在于,包括安装在钢管桩桩头的桩帽、进气阀门、出气阀门、速度应变计、连接线材和控制器;所述进气阀门和所述出气阀门设置在所述桩帽上,进气阀门和出气阀门通过所述连接线材与所述控制器电连;所述速度应变计设置在所述桩帽的下端,并通过所述连接线材与所述控制器电连,用于检测钢管桩的运动速度;
当速度应变计检测到钢管桩的运动速度加快,钢管桩溜桩,控制器电动控制出气阀门关闭,进气阀门打开并向钢管桩桩身内打入气体;
当速度应变计检测到钢管桩溜桩停止时,控制器电动控制出气阀门打开,进气阀门停止打气,钢管桩桩体内气压恢复平衡,至此通过调节桩体内气压完成防止溜桩。
2.根据权利要求1所述的一种防溜桩的桩体内气压调节装置,其特征在于,所述进气阀门与所述出气阀门在所述桩帽上呈相互左右对称设置。
3.根据权利要求1所述的一种防溜桩的桩体内气压调节装置,其特征在于,所述控制器上设有进气阀门指示灯和出气阀门指示灯。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910034477.4A CN109613939A (zh) | 2019-01-15 | 2019-01-15 | 一种防溜桩的桩体内气压调节装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910034477.4A CN109613939A (zh) | 2019-01-15 | 2019-01-15 | 一种防溜桩的桩体内气压调节装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109613939A true CN109613939A (zh) | 2019-04-12 |
Family
ID=66016958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910034477.4A Pending CN109613939A (zh) | 2019-01-15 | 2019-01-15 | 一种防溜桩的桩体内气压调节装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109613939A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113863307A (zh) * | 2021-09-15 | 2021-12-31 | 天津大学 | 一种用于海洋大直径管桩安装中位置可调式溜桩控制装置 |
CN117332638A (zh) * | 2023-09-22 | 2024-01-02 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种适用于大兆瓦海上风力机的防溜钢管桩及其优化方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1463199A (en) * | 1973-04-19 | 1977-02-02 | Stephens R M | Open bottom caissons |
CN103790189A (zh) * | 2014-02-19 | 2014-05-14 | 中国海洋石油总公司 | 海洋工程打桩过程中溜桩的现场预警方法 |
CN104452790A (zh) * | 2014-10-13 | 2015-03-25 | 天津大学前沿技术研究院有限公司 | 一种带裙板的沉箱及其在气浮拖航时的调节方法 |
CN105951832A (zh) * | 2016-05-27 | 2016-09-21 | 中交第航务工程局有限公司 | 柴油锤偏位打桩纠偏施工工艺及装备 |
CN106759426A (zh) * | 2016-12-30 | 2017-05-31 | 中交第二航务工程局有限公司 | 软弱土层沉井下沉控制方法及装置 |
CN208039289U (zh) * | 2018-01-25 | 2018-11-02 | 中交上海港湾工程设计研究院有限公司 | 一种桶式结构的控制*** |
-
2019
- 2019-01-15 CN CN201910034477.4A patent/CN109613939A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1463199A (en) * | 1973-04-19 | 1977-02-02 | Stephens R M | Open bottom caissons |
CN103790189A (zh) * | 2014-02-19 | 2014-05-14 | 中国海洋石油总公司 | 海洋工程打桩过程中溜桩的现场预警方法 |
CN104452790A (zh) * | 2014-10-13 | 2015-03-25 | 天津大学前沿技术研究院有限公司 | 一种带裙板的沉箱及其在气浮拖航时的调节方法 |
CN105951832A (zh) * | 2016-05-27 | 2016-09-21 | 中交第航务工程局有限公司 | 柴油锤偏位打桩纠偏施工工艺及装备 |
CN106759426A (zh) * | 2016-12-30 | 2017-05-31 | 中交第二航务工程局有限公司 | 软弱土层沉井下沉控制方法及装置 |
CN208039289U (zh) * | 2018-01-25 | 2018-11-02 | 中交上海港湾工程设计研究院有限公司 | 一种桶式结构的控制*** |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113863307A (zh) * | 2021-09-15 | 2021-12-31 | 天津大学 | 一种用于海洋大直径管桩安装中位置可调式溜桩控制装置 |
CN117332638A (zh) * | 2023-09-22 | 2024-01-02 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种适用于大兆瓦海上风力机的防溜钢管桩及其优化方法 |
CN117332638B (zh) * | 2023-09-22 | 2024-04-09 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种适用于大兆瓦海上风力机的防溜钢管桩及其优化方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109629568A (zh) | 海上风电导管架基础钢管桩用浮式稳桩平台的沉桩工艺 | |
CN105464117B (zh) | 旋转式水上打桩导架及水上群桩基础打桩工艺 | |
CN105951832B (zh) | 海上柴油锤偏位打桩纠偏施工工艺 | |
CN104480865B (zh) | 一种大型钢沉井精确定位方法 | |
CN105501396B (zh) | 带倒刺的负压桶锚固装置、安装方法及漂浮式海上风电场 | |
CN205653772U (zh) | 一种小型海洋平台自升式桩腿 | |
CN101812849A (zh) | 一种海上单桩基础结构及其安装方法 | |
CN107933828B (zh) | 一种锚头可张开的新型鱼雷锚及其安装方法 | |
CN109613939A (zh) | 一种防溜桩的桩体内气压调节装置 | |
CN105178325B (zh) | 伞式海底吸力锚基础的安装设备及安装方法 | |
CN107541732A (zh) | 一种海上拉伸阳极***及其安装方法 | |
CN109911125A (zh) | 一种海上风电基础钢管桩的滚装上船方法 | |
CN104250968B (zh) | 自安装吸力桩式可移动平台结构 | |
CN103556972A (zh) | 一种自安装式海底钻井基盘及其安装方法 | |
JP6914411B1 (ja) | 杭の施工方法 | |
CN101871207B (zh) | 海上风力发电机组承载装置 | |
CN107792307A (zh) | 一种便于安装的浮式风电塔 | |
CN107155992A (zh) | 适用于淤泥质海床的重力式刚性锚泊基础及其施工方法 | |
CN206438538U (zh) | 沉管隧道施工*** | |
CN217105014U (zh) | 一种用于粉土地层的海洋孔压静力触探连续贯入装置 | |
Audibert et al. | Suction caisson installation at Horn Mountain–a case history | |
CN102392446A (zh) | 一种大型无过渡段单桩施工技术 | |
CN102409680B (zh) | 滑道组合桩水下送桩工艺 | |
CN105401564A (zh) | 将潮流能发电装置固定于水底的施工方法和潮流发电装置 | |
JP2023059098A (ja) | 水底設置用筒状体及びその水底設置方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20220701 |
|
AD01 | Patent right deemed abandoned |