CN109610824A CN201811416292.1A CN201811416292A CN109610824A CN 109610824 A CN109610824 A CN 109610824A CN 201811416292 A CN201811416292 A CN 201811416292A CN 109610824 A CN109610824 A CN 109610824A
Authority
CN
China
Prior art keywords
casing
fixed
template
localization method
buried steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811416292.1A
Other languages
Chinese (zh)
Inventor
耿为为
周叙伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201811416292.1A priority Critical patent/CN109610824A/en
Publication of CN109610824A publication Critical patent/CN109610824A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/063Re-usable forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of localization method of fixed pre-buried steel casing, include the following steps: 1. wall mould or one side template of beam form molding after, cannula center is made in template according to design drawing, draws casing profile;2. casing joints are fixed on one side template of wall mould or beam form according to casing profile installation set pipe, and using fixed screw;3. adding stiffener in periphery of spigot according to casing diameter size and design requirement;4. installing wall, another side template of beam, the fixation of casing other side connector is similarly carried out using fixed screw;5. formwork reinforcement, template is checked and accepted.Pre-buried steel casing securely, accurate positioning can be fixed and be can be improved construction efficiency using this method, save construction cost.

Description

A kind of localization method of fixed pre-buried steel casing
Technical field
The invention belongs to the architectural engineerings installing areas such as water, warm, electricity, in particular to a kind of positioning of fixed pre-buried steel casing Method.
Background technique
In building field, all kinds of installation profession service sleeves are commonplace, casing diameter it is small have 0.1m hereinafter, big has 1m or more.Traditional set pipe fixing method is to use first to position, and periphery uses bar dowel and casing and framework of steel reinforcement to carry out a little again Weldering is reinforced, and this fixed form is not only time-consuming but also cost of idleness, and inevitably occur in casting process the offset of framework of steel reinforcement or by The phenomenon that being displaced casing to the influence that concrete vibrates.
Summary of the invention
The object of the invention is that overcoming above-mentioned the deficiencies in the prior art, and provide a kind of fixed pre-embedded steel sleeve The localization method of pipe, using this method can securely, accurate positioning by pre-buried steel casing be fixed and can be improved construction efficiency, Save construction cost.
As above design, the technical scheme is that a kind of localization method of fixed pre-buried steel casing, it is characterised in that: Include the following steps:
1. making cannula center in template after wall mould or the molding of one side template of beam form according to design drawing, drawing set Pipe profile;
2. casing joints are fixed on wall mould or beam form side according to casing profile installation set pipe, and using fixed screw In template;
3. adding stiffener in periphery of spigot according to casing diameter size and design requirement;
4. installing wall, another side template of beam, the fixation of casing other side connector is similarly carried out using fixed screw;
5. formwork reinforcement, template is checked and accepted.
Above-mentioned fixed screw uses drilling tail tap bolt, the minimum 4.8 × 40mm of specification, and material requires to be SUS410.
Above-mentioned casing joints use band steel, minimum -4 × 40mm of size, and band steel size is 40mm × 50mm, material Matter requirement >=Q235B.
Above-mentioned casing joints are fully welded with casing, the minimum 4mm of weld bead height.
The present invention has the advantage that and good effect:
1, the method that the present invention changes conventionally employed reinforcing bar spot welding fixed sleeving, and fixing can with drilling tail tap bolt Secondary use saves construction cost.
2, casing positioning and fixing of the present invention are detached from, so as to avoid framework of steel reinforcement using template as carrier with framework of steel reinforcement The phenomenon that shifting during concrete placings and affecting casing positioning.
3, accurate positioning of the present invention, while also improving construction efficiency.
Detailed description of the invention
Fig. 1 is main view of the invention;
Fig. 2 is casing diameter≤325mm construction schematic diagram;
Fig. 3 is construction schematic diagram of the casing diameter between 325mm and 630mm.
In figure: 1- band steel connecting plate;2- steel sleeve;3- drilling tail tap bolt;4- external wall waterproof casing;5- template.
Specific embodiment
As shown in the figure: a kind of localization method of fixed pre-buried steel casing includes the following steps:
1, after wall mould or one side template of beam form form, cannula center is made in template according to design drawing, draws casing Profile.
2, steel sleeve is installed according to casing profile, and the band steel connector of casing is fixed on by wall using drilling tail tap bolt On one side template of mould or beam form.(excessive casing can be used the spot welding reinforcing bar on framework of steel reinforcement and carry out temporary support, in addition, casing Guarantee that band steel connector is fully welded with casing before installation, the minimum 4mm of weld bead height, and sleeve opening is sealed using adhesive tape It closes, closing is minimum two layers)
3, stiffener is added in periphery of spigot according to casing diameter size and design requirement.
4, wall, another side template of beam are installed, band steel company in the steel sleeve other side is similarly fixed using drilling tail self-tapping screw Fitting.(positioning for other side fixing piece, generally use two methods: the first can first be brushed on casing band steel connector One layer of paint or prepared Chinese ink, remove template later, again by upper mold after using nail to make Position Approximate at the connector marking Plate, outside are drilled fixation using drilling tail tap bolt at nail.Second according to template size modulus, preferentially will be at steel sleeve One piece of Template Location, then fixed using drilling tail tap bolt, later again carried out remaining template perfect)
5, formwork reinforcement, template are checked and accepted.
6, self-tapping screw is back-outed using electric tool when removing.
Above-mentioned fixed screw uses drilling tail tap bolt, the minimum 4.8 × 40mm of specification, and material requires to be SUS410.
Above-mentioned casing joints use band steel, minimum -4 × 40mm of size, and band steel size is 40mm × 50mm, material Matter requirement >=Q235B.
Above-mentioned connector is fully welded with casing, the minimum 4mm of weld bead height.
The above embodiment is used for illustrative purposes only, rather than limitation of the present invention, the technology in relation to technical field Personnel can also make various transformation or variation without departing from the spirit and scope of the present invention.Therefore, all etc. Same technical solution also should belong to scope of the invention, should be limited by each claim.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (4)

1. a kind of localization method of fixed pre-buried steel casing, characterized by the following steps:
1. making cannula center in template after wall mould or the molding of one side template of beam form according to design drawing, drawing casing wheel It is wide;
2. casing joints are fixed on one side template of wall mould or beam form according to casing profile installation set pipe, and using fixed screw On;
3. adding stiffener in periphery of spigot according to casing diameter size and design requirement;
4. installing wall, another side template of beam, the fixation of casing other side connector is similarly carried out using fixed screw;
5. formwork reinforcement, template is checked and accepted.
2. above-mentioned a kind of localization method of fixed pre-buried steel casing according to claim 1, it is characterised in that: fixed screw Using drilling tail tap bolt, the minimum 4.8 × 40mm of specification, material requires to be SUS410.
3. above-mentioned a kind of localization method of fixed pre-buried steel casing according to claim 1, it is characterised in that: above-mentioned casing Connector uses band steel, minimum -4 × 40mm of size, and band steel size is 40mm × 50mm, material requirement >=Q235B.
4. above-mentioned a kind of localization method of fixed pre-buried steel casing according to claim 1 or 3, it is characterised in that: above-mentioned Casing joints are fully welded with casing, the minimum 4mm of weld bead height.
CN201811416292.1A 2018-11-26 2018-11-26 A kind of localization method of fixed pre-buried steel casing Pending CN109610824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811416292.1A CN109610824A (en) 2018-11-26 2018-11-26 A kind of localization method of fixed pre-buried steel casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811416292.1A CN109610824A (en) 2018-11-26 2018-11-26 A kind of localization method of fixed pre-buried steel casing

Publications (1)

Publication Number Publication Date
CN109610824A true CN109610824A (en) 2019-04-12

Family

ID=66004676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811416292.1A Pending CN109610824A (en) 2018-11-26 2018-11-26 A kind of localization method of fixed pre-buried steel casing

Country Status (1)

Country Link
CN (1) CN109610824A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029815A (en) * 2019-04-29 2019-07-19 成都建工第七建筑工程有限公司 The fixation construction method and special installation tool of steel sleeve in a kind of narrow casting space
CN110173121A (en) * 2019-04-19 2019-08-27 中冶天工集团有限公司 Rapid installation method of steel sleeve
CN110409812A (en) * 2019-07-19 2019-11-05 五冶集团上海有限公司 A method of improving service sleeve installation accuracy in beam steel concrete blinding
CN111005561A (en) * 2019-11-25 2020-04-14 成都建工第四建筑工程有限公司 Reinforced concrete structure sleeve and using method thereof
CN113685025A (en) * 2020-05-19 2021-11-23 广东博意建筑设计院有限公司 Wall bushing and mounting method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204126263U (en) * 2014-08-01 2015-01-28 中天建设集团有限公司 A kind of beam, the pre-buried horizontal case fastening devices of wall
CN205219409U (en) * 2015-12-01 2016-05-11 龙信建设集团有限公司 Sleeve pipe positioner in precast beam
CN106121226A (en) * 2016-07-25 2016-11-16 北京建工集团有限责任公司 Construction method reserved by steel thimble
CN206513023U (en) * 2016-12-07 2017-09-22 山西省第三建筑工程公司 Concrete floor reserved holes of pipes steel sleeve positioner

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204126263U (en) * 2014-08-01 2015-01-28 中天建设集团有限公司 A kind of beam, the pre-buried horizontal case fastening devices of wall
CN205219409U (en) * 2015-12-01 2016-05-11 龙信建设集团有限公司 Sleeve pipe positioner in precast beam
CN106121226A (en) * 2016-07-25 2016-11-16 北京建工集团有限责任公司 Construction method reserved by steel thimble
CN206513023U (en) * 2016-12-07 2017-09-22 山西省第三建筑工程公司 Concrete floor reserved holes of pipes steel sleeve positioner

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173121A (en) * 2019-04-19 2019-08-27 中冶天工集团有限公司 Rapid installation method of steel sleeve
CN110029815A (en) * 2019-04-29 2019-07-19 成都建工第七建筑工程有限公司 The fixation construction method and special installation tool of steel sleeve in a kind of narrow casting space
CN110409812A (en) * 2019-07-19 2019-11-05 五冶集团上海有限公司 A method of improving service sleeve installation accuracy in beam steel concrete blinding
CN111005561A (en) * 2019-11-25 2020-04-14 成都建工第四建筑工程有限公司 Reinforced concrete structure sleeve and using method thereof
CN113685025A (en) * 2020-05-19 2021-11-23 广东博意建筑设计院有限公司 Wall bushing and mounting method thereof

Similar Documents

Publication Publication Date Title
CN109610824A (en) A kind of localization method of fixed pre-buried steel casing
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN204899938U (en) Tunnel secondary lining formworking jumbo bulkhead
CN103672181A (en) Water supply and drainage pipeline sleeve pre-embedding construction method
CN102561679B (en) Fabricated floor decking sheet, fastener and construction method of cast-in-situ concrete floor slabs
CN107503382B (en) End template fixed rubber water stop belt structure and construction method thereof
CN106049537A (en) Comprehensive pipe gallery embedded part fixing device and fixing method thereof
CN102011369A (en) Construction method of steel shells of bridge closure segments striding over various roads
CN107313787B (en) Tunnel lining trolley end die and construction method
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN101846226A (en) Method for restoring lining of large pipeline or ditch by pouring resin on nail-embedded plastic plate
CN204357448U (en) Tunnel lining cutting movement joint red copper waterstop end template reinforcement processing apparatus
CN204983655U (en) Reserved pipe cover of floor poling hole
CN108571012A (en) Piping lane construction joint integrated installation mold construction technology
CN210976619U (en) Aluminum alloy template reinforced structure
CN205476452U (en) Connection structure of shear force wall and floor
CN211118029U (en) Structure suitable for embedded sleeve behind existing pool wall
CN219080977U (en) Plugging device of steel concrete hybrid structure junction bottom
CN214785917U (en) Aluminum alloy template convenient to spool location installation
CN110173113A (en) A kind of Lin Qiang hangs hole constructing structure and method
CN217601515U (en) Quick mould device of outdoor inspection shaft
CN214695762U (en) Horizontal construction joint structure of underground hydraulic structure
CN204225555U (en) A kind of assembling mixing station storage bin partition wall reused
CN214117560U (en) Combined plugging pipe penetrating tool on prefabricated laminated slab and mounting structure thereof
CN109025290A (en) A kind of water-proof concrete exterior wall and basic intersection setting-up of construction joint construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190412

WD01 Invention patent application deemed withdrawn after publication