CN109604978A - It is a kind of to solve the big processing method of the high scattered error of out star wheel soccer star - Google Patents
It is a kind of to solve the big processing method of the high scattered error of out star wheel soccer star Download PDFInfo
- Publication number
- CN109604978A CN109604978A CN201811480135.7A CN201811480135A CN109604978A CN 109604978 A CN109604978 A CN 109604978A CN 201811480135 A CN201811480135 A CN 201811480135A CN 109604978 A CN109604978 A CN 109604978A
- Authority
- CN
- China
- Prior art keywords
- rod
- forging stock
- bar
- finishing
- star
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
- B23P15/14—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass gear parts, e.g. gear wheels
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Forging (AREA)
Abstract
The present invention provides a kind of processing methods that the solution high scattered error of out star wheel soccer star is big, including blanking, first time ball blast, coating, heating, just crowded, jumping-up, anti-crowded, temperature control cooling, second of ball blast, pre-treatment, pre- finishing and finishing.The present invention increases pre- finishing process on original Process ba- sis, and by way of pre- finishing cold extrusion, anti-material extrusion intracavity bottom is carried out preform, makes instead to squeeze blank intracavity bottom angle and is preferably bonded with trimming punch, ensure that the high stability of soccer star.
Description
Technical field
The invention belongs to the processing method of out star wheel soccer star, it is big to be more particularly to a kind of solution high scattered error of out star wheel soccer star
Processing method.
Background technique
Out star wheel forging is that one of important part, automobile power pass to vehicle by transmission system in transmission system in automobile
Wheel.In traditional technique, the technique combined using cold temperature can directly be completed out star wheel forging, but due to warm forging
In production process, when warm forging formed punch uses certain service life, the serious wear on head, soccer star's high scattered error fluctuation when essence being caused to shape
Greatly, customer drawings requirement can not be met.So that meet customer requirement, need to not stop more to renew warm forging formed punch can guarantee essence forming ball
The stability of the high scattered error size of star.So that mould utilization factor is low, mold repair rate is high, increases Mold Making cost.
Summary of the invention
The present invention provides a kind of processing methods that the solution high scattered error of out star wheel soccer star that mould utilization factor can be improved is big.
According to an aspect of the invention, there is provided a kind of solve the big processing method of the high scattered error of out star wheel soccer star, comprising:
Blanking: it is using circular saw that steel are sawed-off, obtain bar forging stock;
First time ball blast: Shot Blasting is carried out by surface of the shot-blasting machine to the bar forging stock, removes bar forging stock table
Face impurity increases billet surface product;
Coating: being heated bar with electric circle, is heated to 180 DEG C~220 DEG C, with graphite liquid to the table of rodlike forging stock
Face carries out coating treatment, its surface is made to form one layer of uniform graphite linings;
Heating: bar is heated with intermediate frequency furnace, temperature is heated to 860 DEG C~900 DEG C;
It just squeezes: the forging stock after blanking just squeeze to form preforming forging stock, the preforming forging stock includes the first bar
Portion, the second bar portion and third bar portion, the top of first bar portion are connect with the bottom end of second bar portion, second bar portion
Top connect with the bottom end of the third bar portion, the central axes of first body of rod, the central axes of second body of rod and the second bar
The central axes of body are located in a straight line, and the diameter of first body of rod is less than the diameter of second body of rod, second bar
The diameter of body is less than the diameter of the third body of rod, and the junction of first body of rod and second body of rod is chamfering structure,
The junction of second body of rod and the third body of rod is chamfering structure;
Jumping-up: carrying out jumping-up to the third body of rod of the forging stock after just squeezing, so that the diameter of the third body of rod becomes larger and height becomes
It is small;
It is anti-to squeeze: anti-squeeze being carried out to the third body of rod of the forging stock after jumping-up and is formed with the top in the third body of rod to its inner-concave
Sunken inner cavity;
Temperature control is cooling: eliminating the stress generated when product squeezes, improves hardness;
Second of ball blast: Shot Blasting is carried out to the surface by the cooling preforming forging stock of temperature control, removes anti-material extrusion table
Surface oxidized skin increases surface area;
Pre-treatment: the preforming forging stock Jing Guo Shot Blasting is first sequentially placed into pickling in pickling tube, is put into phosphating pond
Phosphate coating is adsorbed, absorption saponification layer in saponification pond is put into;
Pre- finishing: obtained intracavity bottom progress backward extrusion is squeezed to anti-, makes blank intracavity bottom angle and trimming punch
Preferably fitting, ensure that the high stability of soccer star;
Forging stock after pre- finishing: being put into that the sizing die to finishing mold is intracavitary by finishing, is carried out to the inner cavity of the forging stock
Shaping, to form head cavity small in the end and big in the middle.
In some embodiments, the graphite liquid is JD-16 graphite liquid.
In some embodiments, the concentration of the graphite liquid is 18%~22%.
In some embodiments, the preforming forging stock is structure as a whole.
It has the advantage that: the present invention increases pre- finishing process on original Process ba- sis, pass through pre- finishing cold extrusion
Mode, anti-material extrusion intracavity bottom is subjected to preform, makes instead to squeeze blank intracavity bottom angle and is preferably bonded with trimming punch,
It ensure that the high stability of soccer star.
Invention increases pre- finishing process together, and anti-material extrusion intracavity bottom is carried out preform, makes instead to squeeze blank inner cavity
Bottom angle is preferably bonded with trimming punch, ensure that the high stability of soccer star, improves the service life of warm forging formed punch, section
About artificial and die cost, improves production efficiency.
Detailed description of the invention
Fig. 1 is the blanking solved in the big processing method of the high scattered error of out star wheel soccer star, just of one embodiment of the present invention
It squeezes, the structural schematic diagram of forging stock obtained by jumping-up, anti-crowded, pre- finishing and finishing.
Specific embodiment
The present invention will be further described below with reference to the drawings.
It is a kind of to solve the big processing method of the high scattered error of out star wheel soccer star, including blanking, first time ball blast, coating, heating, just
Crowded, jumping-up, anti-crowded, temperature control cooling, second of ball blast, pre-treatment, pre- finishing and finishing.Fig. 1 schematically shows the present invention
A kind of embodiment the blanking solved in the big processing method of the high scattered error of out star wheel soccer star, just squeezing, jumping-up, it is anti-squeeze, pre- essence
The structural schematic diagram of forging stock obtained by whole and finishing.
As shown in Figure 1, blanking is using circular saw that steel are sawed-off, acquisition bar forging stock.First time ball blast is to pass through throwing
Ball machine carries out Shot Blasting to the surface of bar forging stock.Bar forging stock surface impurity is removed, billet surface product is increased.Coating is to use
Electric circle heats bar, is heated to 180 DEG C~220 DEG C, carries out coating treatment with surface of the graphite liquid to rodlike forging stock,
Its surface is set to form one layer of uniform graphite linings.Be heated to be and bar heated with intermediate frequency furnace, temperature be heated to 860 DEG C~
900℃.The concentration of the graphite liquid is 18%~22%.As shown in Figure 1, just squeezing for after blanking forging stock carry out just squeeze with
Form preforming forging stock.The preforming forging stock is structure as a whole.The preforming forging stock include the first bar portion, the second bar portion and
Third bar portion.The top of first bar portion is connect with the bottom end of second bar portion, the top of second bar portion with it is described
The bottom end of third bar portion connects.In the central axes of first body of rod 11, the central axes of second body of rod 12 and second body of rod 12
Axis is located in a straight line.The diameter of first body of rod 11 is less than the diameter of second body of rod 12, second body of rod
12 diameter is less than the diameter of the third body of rod 13.The junction of first body of rod 11 and second body of rod 12 is chamfering
The junction of structure, second body of rod 12 and the third body of rod 13 is chamfering structure.As shown in Figure 1, jumping-up is to just crowded
The third body of rod 13 of forging stock afterwards carries out jumping-up, so that the diameter of the third body of rod 13 becomes larger and height becomes smaller.As shown in Figure 1, anti-
It squeezes and instead squeeze to be formed on the top of the third body of rod 13 to its inner recess for the third body of rod 13 to the forging stock after jumping-up
Inner cavity.Temperature control is cooled to eliminate the stress generated when product squeezes, improves hardness.Second of ball blast is to cooling by temperature control
The surface of preforming forging stock carries out Shot Blasting, removes anti-material extrusion surface scale, increases surface area.Pre-treatment is that will first pass through
The preforming forging stock of Shot Blasting is sequentially placed into pickling in pickling tube, is put into phosphating pond and adsorbs phosphate coating, is put into saponification pond
Absorption saponification layer.Using the forging of phosphorus saponification process, wearability is substantially increased, and process layer separates deformable metal with mold,
It avoids between them and contacts, die cavity will not be torn to shreds, thus improve the working life of mold.As shown in Figure 1, pre- essence
Whole is to squeeze obtained intracavity bottom progress backward extrusion to anti-, is bonded blank intracavity bottom angle preferably with trimming punch,
It ensure that the high stability of soccer star.As shown in Figure 1, finishing is that the forging stock after pre- finishing is put into the shaping die cavity of finishing mold
It is interior, shaping is carried out to the inner cavity of the forging stock, to form head cavity small in the end and big in the middle.
The present invention increases pre- finishing process on original Process ba- sis, by way of pre- finishing cold extrusion, counter will squeeze
Expect that intracavity bottom carries out preform, make instead to squeeze blank intracavity bottom angle and be preferably bonded with trimming punch, ensure that soccer star's height
Stability.Invention increases pre- finishing process together, and anti-material extrusion intracavity bottom is carried out preform, makes instead to squeeze blank inner cavity
Bottom angle is preferably bonded with trimming punch, ensure that the high stability of soccer star, improves the service life of warm forging formed punch, section
About artificial and die cost, improves production efficiency.
Above-described is only some embodiments of the present invention.For those of ordinary skill in the art, it is not taking off
Under the premise of from the invention design, various modifications and improvements can be made, and these are all within the scope of protection of the present invention.
Claims (4)
1. a kind of solve the big method of the high scattered error of out star wheel soccer star characterized by comprising
Blanking: it is using circular saw that steel are sawed-off, obtain bar forging stock;
First time ball blast: Shot Blasting is carried out by surface of the shot-blasting machine to the bar forging stock, removal bar forging stock surface is miscellaneous
Matter increases billet surface product;
Coating: being heated bar with electric circle, is heated to 180 DEG C~220 DEG C, with graphite liquid to the surface of rodlike forging stock into
Row coating treatment makes its surface form one layer of uniform graphite linings;
Heating: bar is heated with intermediate frequency furnace, temperature is heated to 860 DEG C~900 DEG C;
It just squeezes: the forging stock after blanking just squeeze to form preforming forging stock, the preforming forging stock includes the first bar portion, the
Two bar portions and third bar portion, the top of first bar portion are connect with the bottom end of second bar portion, the top of second bar portion
End connect with the bottom end of the third bar portion, the central axes of first body of rod, the central axes of second body of rod and second body of rod
Central axes are located in a straight line, and the diameter of first body of rod is less than the diameter of second body of rod, second body of rod
Diameter is less than the diameter of the third body of rod, and the junction of first body of rod and second body of rod is chamfering structure, described
The junction of second body of rod and the third body of rod is chamfering structure;
Jumping-up: carrying out jumping-up to the third body of rod of the forging stock after just squeezing, so that the diameter of the third body of rod becomes larger and height becomes smaller;
It is anti-to squeeze: anti-squeeze being carried out to the third body of rod of the forging stock after jumping-up and is formed with the top in the third body of rod to its inner recess
Inner cavity;
Temperature control is cooling: eliminating the stress generated when product squeezes, improves hardness;
Second of ball blast: Shot Blasting is carried out to the surface by the cooling preforming forging stock of temperature control, removes anti-material extrusion Surface Oxygen
Change skin, increases surface area;
Pre-treatment: the preforming forging stock Jing Guo Shot Blasting is first sequentially placed into pickling in pickling tube, is put into phosphating pond and adsorbs
Phosphate coating is put into absorption saponification layer in saponification pond;
Pre- finishing: obtained intracavity bottom progress backward extrusion is squeezed to anti-, keeps blank intracavity bottom angle and trimming punch more preferable
Fitting, ensure that the high stability of soccer star;
Forging stock after pre- finishing: being put into that the sizing die to finishing mold is intracavitary by finishing, carries out shaping to the inner cavity of the forging stock,
To form head cavity small in the end and big in the middle.
2. according to claim 1 solve the big method of the high scattered error of out star wheel soccer star, which is characterized in that the graphite liquid
For JD-16 graphite liquid.
3. according to claim 2 solve the big method of the high scattered error of out star wheel soccer star, which is characterized in that the graphite liquid
Concentration be 18%~22%.
4. according to claim 1 solve the big method of the high scattered error of out star wheel soccer star, which is characterized in that the preforming forging
Base is structure as a whole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811480135.7A CN109604978A (en) | 2018-12-05 | 2018-12-05 | It is a kind of to solve the big processing method of the high scattered error of out star wheel soccer star |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811480135.7A CN109604978A (en) | 2018-12-05 | 2018-12-05 | It is a kind of to solve the big processing method of the high scattered error of out star wheel soccer star |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109604978A true CN109604978A (en) | 2019-04-12 |
Family
ID=66007106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811480135.7A Pending CN109604978A (en) | 2018-12-05 | 2018-12-05 | It is a kind of to solve the big processing method of the high scattered error of out star wheel soccer star |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109604978A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3816090C2 (en) * | 1988-05-11 | 1993-05-27 | Hoesch Ag, 4600 Dortmund, De | |
CN102248101A (en) * | 2011-06-15 | 2011-11-23 | 江苏创一精锻有限公司 | Whole forging near net forming process for inner ball cage sliding sleeve |
CN102861861A (en) * | 2011-07-06 | 2013-01-09 | 张太良 | Precision-forging plastic molding technology of bell shell of ball-cage type universal joint |
CN102909309A (en) * | 2012-10-17 | 2013-02-06 | 盐城理研精密锻造有限公司 | Universal joint forging method and shaping mould |
CN104001852A (en) * | 2014-05-13 | 2014-08-27 | 盐城理研精密锻造有限公司 | Besides-star wheel warm piece forging process and upsetting die |
CN104924037A (en) * | 2015-06-19 | 2015-09-23 | 江苏大洋精锻有限公司 | Machining technology of precise forged piece bell housing |
CN106112417A (en) * | 2016-07-24 | 2016-11-16 | 盐城中德精锻股份有限公司 | Exempt to weld major axis inner constant velocity universal joint precision forging Forging Technology |
CN207267016U (en) * | 2017-07-18 | 2018-04-24 | 江苏大洋精锻有限公司 | A kind of clutch can shaping dies |
-
2018
- 2018-12-05 CN CN201811480135.7A patent/CN109604978A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3816090C2 (en) * | 1988-05-11 | 1993-05-27 | Hoesch Ag, 4600 Dortmund, De | |
CN102248101A (en) * | 2011-06-15 | 2011-11-23 | 江苏创一精锻有限公司 | Whole forging near net forming process for inner ball cage sliding sleeve |
CN102861861A (en) * | 2011-07-06 | 2013-01-09 | 张太良 | Precision-forging plastic molding technology of bell shell of ball-cage type universal joint |
CN102909309A (en) * | 2012-10-17 | 2013-02-06 | 盐城理研精密锻造有限公司 | Universal joint forging method and shaping mould |
CN104001852A (en) * | 2014-05-13 | 2014-08-27 | 盐城理研精密锻造有限公司 | Besides-star wheel warm piece forging process and upsetting die |
CN104924037A (en) * | 2015-06-19 | 2015-09-23 | 江苏大洋精锻有限公司 | Machining technology of precise forged piece bell housing |
CN106112417A (en) * | 2016-07-24 | 2016-11-16 | 盐城中德精锻股份有限公司 | Exempt to weld major axis inner constant velocity universal joint precision forging Forging Technology |
CN207267016U (en) * | 2017-07-18 | 2018-04-24 | 江苏大洋精锻有限公司 | A kind of clutch can shaping dies |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102861861A (en) | Precision-forging plastic molding technology of bell shell of ball-cage type universal joint | |
CN101590588B (en) | Method for manufacturing mechanical drive chain wheel | |
CN104646956B (en) | Process for machining ball cage bell-like shell | |
CN105108457B (en) | The processing method of overall driven disc | |
CN103317313B (en) | Automobile hub bolt and machining technology thereof | |
CN106180506B (en) | A kind of GH4169 stator blades closed die forging method | |
CN106624652A (en) | Rotary forging forming method for metal circular plate | |
CN102248101A (en) | Whole forging near net forming process for inner ball cage sliding sleeve | |
CN105290299A (en) | Forging technology of long shaft type half shaft gear | |
CN103464991A (en) | Gear ring machining process | |
CN105921672A (en) | Isothermal forging method of straight bevel gear | |
CN110026514B (en) | Process method for simultaneously net forming closed forging of driving triple gear bevel gear and end gear | |
CN112589021B (en) | Manufacturing method of IN718 alloy double-flange high-cylinder casing ring piece | |
CN104439955B (en) | Two-sided combination gear manufacturing process | |
CN104625627B (en) | A kind of preparation method of plasma rotating electrode titanium alloy electrode rod | |
CN104384428B (en) | A kind of hollow wheel gear axis blank temperature finish forge forming method | |
CN102319851B (en) | Cold precision forging technique for Z type contacts | |
CN105904163A (en) | Cold forging forming technology of input bracket claw piece | |
CN105710151A (en) | Compound gear extrusion die | |
CN111545697B (en) | Forging process of besides-star wheel | |
CN109454198A (en) | The method for forging and molding and its triple gear of a kind of triple gear and application | |
CN114367624A (en) | Automatic multi-station forging production line for sector gear shaft | |
CN104454883B (en) | A kind of Wheel set bolt processing technique | |
CN103071747A (en) | Fan-shaped forged piece and precision forging process for same | |
CN109604978A (en) | It is a kind of to solve the big processing method of the high scattered error of out star wheel soccer star |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200622 Address after: No.19, Shenfeng North Road, Dafeng District, Yancheng City, Jiangsu Province Applicant after: JIANGSU LIKEN TECHNOLOGY Co.,Ltd. Address before: 224100 road 3, Yancheng City economic and Technological Development Zone, Dafeng District, Jiangsu Applicant before: YANCHENG YUQI MACHINERY MANUFACTURING Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190412 |