CN109591128A - A kind of thick bamboo tube preparation facilities - Google Patents

A kind of thick bamboo tube preparation facilities Download PDF

Info

Publication number
CN109591128A
CN109591128A CN201811396630.XA CN201811396630A CN109591128A CN 109591128 A CN109591128 A CN 109591128A CN 201811396630 A CN201811396630 A CN 201811396630A CN 109591128 A CN109591128 A CN 109591128A
Authority
CN
China
Prior art keywords
thick bamboo
bamboo tube
tube
wall
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811396630.XA
Other languages
Chinese (zh)
Other versions
CN109591128B (en
Inventor
刘达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Green Era Creative Technology Co ltd
Original Assignee
Wuhan Green Era Creative Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Green Era Creative Technology Co ltd filed Critical Wuhan Green Era Creative Technology Co ltd
Priority to CN201811396630.XA priority Critical patent/CN109591128B/en
Publication of CN109591128A publication Critical patent/CN109591128A/en
Application granted granted Critical
Publication of CN109591128B publication Critical patent/CN109591128B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27JMECHANICAL WORKING OF CANE, CORK, OR SIMILAR MATERIALS
    • B27J1/00Mechanical working of cane or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B19/00Single-purpose machines or devices for particular grinding operations not covered by any other main group
    • B24B19/22Single-purpose machines or devices for particular grinding operations not covered by any other main group characterised by a special design with respect to properties of the material of non-metallic articles to be ground
    • B24B19/24Single-purpose machines or devices for particular grinding operations not covered by any other main group characterised by a special design with respect to properties of the material of non-metallic articles to be ground of wood, e.g. furniture
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B41/00Component parts such as frames, beds, carriages, headstocks
    • B24B41/06Work supports, e.g. adjustable steadies

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Forests & Forestry (AREA)
  • Chemical And Physical Treatments For Wood And The Like (AREA)

Abstract

The invention discloses a kind of thick bamboo tube preparation facilities, are related to thick bamboo tube processing technique field, including board, clamping device and logical bamboo device;Clamping device includes positioning tube and its inner wall is hingedly connected with multiple power rails, and one end of power rail towards positioning tube axis is hingedly connected with pressing plate, and the one end of power rail far from pressing plate is provided with linkage unit through positioning drum outer wall, positioning drum outer wall;Logical bamboo device includes the slide being slidably disposed in board, and one end rotary setting of slide has shaft, and the peripheral wall of shaft is fixed with cutter, and driving motor is fixed in slide, driving cylinder is fixed in board.The present invention can realize quickly positioning to thick bamboo tube and precisely get through, bamboo can be not only got through by cutter every can also polish the inner wall of thick bamboo tube, the cutter being threadingly advanced can one-pass molding to the processing of thick bamboo tube inner wall, it is small to thick bamboo tube structural damage, ensure the processing quality of thick bamboo tube, the present invention realizes the automatic processing to thick bamboo tube, and one-pass molding improves the processing efficiency of thick bamboo tube.

Description

A kind of thick bamboo tube preparation facilities
Technical field
The present invention relates to thick bamboo tube processing technique fields, more particularly, to a kind of thick bamboo tube preparation facilities.
Background technique
Existing market has many bamboo salt products, and bamboo salt is rich in minerals, and application field is very wide in range, but its production technology More many and diverse, production stage is broadly divided into: 1, salt is filling into thick bamboo tube;2, thick bamboo tube is placed in kiln;3, pass through combustion Pine is burnt to toast thick bamboo tube;4, it repeats the above steps 6-10 times;5, molding bamboo salt is finally taken out.Due to the production of bamboo salt It needs using to a large amount of mao bamboos, thus needs being made for extensive thick bamboo tube.
Since the mao bamboo itself is multi-section structure, there are bamboos every and the two ends diameter of the mao bamboo is not between each section Identical, this causes the bamboo after being difficult to have efficient mode that centralized processing is gone to cut off in thick bamboo tube every prior art is with artificial Break the bamboo in thick bamboo tube with jump bit and be divided into master, prior art has the following defects, and impact be easy to cause thick bamboo tube to be tied Structure damage, in addition, to bamboo every the corner for not fully having and leaving of getting through also be present in inside thick bamboo tube, it is final influence after Use when the filling bamboo salt of continuous thick bamboo tube.
Summary of the invention
The object of the present invention is to provide it is a kind of quickly get through bamboo every thick bamboo tube preparation facilities.
The technical scheme is that:
A kind of thick bamboo tube preparation facilities, including board are arranged in parallel with multiple groups on the board for fixing the clamping of thick bamboo tube position The logical bamboo device for being used to get through different-diameter thick bamboo tube of device and the corresponding clamping device setting;
The clamping device includes the positioning tube for being fixed on the board top and its inner wall is hingedly connected with multiple power rails, institute The one end for stating power rail towards the positioning tube axis is hingedly connected with pressing plate, and the power rail is passed through far from one end of the pressing plate The positioning drum outer wall is worn, the positioning drum outer wall is provided with the linkage groups for driving multiple power rails to rotate synchronously Part;
The logical bamboo device includes the slide being slidably disposed in the board, and one end rotary setting of the slide extends to institute State the shaft inside positioning tube, the peripheral wall of the shaft be fixed with helical form and for get through bamboo every cutter, in the slide It is fixed with the driving motor connecting with the rotating shaft transmission, the driving for driving the slide sliding is fixed in the board Cylinder.
By using above-mentioned technical proposal, thick bamboo tube to be processed is placed into corresponding positioning tube, and multiple power rails are same Thick bamboo tube is fixed on in step rotation process by pressing plate the center of positioning tube, it is sliding after driving cylinder and driving motor starting Seat pushes the cutter of rotation by bamboo every getting through.The present invention, which can realize thick bamboo tube, quickly to position and precisely gets through, not only by cutter Bamboo can be got through every can also polish the inner wall of thick bamboo tube, the cutter being threadingly advanced to the processing of thick bamboo tube inner wall can one-pass molding, It is small to thick bamboo tube structural damage, it is ensured that the processing quality of thick bamboo tube, the present invention realize the automatic processing to thick bamboo tube, and one-pass molding mentions The high processing efficiency of thick bamboo tube, convenient for the filling of later period bamboo salt.
Be further arranged to: the linkage unit includes the dynamic ring that sliding is sheathed on the positioning drum outer wall, described dynamic The one end of power bar outside the positioning tube offers sliding slot along its length, and the dynamic ring outer wall is fixed with sliding setting In the positioning pin of the sliding slot, the board outer wall is fixed with multiple for driving the actuating cylinder of the dynamic ring sliding.
By using above-mentioned technical proposal, after actuating cylinder starting, propulsion power ring is slided along positioning drum outer wall, power The positioning pin of ring end slides in the sliding slot of power rail, rotates synchronously all power rails, thus firmly by thick bamboo tube It is pressed on the center of positioning tube.
It is further arranged to: corresponding to the blanking that the logical bamboo device is additionally provided with for releasing thick bamboo tube on the board and fill It sets;
The blanking device include it is multiple be placed in the guide rod fixed in the positioning tube and with the board, the guide rod and The pressing plate is staggered, and is arranged with pusher ring simultaneously on multiple guide rods, is fixed in the board multiple for pushing away Move the thrust cylinder of the pusher ring sliding.
It can be placed on guide rod by using above-mentioned technical proposal when thick bamboo tube is sent into positioning tube, pressed convenient for the later period The clamping of plate, when thick bamboo tube after processing is completed, thrust cylinder pushes pusher ring to slide along guide rod, and charging ram is by thick bamboo tube from positioning It is released in cylinder, realizes automatic discharging.
It is further arranged to: being offered on the pusher ring and slide the through-hole being adapted to the guide rod.
By using above-mentioned technical proposal, guide rod is pierced by from the through-hole of pusher ring, ensures the steady of the sliding of pusher ring It is fixed.
It is further arranged to: is provided between the pressing plate and the power rail for keeping the pressing plate smoothly elastic Component;
The elastic parts includes outer with the interior bar of pressing plate outer wall articulated connection and power rail outer wall articulated connection Cylinder, the interior bar sliding are set in the outer cylinder, and the interior bar is arranged with spring in the outer barrel.
By using above-mentioned technical proposal, when pressing plate malcompression thick bamboo tube, to protect between multiple pressing plates by elastic parts It holds and is parallel to each other, it is ensured that thick bamboo tube passes in and out the unobstructed of positioning tube.
Be further arranged to: the pressing plate is fixed with non-slip mat towards the side of the positioning tube axis.
By using above-mentioned technical proposal, pressing plate is directly contacted with thick bamboo tube by non-slip mat, on the one hand play the role of it is anti-skidding, On the other hand reduce the damage to thick bamboo tube outer wall.
Be further arranged to: the positioning tube offers discharge port far from one end of the slide, fixes in the board There is blower, hose, the one end of the positioning tube far from the discharge port are provided with and communicated between the blower and the discharge port Offer multiple air inlets.
By using above-mentioned technical proposal, during getting through thick bamboo tube, blower starting is simultaneously useless by what is generated in process It considers to be worth doing in suction hose.
It is further arranged to: being provided with material collecting box between the blower and the hose, the material collecting box is detachably arranged In being fixed with filter screen in the board, the material collecting box.
By using above-mentioned technical proposal, the waste material generated after thick bamboo tube processing is all deposited on after filter screen filtration to gather materials In box and filter screen isolation is crossed, lower material collecting box is dismantled after waste material accumulates to a certain extent and is poured out.
In conclusion advantageous effects of the invention are as follows:
(1) thick bamboo tube is pre-positioned by guide rod, precise positioning is carried out to thick bamboo tube by compression bar, it is ensured that the Working position of cutter The position location of face thick bamboo tube is threadingly advanced so that cutter can not only get through bamboo every can also polish the inner wall of thick bamboo tube Cutter to the processing of thick bamboo tube inner wall can one-pass molding simultaneously it is small to thick bamboo tube structural damage;
(2) thick bamboo tube can realize Automatic-clamping, conducting and blanking, and high degree of automation alleviates the difficulty of manual operation, mentions simultaneously The high processing efficiency of thick bamboo tube, convenient for the filling of later period bamboo salt;
(3) scrap generated in thick bamboo tube process can be recycled quickly, reduce pollution of the scrap to environment, more clean and environmental protection.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the cross-sectional view of the line A-A along Fig. 1;
Fig. 3 is the portion B partial enlarged view in Fig. 2;
Fig. 4 is the portion C partial enlarged view in Fig. 2.
Appended drawing reference: 1, board;2, positioning tube;3, power rail;4, pressing plate;5, slide;6, shaft;7, cutter;8, it drives Motor;9, cylinder is driven;10, dynamic ring;11, sliding slot;12, positioning pin;13, actuating cylinder;14, guide rod;15, pusher ring; 16, thrust cylinder;17, through-hole;18, interior bar;19, outer cylinder;20, spring;21, non-slip mat;22, discharge port;23, blower;24, soft Pipe;25, air inlet;26, material collecting box;27, filter screen.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Fig.1, is a kind of thick bamboo tube preparation facilities disclosed by the invention, including board 1, board 1 is provided with multiple groups clamping Device, logical bamboo device and device for discharging.Clamping device is arranged side by side in 1 upper surface of board and the position for fixing thick bamboo tube, leads to Bamboo device corresponds to clamping device and is arranged and can get through to the thick bamboo tube of different-diameter, thick bamboo tube after processing is completed device for discharging by bamboo Cylinder sends out board 1.
Referring to Figures 1 and 2, clamping device includes the positioning tube 2 for being fixed on 1 top of board, and positioning tube 2 is horizontally disposed with and it Inner wall is hingedly connected with multiple power rails 3, and power rail 3 is preferably three and is arranged by center of circle rotational symmetry of 2 axis of positioning tube, One end of power rail 3 towards 2 axis of positioning tube is hingedly connected with pressing plate 4, and the pressing plate 4 under free state is arranged in parallel, moves The one end of power bar 3 far from pressing plate 4 is through 2 outer wall of positioning tube and extends to outside positioning tube 2, and 2 outer wall of positioning tube, which is provided with, to be used for The linkage unit for driving multiple power rails 3 to rotate synchronously is provided with for keeping pressing plate 4 stable between pressing plate 4 and power rail 3 Elastic parts.Pressing plate 4 will be pushed to draw close to 2 axis of positioning tube in 3 rotation process of power rail, multiple moving synchronously for pressing plate 4 can Simultaneously clamp on thick bamboo tube.
Referring to Fig. 2 and Fig. 3, linkage unit includes the dynamic ring 10 that sliding is sheathed on 2 outer wall of positioning tube, and power rail 3 is in fixed One end outside the cylinder 2 of position offers sliding slot 11 along its length, and 10 outer wall of dynamic ring is fixed with sliding and is set to sliding slot 11 Positioning pin 12, positioning pin 12 can be slided along 11 direction of sliding slot, and 1 outer wall of board is fixed with multiple for driving dynamic ring 10 to slide Actuating cylinder 13, actuating cylinder 13 be preferably three and using 2 axis of positioning tube be the center of circle rotational symmetry setting.Actuating cylinder 13 After starting, propulsion power ring 10 is slided along 2 outer wall of positioning tube, and the positioning pin 12 of 10 end of dynamic ring slides on power rail 3 In sliding slot 11, rotate synchronously all power rails 3, so that thick bamboo tube to be firmly pressed on to the center of positioning tube 2.
Referring to Fig. 3, elastic parts includes the interior bar 18 with the articulated connection of the remotely located 2 axis side of cylinder of pressing plate 4, power rail The outer cylinder 19 of the 3 outer wall articulated connection inside positioning tube 2, the free end of interior bar 18 penetrates outer cylinder 19 and sliding is set to outer cylinder In 19, the one end of interior bar 18 inside outer cylinder 19 is arranged with spring 20.When 4 malcompression thick bamboo tube of pressing plate, made by elastic parts It keeps being parallel to each other between multiple pressing plates 4, it is ensured that thick bamboo tube passes in and out the unobstructed of positioning tube 2.Pressing plate 4 is towards 2 axis of positioning tube Side is fixed with non-slip mat 21.It is directly contacted by 21 pressing plate 4 of non-slip mat with thick bamboo tube, on the one hand plays the role of anti-skidding, another party Face reduces the damage to thick bamboo tube outer wall.
Referring to Fig. 2 and Fig. 4, logical bamboo device includes the slide 5 being slidably disposed in board 1, and it is fixed that the glide direction of slide 5 is located at On 2 axis direction of cylinder of position, one end rotary setting of slide 5 has the shaft 6 extended to inside positioning tube 2, and the peripheral wall of shaft 6 is fixed Have helical form and for get through bamboo every cutter 7, the driving motor 8 being sequentially connected with shaft 6, driving electricity are fixed in slide 5 The drive shaft of machine 8 is detachably connected with shaft 6 by shaft coupling, and the side of the remotely located cylinder 2 of board 1 is fixed with for driving cunning The driving cylinder 9 of 5 sliding of seat.After driving cylinder 9 and driving motor 8 to start, slide 5 drives shaft 6 to slide, the cutter 7 of rotation By the bamboo of thick bamboo tube every getting through, rapid processing, one-pass molding are realized.
Blanking device includes multiple guide rods 14 being placed in positioning tube 2 and fix with board 1, guide rod 14 and positioning tube 2 axis are arranged in parallel, and guide rod 14 is preferably three and is arranged by center of circle rotational symmetry of 2 axis of positioning tube, 14 He of guide rod Pressing plate 4 is staggered, and is arranged with pusher ring 15, glide direction and the positioning tube 2 of pusher ring 15 on multiple guide rods 14 simultaneously Axis direction is consistent, offers on pusher ring 15 and slides the through-hole 17 that is adapted to guide rod 14, and the one of the remotely located cylinder 2 of board 1 End is fixed with multiple thrust cylinders 16 for pushing pusher ring 15 to slide, and thrust cylinder 16 is preferably three and with positioning tube 2 Axis is that center of circle rotational symmetry is arranged.It when thick bamboo tube is sent into positioning tube 2, can be placed on guide rod 14, be convenient for later period pressing plate 4 Clamping, when thick bamboo tube after processing is completed, thrust cylinder 16 push pusher ring 15 along guide rod 14 slide, charging ram by thick bamboo tube from It is steadily released in positioning tube 2, to realize automatic discharging.
Referring to Figures 1 and 2, positioning tube 2 offers discharge port 22 far from the opening of 5 one end of slide, and discharge port 22 is in ring Shape is fixed with blower 23 in board 1, hose 24 is provided with and communicated between blower 23 and discharge port 22, positioning tube 2 is far from discharge port 22 one end offers multiple air inlets 25.During getting through thick bamboo tube, the starting of blower 23 is simultaneously useless by what is generated in process It considers to be worth doing in suction hose 24.Material collecting box 26 is provided between blower 23 and hose 24, material collecting box 26 is detachably set to board 1, collection Magazine 26, filter screen 27, the setting of 27 face hose 24 of filter screen are fixed in material collecting box 26.The waste material generated after thick bamboo tube processing It is all deposited in material collecting box 26 after the filtering of filter screen 27 and crosses filter screen 27 and be isolated, torn open after waste material accumulates to a certain extent It unloads material collecting box 26 and pours out.
It the implementation principle of the present embodiment and has the beneficial effect that
Processing staff classifies to the diameter of thick bamboo tube, and thick bamboo tube to be processed is placed into the positioning tube 2 with corresponding diameter, Thick bamboo tube is placed between guide rod 14, starts actuating cylinder 13, and 13 propulsion power ring 10 of actuating cylinder drives during sliding Power rail 3 rotates, and clamps thick bamboo tube by pressing plate 4 and it is made to be located in the center of positioning tube 2.Drive cylinder 9 and driving After motor 8 starts, slide 5 pushes the cutter 7 of rotation to process thick bamboo tube, and gradually by bamboo every getting through, blower 23 starts at this time And the scrap generated in process can be expelled in material collecting box 26 and final centralized collection by discharge port 22.Thick bamboo tube processing After, thrust cylinder 16, which starts, simultaneously pushes pusher ring 15 to slide in positioning tube 2, and by the thick bamboo tube after processing from positioning tube 2 Interior release.Processing staff replaces next thick bamboo tube.
The present invention can realize quickly positioning to thick bamboo tube, precisely get through, the recycling of self-emptying and scrap, it is ensured that thick bamboo tube position It is threadingly advanced with the correspondence of 7 position of cutter so that cutter 7 can not only get through bamboo every can also polish the inner wall of thick bamboo tube Cutter 7 to the processing of thick bamboo tube inner wall can one-pass molding simultaneously it is small to thick bamboo tube structural damage, the processing method of automation makes thick bamboo tube Faster, which greatly enhances the processing efficiencies of thick bamboo tube for shaping speed, it is ensured that the processing quality of thick bamboo tube, convenient for the filling of later period bamboo salt Dress.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (8)

1. a kind of thick bamboo tube preparation facilities, it is characterised in that: including board (1), be arranged in parallel with multiple groups on the board (1) and be used for The logical bamboo device for being used to get through different-diameter thick bamboo tube of the clamping device of fixed thick bamboo tube position and the corresponding clamping device setting;
The clamping device includes the positioning tube (2) for being fixed on the board (1) top and its inner wall is hingedly connected with multiple move One end of power bar (3), the power rail (3) towards the positioning tube (2) axis is hingedly connected with pressing plate (4), the power rail (3) positioning tube (2) outer wall is run through in one end far from the pressing plate (4), and positioning tube (2) outer wall is provided with for driving The linkage unit that multiple power rails (3) rotate synchronously;
The logical bamboo device includes the slide (5) being slidably disposed in the board (1), one end rotary setting of the slide (5) Have and extend to the internal shaft (6) of the positioning tube (2), the peripheral wall of the shaft (6) is fixed with helical form and for getting through bamboo Every cutter (7), the driving motor (8) with the shaft (6) transmission connection, the board (1) are fixed in the slide (5) Inside it is fixed with the driving cylinder (9) for driving the slide (5) to slide.
2. thick bamboo tube preparation facilities according to claim 1, it is characterised in that: the linkage unit includes that sliding is sheathed on institute The dynamic ring (10) of positioning tube (2) outer wall is stated, the external one end of power rail (3) the Yu Suoshu positioning tube (2) is square along its length To offering sliding slot (11), dynamic ring (10) outer wall is fixed with the positioning pin (12) that sliding is set to the sliding slot (11), Board (1) outer wall is fixed with multiple actuating cylinders (13) for driving the dynamic ring (10) to slide.
3. thick bamboo tube preparation facilities according to claim 1, it is characterised in that: correspond to the logical bamboo dress on the board (1) Set the blanking device being additionally provided with for releasing thick bamboo tube;
The blanking device includes multiple guide rods (14) being placed in the positioning tube (2) and fix with the board (1), institute It states guide rod (14) and the pressing plate (4) is staggered, be arranged with pusher ring (15), institute on multiple guide rods (14) simultaneously It states and is fixed with multiple thrust cylinders (16) for pushing the pusher ring (15) to slide in board (1).
4. thick bamboo tube preparation facilities according to claim 3, it is characterised in that: offered on the pusher ring (15) with it is described The through-hole (17) of guide rod (14) sliding adaptation.
5. thick bamboo tube preparation facilities according to claim 2, it is characterised in that: the pressing plate (4) and the power rail (3) it Between be provided with for keeping the pressing plate (4) stable elastic parts;
The elastic parts includes cutting with scissors with the interior bar (18) of the pressing plate (4) outer wall articulated connection and the power rail (3) outer wall The outer cylinder (19) connect in succession, interior bar (18) sliding are set in the outer cylinder (19), interior bar (18) the Yu Suoshu outer cylinder (19) internal sleeve is equipped with spring (20).
6. thick bamboo tube preparation facilities according to claim 5, it is characterised in that: the pressing plate (4) is towards the positioning tube (2) The side of axis is fixed with non-slip mat (21).
7. thick bamboo tube preparation facilities according to claim 1, it is characterised in that: the positioning tube (2) is far from the slide (5) One end offer discharge port (22), is fixed with blower (23) in the board (1), the blower (23) and the discharge port (22) be provided with and communicated between hose (24), the positioning tube (2) far from the discharge port (22) one end offer it is multiple into Air port (25).
8. thick bamboo tube preparation facilities according to claim 7, it is characterised in that: the blower (23) and the hose (24) it Between be provided with material collecting box (26), the material collecting box (26) is detachably set to the board (1), fixed in the material collecting box (26) There are filter screen (27).
CN201811396630.XA 2018-11-22 2018-11-22 Bamboo tube preparation device Active CN109591128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811396630.XA CN109591128B (en) 2018-11-22 2018-11-22 Bamboo tube preparation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811396630.XA CN109591128B (en) 2018-11-22 2018-11-22 Bamboo tube preparation device

Publications (2)

Publication Number Publication Date
CN109591128A true CN109591128A (en) 2019-04-09
CN109591128B CN109591128B (en) 2021-04-13

Family

ID=65960210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811396630.XA Active CN109591128B (en) 2018-11-22 2018-11-22 Bamboo tube preparation device

Country Status (1)

Country Link
CN (1) CN109591128B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039622A (en) * 2019-04-25 2019-07-23 赖成凤 A kind of bamboo cutter device
CN111660387A (en) * 2020-06-17 2020-09-15 湖南家乐竹木有限公司 Bamboo tube goes up outer blue or green tabasheer remove device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102189577A (en) * 2011-03-28 2011-09-21 南京林业大学 Method for removing inner segments and tabasheer of integral bamboo tube
CN202480186U (en) * 2012-03-13 2012-10-10 沈德长 Machine for removing inner bamboo joints of moso bamboo
CN103801957A (en) * 2014-02-14 2014-05-21 南京霞光新能源科技有限公司 Clamp for circular tube
CN204772864U (en) * 2015-07-02 2015-11-18 浙江九川竹木股份有限公司 Thick bamboo tube automatic production equipment
DE202017100993U1 (en) * 2017-02-23 2017-03-08 Desconpro Engineering Gmbh Gripping device with increased flexibility
CN107756559A (en) * 2017-10-26 2018-03-06 福建呈祥机械制造有限公司 A kind of Mao bamboo tube goes internal segment equipment
CN207288479U (en) * 2017-10-20 2018-05-01 巴中市新越不锈钢有限公司 There is the cylindrical element automatic punching device of automatic discharging
CN207415579U (en) * 2017-11-09 2018-05-29 杨发明 A kind of bamboo removes internal segment de-etiolation machine
CN207447407U (en) * 2017-09-12 2018-06-05 温州国正机械有限公司 A kind of axis pin Automatic-clamping and the drilling device of ejection
CN108724373A (en) * 2018-07-27 2018-11-02 安吉竹福工艺品有限公司 A kind of dust-proof cutter device of bamboo and wood products

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102189577A (en) * 2011-03-28 2011-09-21 南京林业大学 Method for removing inner segments and tabasheer of integral bamboo tube
CN202480186U (en) * 2012-03-13 2012-10-10 沈德长 Machine for removing inner bamboo joints of moso bamboo
CN103801957A (en) * 2014-02-14 2014-05-21 南京霞光新能源科技有限公司 Clamp for circular tube
CN204772864U (en) * 2015-07-02 2015-11-18 浙江九川竹木股份有限公司 Thick bamboo tube automatic production equipment
DE202017100993U1 (en) * 2017-02-23 2017-03-08 Desconpro Engineering Gmbh Gripping device with increased flexibility
CN207447407U (en) * 2017-09-12 2018-06-05 温州国正机械有限公司 A kind of axis pin Automatic-clamping and the drilling device of ejection
CN207288479U (en) * 2017-10-20 2018-05-01 巴中市新越不锈钢有限公司 There is the cylindrical element automatic punching device of automatic discharging
CN107756559A (en) * 2017-10-26 2018-03-06 福建呈祥机械制造有限公司 A kind of Mao bamboo tube goes internal segment equipment
CN207415579U (en) * 2017-11-09 2018-05-29 杨发明 A kind of bamboo removes internal segment de-etiolation machine
CN108724373A (en) * 2018-07-27 2018-11-02 安吉竹福工艺品有限公司 A kind of dust-proof cutter device of bamboo and wood products

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039622A (en) * 2019-04-25 2019-07-23 赖成凤 A kind of bamboo cutter device
CN111660387A (en) * 2020-06-17 2020-09-15 湖南家乐竹木有限公司 Bamboo tube goes up outer blue or green tabasheer remove device

Also Published As

Publication number Publication date
CN109591128B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
CN109591128A (en) A kind of thick bamboo tube preparation facilities
CN111701848B (en) Chinese-medicinal material removes dirt machine
CN209256008U (en) A kind of metallic article punching mouth burr remover
CN212883937U (en) Dust cleaning device based on special engineering plastic modification
CN109787070A (en) A kind of gauze screen disconnecting device
CN112369564A (en) Die pressing equipment for producing green bean cakes
CN209577584U (en) A kind of green wood material cleaning device that cleaning efficiency is high
CN219315601U (en) Gardens dead leaf treatment collector
CN112917597A (en) Chinese-medicinal material cocklebur fruit primary processing device
CN208929277U (en) A kind of drilling machine cleaning plant
CN115042238B (en) Automatic clear up honey pomelo slicing equipment of honey pomelo slicing piece
CN109772256A (en) A kind of configuration equipment synthesizing Anastrozole complex
CN110238440A (en) A kind of steel pipe cutting method
CN215465193U (en) Automatic limit equipment of tearing open of rubber with dust removal efficient
CN115055708A (en) Numerical control lathe discharging device and control method thereof
CN113134900B (en) Nail ring device is pulled out to package thick liquid foaming heated board rotation type
CN212505536U (en) Automatic defeathering device for garment manufacturing
CN209313188U (en) A kind of gauze screen disconnecting device
CN208231899U (en) plastic pipe cutting device
CN113182009A (en) Breaker is used in concrete raw materials processing
CN208493382U (en) A kind of plate and frame filter press for tyrosine production
CN112514937A (en) Full-automatic dough kneading machine
CN112077071A (en) Handicraft cleaning and drying equipment taking new material as base material
CN206154027U (en) Full -automatic remove device of thimble burr
CN219987767U (en) Waste collection equipment is cut with tailorring in oil-gas separation paper production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant