CN109578800A - Oversize high pressure gas cylinder aluminium alloy inner container and its manufacturing method - Google Patents

Oversize high pressure gas cylinder aluminium alloy inner container and its manufacturing method Download PDF

Info

Publication number
CN109578800A
CN109578800A CN201811601577.2A CN201811601577A CN109578800A CN 109578800 A CN109578800 A CN 109578800A CN 201811601577 A CN201811601577 A CN 201811601577A CN 109578800 A CN109578800 A CN 109578800A
Authority
CN
China
Prior art keywords
aluminium alloy
inner container
end socket
high pressure
alloy inner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811601577.2A
Other languages
Chinese (zh)
Other versions
CN109578800B (en
Inventor
王东坡
马世成
汪宇羿
赵文龙
张月倩
孙昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aerospace Research Institute of Materials and Processing Technology
Original Assignee
Aerospace Research Institute of Materials and Processing Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aerospace Research Institute of Materials and Processing Technology filed Critical Aerospace Research Institute of Materials and Processing Technology
Priority to CN201811601577.2A priority Critical patent/CN109578800B/en
Publication of CN109578800A publication Critical patent/CN109578800A/en
Application granted granted Critical
Publication of CN109578800B publication Critical patent/CN109578800B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C1/00Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/04Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass for both machining and other metal-working operations
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/002Details of vessels or of the filling or discharging of vessels for vessels under pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/01Shape
    • F17C2201/0104Shape cylindrical

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention provides a kind of oversize high pressure gas cylinder aluminium alloy inner container and its manufacturing method, including direct tube section, and is located at the A end socket and B end socket at direct tube section both ends, and A bottleneck and B bottleneck are located on A end socket and B end socket;The length of oversize high pressure gas cylinder aluminium alloy inner container is 5-13m, and the nominal outside diameter of direct tube section is Φ 300- Φ 850mm, and the rated pressure of high pressure gas cylinder is 20-30Mpa.The processing method that the present invention totally uses spinning, product integrated welding seam-free, preparation process is simple, easy to operate, and low energy consumption, and pollution is small, and the loss of entire manufacturing process chinese raw materials is fewer, has saved the cost of raw material.The oversize high pressure gas cylinder aluminium alloy inner container that the manufacturing method of the present invention processes has the characteristics that wall is thin, light weight;Its interior material structure even compact, integral strength excellent effect have high pressure resistant property, have great importance to the manufacture of high pressure gas cylinder.

Description

Oversize high pressure gas cylinder aluminium alloy inner container and its manufacturing method
Technical field
The invention belongs to high-pressure bottle technical fields, and in particular to a kind of oversize high pressure gas cylinder aluminium alloy inner container and Its manufacturing method.
Background technique
High pressure gas cylinder is widely used for the national economy such as industrial and mineral production, building, traffic, ocean, aviation, medical treatment, military affairs Various industries.Capacity, bottle wall thickness and the manufacture craft and material of high pressure gas cylinder can all influence the performance of high pressure gas cylinder.Such as day Right gas and hydrogen are given priority to and widely used clean energy resource in a kind of world wide.20-30MP high pressure gas is used at present Bottle storage and transportation and use compressed natural gas (CNG), compression hydrogen and other compression industrial gasses are that these gases are conveyed from main line To the major way with gas point, gas station and other places.
Currently, aluminum alloy inner container carbon fiber winds high pressure gas cylinder with many merits entirely, gradually replace traditional steel gas Bottle, becomes the main product of world today's high pressure gas cylinder.Its advantage is as follows:
(1) substantially loss of weight;Using the gas cylinder of aluminium alloy inner container composite winding, material thickness is only steel cylinder under equal performance 50%-70%, and density is lower, thus its weight is only the 35%-40% of traditional steel cylinder.
(2) fail-safety is good;Aluminum alloy inner container carbon fiber full wrapped cylinders are compound using aluminium alloy inner container and carbon fiber Material reinforcement, it is every square centimeter on fiber it is up to ten thousand up to thousands of, when gas cylinder overloads and a small amount of fibrous fracture occurs, carry Lotus can distribute rapidly on unbroken fiber, this can make gas cylinder that will not lose carrying within short-term or even significant period of time Ability greatly improves safety.
(3) damping property is good;Fiber In Composite Material and resin matrix interface have damping capaicty, and shock damping is good, acoustic resistive It is also very high to shake fatigue behaviour.
(4) compared with the complicated procedures of forming that seamless steel gas cylinder needs, pressure stochastic distribution is more flexible, is easy transformation, work Sequence is more simplified, also automation easy to accomplish, and energy consumption is well below the production process of steel gas cylinder.
For example, the aluminum alloy inner container carbon fiber full wrapped cylinders of outer diameter Φ 300- Φ 850mm, length 5-13m are mainly used as The big capacity high pressures such as large-scale natural natural gas transportation tank car storage and transportation gas cylinder, gas station storage and transportation gas cylinder, CNG cargo ship storage and transportation gas cylinder Storage and transportation gas cylinder.
But limited by material production and technical capability, China also fails to the aluminium alloy that production length is greater than 5m at present Inner container carbon fiber full wrapped cylinders, key problem are exactly that aluminium alloy inner container can not manufacture.
In the above context, in order to greatly improve the storage and transportation ability of natural gas, hydrogen, industrial high-purity gas tank car, in order to Further grasp the key technology and production of the storage and transportation apparatus such as large-scale compression natural gas, hydrogen and the air mixture with autonomous property right Product, urgent need exploitation have that diameter is big, length is long, the high pressure gas cylinder aluminium alloy inner container of light weight, the characteristics such as highly reliable Product.
Summary of the invention
It is an object of the invention to propose a kind of high pressure gas cylinder aluminium alloy inner container and its manufacturing method.At least to solve at present The problem of high pressure gas cylinder volume is small, and quality is overweight, poor reliability.
To achieve the goals above, the invention provides the following technical scheme:
A kind of oversize high pressure gas cylinder aluminium alloy inner container, oversize high pressure gas cylinder use aluminium alloy inner container as winding For the liner of gas cylinder for storing compressed gas, the oversize high pressure gas cylinder is both ends closing in formed head with aluminium alloy inner container And the integrated seamless structure of bottleneck, including A bottleneck, A end socket, direct tube section, B end socket and B bottleneck, the A end socket and B end socket point Not Wei Yu the direct tube section both ends, the A bottleneck and B bottleneck are located on the A end socket and B end socket;The super large ruler The length of very little high pressure gas cylinder aluminium alloy inner container is 5-13m, and the nominal outside diameter of the direct tube section is Φ 300- Φ 850mm, described The rated pressure of high pressure gas cylinder is 20-30Mpa.
Oversize high pressure gas cylinder aluminium alloy inner container as described above, it is preferable that the wall thickness of the direct tube section is 3-10mm, The whole straightness of the direct tube section is not more than 0.5mm/m;
Preferably, the tolerance of the wall thickness of the direct tube section is less than or equal to ± 0.15mm;
More preferably, the direct tube section arbitrary line fragment position part straightness is not more than 0.5mm/300mm;
More preferably, the circularity of the direct tube section any position is not more than 0.5mm;
More preferably, the inside surface roughness of the direct tube section is less than Ra1.6 μm, the outer surface roughness of the direct tube section Less than Ra3.2 μm.
Oversize high pressure gas cylinder aluminium alloy inner container as described above, it is preferable that the structure type of the end socket is ellipsoid Type end socket, disk bottom or dome-type end socket, the structure type of the A end socket is identical as the structure type of the B end socket, described The thickness of end socket is thickened from edge to the uniform gradual change in bottleneck position;
Preferably, the thickness of the end socket is thickened from the 5-8mm at edge to the uniform gradual change of the 10-15mm at bottleneck position;
More preferably, the length of the bottleneck is 40mm, the outer diameter of the bottleneck is 50mm, and the internal diameter of the bottleneck is 28mm。
The manufacturing method of described in any item oversize high pressure gas cylinder aluminium alloy inner containers as above, it is preferable that the manufacture Method includes the following steps:
S1, aluminium alloy inner container spinning control is standby, using ultra-long barrel spinning with tension equipment to the direct tube section of seamless tubular goods into The processing of row multi-pass strength outward turning pressing formation, obtains aluminium alloy inner container spinning pipe;The step specifically comprises the following steps:
S1a, the rotary press modelling of aluminium alloy inner container spinning pipe direct tube section, uses ultra-long barrel spinning with tension equipment with tension three Spinning roller mistake carries out multiple spinning process to seamless tubular goods away from dextrorotation spin-on process, obtains spinning part A;Floating core die is used when spinning Carry out spinning secondary process;In spinning manufacturing process, one end using tractive force traction seamless tubular goods extends outwardly, tractive force Lead is opposite with the flow direction of material;The tractive force is constant force, the deformation velocity of the adaptive material of hauling speed; Seamless tubular goods is axially fixed on traction mechanism by traction one end, it is ensured that by the radial free of traction one end;It is filled using positioning Set and the radial direction of the other end of seamless tubular goods be fixed and supported, it is ensured that the other end of seamless tubular goods it is axially free;
S1b, the Processing to length of aluminium alloy inner container spinning pipe determine spinning part A obtained in step S1a using sawing machine Long processing, obtains aluminium alloy inner container spinning pipe;
S1c, the cleaning of aluminium alloy inner container spinning pipe, using cleaning machine to aluminium alloy inner container spinning obtained in step S1b Pipe is cleaned;
S1d, flaw detection carry out ultrasonic inspection to the direct tube section of aluminium alloy inner container spinning pipe obtained in step S1c, in inspection Surface pores is mingled with, is recessed, the defect of micro-crack;
S2, the reconditioning of aluminium alloy inner container spinning pipe carry out interior appearance to aluminium alloy inner container spinning pipe obtained in step S1 The reconditioning that face scratches, damages;
The rotary press modelling of S3, end socket and bottleneck;
S4, the processing of bottleneck centre bore;
S5, curved surface flaw detection;
S6, curved interior surface reconditioning, according to result of detection, using end socket inner surface grinding machine tool to being found in step S5 End socket defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C;
S7, heat treatment carry out T6 process to rotary press modelling part C obtained in step S6, obtain oversize high pressure Gas cylinder aluminium alloy inner container base;
S8, bottleneck processing, using overlength bottleneck machining center to oversize high pressure gas cylinder aluminium obtained in step S7 The A bottleneck of alloy liner base and the internal diameter and outer diameter of B bottleneck are machined out respectively, and process bottle outlet internal screw thread, are surpassed Large scale high pressure gas cylinder aluminium alloy inner container;
S9, liner cleaning, uses oversize high pressure gas cylinder obtained in step S8 using horizontal gas bottle liner cleaning machine The inner cavity of aluminium alloy inner container carries out high pressure water spray cleaning, removes processing pollution object.
The manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as described above, it is preferable that in the step S1: institute The three spinning roller mistake of tension stated in step S1a is set as 6-12mm away from amount away from the mistake in dextrorotation spin-on process;
Preferably, the cleaning machine in the step S1c is rotary spray cleaning machine or supersonic cleaning machine;
Preferably, the cleaning of the aluminium alloy inner container spinning pipe is completed using the neutral cleaners for heating 30-45 DEG C;
More preferably, formula drying unit removal remained on surface water is stretched using interior after the aluminium alloy inner container spinning pipe cleaning Stain.
The manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as described above, it is preferable that the step S2 is specific Include the following steps:
S21 carries out reconditioning using outer surface of the cloth abrasive band to aluminium alloy inner container spinning pipe;
S22 carries out thick reconditioning using inner surface of the Chiba fabric disc to aluminium alloy inner container spinning pipe;
S23 carries out refine mill using inner surface of the scouring pad wheel to aluminium alloy inner container spinning pipe.
The manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as described above, it is preferable that the step S3 are as follows: adopt Being spun into for end socket and bottleneck is carried out respectively to the opening at the aluminium alloy inner container spinning pipe both ends with heating closing in spinning machine Type obtains rotary press modelling part B;The rotary press modelling part B includes the A end socket and B end socket at direct tube section and direct tube section both ends;Specific packet Include following steps:
S31, clamping carry out aluminium conjunction using Automatic-clamping, the centralising device after the hollow tooling of double fastener mouth split-type and main shaft The clamping of golden liner spinning pipe
S32, heating, to being heated to 200-400 DEG C at the spinning to be closed up of aluminium alloy inner container spinning pipe;
The formed spinning of S33, end socket and bottleneck, using unilateral X straight line, Z straight line and rotation three-dimensional insertion packing closing in spinning Machine carries out multi-pass closing in spinning to the aluminium alloy inner container spinning pipe heated in step S32;
S34 repeats the operation of step S31, S32, S33 to the other end of aluminium alloy inner container spinning pipe, obtains rotary press modelling Part B;The rotary press modelling part B includes the A end socket and B end socket at direct tube section and direct tube section both ends;
Preferably, the heating in the step S32 carries out burning bright eruption heating using oxygen, propane/LNG.
Oversize high pressure gas cylinder aluminium alloy inner container manufacturing method as described above, it is preferable that in oversize high pressure gas In bottle aluminium alloy inner container manufacturing method:
The A end socket and B end socket at the both ends rotary press modelling part B obtained in step S3 are distinguished in S4, the processing of bottleneck centre bore The machining for carrying out bottleneck centre bore, obtains rotary press modelling part C;
S5, curved surface flaw detection carry out closing in quality flaw detection to rotary press modelling part C obtained in step S4, examine end socket position Whether the manufacturing deficiency of orange peel, folding is had;
S6, curved interior surface reconditioning, according to result of detection, using end socket inner surface grinding machine tool to being found in step S5 End socket defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C;
Wherein it is preferred to which the step S6 specifically comprises the following steps:
S61, using clamping tooling clamping rotary press modelling part C;
S62, the automatic endoscope system automatic Observation carried using end socket inner surface grinding machine tool judge that end socket inner surface lacks Situation is fallen into, corresponding position is recorded, and combines artificial confirmation;
S63, using the end socket inner mold face slot trimming mechanism of end socket inner surface grinding machine tool in the end socket found in step S5 Surface defect carries out reconditioning, obtains up-to-standard rotary press modelling part C;
Preferably, the clamping tooling of the rotary press modelling part C is the hollow clamping tooling of split-type;
Preferably, end socket inner mold face reconditioning is numerical control automatic grinding mechanism, programmable to independently execute.
The manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as described above, it is preferable that the step S7 includes Following steps:
S71, clamping, using the equidistant clamping rotary press modelling part C of the dedicated heat treatment tooling of multiple split-types;
S72, quenching treatment, is put into glowing furnace for the rotary press modelling part C of clamping in step S71 and is quenched, will revolve Molded part C is heated to 525-531 DEG C, and keeps the temperature 2-4 hours in 525-531 DEG C of environment, then carries out rotary press modelling part C Quenching;
Quenched rotary press modelling part C is transferred to aging furnace and carries out ageing treatment, finally in 160- by S73, ageing treatment 6-10 hours are kept the temperature in 200 DEG C of environment, oversize high pressure gas cylinder aluminium alloy inner container base is made;
Preferably, the quenching and timeliness are heat-treated using horizontal continuous quenching, aging furnace.
Oversize high pressure gas cylinder aluminium alloy inner container manufacturing method as described above, it is preferable that the step S8 is specifically wrapped Include following steps:
S81, using multiple split-types being fixed on platen from clamping device clamping high pressure gas cylinder aluminium alloy Liner base;
S82, bottleneck machining, using dedicated overlength bottleneck machining center to oversize high pressure gas obtained in step S6 The A bottleneck of bottle aluminium alloy inner container base and outer diameter, internal diameter and the bottleneck internal screw thread of B bottleneck carry out High-speed machining, obtain super large ruler Length, the outer diameter and inner diameter size of very little high pressure gas cylinder aluminium alloy inner container, the A bottleneck and B bottleneck be 40mm, 50mm、28mm。
Compared with the immediate prior art, technical solution provided by the invention is had the following beneficial effects:
The manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container provided by the invention, the overall processing for using spinning Method, preparation process is simple, easy to operate, and low energy consumption, and pollution is small, and the loss of entire manufacturing process chinese raw materials is fewer, section The about cost of raw material.
In the aluminium alloy inner container spinning process of oversize, creative leads the present invention using floating core die cooperation is constant The method of gravitation, it is ensured that can smoothly process the high pressure gas cylinder liner of oversize.In heat treatment stages, in order to avoid The deformation of the aluminium alloy inner container of oversize is continuously heat-treated using horizontal continuous quenching, aging furnace, ensure that hot place Quality is managed, the generation of deformation is avoided.
The oversize high pressure gas cylinder aluminium alloy inner container that the manufacturing method of the present invention processes, nominal outside diameter Φ 300- Φ 850mm, volume are much higher than the volume of existing standard aluminium alloy inner container;The wall thickness of direct tube section is 3-10mm, has wall The characteristics of thin, light weight;The tensile strength of direct tube section is more than or equal to 345MPa, yield strength is more than or equal to 310MPa, elongation percentage More than or equal to 15%;Direct tube section any position organizes grain size to be more than or equal to 5 grades according to ASTME112 standard, interior material structure Even compact, integral strength excellent effect have high pressure resistant property, have great importance to the manufacture of high pressure gas cylinder.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of oversize high pressure gas cylinder aluminium alloy inner container in the embodiment of the present invention;
Fig. 2 is the manufacturing method flow chart of oversize high pressure gas cylinder aluminium alloy inner container in the embodiment of the present invention.
In figure: 1, A bottleneck;2, A end socket;3, direct tube section;4, B end socket;5, B bottleneck.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general Logical technical staff's every other embodiment obtained, shall fall within the protection scope of the present invention.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.It should be noted that in the feelings not conflicted Under condition, the feature in embodiment and embodiment in the present invention be can be combined with each other.
In the description of the present invention, term " connected ", " connection " used in the present invention shall be understood in a broad sense, for example, can To be to be fixedly connected, may be a detachable connection;It can be directly connected, can also be indirectly connected by intermediate member, it is right For those skilled in the art, the concrete meaning of above-mentioned term can be understood as the case may be.
The present invention provides a kind of manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container, oversize high pressure gas cylinder It is process by seamless tubular goods by this manufacturing method with aluminium alloy inner container;As shown in Figure 1, oversize high pressure gas cylinder is closed with aluminium Golden liner is the integrated seamless structure of both ends closing in formed head and bottleneck, including A bottleneck 1, A end socket 2, direct tube section 3, B envelope First 4 and B bottleneck 5, A end socket 2 and B end socket 4 are located at the both ends of direct tube section 3, and A bottleneck 1 and B bottleneck 5 are located at A end socket 2 On B end socket 4;The length of oversize high pressure gas cylinder aluminium alloy inner container be 5-13m (such as 5.5m, 6m, 6.5m, 7m, 7.5m, 8m, 8.5m, 9m, 9.5m, 10m, 10.5m, 11m, 11.5m, 12m, 12.5m), the nominal outside diameter of direct tube section 3 is Φ 300- Φ 850mm (such as Ф 350mm, Ф 400mm, Ф 450mm, Ф 500mm, Ф 550mm, Ф 600mm, Ф 650mm, Ф 700mm, Ф 750mm, Ф 800mm), the rated pressure of high pressure gas cylinder be 20-30Mpa (such as 21Mpa, 22Mpa, 23Mpa, 24Mpa, 25Mpa,26Mpa,27Mpa,28Mpa,29Mpa).The structure type of end socket is spheroid shape end socket, disk bottom or dome-type envelope The structure type of head, A end socket 2 is identical as the structure type of B end socket 4, and the thickness of end socket is from edge to the uniform gradual change in bottleneck position It thickens;, in an embodiment of the present invention, the structure type of A end socket 2 and B end socket 4 is dish-like;As shown in Fig. 2, of the invention The manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container includes the following steps:
S1, aluminium alloy inner container spinning control is standby, using ultra-long barrel spinning with tension equipment to the direct tube section 3 of seamless tubular goods into The processing of row multi-pass strength outward turning pressing formation, obtains aluminium alloy inner container spinning pipe;The step specifically comprises the following steps:
S1a, the rotary press modelling of aluminium alloy inner container spinning pipe direct tube section 3, uses ultra-long barrel spinning with tension equipment with tension Three spinning roller mistakes carry out 2-4 (such as 2 times, 3 times, 4 times) spinning process to seamless tubular goods away from dextrorotation spin-on process, obtain spinning part A.In an embodiment of the present invention, three spinning roller mistake of tension away from dextrorotation spin-on process it is wrong away from amount be set as 6-12mm (such as 6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm,10.5mm,11mm,11.5mm);1-2m is used when spinning (such as 1.1m, 1.2m, 1.3m, 1.4m, 1.5m, 1.6m, 1.7m, 1.8m, 1.9m) long floating core die carries out spinning auxiliary and adds Work;Seamless tubular goods is 55%-70% through spinning treated total deformation;In an embodiment of the present invention, when total deformation is big Intermediate annealing process should be carried out when 70%.Spinning part A is the direct tube section 3 of uniform thickness straight tube or both ends with outer circumferential end frame.? In the spinning manufacturing process of this step, one end using tractive force traction seamless tubular goods extends outwardly, the lead of tractive force It is opposite with the flow direction of material;Tractive force is constant force, the deformation velocity of the adaptive material of hauling speed;Seamless tubular goods is led Draw being axially fixed on traction mechanism of one end, it is ensured that by traction one end it is radial freely;Using positioning device to seamless tubular goods The radial direction of the other end be fixed and support, it is ensured that the other end of seamless tubular goods it is axially free.
S1b, the Processing to length of aluminium alloy inner container spinning pipe determine spinning part A obtained in step S1a using sawing machine Long processing, obtains aluminium alloy inner container spinning pipe;In an embodiment of the present invention, sawing machine uses double end automatic sawing machine, and saw blade uses The dedicated saw blade of aluminium alloy.
S1c, the cleaning of aluminium alloy inner container spinning pipe add 30-45 DEG C using rotary spray cleaning machine or supersonic cleaning machine Neutral cleaners aluminium alloy inner container spinning pipe obtained in step S1b is cleaned;Formula baking is stretched in using after the completion of cleaning It is water stain that equipment for drying removes remained on surface.
S1d, flaw detection carry out ultrasonic inspection to the direct tube section 3 of aluminium alloy inner container spinning pipe obtained in step S1c, check Inner surface stomata, be mingled with, be recessed, micro-crack the defects of;
S2, the reconditioning of aluminium alloy inner container spinning pipe, using overlength numerical control internal-external cavetto grinding machine to aluminium obtained in step S1 The reconditioning that alloy liner spinning pipe carries out surfaces externally and internally scuffing, damages;The step specifically comprises the following steps:
S21 carries out reconditioning using outer surface of the cloth abrasive band to aluminium alloy inner container spinning pipe;
S22 carries out thick reconditioning using inner surface of the Chiba fabric disc to aluminium alloy inner container spinning pipe;
S23 carries out refine mill using inner surface of the scouring pad wheel to aluminium alloy inner container spinning pipe.
The rotary press modelling of S3, end socket and bottleneck opens aluminium alloy inner container spinning pipe both ends using heating closing in spinning machine The rotary press modelling for carrying out end socket and bottleneck at mouthful respectively, obtains rotary press modelling part B;Rotary press modelling part B includes direct tube section 3 and straight tube The A end socket 2 and B end socket 4 at 3 both ends of section;The step specifically comprises the following steps:
S31, clamping carry out aluminium conjunction using Automatic-clamping, the centralising device after the hollow tooling of double fastener mouth split-type and main shaft The clamping of golden liner spinning pipe;
S32, heating, using oxygen, the burning of propane/LNG to being sprayed at the spinning to be closed up of aluminium alloy inner container spinning pipe Flame is heated to 200-400 DEG C (such as 220 DEG C, 240 DEG C, 260 DEG C, 280 DEG C, 300 DEG C, 320 DEG C, 340 DEG C, 360 DEG C, 380 DEG C);
The formed spinning of S33, end socket and bottleneck, using unilateral X straight line, Z straight line and rotation three-dimensional insertion packing closing in spinning Machine carries out 10-18 passage (such as 10 passages, 11 passages, 12 passages, 13 to the aluminium alloy inner container spinning pipe that heats in step S32 Passage, 14 passages, 15 passages, 16 passages, 17 passages, 18 passages) closing in spinning, in spinning process, the road closing in spinning 1-8 Secondary (such as 2 passages, 3 passages, 4 passages, 5 passages, 6 passages, 7 passages) have derotation, for thickening for bottleneck position;It is obtained The thickness of end socket by edge 5-8mm (such as 5.2mm, 5.4mm, 5.6mm, 5.8mm, 6mm, 6.2mm, 6.4mm, 6.6mm, 6.8mm, 7mm, 7.3mm, 7.6mm, 7.8mm) to bottleneck position 10-15mm (such as 10.5mm, 11mm, 11.5mm, 12mm, 12.5mm, 13mm, 13.5mm, 14mm, 14.5mm) uniformly gradual change thicken;
S34 repeats the operation of step S31, S32, S33 to the other end of aluminium alloy inner container spinning pipe, obtains rotary press modelling Part B;Rotary press modelling part B includes the A end socket 2 and B end socket 4 at 3 both ends of direct tube section 3 and direct tube section.
S4, the processing of bottleneck centre bore, the split-type being fixed on platen using 2-3 are carried out from clamping device The clamping of rotary press modelling part B;Using dedicated overlength bottleneck machining center to the A at the both ends rotary press modelling part B obtained in step S3 End socket 2 and B end socket 4 carry out the machining of bottleneck centre bore respectively, obtain rotary press modelling part C;It is ready for subsequent heat treatment;
S5, curved surface flaw detection, using Special curved surface ultrasound automatic flaw detector to rotary press modelling part C obtained in step S4 into The flaw detection of row closing in quality, examines whether end socket position has the manufacturing deficiencies such as orange peel, folding;
S6, curved interior surface reconditioning, according to result of detection, using dedicated end socket inner surface grinding machine tool to being sent out in step S5 Existing end socket defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C;The step specifically comprises the following steps:
S61, using Automatic-clamping, the centralising device clamping rotary press modelling part after the hollow tooling of double fastener mouth split-type and main shaft C;
S62, the automatic endoscope system automatic Observation carried using dedicated end socket inner surface grinding machine tool judge 2 and of A end socket The defect in inner surface situation of B end socket 4 records corresponding position, and combines artificial confirmation;
S63, using the numerical control automatic grinding mechanism of dedicated end socket inner surface grinding machine tool to the end socket found in step S5 Defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C, during reconditioning, numerical control automatic grinding mechanism can Programming independently executes.
S7, heat treatment carry out T6 process to rotary press modelling part C obtained in step S6, obtain oversize high pressure Gas cylinder aluminium alloy inner container base;The step specifically comprises the following steps:
S71, clamping, using the 3-5 equidistant clamping spinning of (such as 3,4,5) the dedicated heat treatment tooling of split-type Molded part C prevents its heat-treatment distortion;Multiple rotary press modelling part C are placed on solid by the dedicated heat treatment tooling of split-type It is heat-treated in the movements and postures of actors, convenient for primary heat treatment more than one piece rotary press modelling part C.
The rotary press modelling part C of clamping in step S71, is put into the roller of horizontal continuous quenching, aging furnace by S72, quenching treatment It on road, is sent into quenching chamber and is quenched, rotary press modelling part C is heated to 525-531 DEG C (such as 525.5 in quenching chamber DEG C, 526 DEG C, 526.5 DEG C, 527 DEG C, 527.5 DEG C, 528 DEG C, 528.5 DEG C, 529 DEG C, 529.5 DEG C, 530 DEG C, 530.5 DEG C), and In 525-531 DEG C of (such as 525.5 DEG C, 526 DEG C, 526.5 DEG C, 527 DEG C, 527.5 DEG C, 528 DEG C, 528.5 DEG C, 529 DEG C, 529.5 DEG C, 530 DEG C, 530.5 DEG C) keep the temperature 2-4 hours in environment (for example (,) 2.2 hours, 2.4 hours, 2.6 hours, 2.8 hours, 3 hours, 3.2 hours, 3.4 hours, 3.6 hours, 3.8 hours), rotary press modelling part C is then subjected to water fog medium quenching;It is answered in quenching Guarantee that all the contact water mist time is not greater than 5s to oversize high pressure gas cylinder with aluminium alloy inner container.
Quenched rotary press modelling part C is transferred to aging furnace and carries out ageing treatment, finally in 160- by S73, ageing treatment Keep the temperature 6-10 hours in 200 DEG C of (such as 165 DEG C, 170 DEG C, 175 DEG C, 180 DEG C, 185 DEG C, 190 DEG C, 195 DEG C) environment (such as 6.3 hours, 6.6 hours, 7 hours, 7.3 hours, 7.7 hours, 8 hours, 8.4 hours, 8.7 hours, 9 hours, 9.3 hours, 9.7 Hour), oversize high pressure gas cylinder aluminium alloy inner container base is made.
S8, bottleneck processing, using dedicated overlength bottleneck machining center to oversize high pressure gas cylinder obtained in step S7 It is machined out respectively with the internal diameter and outer diameter of the A bottleneck 1 of aluminium alloy inner container base and B bottleneck 5, and processes bottle outlet internal screw thread, Obtain oversize high pressure gas cylinder aluminium alloy inner container;The step specifically comprises the following steps:
S81 is fixed on the split-type on platen from clamping device clamping high pressure gas cylinder aluminium alloy using 2-3 Liner base;
S82, bottleneck machining, using dedicated overlength bottleneck machining center to oversize high pressure gas obtained in step S7 The A bottleneck 1 of bottle aluminium alloy inner container base and outer diameter, internal diameter and the bottleneck internal screw thread of B bottleneck 5 carry out High-speed machining, obtain super large Length, the outer diameter and inner diameter size of size high voltage gas cylinder aluminium alloy inner container, A bottleneck 1 and B bottleneck 5 be 40mm, 50mm、28mm。
S9, liner cleaning, using special horizontal cylinder liner cleaning machine to oversize high pressure gas obtained in step S8 The inner cavity of bottle aluminium alloy inner container carries out high pressure water spray cleaning, removes aluminium skimmings and other processing pollution objects;The step is specifically wrapped Include following steps:
S91 is placed on oversize high pressure gas cylinder aluminium alloy inner container is horizontal on special vertical cylinder liner cleaning machine, Enter special horizontal cylinder liner cleaning machine spraying mechanism inside liner, fixed liner;
S92 is sprayed using high pressure water or is cleaned by ultrasonic mode to the inner cavity of oversize high pressure gas cylinder aluminium alloy inner container It is cleaned, removes aluminium skimmings and other processing pollution objects;
S93, cleaning finish 45 ° of rear-inclined pourings;
S94 carries out liner drying using interior formula steam drying machine of stretching.
S10, product inspection are tested to the oversize high pressure gas cylinder obtained in step S9 with aluminium alloy inner container, are obtained To the finished product of oversize high pressure gas cylinder aluminium alloy inner container.
S11 carries out carbon fiber winding to the finished product of the obtained oversize high pressure gas cylinder aluminium alloy inner container of step S10, Oversize high pressure gas cylinder is obtained, the ultimate pressure capacity situation of the oversize high pressure gas cylinder is detected.
The oversize high pressure gas cylinder aluminium alloy inner container prepared through the manufacturing method of the present invention, the length is 5-13m, directly The nominal outside diameter of cylinder section 3 is Φ 300- Φ 850mm, and the wall thickness of direct tube section 3 is 3-10mm, and the whole straightness of direct tube section 3 is little In 0.5mm/m;The tolerance of the wall thickness of direct tube section 3 is less than or equal to ± 0.15mm;3 arbitrary line fragment position part straightness of direct tube section No more than 0.5mm/300mm;The circularity of 3 any position of direct tube section is not more than 0.5mm;The inside surface roughness of direct tube section 3 is less than Ra1.6 μm, the outer surface roughness of direct tube section 3 is less than Ra3.2 μm.Oversize high pressure gas made from the manufacturing method of the present invention The volume of bottle aluminium alloy inner container is much higher than the volume of existing standard aluminium alloy inner container, while also having wall thickness thin, high pressure resistant With the characteristics such as light weight.
Embodiment 1
A kind of diameter 300mm, length 10m are prepared, wall thickness is the oversize high pressure gas cylinder aluminium alloy inner container of 6mm, High pressure gas cylinder rated pressure requires to be 25Mpa, specifically includes following operating procedure:
S1, aluminium alloy inner container spinning control is standby, using ultra-long barrel spinning with tension equipment to the direct tube section 3 of seamless tubular goods into The processing of row multi-pass strength outward turning pressing formation, obtains aluminium alloy inner container spinning pipe;The step specifically comprises the following steps:
S1a, the rotary press modelling of aluminium alloy inner container spinning pipe direct tube section 3, uses ultra-long barrel spinning with tension equipment with tension Three spinning roller mistakes away from dextrorotation spin-on process to length be 1600mm seamless tubular goods carry out 4 spinning processes, three spinning roller mistake of tension away from Mistake in dextrorotation spin-on process is set as 6mm away from amount;Spinning secondary process is carried out using the floating core die of m long when spinning;It obtains Spinning part A, spinning part A are the direct tube section 3 of uniform thickness straight tube or both ends with outer circumferential end frame.In the spinning manufacturing process of this step In, one end using tractive force traction seamless tubular goods extends outwardly, and the lead of tractive force and the flow direction of material are opposite; Tractive force is constant force, the deformation velocity of the adaptive material of hauling speed;Seamless tubular goods is led by being axially fixed in for one end of traction Draw in mechanism, it is ensured that by the radial free of traction one end;Consolidated using radial direction of the positioning device to the other end of seamless tubular goods Fixed and support, it is ensured that the other end of seamless tubular goods it is axially free.The size of spinning part A are as follows: total length 12500mm, straight tube Section 3 with a thickness of 6mm, both ends step section is with a thickness of 9mm.
S1b, the Processing to length of aluminium alloy inner container spinning pipe, using double end automatic sawing machine to spinning obtained in step S1a Part A carries out Processing to length, obtains aluminium alloy inner container spinning pipe;The length of the aluminium alloy inner container spinning pipe direct tube section 3 is 12000mm;
S1c, the cleaning of aluminium alloy inner container spinning pipe are added in 35 DEG C using rotary spray cleaning machine or supersonic cleaning machine Property cleaning agent cleans aluminium alloy inner container spinning pipe obtained in step S1b;Formula drying dress is stretched in using after the completion of cleaning It is water stain to set removal remained on surface.
S1d, flaw detection carry out ultrasonic inspection to the direct tube section 3 of aluminium alloy inner container spinning pipe obtained in step S1c, check Inner surface stomata, be mingled with, be recessed, micro-crack the defects of;
S2, the reconditioning of aluminium alloy inner container spinning pipe, using overlength numerical control internal-external cavetto grinding machine to aluminium obtained in step S1 The reconditioning that alloy liner spinning pipe carries out surfaces externally and internally scuffing, damages;The step specifically comprises the following steps:
S21 carries out reconditioning using outer surface of the cloth abrasive band to aluminium alloy inner container spinning pipe;
S22 carries out thick reconditioning using inner surface of the Chiba fabric disc to aluminium alloy inner container spinning pipe;
S23 carries out refine mill using inner surface of the scouring pad wheel to aluminium alloy inner container spinning pipe.
The rotary press modelling of S3, end socket and bottleneck opens aluminium alloy inner container spinning pipe both ends using heating closing in spinning machine The rotary press modelling for carrying out end socket and bottleneck at mouthful respectively, obtains rotary press modelling part B;Rotary press modelling part B includes direct tube section 3 and straight tube The A end socket 2 and B end socket 4 at 3 both ends of section;The step specifically comprises the following steps:
S31, clamping carry out aluminium conjunction using Automatic-clamping, the centralising device after the hollow tooling of double fastener mouth split-type and main shaft The clamping of golden liner spinning pipe;
S32, heating, using oxygen, the burning of propane/LNG to being sprayed at the spinning to be closed up of aluminium alloy inner container spinning pipe Flame is heated to 300 DEG C;
The formed spinning of S33, end socket and bottleneck, using unilateral X straight line, Z straight line and rotation three-dimensional insertion packing closing in spinning Machine carries out 12 passage closing in spinning to the aluminium alloy inner container spinning pipe heated in step S32;In spinning process, closing in spinning band There are 4 derotations, for thickening for bottleneck position;The thickness of end socket obtained is uniform from the 8mm at edge to the 12mm at bottleneck position Gradual change thickens;
S34 repeats the operation of step S31, S32, S33 to the other end of aluminium alloy inner container spinning pipe, obtains rotary press modelling Part B;Rotary press modelling part B includes the A end socket 2 and B end socket 4 at 3 both ends of direct tube section 3 and direct tube section.
S4, the processing of bottleneck centre bore, the split-type being fixed on platen using 2 are revolved from clamping device The clamping of molded part B;It is sealed using A of the dedicated overlength bottleneck machining center to the both ends rotary press modelling part B obtained in step S3 First 2 and B end socket 4 carry out the machining of bottleneck centre bore respectively, obtain rotary press modelling part C;It is ready for subsequent heat treatment;
S5, curved surface flaw detection, using Special curved surface ultrasound automatic flaw detector to rotary press modelling part C obtained in step S4 into The flaw detection of row closing in quality, examines whether end socket position has the manufacturing deficiencies such as orange peel, folding;
S6, curved interior surface reconditioning, according to result of detection, using dedicated end socket inner surface grinding machine tool to being sent out in step S5 Existing end socket defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C;The step specifically comprises the following steps:
S61, using Automatic-clamping, the centralising device clamping rotary press modelling part after the hollow tooling of double fastener mouth split-type and main shaft C;
S62, the automatic endoscope system automatic Observation carried using dedicated end socket inner surface grinding machine tool judge 2 and of A end socket The defect in inner surface situation of B end socket 4 records corresponding position, and combines artificial confirmation;
S63, using the numerical control automatic grinding mechanism of dedicated end socket inner surface grinding machine tool to the end socket found in step S5 Defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C, during reconditioning, numerical control automatic grinding mechanism can Programming independently executes.
S7, heat treatment carry out T6 process to rotary press modelling part C obtained in step S6, obtain oversize high pressure Gas cylinder aluminium alloy inner container base;The step specifically comprises the following steps:
S71, clamping are prevented at its heat using the equidistant clamping rotary press modelling part C of 4 dedicated heat treatment toolings of split-type Reason deformation;Multiple rotary press modelling part C are placed in the three-dimensional heat treatment movements and postures of actors by the dedicated heat treatment tooling of split-type, are convenient for one Secondary heat treatment more than one piece rotary press modelling part C.
The rotary press modelling part C of clamping in step S71, is put into the roller of horizontal continuous quenching, aging furnace by S72, quenching treatment On road, it is sent into quenching chamber and is quenched, rotary press modelling part C is heated to 525-531 DEG C in quenching chamber, and in 525- 3.5 hours are kept the temperature in 531 DEG C of environment, rotary press modelling part C is then subjected to water fog medium quenching;It should ensure that super large ruler in quenching With aluminium alloy inner container, all the contact water mist time is not greater than 5s to very little high pressure gas cylinder.
Quenched rotary press modelling part C is transferred to aging furnace and carries out ageing treatment, finally 170 by S73, ageing treatment 10 hours are kept the temperature in DEG C environment, oversize high pressure gas cylinder aluminium alloy inner container base is made.
S8, bottleneck processing, using dedicated overlength bottleneck machining center to oversize high pressure gas cylinder obtained in step S7 It is machined out respectively with the internal diameter and outer diameter of the A bottleneck 1 of aluminium alloy inner container base and B bottleneck 5, and processes bottle outlet internal screw thread, Obtain oversize high pressure gas cylinder aluminium alloy inner container;The step specifically comprises the following steps:
S81, the split-type being fixed on platen using 4 is from clamping device clamping high pressure gas cylinder aluminium alloy Gallbladder base;
S82, bottleneck machining, using dedicated overlength bottleneck machining center to oversize high pressure gas obtained in step S7 The A bottleneck 1 of bottle aluminium alloy inner container base and outer diameter, internal diameter and the bottleneck internal screw thread of B bottleneck 5 carry out High-speed machining, obtain super large Length, the outer diameter and inner diameter size of size high voltage gas cylinder aluminium alloy inner container, A bottleneck 1 and B bottleneck 5 be 40mm, 50mm、28mm。
S9, liner cleaning, using special horizontal cylinder liner cleaning machine to oversize high pressure gas obtained in step S8 The inner cavity of bottle aluminium alloy inner container carries out high pressure water spray cleaning, removes aluminium skimmings and other processing pollution objects;The step is specifically wrapped Include following steps:
S91 is placed on oversize high pressure gas cylinder aluminium alloy inner container is horizontal on special vertical cylinder liner cleaning machine, Enter special horizontal cylinder liner cleaning machine spraying mechanism inside liner, fixed liner;
S92 is sprayed using high pressure water or is cleaned by ultrasonic mode to the inner cavity of oversize high pressure gas cylinder aluminium alloy inner container It is cleaned, removes aluminium skimmings and other processing pollution objects;
S93, cleaning finish 45 ° of rear-inclined pourings;
S94 carries out liner drying using interior formula steam drying machine of stretching.
S10, product inspection test to the oversize high pressure gas cylinder obtained in step S9 with aluminium alloy inner container, portion Sub-item is inspected by random samples, is surveyed to the tissue grain size of any six positions of the high pressure gas cylinder aluminium alloy inner container of sampling observation Amount, the tissue grain size of measurement result six positions is respectively 6 grades according to ASTME112 standard, 6 grades, 7 grades, 7 grades, 6 grades, 5 Grade, to the tensile strength of the direct tube section 3 of the high pressure gas cylinder aluminium alloy inner container of sampling observation.Yield strength and elongation percentage are surveyed respectively Amount, through measuring, the tensile strength of direct tube section 3 is 345MPa, yield strength 310MPa, elongation percentage 16%, the production of this batch Product is qualified, obtains the finished product of high pressure gas cylinder aluminium alloy inner container.
S11 carries out carbon fiber winding to the finished product of the obtained oversize high pressure gas cylinder aluminium alloy inner container of step S10, Oversize high pressure gas cylinder is obtained, the ultimate pressure capacity situation of the oversize high pressure gas cylinder is detected.
By examining, the tissue grain size of any position of high pressure gas cylinder aluminium alloy inner container made from the present embodiment according to ASTME112 standard class is all larger than equal to 5 grades, and the tensile strength of direct tube section 3 is 345MPa, yield strength 310MPa, extends Rate is 16%;Carrying out the high pressure gas cylinder test limits pressure obtained after liner winding is 72Mpa, meets rated pressure 25Mpa's It is required that.
In conclusion the manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container provided by the invention, overall to use The processing method of spinning, low energy consumption, pollute it is small, the loss of entire manufacturing process chinese raw materials is fewer, saved raw material at This.The oversize high pressure gas cylinder aluminium alloy inner container that the manufacturing method of the present invention processes, nominal outside diameter are Φ 300- Φ 850mm, volume are much higher than the volume of existing standard aluminium alloy inner container;The wall thickness of direct tube section is 3-10mm, the thin, matter with wall thickness Measure light feature;The tensile strength of direct tube section meets the requirement for being more than or equal to 345Mpa, yield strength satisfaction is more than or equal to The requirement of 310Mpa, elongation percentage meet the requirement more than or equal to 15%;Direct tube section any position organize grain size according to ASTME112 standard is more than or equal to 5 grades, and interior material structure even compact, integral strength excellent effect has high pressure resistant property, Have great importance to the manufacture of high pressure gas cylinder.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Mind and principle within, any modification, equivalent replacement, improvement and so on, accompanying claims protection scope of the present invention it It is interior.

Claims (10)

1. a kind of oversize high pressure gas cylinder aluminium alloy inner container, which is characterized in that the oversize high pressure gas cylinder is closed with aluminium Golden liner is used to store compressed gas as the liner of winding gas cylinder, and the oversize high pressure gas cylinder aluminium alloy inner container is two The integrated seamless structure of closing in formed head and bottleneck, including A bottleneck, A end socket, direct tube section, B end socket and B bottleneck are held, it is described A end socket and B end socket are located at the both ends of the direct tube section, and the A bottleneck and B bottleneck are located at the A end socket and B end socket On;The length of the oversize high pressure gas cylinder aluminium alloy inner container is 5-13m, and the nominal outside diameter of the direct tube section is Φ 300- Φ 850mm, the rated pressure of the high pressure gas cylinder are 20-30Mpa.
2. oversize high pressure gas cylinder aluminium alloy inner container as described in claim 1, which is characterized in that the wall of the direct tube section Thickness is 3-10mm, and the whole straightness of the direct tube section is not more than 0.5mm/m;
Preferably, the tolerance of the wall thickness of the direct tube section is less than or equal to ± 0.15mm;
More preferably, the direct tube section arbitrary line fragment position part straightness is not more than 0.5mm/300mm;
More preferably, the circularity of the direct tube section any position is not more than 0.5mm;
More preferably, the inside surface roughness of the direct tube section is less than Ra1.6 μm, and the outer surface roughness of the direct tube section is less than Ra3.2μm。
3. oversize high pressure gas cylinder aluminium alloy inner container as described in claim 1, which is characterized in that the structure of the end socket Type is spheroid shape end socket, disk bottom or dome-type end socket, the structure class of the structure type of the A end socket and the B end socket Type is identical, and the thickness of the end socket is thickened from edge to the uniform gradual change in bottleneck position;
Preferably, the thickness of the end socket is thickened from the 5-8mm at edge to the uniform gradual change of the 10-15mm at bottleneck position;
More preferably, the length of the bottleneck is 40mm, the outer diameter of the bottleneck is 50mm, and the internal diameter of the bottleneck is 28mm.
4. a kind of manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as described in any one of claims 1 to 3, It is characterized in that, the manufacturing method includes the following steps:
S1, aluminium alloy inner container spinning control is standby, is carried out using direct tube section of the ultra-long barrel spinning with tension equipment to seamless tubular goods more The processing of passage strength outward turning pressing formation, obtains aluminium alloy inner container spinning pipe;The step specifically comprises the following steps:
S1a, the rotary press modelling of aluminium alloy inner container spinning pipe direct tube section, uses ultra-long barrel spinning with tension equipment with three spinning roller of tension Mistake carries out multiple spinning process to seamless tubular goods away from dextrorotation spin-on process, obtains spinning part A;It is carried out when spinning using floating core die Spinning secondary process;In spinning manufacturing process, one end using tractive force traction seamless tubular goods extends outwardly, the traction of tractive force Direction is opposite with the flow direction of material;The tractive force is constant force, the deformation velocity of the adaptive material of hauling speed;It is seamless Tubing is axially fixed on traction mechanism by traction one end, it is ensured that by the radial free of traction one end;Using positioning device pair The radial direction of the other end of seamless tubular goods is fixed and supports, it is ensured that the other end of seamless tubular goods it is axially free;
S1b, the Processing to length of aluminium alloy inner container spinning pipe carry out fixed length to spinning part A obtained in step S1a using sawing machine and add Work obtains aluminium alloy inner container spinning pipe;
S1c, the cleaning of aluminium alloy inner container spinning pipe, using cleaning machine to aluminium alloy inner container spinning pipe obtained in step S1b into Row cleaning;
S1d, flaw detection carry out ultrasonic inspection to the direct tube section of aluminium alloy inner container spinning pipe obtained in step S1c, check inner surface Stomata is mingled with, is recessed, the defect of micro-crack;
S2, the reconditioning of aluminium alloy inner container spinning pipe carry out surfaces externally and internally to aluminium alloy inner container spinning pipe obtained in step S1 and draw The reconditioning hurt, damaged;
The rotary press modelling of S3, end socket and bottleneck;
S4, the processing of bottleneck centre bore;
S5, curved surface flaw detection;
S6, curved interior surface reconditioning, according to result of detection, using end socket inner surface grinding machine tool to the end socket found in step S5 Defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C;
S7, heat treatment carry out T6 process to rotary press modelling part C obtained in step S6, obtain oversize high pressure gas cylinder With aluminium alloy inner container base;
S8, bottleneck processing, using overlength bottleneck machining center to oversize high pressure gas cylinder aluminium alloy obtained in step S7 The A bottleneck of liner base and the internal diameter and outer diameter of B bottleneck are machined out respectively, and process bottle outlet internal screw thread, obtain super large ruler Very little high pressure gas cylinder aluminium alloy inner container;
S9, liner cleaning, closes oversize high pressure gas cylinder obtained in step S8 with aluminium using horizontal gas bottle liner cleaning machine The inner cavity of golden liner carries out high pressure water spray cleaning, removes processing pollution object.
5. the manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as claimed in claim 4, which is characterized in that described In step S1: the three spinning roller mistake of tension in the step S1a is set as 6-12mm away from amount away from the mistake in dextrorotation spin-on process;
Preferably, the cleaning machine in the step S1c is rotary spray cleaning machine or supersonic cleaning machine;
Preferably, the cleaning of the aluminium alloy inner container spinning pipe is completed using the neutral cleaners for heating 30-45 DEG C;
More preferably, it is water stain that formula drying unit removal remained on surface is stretched in using after the aluminium alloy inner container spinning pipe cleaning.
6. the manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as claimed in claim 4, which is characterized in that described Step S2 specifically comprises the following steps:
S21 carries out reconditioning using outer surface of the cloth abrasive band to aluminium alloy inner container spinning pipe;
S22 carries out thick reconditioning using inner surface of the Chiba fabric disc to aluminium alloy inner container spinning pipe;
S23 carries out refine mill using inner surface of the scouring pad wheel to aluminium alloy inner container spinning pipe.
7. the manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as claimed in claim 4, which is characterized in that described Step S3 are as follows: end socket and bottle are carried out to the opening at the aluminium alloy inner container spinning pipe both ends using heating closing in spinning machine respectively The rotary press modelling of mouth, obtains rotary press modelling part B;The rotary press modelling part B includes the A end socket and B at direct tube section and direct tube section both ends End socket;Specifically comprise the following steps:
S31, clamping are carried out in aluminium alloy using Automatic-clamping, the centralising device after the hollow tooling of double fastener mouth split-type and main shaft The clamping of gallbladder spinning pipe
S32, heating, to being heated to 200-400 DEG C at the spinning to be closed up of aluminium alloy inner container spinning pipe;
The formed spinning of S33, end socket and bottleneck, using unilateral X straight line, Z straight line and rotation three-dimensional insertion packing closing in spinning machine pair The aluminium alloy inner container spinning pipe heated in step S32 carries out multi-pass closing in spinning;
S34 repeats the operation of step S31, S32, S33 to the other end of aluminium alloy inner container spinning pipe, obtains rotary press modelling part B; The rotary press modelling part B includes the A end socket and B end socket at direct tube section and direct tube section both ends;
Preferably, the heating in the step S32 carries out burning bright eruption heating using oxygen, propane/LNG.
8. oversize high pressure gas cylinder aluminium alloy inner container manufacturing method as claimed in claim 7, which is characterized in that in super large Size high voltage gas cylinder is in aluminium alloy inner container manufacturing method:
S4, the processing of bottleneck centre bore carry out the A end socket and B end socket at the both ends rotary press modelling part B obtained in step S3 respectively The machining of bottleneck centre bore obtains rotary press modelling part C;
S5, curved surface flaw detection carry out closing in quality flaw detection to rotary press modelling part C obtained in step S4, whether examine end socket position There is the manufacturing deficiency of orange peel, folding;
S6, curved interior surface reconditioning, according to result of detection, using end socket inner surface grinding machine tool to the end socket found in step S5 Defect in inner surface carries out reconditioning, obtains up-to-standard rotary press modelling part C;
Wherein it is preferred to which the step S6 specifically comprises the following steps:
S61, using clamping tooling clamping rotary press modelling part C;
S62, the automatic endoscope system automatic Observation carried using end socket inner surface grinding machine tool judge end socket defect in inner surface feelings Condition records corresponding position, and combines artificial confirmation;
S63, using the end socket inner mold face slot trimming mechanism of end socket inner surface grinding machine tool to the end socket inner surface found in step S5 Defect carries out reconditioning, obtains up-to-standard rotary press modelling part C;
Preferably, the clamping tooling of the rotary press modelling part C is the hollow clamping tooling of split-type;
Preferably, end socket inner mold face reconditioning is numerical control automatic grinding mechanism, programmable to independently execute.
9. the manufacturing method of oversize high pressure gas cylinder aluminium alloy inner container as claimed in claim 8, which is characterized in that described Step S7 includes the following steps:
S71, clamping, using the equidistant clamping rotary press modelling part C of the dedicated heat treatment tooling of multiple split-types;
S72, quenching treatment, is put into glowing furnace for the rotary press modelling part C of clamping in step S71 and is quenched, will be spun into Type part C is heated to 525-531 DEG C, and keeps the temperature 2-4 hours in 525-531 DEG C of environment, and then rotary press modelling part C quenches Fire;
Quenched rotary press modelling part C is transferred to aging furnace and carries out ageing treatment, finally in 160-200 by S73, ageing treatment 6-10 hours are kept the temperature in DEG C environment, oversize high pressure gas cylinder aluminium alloy inner container base is made;
Preferably, the quenching and timeliness are heat-treated using horizontal continuous quenching, aging furnace.
10. oversize high pressure gas cylinder aluminium alloy inner container manufacturing method as claimed in claim 4, which is characterized in that described Step S8 specifically comprises the following steps:
S81, using multiple split-types being fixed on platen from clamping device clamping high pressure gas cylinder aluminium alloy inner container Base;
S82, bottleneck machining, uses oversize high pressure gas cylinder obtained in step S6 using dedicated overlength bottleneck machining center The A bottleneck of aluminium alloy inner container base and outer diameter, internal diameter and the bottleneck internal screw thread of B bottleneck carry out High-speed machining, obtain oversize height Length, the outer diameter and inner diameter size of air bottle aluminium alloy inner container, the A bottleneck and B bottleneck be 40mm, 50mm, 28mm。
CN201811601577.2A 2018-12-26 2018-12-26 Aluminum alloy liner for oversized high-pressure gas cylinder and manufacturing method thereof Active CN109578800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811601577.2A CN109578800B (en) 2018-12-26 2018-12-26 Aluminum alloy liner for oversized high-pressure gas cylinder and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811601577.2A CN109578800B (en) 2018-12-26 2018-12-26 Aluminum alloy liner for oversized high-pressure gas cylinder and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN109578800A true CN109578800A (en) 2019-04-05
CN109578800B CN109578800B (en) 2020-06-23

Family

ID=65931911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811601577.2A Active CN109578800B (en) 2018-12-26 2018-12-26 Aluminum alloy liner for oversized high-pressure gas cylinder and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN109578800B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113883408A (en) * 2021-08-31 2022-01-04 海鹰空天材料研究院(苏州)有限责任公司 Ultrahigh-pressure fully-wound gas cylinder with aluminum alloy inner container and manufacturing method thereof
CN113883410A (en) * 2021-08-31 2022-01-04 海鹰空天材料研究院(苏州)有限责任公司 Oversized aluminum alloy inner container high-pressure fully-wound gas cylinder and manufacturing method thereof
CN114183686A (en) * 2021-11-05 2022-03-15 湖北三江航天江北机械工程有限公司 Full-winding seamless aluminum alloy inner container of high-pressure gas cylinder and forming and processing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201032051Y (en) * 2007-04-16 2008-03-05 曾建军 Composite material reinforced high-capacity high pressure air storage tank
CN101879563A (en) * 2010-06-25 2010-11-10 中材科技(苏州)有限公司 Liner end enclosure molding process of high-pressure hydrogen storage cylinder
CN101885137A (en) * 2010-07-21 2010-11-17 北京天海工业有限公司 Method for manufacturing aluminum liner of vehicular composite cylinder
US20110210516A1 (en) * 2010-02-26 2011-09-01 Dynetek Industries Ltd. Anti-extrusion sealing system for the outlet of a plastic-lined compressed gas cylinder
CN202834718U (en) * 2012-07-23 2013-03-27 中油通用鲁西天然气装备有限公司 Large-capacity steel seamless gas cylinder
CN107246548A (en) * 2017-07-28 2017-10-13 上海氦格复合材料科技有限公司 A kind of high pressure fire fighting winds composite cylinder entirely with respirator fibre reinforced aluminum liner

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201032051Y (en) * 2007-04-16 2008-03-05 曾建军 Composite material reinforced high-capacity high pressure air storage tank
US20110210516A1 (en) * 2010-02-26 2011-09-01 Dynetek Industries Ltd. Anti-extrusion sealing system for the outlet of a plastic-lined compressed gas cylinder
CN101879563A (en) * 2010-06-25 2010-11-10 中材科技(苏州)有限公司 Liner end enclosure molding process of high-pressure hydrogen storage cylinder
CN101885137A (en) * 2010-07-21 2010-11-17 北京天海工业有限公司 Method for manufacturing aluminum liner of vehicular composite cylinder
CN202834718U (en) * 2012-07-23 2013-03-27 中油通用鲁西天然气装备有限公司 Large-capacity steel seamless gas cylinder
CN107246548A (en) * 2017-07-28 2017-10-13 上海氦格复合材料科技有限公司 A kind of high pressure fire fighting winds composite cylinder entirely with respirator fibre reinforced aluminum liner

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113883408A (en) * 2021-08-31 2022-01-04 海鹰空天材料研究院(苏州)有限责任公司 Ultrahigh-pressure fully-wound gas cylinder with aluminum alloy inner container and manufacturing method thereof
CN113883410A (en) * 2021-08-31 2022-01-04 海鹰空天材料研究院(苏州)有限责任公司 Oversized aluminum alloy inner container high-pressure fully-wound gas cylinder and manufacturing method thereof
CN114183686A (en) * 2021-11-05 2022-03-15 湖北三江航天江北机械工程有限公司 Full-winding seamless aluminum alloy inner container of high-pressure gas cylinder and forming and processing method thereof

Also Published As

Publication number Publication date
CN109578800B (en) 2020-06-23

Similar Documents

Publication Publication Date Title
CN109595462A (en) Double-seal head oversize super-pressure cylinder liner and its manufacturing method
CN109668051A (en) Large-scale ultrahigh pressure cylinder liner and its manufacturing method
CN109578799A (en) Large-scale High-Pressure storage and transportation cylinder liner and its manufacturing method
CN109578800A (en) Oversize high pressure gas cylinder aluminium alloy inner container and its manufacturing method
CN105605415B (en) Big volume winds the processing technology of high-pressure hydrogen storage entirely
CN109630862B (en) Method for manufacturing inner container of double-sealing-head high-pressure gas cylinder
CN109469817B (en) High-pressure gas cylinder aluminum alloy liner with one end sealed and manufacturing method thereof
CN109630863B (en) Ultrahigh-pressure gas cylinder liner with end sockets at two ends and manufacturing method thereof
CN102489952B (en) Method for manufacturing titanium alloy thick-wall pressure-resistant cylinder body
CN101187441A (en) Method for manufacturing ultrahigh pressure hydrogen cylinder
CN103437913B (en) A kind of carbon fiber composite Metal diaphragm tank and manufacture method thereof
CN112372238A (en) High-pressure ultrahigh-pressure hydrogen storage bottle type container and manufacturing method thereof
CN114183686B (en) Full-winding high-pressure gas cylinder seamless aluminum alloy liner and forming and processing method thereof
CN105921544A (en) Hot-processing production system for titanium and titanium alloy seamless tube, product prepared on basis of system and manufacture method for product
CN109578801A (en) A kind of super-pressure cylinder liner and its manufacturing method
CN106112389A (en) A kind of bimetallic clad steel plate elbow method of manufacturing technology
CN113898869A (en) Ultrahigh-pressure fully-wound gas cylinder with aluminum alloy liner with one end sealed and bottom and manufacturing method thereof
CN113883408A (en) Ultrahigh-pressure fully-wound gas cylinder with aluminum alloy inner container and manufacturing method thereof
CN105140085B (en) A kind of processing technology of glass lamp
CN113432030A (en) Method for manufacturing bottle type container with stainless steel liner and carbon fiber wound completely
CN203594528U (en) Carbon fiber composite metal film storage box
CN105772992A (en) Novel aluminum alloy welding wire preparation method
CN103464459A (en) Method for manufacturing titanium alloy U-shaped material
CN113883407A (en) Large aluminum alloy inner container ultrahigh-pressure fully-wound gas cylinder with one end sealed and manufacturing method thereof
CN113883410A (en) Oversized aluminum alloy inner container high-pressure fully-wound gas cylinder and manufacturing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant