CN109577303A - A kind of mobile formwork system and its working method for Shiplock Culvert - Google Patents

A kind of mobile formwork system and its working method for Shiplock Culvert Download PDF

Info

Publication number
CN109577303A
CN109577303A CN201910072785.6A CN201910072785A CN109577303A CN 109577303 A CN109577303 A CN 109577303A CN 201910072785 A CN201910072785 A CN 201910072785A CN 109577303 A CN109577303 A CN 109577303A
Authority
CN
China
Prior art keywords
die
mobile formwork
flat
formwork system
wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910072785.6A
Other languages
Chinese (zh)
Other versions
CN109577303B (en
Inventor
冯微
***
郭少斌
陈秋声
江闽
白振华
李洪恩
杨威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Original Assignee
Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau filed Critical Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Priority to CN201910072785.6A priority Critical patent/CN109577303B/en
Publication of CN109577303A publication Critical patent/CN109577303A/en
Application granted granted Critical
Publication of CN109577303B publication Critical patent/CN109577303B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C1/00Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C1/00Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
    • E02C1/06Devices for filling or emptying locks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Sewage (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention provides a kind of mobile formwork system for Shiplock Culvert, including a line gallery mobile formwork system and two wires gallery mobile formwork system, wherein the two wires gallery mobile formwork system includes template system, support system, running gear and control system, the template system is assembled by the splicing of left chamfering mould, right chamfering mould, left side flat-die, the right flat-die and middle flat-die, and the left chamfering mould, left side flat-die, middle flat-die, the right flat-die and right chamfering mould successively splice from left to right.Mobile formwork system saves material in the present invention, and construction technology is simple, and form frame system can be utilized repeatedly, is not only facilitated by this method construction, is shortened the construction period, and also a save project cost.It begins to make before gallery bottom slab concreting, compares full hall support frame method and set up simple and only need to install and remove once, form frame system can be used repeatedly, and greatly shorten the duration, save project cost.

Description

A kind of mobile formwork system and its working method for Shiplock Culvert
Technical field
The invention belongs to lock construction engineering fields, and in particular to a kind of mobile formwork system for Shiplock Culvert And its working method.
Background technique
White stone kiln pivot lock engineering includes newly-built second-line shiplock and rebuilds a line ship lock, and second-line shiplock lock wall Main Corridor road is disconnected Face is having a size of 3.5m*4.8m(wide * high), the total 16.8*10*2=336m of 10 section overall length of standard lock chamber section, a line Retaining Wall of Shiplock Main Corridor Road cross dimensions is 3.0m*4.0m(wide * high), 6 section overall length 16.8*6*2=201.6m of standard lock chamber section.
Culvert is the important component of ship lock structure, and since its cross dimensions is larger, quality requirement is high, and construction needs It takes a long time, directly affects ship gateway operation benefit, therefore in the case where guaranteeing quality, construction safety, need to accelerate Culvert construction speed shortens the construction time of major project, realizes ship lock navigation target as early as possible, plays social effect, be The problem of target and concern that we pursue jointly.
Currently, generalling use full hall supporting methods for the construction of Shiplock Culvert, full hall supporting methods refer to ready-made It is gathered and is set up at regular intervals using steel pipe or gate-type frame on gallery bottom plate, be then laid with top plate bed die above, utilizing support The top plate load and construction loads of culvert are born in the supporting role of frame, after after top, concrete reaches design strength requirement, Form removal and support frame.
For white stone kiln pivot lock engineering one, second-line shiplock culvert, need to be purchased largely according to full hall supporting methods Template and the backing materials such as upright bar, cross bar, hound, adjustable jacking, collet and channel steel, and carrying out a group installation and dismantling Need to consume a large amount of artificial, time during removing, recycling rate of waterused is not high, cause engineering cost to improve, construction efficiency compared with It is low, it is difficult to meet construction speed requirement.Meanwhile full hall supports high-formwork construction owned by France, security risk is higher, if control is improper It is just easy to that mould bases cave-in accident occurs.
Summary of the invention
The present invention is to solve the above-mentioned prior art feature existing to Shiplock Culvert construction, is provided a kind of for ship The mobile formwork system and its working method of lock culvert, speed of application is fast, the gallery size after pouring precisely, versatility By force, the number of turnover is high, construction cost is low, security system is high.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of mobile formwork system for Shiplock Culvert System, including a line gallery mobile formwork system and two wires gallery mobile formwork system, wherein the two wires gallery mobile formwork system System includes template system, support system, running gear and control system, and the template system is by left chamfering mould, right chamfering mould, a left side Side flat-die, the right flat-die and the splicing of middle flat-die assemble, the left chamfering mould, left side flat-die, middle flat-die, the right flat-die and the right side Chamfering mould successively splices from left to right;
The support system includes that adjusting block, two lower stringers, multipair bracket component, upper longitudinal beam, crossbeam and at least two are upper vertical The both ends of frame, the lower stringer are fixedly connected with an adjusting block respectively, and the multipair bracket component is along the length side of lower stringer It is arranged to interval, each pair of bracket component is symmetrically disposed on two lower stringers, and the bracket component includes from the bottom up What is be fixedly connected increases block and big column, and the lower end for increasing block is fixedly connected with lower stringer, the upper end for increasing block with The lower end of big column is connected and relative altitude is adjustable, connects between the top of two adjacent bracket components on the same lower stringer One upper longitudinal beam, the horizontal crossbeam in the top of each pair of bracket component, the upper vertical frame are extended longitudinally and are propped up Support is positioned above crossbeam, and the template system is fixedly supported to the top of vertical frame;
The running gear includes two rail and multipair traveling wheel, and the rail parallel laid is on culvert bottom plate, often The lower end of one adjusting block is connected with a pair of of traveling wheel, and the traveling wheel is rolled along rail;
The control system includes hydraulic station, four side hydraulic oil cylinders, four vertical hydraulic cylinder, movable motor and controls Case, four side hydraulic oil cylinders and four vertical hydraulic cylinders control with hydraulic station connect respectively, each tune Connect a vertical hydraulic cylinder above locking nub, four vertical hydraulic cylinders are correspondingly located at left side flat-die and the right flat-die Below end, four side hydraulic oil cylinders are connected correspondingly between the end and big column of left and right chamfering mould, two pairs of institutes It states and is connected with movable motor at traveling wheel, the movable motor and control cabinet control connect.
Wherein, template of the template system of the line gallery mobile formwork system with respect to two wires gallery mobile formwork system System removes middle flat-die, the branch of the support system of the line gallery mobile formwork system with respect to two wires gallery mobile formwork system Frame system, which is removed, increases block.
Preferably, the support system includes three vertical framves disposed in parallel.
Wherein, the two wires gallery mobile formwork system is in being divided into two sections on length direction, then the left chamfering mould used in it, Right chamfering mould, left side flat-die, the right flat-die, middle flat-die and lower stringer are two-part structure.
Further, second-line shiplock lock wall Main Corridor road cross dimensions is 3.5m*4.8m, and 10 section overall length of standard lock chamber section is total The cross dimensions of 16.8*10*2=336m, the two wires gallery mobile formwork system are 3.5m*4.8m, overall length 16.8m, and in length Degree is divided into two sections on direction, and the long * wide of left side flat-die and the right flat-die used in every section is 8.4m*1.1m, and the long * wide of middle flat-die is 8.4m*0.5m;
The structure of the left chamfering mould and right chamfering mould is symmetrical relative to the center line of two wires gallery mobile formwork system, the left side The cross-sectional profiles line of chamfering mould be by outer bevel edge, outer vertical edge, lower horizontal edge, interior vertical edge, interior lower bevel edge and interior upper bevel edge head and the tail according to The secondary blockade line to connect, the outer bevel edge are connected with the junction of interior upper bevel edge with left side flat-die, the long * of the left chamfering mould The outer vertical edge width of the outer wide * of bevel edge is 8.4m*0.56m*0.7m.Left chamfering mould and right chamfering mould are in the size of width direction as a result, 0.4m, the size of short transverse are 1.1 meters.
The present invention also provides a kind of working methods of mobile formwork system for Shiplock Culvert, including a line gallery The working method of mobile formwork system and two wires gallery mobile formwork system, by taking the gallery mobile formwork system of two wires as an example, work Include the following steps: as method
(1) production of two wires gallery mobile formwork system: according to Design of Movable Shuttering Form drawing carry out left chamfering mould, right chamfering mould, Left side flat-die, the right flat-die, middle flat-die, adjusting block, lower stringer, the system for increasing block, big column, upper longitudinal beam, crossbeam and upper vertical frame Make;
(2) installation of two wires gallery mobile formwork system: it is laid with track → running gear installation → support system installation → template System installation → electric hydraulic system installation → debugging, specific steps are as follows:
(2-1) after culvert bottom plate and side wall concrete reach intensity requirement, according to the drawing setting-out of mobile formwork system The center of left and right sides track out, then in top steel rail laying;
(2-2) running gear mainly includes the traveling wheel that two traveling wheels and two pairs are equipped with movable motor, according to drawing walking Wheel, which is hung on the designated position of rail, to be fixed, and the installation of adjusting block is ready for;
The installation corresponding with each pair of traveling wheel of the lower end of (2-3) adjusting block, then successively lift from top to bottom lower stringer, increase block, Big column, upper longitudinal beam, crossbeam, upper vertical frame, and the installation for completing support system is fixed with bolt by drawing;
(2-4) template system is mainly divided to two sections, and every section is by two pieces of 8.4m*1.1m flat-dies, one piece of 8.4m*0.5m flat-die, two pieces 8.4m*0.56m*0.7m chamfering mould composition, first splices on smooth location, is then lifted into support system with loop wheel machine and uses spiral shell Bolt is fixedly connected;
(2-5) hydraulic station is separately connected with vertical hydraulic cylinder, oblique hydraulic cylinder, and movable motor is connect with control cabinet, is completed The installation of electric hydraulic control system;
After (2-6) electric hydraulic control system is installed, is walked using hydraulic station to mobile formwork system, brake, rise The flexible debugging of drop, side form;
(3) it the use of two wires gallery mobile formwork system: after the completion of mobile formwork system debug, can be controlled by hydraulic station perpendicular So that template is raised to designated position to hydraulic cylinder, then uses and adjust screw rod fixation template system, Lai Shixian template system Installation then carries out the construction of concrete process above template system, loosens and adjusts after concrete reaches design strength requirement Screw rod is saved, manipulation hydraulic station shrinks each hydraulic cylinder, achievees the purpose that form removal, and then manipulating hydraulic station makes mobile formwork system System advances to subsequent work face, to carry out subsequent work surface construction.
In the present invention, the working method of a line gallery mobile formwork system and two wires gallery mobile formwork system only need to be Remove middle flat-die when installation template system, remove in mounting bracket system and increase block.
The advantageous effects of the above technical solutions of the present invention are as follows:
Mobile formwork system saves material in the present invention, and construction technology is simple, and form frame system can be utilized repeatedly, passes through this method Construction not only facilitates, and shortens the construction period, and also a save project cost.
1, it begins to make before gallery bottom slab concreting, compares full hall support frame method and set up simple and only need to install and remove Once, form frame system can be used repeatedly, and greatly shorten the duration, save project cost.
2, mobile formwork system is more secured relative to full hall support frame, and does not allow perishable, simple and convenient, the energy of maintenance It is enough accurately to guarantee that gallery pours size.
3, the top plate of 50cm need to only be removed for a line lock corridor, 80cm increases block, mould bases can be utilized repeatedly, It is versatile, save engineering cost.
Detailed description of the invention
Fig. 1 is the main view of two wires gallery mobile formwork system in the present invention;
Fig. 2 is the enlarged drawing of the left view of two wires gallery mobile formwork system in the present invention;
Fig. 3 is the main view of a line gallery mobile formwork system in the present invention;
Fig. 4 is the enlarged drawing of the left view of a line gallery mobile formwork system in the present invention.
Description of symbols:
The left chamfering mould of 100-;The right chamfering mould of 101-;The left side 102- flat-die;Flat-die on the right of 103-;Flat-die in 104-;200- is adjusted Block;Stringer under 201-;203- crossbeam;Frame is indulged on 204-;205- increases block;The big column of 206-;300- rail;301- traveling wheel; 400- hydraulic station;401- side hydraulic oil cylinder;The vertical hydraulic cylinder of 402-;403- movable motor;404- control cabinet.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool Body embodiment is described in detail.
Embodiment 1
As shown in Figure 1 and Figure 2, a kind of two wires gallery mobile formwork system for Shiplock Culvert is present embodiments provided, is wrapped Include template system, support system, running gear and control system, the template system by left chamfering mould 100, right chamfering mould 101, Left side flat-die 102, the right flat-die 103 and middle flat-die 104 splicing assembles, the left chamfering mould 100, left side flat-die 102, in Flat-die 104, the right flat-die 103 and right chamfering mould 101 successively splice from left to right.
The support system includes 200, two lower stringers 201 of adjusting block, multipair bracket component, upper longitudinal beam, 203 and of crossbeam Three upper vertical framves 204, the both ends of the lower stringer 201 are fixedly connected with an adjusting block 200 respectively, the multipair bracket component It is arranged along the length direction interval of lower stringer 201, each pair of bracket component is symmetrically disposed on two lower stringers 201, institute State bracket component include be fixedly connected from the bottom up increase block 205 and big column 206, the lower end for increasing block 205 is under Stringer 201 is fixedly connected, and the upper end for increasing block 205 is connected with the lower end of big column 206 and relative altitude is adjustable, same institute One upper longitudinal beam of connection between the top of two adjacent bracket components on lower stringer 201 is stated (to be not shown in the figure, by left chamfering mould Block), horizontal one of the top of each pair of bracket component crossbeam 203, three upper vertical framves 204 extend longitudinally and Support is positioned at 203 top of crossbeam, and the template system is fixedly supported to the top of vertical frame 204.
The running gear includes two rail 300 and multipair traveling wheel 301, and 300 parallel laid of rail is in water delivery On gallery bottom plate, the lower end of each adjusting block 200 is connected with a pair of of traveling wheel 301, and the traveling wheel 301 is along rail 300 It rolls.
The control system includes the vertical hydraulic cylinder 402 of the side hydraulic oil cylinder 401, four of hydraulic station 400, four, row Walk motor 403 and control cabinet 404, four side hydraulic oil cylinders 401 and four vertical hydraulic cylinders 402 respectively with liquid 400 control of pressure station connects, and a vertical hydraulic cylinder 402, four vertical hydraulic oil are connected above each adjusting block 200 Cylinder 402 is correspondingly located at below the end of left side flat-die 102 and the right flat-die 103, and four side hydraulic oil cylinders 401 are corresponding Ground is connected between the end and big column 206 of left and right chamfering mould, is connected with movable motor at two pairs of traveling wheels 301 403, the movable motor 403 is connected with the control of control cabinet 404.
As shown in Fig. 2, hydraulic station, four side hydraulic oil cylinders, four vertical hydraulic cylinder, movable motor and control cabinets it Between connection relationship are as follows: one side control cabinet is connected with movable motor, and the positive and negative rotation by controlling movable motor controls mould bases System is advanced, is retreated;Another aspect control cabinet is connect with hydraulic station, controls hydraulic station, and hydraulic station controls side hydraulic oil cylinder again With stretching for vertical hydraulic cylinder.Connection, control cabinet between control cabinet and movable motor and connection and liquid between hydraulic station Connection between pressure station and each hydraulic cylinder is routine techniques, does not need especially to repeat, and those skilled in the art are with reference to electrical Control technology data and hydraulic technique data can be attached.
In the present embodiment, second-line shiplock lock wall Main Corridor road cross dimensions is 3.5m*4.8m, and 10 section overall length of standard lock chamber section is total The cross dimensions of 16.8*10*2=336m, the two wires gallery mobile formwork system are 3.5m*4.8m, overall length 16.8m, and in length Degree is divided into two sections on direction, then the left chamfering mould used in it, right chamfering mould, left side flat-die, the right flat-die, middle flat-die and lower stringer It is two-part structure.
The long * wide of left side flat-die used in every section of two wires gallery mobile formwork system and the right flat-die be 8.4m*1.1m, in put down The long * wide of mould is 8.4m*0.5m.
The structure of the left chamfering mould and right chamfering mould is symmetrical relative to the center line of two wires gallery mobile formwork system, institute It is first by outer bevel edge, outer vertical edge, lower horizontal edge, interior vertical edge, interior lower bevel edge and interior upper bevel edge for stating the cross-sectional profiles line of left chamfering mould The blockade line that tail successively connects, the outer bevel edge are connected with the junction of interior upper bevel edge with left side flat-die, the left chamfering mould The outer vertical edge width of the outer wide * of bevel edge of long * be 8.4m*0.56m*0.7m.The ruler of left chamfering mould and right chamfering mould in width direction as a result, Very little is 0.4m, and the size of short transverse is 1.1 meters.
Embodiment 2
In the present invention, the template system of the template system of a line gallery mobile formwork system with respect to two wires gallery mobile formwork system Remove middle flat-die, the support system of a line gallery mobile formwork system is gone with respect to the support system of two wires gallery mobile formwork system Fall to increase block.
As shown in Figure 3, Figure 4, an a kind of line gallery mobile formwork system for Shiplock Culvert, including template system System, support system, running gear and control system, the template system is by left chamfering mould, right chamfering mould, left side flat-die and the right Flat-die splicing assembles, and the left chamfering mould, left side flat-die, the right flat-die and right chamfering mould successively splice from left to right.
The support system includes that adjusting block, two lower stringers, multipair bracket component, upper longitudinal beam, crossbeam and three are upper vertical The both ends of frame, the lower stringer are fixedly connected with an adjusting block respectively, and the multipair bracket component is along the length side of lower stringer It is arranged to interval, each pair of bracket component is symmetrically disposed on two lower stringers, and the bracket component includes big column, institute The lower end for stating big column is fixedly connected with lower stringer, is connected between the top of two adjacent bracket components on the same lower stringer One upper longitudinal beam, the horizontal crossbeam in the top of each pair of bracket component, three upper vertical framves extend longitudinally And support is positioned above crossbeam, the template system is fixedly supported to the top of vertical frame;
The running gear includes two rail and multipair traveling wheel, and the rail parallel laid is on culvert bottom plate, often The lower end of one adjusting block is connected with a pair of of traveling wheel, and the traveling wheel is rolled along rail;
The control system includes hydraulic station, four side hydraulic oil cylinders, four vertical hydraulic cylinder, movable motor and controls Case, four side hydraulic oil cylinders and four vertical hydraulic cylinders control with hydraulic station connect respectively, each tune Connect a vertical hydraulic cylinder above locking nub, four vertical hydraulic cylinders are correspondingly located at left side flat-die and the right flat-die Below end, four side hydraulic oil cylinders are connected correspondingly between the end and big column of left and right chamfering mould, two pairs of institutes It states and is connected with movable motor at traveling wheel, the movable motor and control cabinet control connect.
In the present embodiment, a line Retaining Wall of Shiplock Main Corridor road cross dimensions is 3.0m*4.8m, and 10 section overall length of standard lock chamber section is total The cross dimensions of 16.8*10*2=336m, the line gallery mobile formwork system are 3.0m*4.8m, overall length 16.8m, and in length Degree is divided into two sections on direction, then the left chamfering mould used in it, right chamfering mould, left side flat-die, the right flat-die and lower stringer are two Segmentation structure.
The long * wide of left side flat-die used in every section of line gallery mobile formwork system and the right flat-die is 8.4m*1.1m.
The structure of the left chamfering mould and right chamfering mould is symmetrical relative to the center line of two wires gallery mobile formwork system, institute It is first by outer bevel edge, outer vertical edge, lower horizontal edge, interior vertical edge, interior lower bevel edge and interior upper bevel edge for stating the cross-sectional profiles line of left chamfering mould The blockade line that tail successively connects, the outer bevel edge are connected with the junction of interior upper bevel edge with left side flat-die, the left chamfering mould The outer vertical edge width of the outer wide * of bevel edge of long * be 8.4m*0.56m*0.7m.The ruler of left chamfering mould and right chamfering mould in width direction as a result, Very little is 0.4m, and the size of short transverse is 1.1 meters.
Embodiment 3
The present invention also provides a kind of working method of mobile formwork system for Shiplock Culvert, including a line gallery are mobile The working method of form frame system and two wires gallery mobile formwork system, by taking the gallery mobile formwork system of two wires as an example, work side Method includes the following steps:
(1) production of two wires gallery mobile formwork system: according to the Design of Movable Shuttering Form figure of white stone kiln pivot lock culvert Paper carry out left chamfering mould, right chamfering mould, left side flat-die, the right flat-die, middle flat-die, adjusting block, lower stringer, increase block, big column, The production of upper longitudinal beam, crossbeam and upper vertical frame;
(2) installation of two wires gallery mobile formwork system: it is laid with track → running gear installation → support system installation → template System installation → electric hydraulic system installation → debugging, specific steps are as follows:
(2-1) after culvert bottom plate and side wall concrete reach intensity requirement, according to the drawing setting-out of mobile formwork system The center of left and right sides track out, then in top steel rail laying;
(2-2) running gear mainly includes the traveling wheel that two traveling wheels and two pairs are equipped with movable motor, only need to be according to drawing handle Traveling wheel is hung on the designated position of rail and fixes, and is ready for the installation of adjusting block;
The installation corresponding with each pair of traveling wheel of the lower end of (2-3) adjusting block, then successively lift from top to bottom lower stringer, increase block, Big column, upper longitudinal beam, crossbeam, upper vertical frame, and the installation for completing support system is fixed with bolt by drawing;
(2-4) template system is mainly divided to two sections, and every section is by two pieces of 8.4m*1.1m flat-dies, one piece of 8.4m*0.5m flat-die, two pieces 8.4m*0.56m*0.7m chamfering mould composition, first splices on smooth location, is then lifted into support system with loop wheel machine and uses spiral shell Bolt is fixedly connected;
(2-5) hydraulic station is separately connected with vertical hydraulic cylinder, oblique hydraulic cylinder, and movable motor is connect with control cabinet, is completed The installation of electric hydraulic control system;
After (2-6) electric hydraulic control system is installed, is walked using hydraulic station to mobile formwork system, brake, rise The flexible debugging of drop, side form;
(3) it the use of two wires gallery mobile formwork system: after the completion of mobile formwork system debug, can be controlled by hydraulic station perpendicular Template is set to be raised to designated position to hydraulic cylinder, then with the adjusting screw rod fixation template system being horizontally placed between bracket component System, the installation of Lai Shixian template system then carry out the construction of concrete process above template system, reach to concrete and set Adjusting screw rod is loosened after counting intensity requirement, manipulation hydraulic station shrinks each hydraulic cylinder, achievees the purpose that form removal, then manipulate Hydraulic station makes mobile formwork system advance to subsequent work face, to carry out subsequent work surface construction.
The working method of one line gallery mobile formwork system is compared with the working method of two wires gallery mobile formwork system, only Flat-die in need to removing in installation template system, removes in mounting bracket system and increases block.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of mobile formwork system for Shiplock Culvert, which is characterized in that including a line gallery mobile formwork system With two wires gallery mobile formwork system, wherein the two wires gallery mobile formwork system includes template system, support system, walking System and control system, the template system are spliced by left chamfering mould, right chamfering mould, left side flat-die, the right flat-die and middle flat-die Assemble, the left chamfering mould, left side flat-die, middle flat-die, the right flat-die and right chamfering mould successively splice from left to right;
The support system includes that adjusting block, two lower stringers, multipair bracket component, upper longitudinal beam, crossbeam and at least two are upper vertical The both ends of frame, the lower stringer are fixedly connected with an adjusting block respectively, and the multipair bracket component is along the length side of lower stringer It is arranged to interval, each pair of bracket component is symmetrically disposed on two lower stringers, and the bracket component includes from the bottom up What is be fixedly connected increases block and big column, and the lower end for increasing block is fixedly connected with lower stringer, the upper end for increasing block with The lower end of big column is connected and relative altitude is adjustable, connects between the top of two adjacent bracket components on the same lower stringer One upper longitudinal beam, the horizontal crossbeam in the top of each pair of bracket component, the upper vertical frame are extended longitudinally and are propped up Support is positioned above crossbeam, and the template system is fixedly supported to the top of vertical frame;
The running gear includes two rail and multipair traveling wheel, and the rail parallel laid is on culvert bottom plate, often The lower end of one adjusting block is connected with a pair of of traveling wheel, and the traveling wheel is rolled along rail;
The control system includes hydraulic station, four side hydraulic oil cylinders, four vertical hydraulic cylinder, movable motor and controls Case, four side hydraulic oil cylinders and four vertical hydraulic cylinders control with hydraulic station connect respectively, each tune Connect a vertical hydraulic cylinder above locking nub, four vertical hydraulic cylinders are correspondingly located at left side flat-die and the right flat-die Below end, four side hydraulic oil cylinders are connected correspondingly between the end and big column of left and right chamfering mould, two pairs of institutes It states and is connected with movable motor at traveling wheel, the movable motor and control cabinet control connect.
2. the mobile formwork system according to claim 1 for Shiplock Culvert, which is characterized in that line corridor The template system of road mobile formwork system removes middle flat-die, a line with respect to the template system of two wires gallery mobile formwork system The support system of gallery mobile formwork system is removed with respect to the support system of two wires gallery mobile formwork system and increases block.
3. the mobile formwork system according to claim 1 for Shiplock Culvert, which is characterized in that the carriage support System includes three vertical framves disposed in parallel.
4. the mobile formwork system according to claim 1 for Shiplock Culvert, which is characterized in that the two wires corridor Road mobile formwork system is in being divided into two sections on length direction, then the left chamfering mould used in it, right chamfering mould, left side flat-die, the right Flat-die, middle flat-die and lower stringer are two-part structure.
5. the mobile formwork system according to claim 1 or 4 for Shiplock Culvert, which is characterized in that two wires ship Lock lock wall Main Corridor road cross dimensions is 3.5m*4.8m, the standard lock chamber section total 16.8*10*2=336m of 10 section overall length, the two wires corridor The cross dimensions of road mobile formwork system is 3.5m*4.8m, overall length 16.8m, and in being divided into two sections, used in every section on length direction The long * wide of left side flat-die and the right flat-die is 8.4m*1.1m, and the long * wide of middle flat-die is 8.4m*0.5m;
The structure of the left chamfering mould and right chamfering mould is symmetrical relative to the center line of two wires gallery mobile formwork system, the left side The cross-sectional profiles line of chamfering mould be by outer bevel edge, outer vertical edge, lower horizontal edge, interior vertical edge, interior lower bevel edge and interior upper bevel edge head and the tail according to The secondary blockade line to connect, the outer bevel edge are connected with the junction of interior upper bevel edge with left side flat-die, the long * of the left chamfering mould The outer vertical edge width of the outer wide * of bevel edge is 8.4m*0.56m*0.7m.
6. the working method described in a kind of any one of claim 1 ~ 5 for the mobile formwork system of Shiplock Culvert, It is characterised in that it includes the working method of a line gallery mobile formwork system and two wires gallery mobile formwork system, with two wires corridor For road mobile formwork system, working method includes the following steps:
(1) production of two wires gallery mobile formwork system: according to Design of Movable Shuttering Form drawing carry out left chamfering mould, right chamfering mould, Left side flat-die, the right flat-die, middle flat-die, adjusting block, lower stringer, the system for increasing block, big column, upper longitudinal beam, crossbeam and upper vertical frame Make;
(2) installation of two wires gallery mobile formwork system: it is laid with track → running gear installation → support system installation → template System installation → electric hydraulic system installation → debugging, specific steps are as follows:
(2-1) after culvert bottom plate and side wall concrete reach intensity requirement, according to the drawing setting-out of mobile formwork system The center of left and right sides track out, then in top steel rail laying;
(2-2) running gear mainly includes the traveling wheel that two traveling wheels and two pairs are equipped with movable motor, according to drawing walking Wheel, which is hung on the designated position of rail, to be fixed, and the installation of adjusting block is ready for;
The installation corresponding with each pair of traveling wheel of the lower end of (2-3) adjusting block, then successively lift from top to bottom lower stringer, increase block, Big column, upper longitudinal beam, crossbeam, upper vertical frame, and the installation for completing support system is fixed with bolt by drawing;
(2-4) template system is mainly divided to two sections, and every section is by two pieces of 8.4m*1.1m flat-dies, one piece of 8.4m*0.5m flat-die, two pieces 8.4m*0.56m*0.7m chamfering mould composition, first splices on smooth location, is then lifted into support system with loop wheel machine and uses spiral shell Bolt is fixedly connected;
(2-5) hydraulic station is separately connected with vertical hydraulic cylinder, oblique hydraulic cylinder, and movable motor is connect with control cabinet, is completed The installation of electric hydraulic control system;
After (2-6) electric hydraulic control system is installed, is walked using hydraulic station to mobile formwork system, brake, rise The flexible debugging of drop, side form;
(3) it the use of two wires gallery mobile formwork system: after the completion of mobile formwork system debug, can be controlled by hydraulic station perpendicular So that template is raised to designated position to hydraulic cylinder, then uses and adjust screw rod fixation template system, Lai Shixian template system Installation then carries out the construction of concrete process above template system, loosens and adjusts after concrete reaches design strength requirement Screw rod is saved, manipulation hydraulic station shrinks each hydraulic cylinder, achievees the purpose that form removal, and then manipulating hydraulic station makes mobile formwork system System advances to subsequent work face, to carry out subsequent work surface construction.
CN201910072785.6A 2019-01-25 2019-01-25 Movable formwork system for ship lock water delivery gallery and working method thereof Active CN109577303B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910072785.6A CN109577303B (en) 2019-01-25 2019-01-25 Movable formwork system for ship lock water delivery gallery and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910072785.6A CN109577303B (en) 2019-01-25 2019-01-25 Movable formwork system for ship lock water delivery gallery and working method thereof

Publications (2)

Publication Number Publication Date
CN109577303A true CN109577303A (en) 2019-04-05
CN109577303B CN109577303B (en) 2024-01-02

Family

ID=65918008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910072785.6A Active CN109577303B (en) 2019-01-25 2019-01-25 Movable formwork system for ship lock water delivery gallery and working method thereof

Country Status (1)

Country Link
CN (1) CN109577303B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110076889A (en) * 2019-05-31 2019-08-02 中交武汉港湾工程设计研究院有限公司 A kind of integral prefabricated immersed tube template system of dry-docking sequential method tunneling boring
CN112647505A (en) * 2020-12-28 2021-04-13 合肥工业大学 Corridor safety construction equipment and system
CN115263365A (en) * 2022-08-04 2022-11-01 广东省水利水电第三工程局有限公司 Flexible combination mode of intelligent trolley suitable for box culvert structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906758A (en) * 2017-04-27 2017-06-30 中交二公局东萌工程有限公司 A kind of culvert fluid pressure type entire combination moving die plate
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN108442405A (en) * 2018-04-11 2018-08-24 中建三局第二建设工程有限责任公司 A kind of piping lane support construction based on Urban Underground pipe gallery
DE102017107059A1 (en) * 2017-04-03 2018-10-04 Ludwig Koehne Rail grinding apparatus
CN208380589U (en) * 2018-06-26 2019-01-15 中铁十一局集团城市轨道工程有限公司 The rail formwork jumbo system that road is constructed against the wind can be carried out simultaneously in the shield-tunneling construction stage
CN209703467U (en) * 2019-01-25 2019-11-29 广东省水利水电第三工程局有限公司 A kind of mobile formwork system for Shiplock Culvert

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017107059A1 (en) * 2017-04-03 2018-10-04 Ludwig Koehne Rail grinding apparatus
CN106906758A (en) * 2017-04-27 2017-06-30 中交二公局东萌工程有限公司 A kind of culvert fluid pressure type entire combination moving die plate
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN108442405A (en) * 2018-04-11 2018-08-24 中建三局第二建设工程有限责任公司 A kind of piping lane support construction based on Urban Underground pipe gallery
CN208380589U (en) * 2018-06-26 2019-01-15 中铁十一局集团城市轨道工程有限公司 The rail formwork jumbo system that road is constructed against the wind can be carried out simultaneously in the shield-tunneling construction stage
CN209703467U (en) * 2019-01-25 2019-11-29 广东省水利水电第三工程局有限公司 A kind of mobile formwork system for Shiplock Culvert

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110076889A (en) * 2019-05-31 2019-08-02 中交武汉港湾工程设计研究院有限公司 A kind of integral prefabricated immersed tube template system of dry-docking sequential method tunneling boring
CN110076889B (en) * 2019-05-31 2024-03-22 中交武汉港湾工程设计研究院有限公司 Full-section integral prefabricated immersed tube template system adopting dry dock sequential method
CN112647505A (en) * 2020-12-28 2021-04-13 合肥工业大学 Corridor safety construction equipment and system
CN115263365A (en) * 2022-08-04 2022-11-01 广东省水利水电第三工程局有限公司 Flexible combination mode of intelligent trolley suitable for box culvert structure
CN115263365B (en) * 2022-08-04 2023-09-29 广东省水利水电第三工程局有限公司 Flexible combination mode of intelligent trolley suitable for box culvert structure

Also Published As

Publication number Publication date
CN109577303B (en) 2024-01-02

Similar Documents

Publication Publication Date Title
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN109577303A (en) A kind of mobile formwork system and its working method for Shiplock Culvert
CN102146799B (en) Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN113235472A (en) Concrete placement platform truck is contained to apron
CN210766266U (en) Highway construction is with floating device
CN107060823B (en) Non-dismantling trolley for tunnel anchor section secondary lining concrete construction
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN104695335B (en) Upstroke movable framework steel bar overall binding lifting construction engineering method and constructing device
CN112359779B (en) Inclined concrete turnover construction integrated device and construction process thereof
CN209703467U (en) A kind of mobile formwork system for Shiplock Culvert
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN205936645U (en) A full liquid die plate system for culvert is pour
CN214993219U (en) Concrete placement platform truck is contained to apron
CN202017493U (en) Construction equipment for inverted arch of high-speed railway double-track tunnel
CN103419279A (en) Overall dismantling and longitudinal slipping construction method of T beam formwork
CN104948203A (en) Integral construction method for inclined-shaft tunnel linings and asymmetric mid-wall linings
CN210151779U (en) Municipal administration utility tunnel hydraulic template platform truck
CN108005684B (en) Separated steel mould trolley and construction method thereof
CN107060831A (en) One kind is used for tunnel groove constructing device
CN208594572U (en) Single layer double cabin pipe galleries in underground are hydraulic from walking formwork jumbo
CN113882286B (en) Bridge dismantling and building integrated machine, crossing method thereof, bridge dismantling method and newly-built method
CN217151958U (en) Tunnel center ditch pouring trolley
CN217327341U (en) Self-propelled long-span variable cross-section hydraulic formwork trolley
CN215594110U (en) Formula of walking piping lane lining cutting system
CN210637087U (en) Inner and outer mould trolley lining system for open-cut underground canal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant