CN109577170A - A kind of concrete pier of steel tube - Google Patents

A kind of concrete pier of steel tube Download PDF

Info

Publication number
CN109577170A
CN109577170A CN201810553264.8A CN201810553264A CN109577170A CN 109577170 A CN109577170 A CN 109577170A CN 201810553264 A CN201810553264 A CN 201810553264A CN 109577170 A CN109577170 A CN 109577170A
Authority
CN
China
Prior art keywords
steel pipe
steel
inner core
concrete
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810553264.8A
Other languages
Chinese (zh)
Other versions
CN109577170B (en
Inventor
孙伟
李卉
李海锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaqiao University
Original Assignee
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaqiao University filed Critical Huaqiao University
Priority to CN201810553264.8A priority Critical patent/CN109577170B/en
Publication of CN109577170A publication Critical patent/CN109577170A/en
Application granted granted Critical
Publication of CN109577170B publication Critical patent/CN109577170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of concrete pier of steel tube, including crossbeam, pier stud and binder, the binder includes binder main body and binder energy consuming components, the binder main body include the first steel pipe, the first hose inner core, the first concrete and the first connecting plate, the binder energy consuming components include the second steel pipe, the second mild steel inner core, the first PVP film, the second concrete and the second connecting plate, are bolted to connection between second connecting plate and corresponding first connecting plate.By the way that binder is arranged, the strength and stiffness of bridge twin shaft pier direction across bridge are improved, under geological process, binder is surrendered prior to bridge pier, and formation plastic hinge and the seismic energy that dissipates have delayed the damage and failure process of bridge pier, anti-seismic performance is relatively preferable;Simultaneously because each connecting plate is achieved a fixed connection by bolt, energy consuming components can be replaced after shake rapidly, realizes and quickly repairs.

Description

A kind of concrete pier of steel tube
Technical field
The present invention relates to a kind of bridge pier structure, especially a kind of concrete pier of steel tube.
Background technique
Domestic and international many times earthquake all shows bridge structure as the important component in transportation lifeline, after calamity First aid and restoration and reconstruction are significant.But traditional bridge pier mostly uses reinforced concrete structure form, and reinforced concrete bridge Pier is from great, ductility is poor, and difficulty of construction is big, long construction period, and reparation difficulty is big, at high cost, at home and abroad under all previous macroseism It destroys serious and is difficult to quickly repair, cause extreme difficulties and huge indirect loss to rescue and relief work after shake, therefore, realize The restorability of bridge has great researching value.
With the fast development in contemporary Chinese city, interchange and overpass are more and more, concrete pier of steel tube Application it is also more and more extensive.Steel structure bridge has many advantages, such as from heavy and light, bearing capacity is high, anti-seismic performance is good.It is easy to factory Change manufacture, prefabricated construction, the construction period can be shortened, improves field operation condition;Obtain working security and quality effectively Control, and minimize the influence constructed to urban ecological environment and traffic.But existing concrete pier of steel tube form Failure by shear and extremely low cycle fatigue crack easily occur under actual seismic, reparation or very long and serious because of repair time is difficult after shake Emergency and normal use after influencing the disaster relief and shake.
In view of this, the applicant conducts in-depth research the structure of concrete pier of steel tube, there is this case generation then.
Summary of the invention
The purpose of the present invention is to provide the concrete filled steel tubes that a kind of anti-seismic performance preferably and after shake can be repaired quickly relatively Bridge pier.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of concrete pier of steel tube, including crossbeam, two or more are located at the below the crossbeam and are used to support the crossbeam Pier stud and the binder that is connected between the two neighboring pier stud, the binder include horizontally disposed binder main body and point It is not fixedly connected on the binder energy consuming components at binder main body both ends, the binder main body includes the first steel pipe, is interspersed in institute State the first hose inner core in the first steel pipe, the first coagulation being filled between first steel pipe and the first mild steel inner core Soil and the first connecting plate for being welded on the first mild steel inner core both ends, the binder energy consuming components include the second steel pipe, wear The second mild steel inner core for being inserted in second steel pipe, is filled out the first PVP film being covered on the second mild steel inner core side surface The second concrete for filling between second steel pipe and the first PVP film and it is welded on described second mild steel inner core one end The second connecting plate, the one end of the second mild steel inner core far from second connecting plate is pierced by and fixes from second steel pipe It is connected on the corresponding pier stud, the company of being bolted between second connecting plate and corresponding first connecting plate It connects.
As an improvement of the present invention, the second mild steel inner core is provided with from the position that second steel pipe is pierced by Multiple ribs arranged in length and breadth.
As an improvement of the present invention, the pier stud includes the pier stud main body arranged vertically, is fixedly connected on the pier The pier stud energy consuming components of column lower body and the suspension column for being fixedly connected on pier stud energy consuming components lower end, the pier stud main body packet It includes third steel pipe, the third mild steel inner core that is interspersed in the third steel pipe, be filled in the third mild steel inner core and described Third concrete between three steel pipes and the third connecting plate for being welded on the third mild steel inner core lower end, the pier stud energy consumption Component includes the 4th steel pipe, the 4th mild steel inner core being interspersed in the 4th steel pipe, is covered on the 4th mild steel inner core side It the 2nd PVP film on surface, the 4th concrete being filled between the 4th steel pipe and the 2nd PVP film and is welded on 4th connecting plate at the 4th mild steel inner core both ends, between the 4th connecting plate and the third connecting plate or the suspension column It is bolted to connection.
As an improvement of the present invention, first steel pipe, second steel pipe, the third steel pipe and the described 4th Steel pipe is all rectangular steel tube, the first mild steel inner core, the second mild steel inner core, the third mild steel inner core and the described 4th Mild steel inner core is all H-shaped mild steel.
As an improvement of the present invention, the height of the pier stud energy consuming components is the width of the cross section of the pier stud main body 1-1.2 times of degree.
As an improvement of the present invention, first steel pipe, second steel pipe, the third steel pipe and the described 4th The wall thickness of steel pipe is identical, and first steel pipe is identical with the area of the cross section of second steel pipe, the third steel pipe and institute The area for stating the cross section of the 4th steel pipe is identical, and the area of the cross section of first steel pipe is the cross section of the third steel pipe 0.8 times of area.
As an improvement of the present invention, second concrete and the 4th concrete are ductility concrete.
Using the above scheme, the invention has the following advantages:
1, the strength and stiffness of bridge twin shaft pier direction across bridge are improved by setting binder, under geological process, binder prior to Bridge pier is surrendered, and is formed plastic hinge and the seismic energy that dissipates, has been delayed the damage and failure process of bridge pier, anti-seismic performance is relatively It is good;Simultaneously because each connecting plate is achieved a fixed connection by bolt, energy consuming components can be replaced after shake rapidly, realizes and quickly repairs.
2, each component part of binder and pier stud can only need to lift in processing and fabricating, scene in factory, can also be with Outer wall of steel pipe is template cast in situs, and the construction period is short, quick construction, the road after can also greatly speeding up earthquake and burst accident Repair speed in road.
3, each component part of binder and pier stud can realize design standard, manufacturing works, construction assembling, avoid Raw material manufacture and the environmental pollution of construction site improve speed of application, alleviate urban traffic blocking.
Figure of description
Fig. 1 is the structural schematic diagram of concrete pier of steel tube of the present invention, omits ribs in figure;
Fig. 2 is the schematic cross-section of the position A-A in Fig. 1;
Fig. 3 is the schematic cross-section of the position B-B in Fig. 1, omits bolt in figure;
Fig. 4 is the arragement construction signal of ribs in the present invention;
Fig. 5 is that the local arragement construction at another visual angle of ribs of the present invention is illustrated.
It is as follows that correspondence is indicated in figure:
100- crossbeam;200- pier stud;
210- pier stud main body;211- third steel pipe;
212- third mild steel inner core;213- third concrete;
214- third connecting plate;220- pier stud energy consuming components;
The 4th steel pipe of 221-;The 4th mild steel inner core of 222-;
The 4th concrete of 224-;The 4th connecting plate of 225-;
230- suspension column;300- binder;
310- binder main body;The first steel pipe of 311-;
312- the first mild steel inner core;The first concrete of 313-;
The first connecting plate of 314-;320- binder energy consuming components;
The second steel pipe of 321-;322- the second mild steel inner core;
The second concrete of 324-;The second connecting plate of 325-;
326- ribs.
Specific embodiment
The present invention is described further in the following with reference to the drawings and specific embodiments.
As Figure 1-Figure 5, concrete pier of steel tube provided in this embodiment, including crossbeam 100, two or more are located at cross The binder 300 for being used to support the pier stud 200 of crossbeam 100 below beam 100 and being connected between two neighboring pier stud 200, wherein The quantity of pier stud 200 can be configured according to actual needs, be said there are two for by pier stud 200 in the present embodiment It is bright.
Binder 300 includes horizontally disposed binder main body 310 and is respectively fixedly connected with the binder at 310 both ends of binder main body Energy consuming components 320, i.e., there are two binder energy consuming components 320.Binder main body 310 includes the first steel pipe 311, is interspersed in the first steel pipe The first hose inner core 312 in 311, the first concrete 313 being filled between the first steel pipe 311 and the first mild steel inner core 312 And being welded on first connecting plate 314 at 312 both ends of the first mild steel inner core, i.e. there are two the first connecting plates 314, two first companies Fishplate bar 314 is supported simultaneously on the first steel pipe 311, and certain two the first connecting plates 314 can also be welded to connect with the first steel pipe 311 Or be bolted by high strength friction type, the connection structure between each connecting plate and corresponding steel pipe that will hereafter refer to Connection structure between first connecting plate 314 and the first steel pipe 311 is identical, will not be repeated again.Preferably, the first connecting plate 314 And the periphery for each connecting plate that will hereafter refer to is both provided with anchor hole, convenient for being connected with corresponding steel pipe.First steel pipe 311 and each steel pipe that will hereafter refer to all be common steel tube, yield strength is higher than the first mild steel inner core 312 and hereafter Each mild steel inner core that will be referred to, i.e., in the present embodiment, the yield strength of each steel pipe are higher than the yield strength of each mild steel inner core, It can prevent from destroying the position transfer from the position of energy consuming components to main body when earthquake in this way.First concrete 313 is conventional Concrete used in concrete pier of steel tube fills up the inner cavity of the first steel pipe 311, it should be noted that hereinafter mention And each concrete also all fill up the inner cavity of corresponding steel pipe.
Binder energy consuming components 320 include the second steel pipe 321, be interspersed in the second steel pipe 321 the second mild steel inner core 322, The first PVP film (not shown) that is covered on 322 side surface of the second mild steel inner core is filled in the second steel pipe 321 and first It the second concrete 324 between PVP film and is welded on the second mild steel inner core 322 and connects towards the second of 310 one end of binder main body Fishplate bar 325, wherein the effect for covering the first PVP film on 322 side surface of the second mild steel inner core is to eliminate in the second mild steel Cohering between core 322 and the second concrete 324.The one end of second mild steel inner core 322 far from the second connecting plate 325 is from the second steel Pipe 321 is pierced by and is fixedly connected on corresponding pier stud 200, therefore, is wearing with the second mild steel inner core 322 from the second steel pipe 321 Without the presence of the second concrete 324 at position out, certain position can not also cover the first PVP film, i.e. the second mild steel Inner core 322 is exposed outside from the position that the second steel pipe 321 is pierced by.Preferably, in order to prevent the second mild steel inner core 322 from the second steel There is buckling phenomenon in the position that pipe 321 is pierced by, in the second mild steel inner core 322 from the portion that the second steel pipe 321 is pierced by the present embodiment Multiple ribs 326 arranged in length and breadth are provided on position.Pass through between second connecting plate 325 and corresponding first connecting plate 314 Bolt is fixedly connected, and the bolt and each bolt that will hereafter refer to all are the high intensity that can directly buy acquisition from the market Friction-type bolt, this kind of bolt generally includes stud, spiral is connected to two nuts on the stud and with nut cooperation Gasket helps to prevent bolt looseness in long-term use process.In addition, the second concrete 324 is preferably ductility concrete, become Shape ability is also bigger than concrete used in conventional concrete pier of steel tube.
The presence of binder 300 constitutes the first line of defence of concrete pier of steel tube antidetonation, it helps it is mixed to improve steel pipe The transverse strength and rigidity of solidifying soil bridge pier.When an earthquake occurs, binder 300 is destroyed prior to pier column 200, passes through its both ends 320 earthquake energy of binder energy consuming components, delay the damage and failure process of pier stud 200.Binder energy consuming components 320 damage simultaneously Quick-replaceable can be realized by demounting bolt after consumption, restore the shock resistance of binder 300.Further, since the first PVP film is deposited , when binder energy consuming components 320 bear pulling force, the elongation of the second mild steel inner core 322 is simultaneously slided with the second concrete 324 relatively, It will not cause to be located at 324 drawing crack of the second concrete inside the second steel pipe 321, when binder energy consuming components 320 bear pressure, the Two mild steel inner cores 322 can bear jointly pressure with the second concrete 324.
Pier stud 200 includes the pier stud main body 210 arranged vertically, the pier stud energy consumption for being fixedly connected on 210 lower end of pier stud main body Component 220 and the suspension column 230 for being fixedly connected on 220 lower end of pier stud energy consuming components, the wherein structure of suspension column 230 and conventional steel pipe Concrete pier is identical, not the emphasis of the present embodiment, and and will not be described here in detail.Pier stud main body 210 includes third steel pipe 211, wears The third mild steel inner core 212 that is inserted in third steel pipe 211, be filled between third mild steel inner core 212 and third steel pipe 211 Three concrete 213 and the third connecting plate 214 for being welded on 212 lower end of third mild steel inner core, wherein third concrete 213 be also Concrete used in conventional concrete pier of steel tube, the difference from the first concrete 313 is only that dosage is different.This Outside, the second mild steel inner core 322 is welded on third steel pipe 211 far from one end of the second connecting plate 325.
Pier stud energy consuming components 220 include the 4th steel pipe 221, be interspersed in the 4th steel pipe 221 the 4th mild steel inner core 222, The 2nd PVP film (not shown) that is covered on 222 side surface of the 4th mild steel inner core is filled in the 4th steel pipe 221 and second The 4th concrete 224 between PVP film and the 4th connecting plate 225 for being welded on 222 both ends of the 4th mild steel inner core, i.e., the 4th connects There are two fishplate bars 225.The effect of 2nd PVP film is identical as the effect of the first PVP film, and and will not be described here in detail.4th connecting plate 225 It is bolted to connection between third connecting plate 214 or suspension column 230, specifically, two the 4th connecting plates 225 are respectively with Three connecting plates 214 are fixedly connected with suspension column 230 by high strength friction type bolt mentioned above one-to-one correspondence.In addition, the 4th Concrete 224 is also preferably ductility concrete, and the difference from the second concrete 324 is only that dosage is different.
The presence of pier stud energy consuming components 220 constitutes the first line of defence of concrete pier of steel tube antidetonation, once binder consumes Can component 320 lose energy-dissipating property, can be by the 4th mild steel inner core 222 and 224 earthquake energy of the 4th concrete, while pier Column energy consuming components 220 can realize quick-replaceable by demounting bolt after being lost, and restore the shock resistance of pier stud energy consuming components 220.
Preferably, the first steel pipe 311, the second steel pipe 321, third steel pipe 211 and the 4th steel pipe 221 are all rectangular steel tube, And first steel pipe 311, the second steel pipe 321, third steel pipe 211 are identical with the wall thickness of the 4th steel pipe 221.First steel pipe 311 and The length of the cross section of two steel pipes 321 is identical with area, the face of the length and cross section of third steel pipe 211 and the 4th steel pipe 222 Product is identical, and the area of the cross section of the first steel pipe 311 is 0.8 times of the area of the cross section of third steel pipe 211.In addition, the The intensity of one steel pipe 311 and third steel pipe 211 is preferably higher than the intensity of the second steel pipe 321 and the 4th steel pipe 221, to improve correspondence Main body bearing capacity, protection destroy take the lead in occurring at the position where energy consuming components.It should be noted that in the present embodiment In, the cross section of each component is the section vertical with the length direction of corresponding component.
Preferably, the height of pier stud energy consuming components 220 is 1-1.2 times of the width of the cross section of pier stud main body 210.This Outside, in the present embodiment, the first mild steel inner core 312, the second mild steel inner core 322, third mild steel inner core 212 and the 4th mild steel inner core 22 be all H-shaped mild steel, i.e., the cross section of each mild steel inner core 312 is all H-shaped.H-shaped mild steel has apparent omen before being destroyed, Such as there is biggish deformation (i.e. plastic failure), the H-shaped mild steel being embedded in corresponding concrete has outside buckling when being pressurized Deformation tendency, but its outside bending deformation is limited by corresponding concrete and steel pipe, greatly improves steel pipe encased concrete bridge The energy dissipation capacity and anti-seismic performance of pier;Simultaneously as the one end of the second mild steel inner core 322 far from the second connecting plate 325 is from second Steel pipe 321 is pierced by, can be by the surrender situation at the position that the second hose inner core 322 of detection is pierced by, and steel pipe is mixed after evaluation shake rapidly The anti-seismic performance of solidifying soil bridge pier.It should be noted that the second mild steel inner core 322 should not mistake from the position that the second steel pipe 321 is pierced by Greatly to prevent its buckling, and the specific setting quantity of multiple ribs 326 arranged in length and breadth is transversal according to binder energy consuming components 320 The length-width ratio in face determines, when the length-width ratio is relatively small, can be arranged or be not provided with ribs 326 less, when the length-width ratio is opposite When larger, it can suitably increase ribs 326.
Pier stud 200 with the production method of binder 300 be it is similar, be illustrated by taking pier stud 200 as an example in the present embodiment, Its production method the following steps are included:
S1 determines the size of pier stud energy consuming components 220, in the present embodiment according to the bridge pier size actually built first The height of middle pier stud energy consuming components 220 takes 1.2 times of the cross-sectional width of rectangular pier stud 200.
S2, for pier stud energy consuming components 220, the height according to outer wall square steel tube determines the casting position of ductility concrete, Ductility concreting at height identical as outer wall square steel tube, wherein outer wall square steel tube can be used as template and pour.
The bottom of H-shaped mild steel inner core before casting concrete, need to be welded on corresponding connection for pier stud main body 210 by S3 On plate, and one layer of PVP film or release agent are applied on the surface of H-shaped mild steel inner core, to eliminate H-shaped mild steel inner core and concrete Between cohere.
S4, H mild steel inner core will have more the scheduled height of outer wall square steel tube, and H-shaped mild steel inner core is higher by the portion of outer wall square steel tube Divide and is directly welded with corresponding connecting plate.
The various pieces of pier stud 200 after pouring molding, are fixed together by S5 using high strength friction type bolt.
The present invention is described in detail above in conjunction with attached drawing, but embodiments of the present invention be not limited in it is above-mentioned Embodiment, those skilled in the art can make various modifications according to the prior art to the present invention, such as become above-mentioned H-shaped mild steel More cross mild steel etc., these are all within the scope of protection of the present invention.

Claims (7)

1. a kind of concrete pier of steel tube is located at the below the crossbeam including crossbeam, two or more and is used to support the crossbeam Pier stud and the binder being connected between the two neighboring pier stud, which is characterized in that the binder includes horizontally disposed system Beam body includes the first steel with the binder energy consuming components at binder main body both ends, the binder main body is respectively fixedly connected with The first hose inner core for manage, being interspersed in first steel pipe, be filled in first steel pipe and the first mild steel inner core it Between the first concrete and be welded on first connecting plate at the first mild steel inner core both ends, the binder energy consuming components include Second steel pipe, is covered on the second mild steel inner core side surface the second mild steel inner core being interspersed in second steel pipe First PVP film, the second concrete being filled between second steel pipe and the first PVP film and it is welded on described second Second connecting plate of mild steel inner core one end, the one end of the second mild steel inner core far from second connecting plate is from second steel Pipe is pierced by and is fixedly connected on the corresponding pier stud, leads between second connecting plate and corresponding first connecting plate Bolt is crossed to be fixedly connected.
2. concrete pier of steel tube as described in claim 1, which is characterized in that the second mild steel inner core is from second steel Multiple ribs arranged in length and breadth are provided on the position that pipe is pierced by.
3. concrete pier of steel tube as claimed in claim 1 or 2, which is characterized in that the pier stud includes the pier arranged vertically It column main body, the pier stud energy consuming components for being fixedly connected on the pier stud lower body and is fixedly connected under the pier stud energy consuming components The suspension column at end, the pier stud main body include third steel pipe, the third mild steel inner core being interspersed in the third steel pipe, are filled in institute It states the third concrete between third mild steel inner core and the third steel pipe and is welded on the third mild steel inner core lower end Third connecting plate, the pier stud energy consuming components include the 4th steel pipe, the 4th mild steel inner core being interspersed in the 4th steel pipe, cover The 2nd PVP film that covers on the 4th mild steel inner core side surface is filled between the 4th steel pipe and the 2nd PVP film The 4th concrete and be welded on the 4th connecting plate at the 4th mild steel inner core both ends, the 4th connecting plate and described It is bolted to connection between three connecting plates or the suspension column.
4. concrete pier of steel tube as claimed in claim 3, which is characterized in that first steel pipe, second steel pipe, institute Stating third steel pipe and the 4th steel pipe is all rectangular steel tube, the first mild steel inner core, the second mild steel inner core, described Three mild steel inner cores and the 4th mild steel inner core are all H-shaped mild steel.
5. concrete pier of steel tube as claimed in claim 4, which is characterized in that the height of the pier stud energy consuming components is described 1-1.2 times of the width of the cross section of pier stud main body.
6. concrete pier of steel tube as claimed in claim 3, which is characterized in that first steel pipe, second steel pipe, institute It is identical with the wall thickness of the 4th steel pipe to state third steel pipe, the area phase of the cross section of first steel pipe and second steel pipe Together, the third steel pipe is identical with the area of the cross section of the 4th steel pipe, and the area of the cross section of first steel pipe is 0.8 times of the area of the cross section of the third steel pipe.
7. concrete pier of steel tube as claimed in claim 3, which is characterized in that second concrete and the 4th coagulation Soil is ductility concrete.
CN201810553264.8A 2018-05-31 2018-05-31 Steel pipe concrete bridge pier Active CN109577170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810553264.8A CN109577170B (en) 2018-05-31 2018-05-31 Steel pipe concrete bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810553264.8A CN109577170B (en) 2018-05-31 2018-05-31 Steel pipe concrete bridge pier

Publications (2)

Publication Number Publication Date
CN109577170A true CN109577170A (en) 2019-04-05
CN109577170B CN109577170B (en) 2024-02-23

Family

ID=65919442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810553264.8A Active CN109577170B (en) 2018-05-31 2018-05-31 Steel pipe concrete bridge pier

Country Status (1)

Country Link
CN (1) CN109577170B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541354A (en) * 2019-09-30 2019-12-06 大连理工大学 Single-section prefabricated anti-seismic pier and construction method thereof
CN113174842A (en) * 2021-05-26 2021-07-27 合肥工业大学 Combined pier crossbeam of split type power consumption antidetonation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010046417A1 (en) * 2000-04-11 2001-11-29 Hirokazu Iemura High-aseismic reinforced concrete pier using unbonded high-strength core member
CN104963280A (en) * 2015-06-25 2015-10-07 华侨大学 Novel circular steel tube bridge pier
CN107354863A (en) * 2017-07-21 2017-11-17 华侨大学 A kind of assembled gate-type round steel pipe bridge pier that power consumption binder is set
CN107938498A (en) * 2017-11-27 2018-04-20 华侨大学 Assembled steel bridge pier and assembly type gate-type steel bridge pier
CN209443360U (en) * 2018-05-31 2019-09-27 华侨大学 A kind of concrete pier of steel tube

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010046417A1 (en) * 2000-04-11 2001-11-29 Hirokazu Iemura High-aseismic reinforced concrete pier using unbonded high-strength core member
CN104963280A (en) * 2015-06-25 2015-10-07 华侨大学 Novel circular steel tube bridge pier
CN107354863A (en) * 2017-07-21 2017-11-17 华侨大学 A kind of assembled gate-type round steel pipe bridge pier that power consumption binder is set
CN107938498A (en) * 2017-11-27 2018-04-20 华侨大学 Assembled steel bridge pier and assembly type gate-type steel bridge pier
CN209443360U (en) * 2018-05-31 2019-09-27 华侨大学 A kind of concrete pier of steel tube

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110541354A (en) * 2019-09-30 2019-12-06 大连理工大学 Single-section prefabricated anti-seismic pier and construction method thereof
CN113174842A (en) * 2021-05-26 2021-07-27 合肥工业大学 Combined pier crossbeam of split type power consumption antidetonation

Also Published As

Publication number Publication date
CN109577170B (en) 2024-02-23

Similar Documents

Publication Publication Date Title
CN109707037B (en) Self-resetting energy dissipation system of assembled frame structure and construction method thereof
CN107675800B (en) Self-resetting deformation coordination floor slab node structure
CN108374431B (en) Novel semi-fabricated anti-seismic energy dissipation retaining wall and construction method thereof
CN202831233U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns inscribed a pipe coat
CN103088933A (en) Collaborative energy dissipation anti-buckling supporting construction member with major earthquake protection function
CN107190635B (en) Dumbbell type steel pipe concrete combined bridge pier and connecting structure and method of dumbbell type steel pipe concrete combined bridge pier and bearing platform
CN110468691B (en) Replaceable assembled concrete anti-swing pier system after disaster
CN110439183B (en) Post-earthquake self-recovery embedded energy-consumption steel column foot
CN209443360U (en) A kind of concrete pier of steel tube
CN108625650B (en) Novel assembly conversion type buckling-restrained brace and manufacturing process
CN103883027B (en) Composite shear wall formed by embedding energy-dissipation bars between frame and wall with inbuilt steel plate and construction method
CN109577170A (en) A kind of concrete pier of steel tube
CN104674943A (en) Hub-cover plate composite aluminum-alloy bilayer grid structure
CN107386098B (en) Buckling restrained round-end type steel pipe concrete pier and bearing platform connecting structure and method
CN103953134B (en) Shear wall with energy-consuming strips embedded between border and built-in steel plates and steel braces, and making method
CN104234254B (en) A kind of combined type buckling-restrained energy-dissipation and processing technology thereof
CN113445670A (en) Prefabricated and assembled composite steel pipe concrete lattice column and construction method
CN206928427U (en) A kind of dry type assembled ECC protective layer node structures
CN211548196U (en) Steel plate concrete shear wall with strong edge member
CN103883036B (en) Shear wall formed by embedding energy-dissipation bars between frame and wall with inbuilt multiple steel plates and construction method
CN110777960A (en) Beam hinge assembly type self-resetting friction connection node structure and method
CN203769108U (en) Concrete filled steel tube bending prevention support containing isolation steel tubes
CN207597642U (en) A kind of substation structure antidetonation fills wall
CN110409647A (en) A kind of easy reparation assembly concrete steel frame ductility energy dissipation node of unilateral surrender
CN113152253B (en) Simply supported bridge anti-falling beam connecting device with dual guarantee

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant