CN109571776A - A kind of contraction compacting means of building monitoring auxiliary installing device - Google Patents

A kind of contraction compacting means of building monitoring auxiliary installing device Download PDF

Info

Publication number
CN109571776A
CN109571776A CN201811456106.7A CN201811456106A CN109571776A CN 109571776 A CN109571776 A CN 109571776A CN 201811456106 A CN201811456106 A CN 201811456106A CN 109571776 A CN109571776 A CN 109571776A
Authority
CN
China
Prior art keywords
wheel
contraction
sliding
rotation
compacting means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811456106.7A
Other languages
Chinese (zh)
Other versions
CN109571776B (en
Inventor
邬成眉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Mingcheng Construction Project Management Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811456106.7A priority Critical patent/CN109571776B/en
Publication of CN109571776A publication Critical patent/CN109571776A/en
Application granted granted Critical
Publication of CN109571776B publication Critical patent/CN109571776B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The invention discloses a kind of contraction compacting means of building monitoring auxiliary installing device, its structure includes idler wheel, reel, chassis, mounting base, shrink compacting means, slide mobile jib, the present invention rotates rotary table fluted disc by rotation rotation Kenko disk, by the tooth plate that rotary table fluted disc is driven actuation arc plate right actuation arc plate is moved to the left and extruding actuation is carried out to the ceramic tile on wall, it is moved to left surely to be taken turns by the extruding in the side push mechanism inside the ring set that shrinks in drill bit simultaneously and rolling locking is carried out to drill bit, so that drill bit stablizes drilling of advancing, so that ceramic tile, which will not damage to fall, injures staff by a crashing object, it moves up and is moved to right after withstanding by rotating rocker, so that the triangular prism and locking fixture block on rotation rocker carry out blocking fixation, when being pushed on wheel and side wheel so that punching by above pressing, it power that drill bit is extrapolated by wall and is pressed on upper end The power that pushing is pushed on driving wheel and side wheel is offset, so that the position of punching will not shift.

Description

A kind of contraction compacting means of building monitoring auxiliary installing device
Technical field
The present invention relates to buildings to assist device field, especially relates to a kind of contraction of building monitoring auxiliary installing device Compacting means.
Background technique
Building monitoring mark auxiliary installing device, by being punched to metope, so that the through-hole of metope is for assisting people Carry out installation monitoring camera equipment, but existing metope is in order to protect eyes that can stick sheen Dali stone ceramic tile, this kind of ceramic tile Glossiness controls between 32 degree to 37 degree of human visual the most comfortable, while the smooth good cleaning of surface abnormalities, with building monitoring mark Will auxiliary installing device has the following problems:
1. construction personnel is punched by auxiliary installing device, since ceramic tile surface is smooth, auxiliary installation is caused to set The frictional force contacted when standby drill bit punching with ceramic tile is small, and rotary head weak vibrations skid, the continuous rotational slippage of drill bit, constantly in ceramic tile Surface high speed is shaken, so that ceramic tile is constantly impacted, causes wall tile breakage that can also injure by a crashing object to lower section construction personnel.
2. simultaneously when auxiliary installing device is punched, equipment when being punched to wall tile, equipment constantly to Wall promotes, so that wall forces wall to first deboost is bored, assist peace constantly by the thrust given to equipment that arrives It installs standby upper end to punch, lower end is moved, and centre is attached by mobile jib, in thrust of the drill bit by wall, is formed Upper end is extrapolated, and is moved in lower end and is constituted a Z-shaped thrust, causes upper end drill bit to upwarp, so that punch position shifts.
Summary of the invention
In order to solve the problems, such as that above-mentioned technology exists, the contraction that the present invention provides a kind of building monitoring auxiliary installing device is tight Close device, structure include idler wheel, reel, chassis, mounting base, shrink compacting means, sliding mobile jib, the idler wheel by axis with Reel mechanical connection, the reel set there are four altogether and are vertically arranged to the lower surface on chassis, the lower end surface of the mounting base It fits with the upper surface on chassis, the sliding mobile jib is slidably connected by drill head and sliding mobile jib, and the sliding mobile jib hangs down It is directly installed on the upper surface of mounting base, the contraction compacting means include fitting closely mechanism, above pushing away sliding equipment, adjusting machine Structure, the left surface for fitting closely mechanism and being horizontally installed to regulating mechanism by connecting rod, the sliding equipment that above pushes away pass through Impeller-hub and regulating mechanism mechanical engagement.
Preferably, the mechanism that fits closely includes rotation Kenko disk, protection clamshell, is attracted arc plate, rotary table fluted disc, gearing machine Structure, contracting mechanism, the rotation Kenko disk is installed on the right surface of protective case cover and the two is slidably connected, the actuation arc plate It is horizontally installed to the inside of protection clamshell, the arc plate that is attracted is threadedly coupled with the rotary table fluted disc on rotation Kenko disk, the rotary table Integral structure is presented in fluted disc and rotation Kenko disk, and the interlinked mechanism is horizontally installed to the middle position of protection clamshell, the receipts Contracting mechanism be horizontally installed to protection clamshell right surface, the interlinked mechanism include sliding turntable, the ring set that shrinks, interlock slide rail, Side push mechanism, the sliding turntable are slidably connected by interlock slide rail with the ring set that shrinks, and the ring set that shrinks is in interlock slide rail Existing integral structure, the side push mechanism are horizontally installed to shrink the inside of ring set, and the actuations arc plate, which is presented, embeds falcate It shape and is made of high-precision rubber, truncated conical shape is presented in the rotary table fluted disc, and the rotary table fluted disc right end inner hollow goes out one There are a perforative cylindrical hole in a circular cone and inside, and the interlock slide rail arc is distributed in the inside for the ring set that shrinks.
The preferred side push mechanism includes interior body contact, reversion spring, gradient bar, gearing side's cover, squeezes steady wheel, the reversion Spring is wound in the outer surface of gradient bar, and the gradient bar is horizontally installed to the inside of interior body contact, and gearing side's cover passes through sliding Track is slidably connected with gradient bar, and for the steady wheel of extruding by axis and gearing side's cover mechanical engagement, the contracting mechanism includes connecting Dynamic lock tube, annular tooth set, holds in the mouth dynamic pipe axis, stablizes push rod side push rod, and the gearing lock tube is mechanical by annular tooth set and side push rod Transmission, the dynamic pipe axis of rank are vertically arranged to stablize the inside of push rod, and horizontal L-type is presented in the gradient bar, and the extruding is steady to be taken turns Front end, which is equipped with, docks with the matched sliding screw thread of drill bit, the steady wheel of guarantee extruding with drill bit.
Preferably, it is described above push away sliding equipment include above press wheel, side wheel, in push away drive rod, locking stable column, elasticity punching Pressing plate, expanding support pillar, it is described on press wheel pass through in push away drive rod and side wheel mechanical engagement, the locking stable column passes through linking Bar and elastic pressed sheet mechanical engagement, the elasticity pressed sheet are horizontally installed to the inside of expanding support pillar, it is described on press wheel with The tilt angle of the side wheel of two sides is 15 degree composition gusseteds, the elastic pressed sheet be made of high-intensitive synthetic rubber and The radian of composition is 60 degree.
Preferably, the regulating mechanism includes inclined plate, middle part latch wheel, even rank moving axis, rotation rocker, locking fixture block, institute It states inclined plate and passes through even rank moving axis and rotation rocker mechanical engagement, the middle part latch wheel carries out machine by latch with middle part latch wheel Tool cooperation, the locking fixture block are vertically arranged to the right end of rotation rocker, and rear one side of something of the inclined plate is equipped with one and shakes with rotation The same groove of plate, the small triangle that the rotation rocker is equipped with multiple isosceles block, and the inclined plate and rotation rocker are presented 60 It spends inclination angle and latch wheel in middle part cooperates.
Beneficial effect
1, in the present invention, which revolves Kenko disk by rotation So that rotary table fluted disc is rotated, it is driven by rotary table fluted disc and is attracted the tooth plate of arc plate right and to be attracted arc plate and carry out to moving to left It is dynamic that extruding actuation is carried out to the ceramic tile on wall, while being moved to left in drill bit by squeezing in the side push mechanism inside the ring set that shrinks The steady wheel of pressure carries out rolling locking to drill bit, so that drill bit stablizes drilling of advancing, so that ceramic tile, which will not damage to fall, injures work people by a crashing object Member.
2, in the present invention, which is moved down by dragging inclined plate So that middle part latch wheel rotates backward transmission expanding support pillar and moves up, moving up for expanding support pillar presses wheel and side wheel to main room in promotion It is pushed, the buffering of part strength is carried out by elastic pressed sheet, moved up and moved to right after withstanding by rotating rocker, so that turning Shake the triangular prism on plate and locking fixture block carries out blocking fixation, when being pushed on wheel and side wheel so that punching by above pressing, bores Head is offset by the power for pushing pushing on wheel and side wheel is pressed on the power of wall extrapolation and upper end, so that the position of punching will not be sent out Raw offset.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of the contraction compacting means of building monitoring auxiliary installing device of the present invention.
Fig. 2 is a kind of principal section partial structure diagram for shrinking compacting means of the present invention.
Fig. 3 is a kind of principal section partial structural diagram of interlinked mechanism of the present invention.
Fig. 4 is a kind of detailed construction schematic diagram of the principal section of side push mechanism of the present invention.
Fig. 5 is a kind of left profile partial structural diagram of interlinked mechanism of the present invention.
Fig. 6 is that a kind of principal section of contracting mechanism of the present invention amplifies detailed construction schematic diagram.
In figure: idler wheel -1, chassis -3, mounting base -4, shrinks compacting means -5, sliding mobile jib -6, fits closely reel -2 Mechanism -51 above pushes away sliding equipment -52, regulating mechanism -53, rotation Kenko disk -511, protection clamshell -512, is attracted arc plate -513, circle Platform fluted disc -514, interlinked mechanism -515, contracting mechanism -516, sliding turntable -5151, the ring set -5152 that shrinks, interlock slide rail - 5153, side push mechanism -5154, interior body contact -51541, reversion spring -51542, gradient bar -51543, gearing side's cover -51544, extruding Steady wheel -51545 interlocks lock tube -5161, side push rod -5162, annular tooth set -5163, holds in the mouth dynamic pipe axis -5164, stablizes push rod - 5165, pressed on wheel -521, side wheel -522, in push away drive rod -523, locking stable column -524, elastic pressed sheet -525, flexible Top pillar -526, inclined plate -531, middle part latch wheel -532, even rank moving axis -533, rotation rocker -534, locking fixture block -535.
Specific embodiment
It is lower the present invention in conjunction with the embodiments in attached drawing, technical solution in the embodiment of the present invention carry out clearly and completely Description, below in conjunction with specific embodiment and Detailed description of the invention, the preferred embodiment that the present invention is further explained.
Embodiment
As shown in figs 1 to 6, the present invention provides a kind of contraction compacting means of building monitoring auxiliary installing device, structure Including idler wheel 1, reel 2, chassis 3, mounting base 4, compacting means 5, sliding mobile jib 6 are shunk, the idler wheel 1 passes through axis and reel 2 Mechanical connection, the reel 2 set there are four altogether and are vertically arranged to the lower surface on chassis 3, the lower end surface of the mounting base 4 with The upper surface on chassis 3 fits, and the sliding mobile jib 6 is slidably connected by drill head and sliding mobile jib 6, the sliding mobile jib 6 Be installed vertically on the upper surface of mounting base 4, the contraction compacting means 5 include fit closely mechanism 51, above push away sliding equipment 52, Regulating mechanism 53, the left surface for fitting closely mechanism 51 and being horizontally installed to regulating mechanism 53 by connecting rod are described above to push away Sliding equipment 52 passes through impeller-hub and 53 mechanical engagement of regulating mechanism.
The mechanism 51 that fits closely includes rotation Kenko disk 511, protection clamshell 512, is attracted arc plate 513, rotary table fluted disc 514, interlinked mechanism 515, contracting mechanism 516, it is described rotation Kenko disk 511 be installed on protective case cover 512 right surface and the two into Row is slidably connected, the inside for being attracted arc plate 513 and being horizontally installed to protection clamshell 512, the actuation arc plate 513 and rotation Kenko Rotary table fluted disc 514 on disk 511 is threadedly coupled, and integral structure is presented with rotation Kenko disk 511 in the rotary table fluted disc 514, described Interlinked mechanism 515 is horizontally installed to the middle position of protection clamshell 512, and the contracting mechanism 516 is horizontally installed to protection clamshell 512 right surface, the interlinked mechanism 515 push away machine including sliding turntable 5151, the ring set 5152 that shrinks, interlock slide rail 5153, side Structure 5154, the sliding turntable 5151 are slidably connected by interlock slide rail 5153 with the ring set 5152 that shrinks, the ring set that shrinks 5152 are presented integral structure with interlock slide rail 5153, and the side push mechanism 5154 is horizontally installed to the interior of ring set 5152 that shrink Portion, the actuation arc plate 513 are presented embedded meniscus shape and are made of high-precision rubber, and circle is presented in the rotary table fluted disc 514 Platform shape, the 514 right end inner hollow of rotary table fluted disc goes out a circular cone and there is a perforative cylindrical hole in inside, described 5153 arc of interlock slide rail is distributed in the inside for the ring set 5152 that shrinks, compared with prior art by be attracted arc plate 513 move to left with Ceramic tile fitting exclusion air be attracted to ceramic tile firm.
The side push mechanism 5154 includes interior body contact 51541, reversion spring 51542, gradient bar 51543, gearing side's cover 51544, steady wheel 51545 is squeezed, the reversion spring 51542 is wound in the outer surface of gradient bar 51543, the gradient bar 51543 It is horizontally installed to the inside of interior body contact 51541, gearing side's cover 51544 is connected by sliding rail and the sliding of gradient bar 51543 It connects, the steady wheel 51545 of extruding covers 51544 mechanical engagements by axis and gearing side, and the contracting mechanism 516 includes interlocking lock tube 5161, side push rod 5162, annular tooth set 5163, the dynamic pipe axis 5164 of rank, stable push rod 5165, the gearing lock tube 5161 pass through ring Shape tooth set 5163 and 5162 machine driving of side push rod, the dynamic pipe axis 5164 of rank are vertically arranged to stablize the inside of push rod 5165, Horizontal L-type is presented in the gradient bar 51543, and 51545 front ends of the steady wheel of extruding are equipped with and the matched sliding screw thread of drill bit, guarantee The steady wheel 51545 of extruding is docked with drill bit, while sliding turntable of the ring set 5152 by sliding turntable 5151 and right that shrink 5151, which carry out rotation contraction, allows the extruding in side push mechanism 5154 surely to take turns 51545 in the very long a part of drill bit outside wall It is consolidated when portion, guarantees that drill bit drill bit will not be smooth because of ceramic tile surface so that drill bit teetertotters, so that before drill bit is stablized Into drilling, drill bit will not be teetertottered when boring dynamic.
It is described above push away sliding equipment 52 include above press wheel 521, side wheel 522, in push away drive rod 523, locking stable column 524, elastic pressed sheet 525, expanding support pillar 526, it is described on press wheel 521 pass through in push away drive rod 523 and match with 522 machinery of side wheel It closes, the locking stable column 524 passes through 525 mechanical engagement of joining rod and elastic pressed sheet, the horizontal peace of the elasticity pressed sheet 525 Inside loaded on expanding support pillar 526, it is described on to press wheel 521 and the tilt angle of the side wheels 522 of two sides be 15 degree of composition triangles Support, the radian that the elasticity pressed sheet 525 is constituted and constituted by high-intensitive synthetic rubber is 60 degree, compared with prior art By above pressing wheel 521 and support of the side wheel 522 to drill bit on top, so that drill bit constitutes a maintenance level T subtype structure, Make so that boring wall, the thrust of wall is counteracted by pressing wheel 521 on upper end with side wheel 522, allows drill bit will not Because the power of wall deviates bit bore.
The regulating mechanism 53 includes inclined plate 531, middle part latch wheel 532, even rank moving axis 533, rotation rocker 534, locking Fixture block 535, the inclined plate 531 is by even rank moving axis 533 and rotation 534 mechanical engagement of rocker, and the middle part latch wheel 532 is in Portion's latch wheel 532 carries out mechanical engagement by latch, and the locking fixture block 535 is vertically arranged to the right end of rotation rocker 534, institute The rear half of equipped with a groove as rotation rocker 534 of inclined plate 531 is stated, the rotation rocker 534 is equipped with multiple etc. The small triangle of waist blocks, and 60 degree inclination angles and the cooperation of middle part latch wheel 532 are presented with rotation rocker 534 in the inclined plate 531, and existing Technology is compared by pulling inclined plate 531 to adjust the height for pressing wheel 521 and docking roof with side wheel 522 up and down, by rotation rocker 534 right avertence, which are moved, quickly to carry out limit adjustment to the height for above pressing wheel 521 and side wheel 522, improve the work speed of adjusting Degree.
A kind of working principle for shrinking compacting means: chassis 3 is pushed to advance so that shrinking slowly leaning on for 5 left end of compacting means Nearly wall is driven rotary table fluted disc 514 by rotation rotation Kenko disk 511 and is rotated, so that rotary table fluted disc 514 be allowed to drive left end Tooth plate push be attracted arc plate 513 move to left, be attracted arc plate 513 ceramic tile on wall is squeezed by the thrust moved to left, inhale After actuation 513 inner air of arc plate is discharged completely the continuous extruding of conjunction arc plate 513, so that the air pressure inside actuation arc plate 513 is small In external air pressure, is fitted closely so that being attracted arc plate 513 with the ceramic tile on wall, allow drill bit to be fixed so that drill bit When being rotated, through extruding steady wheel 51545 constantly drill bit squeeze but again will not fixed drill bit so that drill bit is a bit Any enters ceramic tile wall, and the ring set 5152 that shrinks is enabled to move to left in progress to bore dynamic form by sliding turntable 5151 Contracting, while the steady wheel 51545 of extruding being cooperated constantly to stablize to drill bit, guarantee that drill bit will not slide on smooth ceramic tile, protects Card ceramic tile, which will not damage to fall, injures worker by a crashing object, while pulling down to inclined plate 531, so that inclined plate 531 drives middle part latch wheel 532 Reversion transmission expanding support pillar 526 pushes elastic pressed sheet 525 to move up with locking stable column 524, by locking stable column 524 Move up so that in push away and press wheel 521 in the transmission of drive rod 523 and move up with side wheel 522 and docked with roof so that drill bit is boring The process for the wall being subject to when wall above presses the upper end support of wheel 521 and side wheel 522 and the support of sliding 6 lower end of mobile jib carries out It cancels out each other, guarantees that drill bit is not forced offset, so that the position of drilling is accurate.
Basic principles and main features and advantages of the present invention of the invention, It should be understood by those skilled in the art that this hair Bright to be not restricted to the described embodiments, the above embodiments and description only illustrate the principle of the present invention, Hen Duoxiu Change and change for the ordinary skill in the art is it will be apparent that selection and description embodiment are in order to more all right Bright the principle of the present invention and practical application.

Claims (5)

1. a kind of contraction compacting means of building monitoring auxiliary installing device, structure includes idler wheel (1), reel (2), chassis (3), mounting base (4), contraction compacting means (5), sliding mobile jib (6), the idler wheel (1) are mechanically connected by axis and reel (2), The reel (2) sets there are four altogether and is vertically arranged to the lower surface of chassis (3), the lower end surface and bottom of the mounting base (4) The upper surface of disk (3) fits, it is characterised in that:
The sliding mobile jib (6) is slidably connected by drill head and sliding mobile jib (6), and the sliding mobile jib (6) is installed vertically on The upper surface of mounting base (4);
The contraction compacting means (5) include fitting closely mechanism (51), above pushing away sliding equipment (52), regulating mechanism (53);
The left surface for fitting closely mechanism (51) and being horizontally installed to regulating mechanism (53) by connecting rod, the upper sliding are dynamic Mechanism (52) passes through impeller-hub and regulating mechanism (53) mechanical engagement.
2. a kind of contraction compacting means of building monitoring auxiliary installing device according to claim 1, it is characterised in that: institute Stating and fitting closely mechanism (51) includes rotation Kenko disk (511), protection clamshell (512), actuation arc plate (513), rotary table fluted disc (514), interlinked mechanism (515), contracting mechanism (516), rotation Kenko disk (511) are installed on the right surface of protective case cover (512) And the two is slidably connected, the inside for being attracted arc plate (513) and being horizontally installed to protection clamshell (512), the actuation Arc plate (513) is threadedly coupled with the rotary table fluted disc (514) in rotation Kenko disk (511), the rotary table fluted disc (514) and rotation Kenko disk (511) integral structure is presented, the interlinked mechanism (515) is horizontally installed to the middle position of protection clamshell (512), the receipts Contracting mechanism (516) is horizontally installed to the right surface of protection clamshell (512), and the interlinked mechanism (515) includes sliding turntable (5151), it shrinks ring set (5152), interlock slide rail (5153), side push mechanism (5154), the sliding turntable (5151) passes through company Dynamic sliding rail (5153) are slidably connected with the ring set that shrinks (5152), and the ring set that shrinks (5152) and interlock slide rail (5153) are presented one Body structure, the side push mechanism (5154) are horizontally installed to shrink the inside of ring set (5152).
3. a kind of contraction compacting means of building monitoring auxiliary installing device according to claim 2, it is characterised in that: institute Stating side push mechanism (5154) includes interior body contact (51541), reversion spring (51542), gradient bar (51543), gearing side's cover (51544), steady wheel (51545) is squeezed, reversion spring (51542) is wound in the outer surface of gradient bar (51543), the gradient Bar (51543) is horizontally installed to the inside of interior body contact (51541), and gearing side's cover (51544) passes through sliding rail and gradient Bar (51543) is slidably connected, and the steady wheel (51545) of extruding covers (51544) mechanical engagement, the contraction by axis and gearing side Mechanism (516) includes gearing lock tube (5161), side push rod (5162), annular tooth set (5163), rank moves pipe axis (5164), stabilization pushes away Bar (5165), for the gearing lock tube (5161) by annular tooth set (5163) and side push rod (5162) machine driving, the rank is dynamic Pipe axis (5164) is vertically arranged to stablize the inside of push rod (5165).
4. a kind of contraction compacting means of building monitoring auxiliary installing device according to claim 1, it is characterised in that: institute State push away sliding equipment (52) include above press wheel (521), side wheel (522), in push away drive rod (523), lock stable column (524), elastic pressed sheet (525), expanding support pillar (526), it is described on press wheel (521) pass through in push away drive rod (523) and side (522) mechanical engagement is taken turns, the locking stable column (524) passes through joining rod and elastic pressed sheet (525) mechanical engagement, the bullet Property pressed sheet (525) is horizontally installed to the inside of expanding support pillar (526).
5. a kind of contraction compacting means of building monitoring auxiliary installing device according to claim 1, it is characterised in that: institute Stating regulating mechanism (53) includes inclined plate (531), middle part latch wheel (532), even rank moving axis (533), rotation rocker (534), locking Fixture block (535), the inclined plate (531) pass through even rank moving axis (533) and rotation rocker (534) mechanical engagement, the middle part latch It takes turns (532) and middle part latch wheel (532) and mechanical engagement is carried out by latch, the locking fixture block (535) is vertically arranged to rotate The right end of rocker (534).
CN201811456106.7A 2018-11-30 2018-11-30 Contraction tightening device of building monitoring auxiliary installation equipment Active CN109571776B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811456106.7A CN109571776B (en) 2018-11-30 2018-11-30 Contraction tightening device of building monitoring auxiliary installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811456106.7A CN109571776B (en) 2018-11-30 2018-11-30 Contraction tightening device of building monitoring auxiliary installation equipment

Publications (2)

Publication Number Publication Date
CN109571776A true CN109571776A (en) 2019-04-05
CN109571776B CN109571776B (en) 2021-03-16

Family

ID=65926669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811456106.7A Active CN109571776B (en) 2018-11-30 2018-11-30 Contraction tightening device of building monitoring auxiliary installation equipment

Country Status (1)

Country Link
CN (1) CN109571776B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111982609A (en) * 2020-08-11 2020-11-24 浙江三青环保科技有限公司 Gas sampling equipment for FID and PID double-detector gas chromatograph

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003094216A (en) * 2001-09-25 2003-04-03 Brother Ind Ltd Work press-down device
WO2007127892A2 (en) * 2006-04-28 2007-11-08 Black & Decker Inc. Pto selector mechanism with brake
CN203592172U (en) * 2013-12-03 2014-05-14 兖矿东华建设有限公司 Movable type top plate drilling telescopic frame
CN105642949A (en) * 2016-03-30 2016-06-08 安徽科技学院 Single drilling device and method for high portion of building wall
CN105817673A (en) * 2016-01-08 2016-08-03 浙江吉利汽车有限公司 Multi-angle drilling device
CN205702556U (en) * 2016-04-13 2016-11-23 刁翔宇 A kind of auxiliary device for knocking in nail
CN206997829U (en) * 2017-06-29 2018-02-13 浙江万丰摩轮有限公司 A kind of hub of motorcycle automatic drill valve core bore equipment
CN207315225U (en) * 2017-10-27 2018-05-04 石先宝 A kind of road engineering drilling machine
CN108356995A (en) * 2018-03-30 2018-08-03 莆田市荔城区海程贸易有限公司 A kind of building monitoring mark installation auxiliary bore hole device
CN108723441A (en) * 2017-04-20 2018-11-02 李洪东 A kind of drilling equipment
CN108856809A (en) * 2018-09-11 2018-11-23 詹哲品 A kind of coating steel pipe multi-angle rat holing device and coating steel pipe rat holing technique

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003094216A (en) * 2001-09-25 2003-04-03 Brother Ind Ltd Work press-down device
WO2007127892A2 (en) * 2006-04-28 2007-11-08 Black & Decker Inc. Pto selector mechanism with brake
CN203592172U (en) * 2013-12-03 2014-05-14 兖矿东华建设有限公司 Movable type top plate drilling telescopic frame
CN105817673A (en) * 2016-01-08 2016-08-03 浙江吉利汽车有限公司 Multi-angle drilling device
CN105642949A (en) * 2016-03-30 2016-06-08 安徽科技学院 Single drilling device and method for high portion of building wall
CN205702556U (en) * 2016-04-13 2016-11-23 刁翔宇 A kind of auxiliary device for knocking in nail
CN108723441A (en) * 2017-04-20 2018-11-02 李洪东 A kind of drilling equipment
CN206997829U (en) * 2017-06-29 2018-02-13 浙江万丰摩轮有限公司 A kind of hub of motorcycle automatic drill valve core bore equipment
CN207315225U (en) * 2017-10-27 2018-05-04 石先宝 A kind of road engineering drilling machine
CN108356995A (en) * 2018-03-30 2018-08-03 莆田市荔城区海程贸易有限公司 A kind of building monitoring mark installation auxiliary bore hole device
CN108856809A (en) * 2018-09-11 2018-11-23 詹哲品 A kind of coating steel pipe multi-angle rat holing device and coating steel pipe rat holing technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111982609A (en) * 2020-08-11 2020-11-24 浙江三青环保科技有限公司 Gas sampling equipment for FID and PID double-detector gas chromatograph
CN111982609B (en) * 2020-08-11 2023-09-19 浙江三青环保科技有限公司 Gas sampling equipment capable of being used for FID and PID dual-detector gas chromatograph

Also Published As

Publication number Publication date
CN109571776B (en) 2021-03-16

Similar Documents

Publication Publication Date Title
CN107558707B (en) A kind of wall construction of building is whitewashed roll leveling machine automatically
CN100434241C (en) Dual-purpose robot for derusting and painting oil tank in cavity and storeroom
CN210598071U (en) Lifting platform for interior decoration
CN107676045A (en) A kind of high accuracy construction drilling platform
CN204877287U (en) Height -adjustable removes assembled roof construction auxiliary device
KR102263335B1 (en) Device for handling drill string components and rock drill rig
CN109571776A (en) A kind of contraction compacting means of building monitoring auxiliary installing device
CN107052402A (en) One kind exempts from suspended ceiling drilling device of ascending a height
CN206732198U (en) One kind exempts from suspended ceiling drilling device of ascending a height
CN209869062U (en) Movable and mountable drilling device
ITTO20090230A1 (en) PERFORATING MACHINE PROVIDED WITH A DEVICE FOR DRIVING DRILL RODS CONTAINED IN A LOADER.
CN108252664A (en) A kind of underground drill rig of remote control automatic loading and unloading drilling rod
CN204371138U (en) Jacking system is driven on pinion and-rack top
CN207521754U (en) A kind of valve drilling equipment
CN102536117A (en) Machine-mounted type multipurpose anchor rod drilling machine
CN111305753A (en) Geotechnical engineering on-site piling device
CN211172987U (en) Construction work platform in tunnel
CN108326338A (en) A kind of valve drilling equipment and its application method
CN207568499U (en) A kind of high-precision construction drilling platform
CN108263398A (en) A kind of automation track conveying device
CN212105957U (en) External channel for tunnel
CN205225113U (en) Drilling rod clamping device prevents heeling
CN103075109A (en) Rotary drilling rig and follow-up rack thereof
CN207204776U (en) A kind of deduster
CN105401895A (en) Anti-sidewise-inclination drill pipe clamping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210226

Address after: No.255-72 Huashu, Jingang north bank, Mingguang City, Chuzhou City, Anhui Province 239400

Applicant after: Anhui Mingcheng Construction Project Management Co.,Ltd.

Address before: 325608 Hongqiao Town Honggang South Road, Leqing City, Wenzhou City, Zhejiang Province

Applicant before: Wu Chengmei

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant