CN109556903A - Shield tunnel vertical structure character model test apparatus and its application method - Google Patents

Shield tunnel vertical structure character model test apparatus and its application method Download PDF

Info

Publication number
CN109556903A
CN109556903A CN201910071127.5A CN201910071127A CN109556903A CN 109556903 A CN109556903 A CN 109556903A CN 201910071127 A CN201910071127 A CN 201910071127A CN 109556903 A CN109556903 A CN 109556903A
Authority
CN
China
Prior art keywords
model
tunnel
casing
test apparatus
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910071127.5A
Other languages
Chinese (zh)
Inventor
刘燕
刘俊岩
杨帆
陆瑶
刘晨阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Jinan
Original Assignee
University of Jinan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Jinan filed Critical University of Jinan
Priority to CN201910071127.5A priority Critical patent/CN109556903A/en
Publication of CN109556903A publication Critical patent/CN109556903A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

This application discloses a kind of shield tunnel vertical structure character model test apparatus and its application method, model casing is an open-topped square box, and two sides of cabinet are transparent toughened glass, is provided with graduated scale on either side tempered glass;A plurality of types of model clays of setting, are separately positioned on the different position in model tunnel along the longitudinal direction in model tunnel in model casing;Supply equipment is arranged on the outside of model casing, and the water inlet end of water supply line is connected with supply equipment, and the water outlet of water supply line is arranged in model casing.By the thickness of different types of model clay in graduated scale Controlling model case, different edpth of tunnels is simulated.By controlling different inlet valves into the model casing for the groundwater level that Fluid Dynamics are different, different local loads is simulated by placing counterweight on model clay.Then it is acquired by deformation, segment inner force, soil pressure, the pore water pressure etc. to model tunnel, and then accurately reflects tunnel linear deformation and Mechanical Characters of Composite Ground.

Description

Shield tunnel vertical structure character model test apparatus and its application method
Technical field
This application involves tunnel structural model technical fields, and in particular to a kind of shield tunnel vertical structure character model examination Experiment device and its application method.
Background technique
Stratum locating for shield tunnel is in certain natural strain condition, before tunnel does not tunnel, primary stress field and ground It is lauched seepage field and is in opposing stationary dynamic balance state.Shield tunnel construction destroys dynamic equilibrium between the two, into And it generates and inducts stress field to maintain the mechanical balance on stratum.It is put down to restore the dynamic of this effect system of seepage field Yu stress field It weighs, must be just able to achieve by certain coupling between double fields.The coupled problem of country rock and underground water can make point of load Boot levies the variation that changes a lot.
In structure design of tunnel, often according to plane strain it is assumed that taking a few ring tunnels is research object, by research object Force analysis result as design considerations, and the less longitudinal stress and deformational behavior for considering tunnel.In fact, being embedded in soil Shield tunnel in layer is a slim-lined construction along longitudinal direction, flexible larger, is affected by the ambient and is more easily deformed, And it then will lead to structural damage when the deformation increases to a certain extent.Compared with the circumferential deformation characteristic of section of jurisdiction, shield tunnel Vertical characteristics it is more fragile and its consequence is often unfavorable to tunnel structure.The shield tunnel largely runed is excessive because generating Sedimentation or inhomogeneous deformation, to induce, infiltration leakage mud, structure partial fall off destruction or internal structure occurs buckling and becomes Shape all has a certain impact to the structure safety, the operation security of train and comfort level in tunnel.Excessive segment deformation, then easily Cause long rails height difference excessive, also make the flatness of track exceeded, aggravates the abrasion of wheel.Construction disturbance, stratum unevenness and water Position variation is the principal element for causing tunnel linear deformation excessive.
The research of duct pieces of shield tunnel structural test is mainly based on prototype test and layer during similar model test.Prototype test is most Directly, most effective research technique, it being capable of actual response section of jurisdiction stress deformation situation;But since prototype test scale is big, It is at high cost, and full-blown equipment is needed to load, so that the prototype test scope of application is restricted.Model test is with similar reason Based on, various relative complex boundary conditions can be simulated, can relatively comprehensively and visually present engineering structure to it is related Stress and deformation mechanism, failure mechanism under Rock And Soil collective effect etc..For a long time, model test method is always to study solution The important means of certainly large complicated ground and Structural Engineering project.Shield tunnel testing program design theory basis selection, The selection of Structural Test of Tunnel Segments, the preparation of model soil material, loading scheme and simulate operating condition determination and boundary condition letter The problems such as change are a complicated system engineerings.
In traditional shield model test, tunnel model is usually placed in same model soil medium, does not account for difference Influence of the soil medium to model tunnel;Moreover, failing the coupled problem of consideration soil layer and underground water.Secondly, most of shields Structure tunnel model does not simulate the longitudinal joint that section of jurisdiction is formed in actual tunnel and circumferential weld and erection method, can not consider or be difficult standard The really influence of simulation tunnel duct piece connector, to the test result inaccuracy of tunnel longitudinal direction performance.
Summary of the invention
In order to solve the above-mentioned technical problem the application, proposes following technical solution:
In a first aspect, the embodiment of the present application provides a kind of shield tunnel vertical structure character model test apparatus, comprising: Model casing, model tunnel and Groundwater Control device, in which: the model casing is an open-topped square box, described Two sides of cabinet are transparent toughened glass, are provided with graduated scale on the tempered glass described in either side;In the model casing A plurality of types of model clays are set, and the model tunnel is arranged in the model clay, and different types of model clay is along institute The longitudinal direction for stating model tunnel is separately positioned on the different position in the model tunnel;The Groundwater Control device includes supplying water to set Standby and water supply line, the supply equipment are arranged on the outside of the model casing, the water inlet end of the water supply line and the water supply Equipment is connected, and the water outlet of the water supply line is arranged in the model casing.
Using above-mentioned implementation, by the thickness of different types of model clay in graduated scale Controlling model case, simulation is not Same edpth of tunnel.The different inlet valves of Groundwater Control device are controlled into the model casing for underground that Fluid Dynamics are different Water water level simulates different local loads by placing counterweight on model clay.Then pass through the deformation to model tunnel, section of jurisdiction Internal force, soil pressure, pore water pressure etc. are acquired, and then accurately reflect tunnel linear deformation and Mechanical Characters of Composite Ground, are practical work Journey provides reference.
With reference to first aspect, in a first possible implementation of that first aspect, the model tunnel includes: model lining Ring and model bolt are built, the model Lining Ring is diameter 200mm, and the short polyethylene pipe of multiple annular shapes of length 40mm forms, The model Lining Ring includes a section of jurisdiction of binding, two adjacent sections of jurisdiction and three standard sections of jurisdiction totally six model section of jurisdiction compositions, The model bolt is diameter phi=3mm, and the nylon66 fiber screw of length l=16mm, every section of jurisdiction four end faces center is each to bore one The hand hole of a 3mm is connected by model bolt with section of jurisdiction all around, and circumferential, longitudinal respectively passes through 6 model spiral shells The different model sections of jurisdiction are connected by bolt.
The first possible implementation with reference to first aspect, in a second possible implementation of that first aspect, institute Stating water supply line includes first pipe, second pipe and third pipeline, the water inlet end of the first pipe and the supply equipment It is connected, the water outlet of the first pipe is connected with the water inlet end of the second pipe and the third pipeline respectively, institute It states second pipe and third pipeline water outlet is separately positioned on the different location of the model casing, the second pipe and institute The part that third pipeline is arranged in the model casing is stated to be connected.
Second of possible implementation with reference to first aspect, in first aspect in the third possible implementation, institute It states and the first inlet valve is set in first pipe, be provided with the second inlet valve on the second pipe, on the third pipeline It is respectively arranged with third inlet valve and the 4th inlet valve.
The third possible implementation with reference to first aspect, in the 4th kind of possible implementation of first aspect, institute Stating model casing includes a box frame, and box frame is made of angle steel and square hollow section steel, and the model casing is except setting tempered glass Waterproof bamboo slab rubber, the seam of the tempered glass and waterproof bamboo slab rubber and the box frame is arranged in other two side and bottom surface Place's setting filling glass glue.
4th kind of possible implementation with reference to first aspect, in the 5th kind of possible implementation of first aspect, mould Monitoring element, the monitoring element and the section of jurisdiction for forming the model tunnel is arranged in vault, arch bottom and the haunch position in type tunnel It is fixedly connected with and does water-proofing treatment, the monitoring element is electrically connected with data collecting instrument.
5th kind of possible implementation with reference to first aspect, in the 6th kind of possible implementation of first aspect, institute It states the part that second pipe and the third pipeline are arranged in model casing and is provided with apopore, the corresponding apopore is provided with Crocus cloth, the crocus cloth are fixedly connected with the second pipe and the third pipeline.
It with reference to first aspect or the first to six kind of first aspect any possible implementation, can at the 7th kind of first aspect In the implementation of energy, it is highly 1.5-1.6 meters that the model casing length and width, which is 2-2.2 meters,.
4th kind of possible implementation with reference to first aspect, in the 8th kind of possible implementation of first aspect, institute The side for stating box frame includes 5 lateral square hollow section steels and 7 longitudinal square hollow section steels, and distance is between the lateral square hollow section steel 500-550mm, distance is 300-310mm between longitudinal square hollow section steel, and the vertical square hollow section steel is apart from the model casing Upper bottom surface 300mm at the welding angle steel, the angle steel is used for the square tube that the side of the box frame is longitudinally disposed Steel links together.
Second aspect, the embodiment of the present application, which provides a kind of shield tunnel vertical structure character test model test apparatus, to be made With method, which comprises the thickness of model clay in model casing is arranged according to graduated scale, the tunnel in simulation model tunnel buries It is deep;It is required according to water level, control Groundwater Control device supplies water into the model casing;Tile wood at the top of the model clay Plate places the counterweight of different weight, for simulating local load on the plank;Monitoring element acquires data, and will acquisition Data be sent to data collecting instrument;After data acquire, adjusted according to thickness of the graduated scale to the model clay It is whole, different edpth of tunnels is simulated, reads above-mentioned testing procedure again.
Detailed description of the invention
Fig. 1 is a kind of structural representation of shield tunnel vertical structure character model test apparatus provided by the embodiments of the present application Figure;
Fig. 2 is a kind of structural schematic diagram of model casing provided by the embodiments of the present application;
Fig. 3 is the schematic diagram that model clay is placed in a kind of model casing provided by the embodiments of the present application;
Fig. 4 is a kind of sectional view in model tunnel provided by the embodiments of the present application;
Fig. 5 is a kind of structural schematic diagram of Groundwater Control device provided by the embodiments of the present application;
Fig. 6 is a kind of shield tunnel vertical structure character model test apparatus application method provided by the embodiments of the present application Flow diagram.
In Fig. 1-6, symbol is expressed as:
1- model casing, 2- model tunnel, 3- Groundwater Control device, 4- tempered glass, 5- graduated scale, 6- model clay, 7- Supply equipment, 8- water supply line, 9- model Lining Ring, 10- model bolt, 11- bind section of jurisdiction, the adjacent section of jurisdiction 12-, 13- standard Section of jurisdiction, 14- first pipe, 15- second pipe, 16- third pipeline, the first inlet valve of 17-, the second inlet valve of 18-, 19- Third inlet valve, the 4th inlet valve of 20-, 21- angle steel, 22- square hollow section steel, 23- waterproof bamboo slab rubber, 24- monitoring element.
Specific embodiment
This programme is illustrated with specific embodiment with reference to the accompanying drawing.
The test device of the embodiment of the present application and geometric similarity ratio, intensity, the stress, cohesive strength, bullet of actual tunnel prototype The property modulus likelihood ratio is 1:30, and the bulk density likelihood ratio, Poisson's ratio, strain, the angle of friction likelihood ratio are 1:1.It can preferably mould Intend under fluid structure interaction in a variety of compound stratums, different water levels, different buried depth and earth's surface Local Loads various working are right The tunnel linear deformation of shield tunnel model shield and the influence of mechanical characteristic provide reliable data branch for actual tunnel engineering It holds.
Fig. 1 is a kind of shield tunnel vertical structure character model test apparatus provided by the embodiments of the present application, and Fig. 2 is this Shen Please a kind of structural schematic diagram of model casing that provides of embodiment, Fig. 3 is to place in a kind of model casing provided by the embodiments of the present application The schematic diagram of model clay, referring to figures 1-3, shield tunnel vertical structure character model test dress provided by the embodiments of the present application It sets, comprising: model casing 1, model tunnel 2 and Groundwater Control device 3.
The model casing 1 is an open-topped square box, and two sides of the cabinet are transparent toughened glass 4, graduated scale 5 is provided on the tempered glass 4 described in either side.Using transparent tempered glass 4, facilitate observation graduated scale 5 It reads, the thickness of the model clay 6 in Controlling model case 1.The model casing 1 includes a box frame, and box frame is by angle steel 21 It is formed with square hollow section steel 22, waterproof bamboo slab rubber is arranged except other two side of setting tempered glass 4 and bottom surface in the model casing 1 23, the seam crossing setting filling glass glue of the tempered glass 4 and waterproof bamboo slab rubber 23 and the box frame.
One illustrative examples, 1 length and width of model casing are 2-2.2 meters, are highly 1.5-1.6 meters.It is described The side of box frame includes 5 lateral longitudinal square hollow section steels 22 of square hollow section steel 22 and 7 piece, distance between the lateral square hollow section steel 22 For 500-550mm, distance is 300-310mm between longitudinal square hollow section steel 22.The vertical square hollow section steel 22 is apart from described The angle steel 21 is welded at the upper bottom surface 300mm of model casing 1, the angle steel 21 is used for the side of the box frame is longitudinal The square hollow section steel 21 of setting links together.
A plurality of types of model clays 6 of setting, the model tunnel 2 are arranged in the model clay 6 in the model casing 1, And different types of model clay 6 is separately positioned on the different position in the model tunnel 2 along the longitudinal direction in the model tunnel 2. As shown in figure 3, being provided with two kinds of model clay 6, including model weak soil and model pan soil in model casing, simulate changeable compound Stratum.The Groundwater Control device 3 includes supply equipment 7 and water supply line 8, and the supply equipment 7 is arranged in the model 1 outside of case, the water inlet end of the water supply line 8 are connected with the supply equipment 7, the water outlet setting of the water supply line 8 In the model casing 1.
According to the likelihood ratio, model tunnel 2 selects the polyethylene pipe of outer diameter 200mm, thickness 10mm as tunnel analog material, Nylon66 fiber is as bolt analog material.Referring to fig. 4, the model tunnel 2 includes: model Lining Ring 9 and model bolt 10, according to Prototype tunnel reduced scale, the model Lining Ring 9 are diameter 200, and the short polyethylene pipe composition of multiple annular shapes of length 40mm is described Circular short tube includes 11, the two adjacent sections of jurisdiction 12 in section of jurisdiction and three standard sections of jurisdiction 13 totally six model section of jurisdiction group that bind At the model bolt 10 is diameter phi=3mm, the nylon66 fiber screw of length l=16mm.Every section of jurisdiction four end faces center is each The hand hole for boring a 3mm is connected by model bolt 10 with section of jurisdiction all around, circumferential, longitudinal mould for respectively passing through 6 The different model sections of jurisdiction are connected by type bolt 10.
The vault in model tunnel 2, arch bottom and haunch position are arranged monitoring element 24, the monitoring element 24 with described in composition The section of jurisdiction in model tunnel 2 is fixedly connected with and does water-proofing treatment, and the monitoring element 24 is electrically connected with data collecting instrument.Detecting element The 24 difference deformations in collection model tunnels, segment inner force, soil pressure, pore water pressure force data, data collecting instrument is by above-mentioned data It is transferred to host computer to be handled, obtains tunnel linear deformation and Mechanical Characters of Composite Ground.
Referring to Fig. 5, the water supply line, 8 include first pipe 14, second pipe 15 and third pipeline 16, described first The water inlet end of pipeline 14 is connected with the supply equipment 7, the water outlet of the first pipe 14 respectively with the second pipe 15 are connected with the water inlet end of the third pipeline 16, and the second pipe 15 and 16 water outlet of third pipeline are respectively set In the different location of the model casing 1.The present embodiment first pipe 14 is main water supply pipe, second pipe 15 and third pipeline 16 For the bypass line to supply water into model casing 1.
First inlet valve 17 is set in the first pipe 14, is provided with the second inlet valve on the second pipe 15 18, third inlet valve 19 and the 4th inlet valve 20 are respectively arranged on the third pipeline 16.First inlet valve 17 is Main control valve when needing simulated groundwater water level, opens the first inlet valve 17, if necessary to simulate the underground water of low water level then Third inlet valve 19 is opened, the 4th inlet valve 20 is closed, supplies water into model casing 1.If necessary to simulate the ground of high water level It is lauched, the second inlet valve 18, third inlet valve 19 and the 4th inlet valve 20 is opened together.When the water for reaching needs Behind position, directly the first inlet valve 17 is closed.
The second pipe 15 and the third pipeline 16 are arranged in the part in model casing and are provided with apopore, corresponding institute It states apopore and is provided with crocus cloth, the crocus cloth is fixedly connected with the second pipe 15 and the third pipeline 16.Setting The effect of crocus cloth is to prevent the sand in model clay 6 from blocking apopore.
As can be seen from the above embodiments, a kind of shield tunnel vertical structure character model test apparatus is present embodiments provided, It include: model casing 1, model tunnel 2 and Groundwater Control device 3, in which: the model casing 1 is one open-topped rectangular Cabinet, two sides of the cabinet are transparent toughened glass 4, are provided with graduated scale 5 on the tempered glass 4 described in either side; A plurality of types of model clays 6 of setting in the model casing 1, the model tunnel 2 is arranged in the model clay 6, and inhomogeneity The model clay 6 of type is separately positioned on the different position in the model tunnel 2 along the longitudinal direction in the model tunnel 2;The underground Water controller 3 includes supply equipment 7 and water supply line 8, and the setting of supply equipment 7 is in 1 outside of model casing, the confession The water inlet end of waterpipe 8 is connected with the supply equipment 7, and the water outlet of the water supply line 8 is arranged in the model casing 1 It is interior.By the thickness of different types of model clay 6 in 5 Controlling model case 1 of graduated scale, different edpth of tunnels is simulated.Control ground The different inlet valves of lower water controller 3 groundwater level different for Fluid Dynamics into the model casing 1, by model Counterweight is placed on soil 6 simulates different local loads.Then pass through the deformation to model tunnel 2, segment inner force, soil pressure, hole Gap water pressure etc. is acquired, and then accurately reflects tunnel linear deformation and Mechanical Characters of Composite Ground, provides reference for Practical Project.
Corresponding with a kind of shield tunnel vertical structure character model test apparatus provided by the above embodiment, the application is also Provide a kind of embodiment of shield tunnel vertical structure character model test apparatus application method.Referring to Fig. 6, the method packet It includes:
The thickness of model clay in model casing, the edpth of tunnel in simulation model tunnel are arranged according to graduated scale by S101.
It needs the thickness to different types of model clay to be configured in the present embodiment, and guarantees different types of model Soil carries out distribution setting along the longitudinal direction in model tunnel, to simulate changeable compound stratum.
S102 is required according to water level, and control Groundwater Control device supplies water into the model casing.
The water supply into model casing is controlled by different inlet valves, simulates different groundwater levels.
S103 places the counterweight of different weight, for simulating in the model clay top horizontal boarding on the plank Local load.
Local loads are simulated if necessary according to operating condition, then in one plank of the top of model clay tiling, by counterweight It loads on plank, controls local load by changing counterweight quantity.
S104, monitoring element acquires data, and the data of acquisition are sent to data collecting instrument.
Monitoring element is counted by deformation, segment inner force, soil pressure, the pore water pressure etc. to model tunnel in the present embodiment According to being acquired, data collecting instrument will acquire data and be sent to host computer, and then accurately reflect tunnel linear deformation and mechanics Character.
S105 is adjusted after data acquire according to Thickness ness of the graduated scale to the model clay, is simulated Different edpth of tunnels reads above-mentioned testing procedure S101-S104 again.
It should be noted that, in this document, the relational terms of such as " first " and " second " or the like are used merely to one A entity or operation with another entity or operate distinguish, without necessarily requiring or implying these entities or operation it Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to Cover non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or setting Standby intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in the process, method, article or apparatus that includes the element.
Certainly, above description is also not limited to the example above, technical characteristic of the application without description can by or It is realized using the prior art, details are not described herein;The technical solution that above embodiments and attached drawing are merely to illustrate the application is not It is the limitation to the application, Tathagata substitutes, and the application is described in detail only in conjunction with and referring to preferred embodiment, ability Domain it is to be appreciated by one skilled in the art that those skilled in the art were made in the essential scope of the application Variations, modifications, additions or substitutions also should belong to claims hereof protection scope without departure from the objective of the application.

Claims (10)

1. a kind of shield tunnel vertical structure character model test apparatus characterized by comprising model casing (1), model tunnel (2) and Groundwater Control device (3), in which:
The model casing (1) is an open-topped square box, and two sides of the cabinet are transparent toughened glass (4), graduated scale (5) are provided on the tempered glass described in either side (4);
A plurality of types of model clays (6) of setting in the model casing (1), the model tunnel (2) are arranged in the model clay (6) It is interior, and different types of model clay (6) is separately positioned on the model tunnel (2) no along the longitudinal direction of the model tunnel (2) Same position;
The Groundwater Control device (3) includes supply equipment (7) and water supply line (8), and the supply equipment (7) is arranged in institute It states on the outside of model casing (1), the water inlet end of the water supply line (8) is connected with the supply equipment (7), the water supply line (8) water outlet setting is in the model casing (1).
2. shield tunnel vertical structure character model test apparatus according to claim 1, which is characterized in that the model Tunnel (2) includes: model Lining Ring (9) and model bolt (10), and the model Lining Ring (9) is diameter 200mm, length 40mm Multiple annular shapes short polyethylene short tube composition, the model Lining Ring includes a section of jurisdiction of binding (11), two adjacent sections of jurisdiction (12) and three standard sections of jurisdiction (13) totally six model sections of jurisdiction composition, the model bolt (10) they are diameter phi=3mm, length l The nylon66 fiber screw of=16mm, the hand hole that a 3mm is respectively bored in every section of jurisdiction four end faces center pass through model bolt (10) with before Left and right section of jurisdiction is connected afterwards, and circumferential, longitudinal is respectively connected by 6 model bolts (10) from the different model sections of jurisdiction It connects.
3. shield tunnel vertical structure character model test apparatus according to claim 2, which is characterized in that the water supply Pipeline (8) includes first pipe (14), second pipe (15) and third pipeline (16), the water inlet end of the first pipe (14) with The supply equipment (7) is connected, the water outlet of the first pipe (14) respectively with the second pipe (15) and described The water inlet end of three pipelines (16) is connected, and the second pipe (15) and the third pipeline (16) water outlet are separately positioned on institute The different location of model casing (1) is stated, the second pipe (15) and the third pipeline (16) setting are in the model casing (1) Part be connected.
4. shield tunnel vertical structure character model test apparatus according to claim 3, which is characterized in that described first It is arranged on pipeline (14) the first inlet valve (17), is provided with the second inlet valve (18) on the second pipe (15), it is described Third inlet valve (19) and the 4th inlet valve (20) are respectively arranged on third pipeline (16).
5. shield tunnel vertical structure character model test apparatus according to claim 4, which is characterized in that the model Case (1) includes a box frame, and box frame is made of angle steel (21) and square hollow section steel (22), and the model casing (1) is except setting steel Change other two side and bottom surface setting waterproof bamboo slab rubber (23), the tempered glass (4) and the waterproof bamboo slab rubber of glass (4) (23) filling glass glue is set with the seam crossing of the box frame.
6. shield tunnel vertical structure character model test apparatus according to claim 5, which is characterized in that model tunnel (2) vault, arch bottom and haunch position setting monitoring element (24), the monitoring element (24) and the composition model tunnel (2) section of jurisdiction is fixedly connected with and does water-proofing treatment, and the monitoring element (24) is electrically connected with data collecting instrument.
7. shield tunnel vertical structure character model test apparatus according to claim 6, which is characterized in that described second Pipeline (15) and the third pipeline (16) are arranged in the part in model casing and are provided with apopore, the corresponding apopore setting There is crocus cloth, the crocus cloth is fixedly connected with the second pipe (15) and the third pipeline (16).
8. shield tunnel vertical structure character model test apparatus according to claim 1-7, which is characterized in that Model casing (1) length and width is 2-2.2 meters, is highly 1.5-1.6 meters.
9. shield tunnel vertical structure character model test apparatus according to claim 5, which is characterized in that the cabinet Frame facet includes 5 lateral square hollow section steels (21) and 7 longitudinal square hollow section steels (21), the spacing of the lateral square hollow section steel (21) From for 500-550mm, distance is 300-310mm between longitudinal square hollow section steel (21), the vertical square hollow section steel (21) away from From the angle steel (20) is welded at the upper bottom surface 300mm of the model casing (1), the angle steel (20) is used for the cabinet frame The longitudinally disposed square hollow section steel in the side of frame (21) links together.
10. a kind of shield tunnel vertical structure character model test apparatus application method, which is characterized in that the described method includes:
The thickness of model clay in model casing, the edpth of tunnel in simulation model tunnel are set according to graduated scale;
It is required according to water level, control Groundwater Control device supplies water into the model casing;
In the model clay top horizontal boarding, the counterweight of different weight is placed on the plank, for simulating local load;
Monitoring element acquires data, and the data of acquisition are sent to data collecting instrument;
After data acquire, it is adjusted according to thickness of the graduated scale to the model clay, simulates different tunnels and bury It is deep, read above-mentioned testing procedure again.
CN201910071127.5A 2019-01-25 2019-01-25 Shield tunnel vertical structure character model test apparatus and its application method Pending CN109556903A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910071127.5A CN109556903A (en) 2019-01-25 2019-01-25 Shield tunnel vertical structure character model test apparatus and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910071127.5A CN109556903A (en) 2019-01-25 2019-01-25 Shield tunnel vertical structure character model test apparatus and its application method

Publications (1)

Publication Number Publication Date
CN109556903A true CN109556903A (en) 2019-04-02

Family

ID=65873723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910071127.5A Pending CN109556903A (en) 2019-01-25 2019-01-25 Shield tunnel vertical structure character model test apparatus and its application method

Country Status (1)

Country Link
CN (1) CN109556903A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110967252A (en) * 2019-12-02 2020-04-07 济南大学 Device for simulating influence of shield tunnel construction on existing tunnel and using method thereof
CN113063613A (en) * 2021-03-11 2021-07-02 同济大学 Shield tunnel model test device based on cross laser three-dimensional deformation measurement
CN114609368A (en) * 2022-03-08 2022-06-10 浙大城市学院 Test device and method for researching influence of external load on soil arch effect of shield tunnel
CN117538509A (en) * 2024-01-10 2024-02-09 北京交通大学 Tunnel excavation test device for simulating groundwater seepage in water-rich stratum

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241707Y (en) * 2008-08-15 2009-05-20 上海隧道工程股份有限公司 Tunnel upward floating model trial apparatus
CN202041394U (en) * 2011-02-28 2011-11-16 西南交通大学 Testing device for mud-water balanced type model shield
KR101529098B1 (en) * 2014-02-19 2015-06-16 한국건설기술연구원 Test apparatus for shield tunnel mock-up considering both underground earth pressure and pore water pressure according to draining condition, and method for the same
CN108007760A (en) * 2017-12-27 2018-05-08 西南交通大学 Tunnel lining structure longitudinal direction mechanics special type experimental rig
CN207379878U (en) * 2017-11-06 2018-05-18 长安大学 A kind of expanding rule model test apparatus of tunnel current
CN108179767A (en) * 2017-12-18 2018-06-19 济南大学 A kind of experimental rig and method for visualizing subway station and section liquefaction uplifting
CN108374666A (en) * 2018-03-13 2018-08-07 中铁隧道局集团有限公司 The method that native case bankets in earth pressure balanced shield, EPBS identification of formation research experiment
CN108709534A (en) * 2018-06-27 2018-10-26 中国地质大学(武汉) Shield tunnel construction stress deformation indoor model test device and its installation method
CN108827669A (en) * 2018-03-12 2018-11-16 同济大学 It is a kind of for simulating the pilot system of tunnel deformation destruction characteristic
CN209247384U (en) * 2019-01-25 2019-08-13 济南大学 A kind of shield tunnel vertical structure character model test apparatus
CN112098624A (en) * 2020-08-05 2020-12-18 中国电建集团华东勘测设计研究院有限公司 Test device and method for simulating excavation of ground access type shield tunnel

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241707Y (en) * 2008-08-15 2009-05-20 上海隧道工程股份有限公司 Tunnel upward floating model trial apparatus
CN202041394U (en) * 2011-02-28 2011-11-16 西南交通大学 Testing device for mud-water balanced type model shield
KR101529098B1 (en) * 2014-02-19 2015-06-16 한국건설기술연구원 Test apparatus for shield tunnel mock-up considering both underground earth pressure and pore water pressure according to draining condition, and method for the same
CN207379878U (en) * 2017-11-06 2018-05-18 长安大学 A kind of expanding rule model test apparatus of tunnel current
CN108179767A (en) * 2017-12-18 2018-06-19 济南大学 A kind of experimental rig and method for visualizing subway station and section liquefaction uplifting
CN108007760A (en) * 2017-12-27 2018-05-08 西南交通大学 Tunnel lining structure longitudinal direction mechanics special type experimental rig
CN108827669A (en) * 2018-03-12 2018-11-16 同济大学 It is a kind of for simulating the pilot system of tunnel deformation destruction characteristic
CN108374666A (en) * 2018-03-13 2018-08-07 中铁隧道局集团有限公司 The method that native case bankets in earth pressure balanced shield, EPBS identification of formation research experiment
CN108709534A (en) * 2018-06-27 2018-10-26 中国地质大学(武汉) Shield tunnel construction stress deformation indoor model test device and its installation method
CN209247384U (en) * 2019-01-25 2019-08-13 济南大学 A kind of shield tunnel vertical structure character model test apparatus
CN112098624A (en) * 2020-08-05 2020-12-18 中国电建集团华东勘测设计研究院有限公司 Test device and method for simulating excavation of ground access type shield tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陆瑶 等: "地铁盾构隧道近距离侧穿建筑物安全分析", 《施工技术》, vol. 46, no. 2, pages 87 - 91 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110967252A (en) * 2019-12-02 2020-04-07 济南大学 Device for simulating influence of shield tunnel construction on existing tunnel and using method thereof
CN113063613A (en) * 2021-03-11 2021-07-02 同济大学 Shield tunnel model test device based on cross laser three-dimensional deformation measurement
CN113063613B (en) * 2021-03-11 2022-04-19 同济大学 Shield tunnel model test device based on cross laser three-dimensional deformation measurement
CN114609368A (en) * 2022-03-08 2022-06-10 浙大城市学院 Test device and method for researching influence of external load on soil arch effect of shield tunnel
CN114609368B (en) * 2022-03-08 2022-11-08 浙大城市学院 Test device and method for researching influence of external load on soil arch effect of shield tunnel
CN117538509A (en) * 2024-01-10 2024-02-09 北京交通大学 Tunnel excavation test device for simulating groundwater seepage in water-rich stratum
CN117538509B (en) * 2024-01-10 2024-03-12 北京交通大学 Tunnel excavation test device for simulating groundwater seepage in water-rich stratum

Similar Documents

Publication Publication Date Title
CN109556903A (en) Shield tunnel vertical structure character model test apparatus and its application method
Liu et al. Long-term performance of metro tunnels induced by adjacent large deep excavation and protective measures in Nanjing silty clay
Li et al. Experimental and numerical study on polymer grouting pretreatment technology in void and corroded concrete pipes
Leung et al. An experimental study of the effect of local contact loss on the earth pressure distribution on existing tunnel linings
Mullins Thermal integrity profiling of drilled shafts
Stephansson Rock stress in the Fennoscandian shield
CN209247384U (en) A kind of shield tunnel vertical structure character model test apparatus
CN110967252A (en) Device for simulating influence of shield tunnel construction on existing tunnel and using method thereof
CN106504630A (en) Pass through the tunnel experiment system of karst strata
Lozovyi et al. Plaxis simulation of static pile tests and determination of reaction piles influence
Yang et al. Investigation of mechanical properties of corroded concrete pipes after cured-in-place-pipe (CIPP) rehabilitation under multi-field coupling
Trinh et al. Design considerations for an underground room in a hard rock subjected to a high horizontal stress field at Rana Gruber, Norway
Xu et al. Stresses measurement and failure prevention of on-line natural gas transmission pipelines for compressor station on collapsible loess area in northwest China
Stille et al. Practical use of the concept of geotechnical categories in rock engineering
Moore Large-scale laboratory experiments to advance the design and performance of buried pipe infrastructure
Tang et al. Experimental study on pipe strength and field performance of pipe jacking TBM in deep-buried coal mines
Kalisz Impact of mining subsidence on natural gas pipeline failures
Mahajan et al. Three-dimensional physical modeling of response of existing metro tunnel to pile loading in delhi silt in India
CN211292345U (en) Device for simulating influence of shield tunnel construction on existing tunnel
Wijewickreme Role of geotechnical engineering in assuring the integrity of buried pipeline systems
Mahajan et al. Effects of basement excavation and raft loading on urban tunnel in sand: model testing and analysis
Pusch et al. The role of crystalline rock for disposal of high-level radioactive waste (HLW)
Tatarinov et al. Underground Research Laboratory: To the Program of Geomechanical Research
Sharma et al. Testing and evaluation of statically-loaded large diameter steel pipe with native backfill soils
Jing et al. Instability Mechanism and Key Control Technology of Deep Soft Rock Roadway under Long‐Term Water Immersion

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination