CN109544086A - A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry - Google Patents
A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry Download PDFInfo
- Publication number
- CN109544086A CN109544086A CN201811136083.1A CN201811136083A CN109544086A CN 109544086 A CN109544086 A CN 109544086A CN 201811136083 A CN201811136083 A CN 201811136083A CN 109544086 A CN109544086 A CN 109544086A
- Authority
- CN
- China
- Prior art keywords
- invoice
- wind
- graphical
- ticket
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 9
- 238000000034 method Methods 0.000 claims abstract description 24
- 238000012544 monitoring process Methods 0.000 claims abstract description 17
- 238000011156 evaluation Methods 0.000 claims abstract description 4
- 238000010801 machine learning Methods 0.000 claims description 4
- 238000012545 processing Methods 0.000 claims description 4
- 238000003860 storage Methods 0.000 claims description 3
- 238000012216 screening Methods 0.000 claims description 2
- 238000001914 filtration Methods 0.000 claims 1
- 238000011160 research Methods 0.000 abstract description 2
- 238000004886 process control Methods 0.000 abstract 1
- 238000007726 management method Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000013475 authorization Methods 0.000 description 1
- 238000013070 change management Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000007418 data mining Methods 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005764 inhibitory process Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Water Supply & Treatment (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry.The system realizes mode that graphical electronics is made out an invoice, and steps are as follows: generating, the position of selection operation and type;Risk Identification and intelligence, which are moved, makes out an invoice;Operation process control;Job result evaluation.The present invention scientifically analyze and research wind power plant work ticket, operation order make out an invoice process and corresponding operation security risk, formulate targeted task instruction and Risk Monitoring and control, work ticket is set to be circulated between each department according to rule predetermined, shorten the time making out an invoice, examine, permitting, modular working ticket management process, conscientiously the management of wind power plant operation safety is improved, realizes that wind power plant is made out an invoice the fining of process, standardization, intelligent control.
Description
Technical field
The invention belongs to the graphical electron work ticket of new energy wind power generation field, graphical electronic operational ticket technologies to lead
A kind of domain, and in particular to two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry.
Background technique
As increasingly complexity, the traditional manual operation ticket of the continuous development of new energy wind power system, electric network composition are write
It mode and artificially fills out single mode and is no longer satisfied requirement under electric system new development situation.The work ticket of wind-powered electricity generation industry,
Operation order is made out an invoice using the manual papery of personnel, and safety measure is executed yet by operations staff, is unfavorable for the safety of operation field
Control and the promotion of Field Force's working efficiency.
Summary of the invention
The purpose of the present invention is combining existing production management system, centralized monitoring system and blower video monitoring system, mention
A kind of relevant intelligence of work ticket, operation order for wind-powered electricity generation industry is dynamic out makes out an invoice, job trace monitoring, online examination etc. comprehensive one
The intelligent graphic electronics billing system of body.
Present general inventive concept is: make out an invoice process and the phase of scientifically analyze and research wind power plant work ticket, operation order
The security risk for answering operation formulates targeted task instruction and Risk Monitoring and control, enables work ticket according to preparatory
The rule of definition circulates between each department, shortens the time making out an invoice, examine, permitting, and modular working ticket management process improves conscientiously
Wind power plant operation safety management realizes that wind power plant is made out an invoice the fining of process, standardization, intelligent control.
The technical scheme is that such:
A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry.The system realizes the mode that graphical electronics is made out an invoice
Steps are as follows:
1) generate, select position and the type of operation.
1. the tower of Wind turbines and Wind turbines, cabin, blade, wheel hub, generator, variable pitch, yaw, hydraulic system are big
Component, the change of Wind turbines case, the structural data of wind power plant booster stations, unstructured data are by data acquisition, storage, processing
Etc. after processes, be uploaded in centralized monitoring system, utilize the big data platform collection machine learning algorithm platform logarithm of centralized control center
According to being filtered and Comprehensive Evaluation, centralized monitoring system realizes electrical to wind power plant and Wind turbines fault message, alarm signals
The screening of breath;
2. the operation that centralized control system does not monitor or other needs are made out an invoice, then be directly entered graphical billing system.
2) Risk Identification and intelligence, which are moved, makes out an invoice.
1. the failure and alarm integrated information screened by centralized control system are uploaded in graphical billing system, system is certainly
It is dynamic to generate corresponding work ticket and operation order, and realization forms relevant safety measure according to different parts and operation and risk is distinguished
The information such as knowledge, risk pre-control measure, enable Field Force quickly to make out an invoice;
It is that 2. centralized control system does not monitor or other need the operation made out an invoice, blower directly in graphical billing system,
Case becomes, in booster stations graphical model, and selection needs position and the homework type of operation, and system automatically forms relevant safety measure
With the information such as Risk Identification, risk pre-control measure.
3) operation process is managed.
Two tickets work responsible person remotely monitors two ticket executive conditions by booster stations and blower video monitoring system
And check and accept, it realizes the process of work of On-line monitor operating personnel, observes blower indices in time, it is ensured that staff's
Working efficiency and safety guarantee.
4) job result is evaluated.
After operation, centralized control system is by realizing to equipment operation condition after operation equipment operating parameter situation of change
Tracking discipline record is carried out, and information and operating personnel's information feedback will be recorded into graphical billing system, realization is to wind turbine
The accurate statistics of situations such as repair history and service life of group parts and the station equipment that boosts, and realize the examination of work teams and groups personnel.
The invention has the advantages that:
1) it solves wind power plant operation field to make out an invoice low efficiency, operations staff executes that safety measure is not in place, and there are security risks
Problem, improves the efficiency of making out an invoice of wind field personnel, and year-on-year invoicing time reduces 30% ~ 50%;It is remotely checked and accepted by the time, ties ticket efficiency
Improve 40% ~ 60%;
2) solve the problems, such as that operating personnel lacks monitoring means in operation process;
3) solve operating personnel lack after the completion of operation the later period to operation effectiveness and operating personnel's tracking, Appraisal process asks
Topic;
4) greatly reduce or avoid the generation of event, accident, it is contemplated that loss caused by year-on-year safety accident reduces 10% or so.
Detailed description of the invention
Fig. 1 is that the graphical electronics of the present invention is made out an invoice operation flow schematic diagram.
Fig. 2 makes out an invoice for the graphical electronics of the present invention and implements process schematic.
Specific embodiment
A specific embodiment of the invention combination attached drawing is illustrated.
As shown in Figure 1 and Figure 2, a kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry, graphical electronic cutting
Steps are as follows for ticket:
1. data acquisition, storage, processing.
Using the data such as Wind turbines and Wind turbines, wind power plant booster stations, video monitoring system as data source, collecting
The big data platform of control system stores data, and uses Storm stream calculation respectively according to different calculating demands,
Spark memory calculates and MR batches calculate;It is flat that data by big data platform calculation processing enter machine learning algorithm
Platform carries out Wind turbines equipment in conjunction with expert knowledge library according to the knowledge excavated using various data mining algorithms
On-line fault diagnosis and early warning are realized and are prejudged by the analysis of centralized monitoring system, to alarm, danger, exception, failure specific aim
Recommendation need the operation that carries out.
2. confirming homework type and job position.
Determine homework type and job position or produced on-site personnel according to live practical by the operation of system recommendation
Situation selects the job position and homework type needed, the patterned boundary of system on the graphic interface of intelligent tickets system
Face aspect operations staff intuitively judges and selected job position.
3. automatic job Risk Identification.
System generates task instruction to the operation of progress according to job position and homework type, and utilizes machine learning algorithm
Model determines security risk existing for this subjob automatically, and generates corresponding Pre-control measures.
4. automatically generating corresponding work ticket, operation order.
By the relevant safety measure of different parts operation and Risk Identification, the information such as risk pre-control measure are associated, from
It is dynamic to generate work ticket Booting sequence engine, record is sent by the good process route of configured in advance.It is different according to the type of record
Personnel need different tasks is executed along certain path, to meet the requirement of the work rules of different work type, and
In each task node, supporting setting in some task node, one or more receives role, when workflow to the node
Afterwards, task to be treated just appears in the Pending tasks of the role personnel, is configured to pass through when process reaches the node
System pop-up window sends SMS, sends the mode of Email etc. to notify you to need to wait defeated task, it is ensured that i.e.
Make to be not logged on same transacting business in the case where system.
5. realizing the intelligent control of operation process.
Some intelligent and safe calibration equipments are associated in system, it is ensured that operation process it is safely controllable, mainly have intelligence
The intelligence regulatory measure such as authentication, smart machine mark, fence safety check, video monitoring.
1) intelligent identity identification: essential information is authenticated by establishing personnel, while according to different personnel's type set standards
Operating right and homework type, support face recognition technology, realize the identification and authentication management of operating personnel, drop significantly
Personnel and operation safety risk in low ticket kind implementation procedure.
2) smart machine identifies: by RFID tag technology, supporting the uniformity identified to all devices, uniqueness pipe
Reason, all operating personnels when starting specific production, demand factor first pass through RFID label tag verify equipment it is whether accurate, pass through face
Identification verifies whether to meet operation authorization, avoids the occurrence of operations specific and execute wrong situation.
3) it fence safety check: by the wireless WIFI soverlay technique of mobile terminal device and station, realizes to personnel
The real-time positioning and tracking of position, simultaneity factor Knowledge Center is distributed for plant area and security control requirements, establishes subregional
Virtual electronic fence system;Producers are during executing production operation, if exceeding or crossing over fence alert zone
Domain, system issue warning alert from trend mobile terminal equipment.
4) video monitoring and access control system: in booster stations key point, case becomes and the tower bottom of every Fans, engine room inside
Be mounted with high-definition digital camera with nacelle exterior, can outdoor scene observation blower inside and outside equipment state, realize the visual of blower
Change management, while blower is had recorded by tower gate inhibition and passes in and out personnel's situation, inspection situation, all video informations are sent to wind
Field control room and centralized control center, our department, New Energy Corporation realize the long-range real-time visual management of operation process, and support to dynamic
State image can realize tracking and capture, real time monitoring and recording exceptional event.
It is formed and is controlled and managed from the overall process that application, preparation, approval, execution, completion, report, examination are closed, needle
Task arrangement and Maintenance Resource scheduling can be effectively carried out to multinomial maintenance task.
6. realizing that the intelligent of job result is judged.
1) two tickets count
Operating personnel automatically counts work ticket, the operation order of input system after work, and work ticket can be by
Teams and groups' statistics is united by work responsible person statistics, by work ticket signed by statistics, by work permit people statistics, by work ticket state
Meter, monthly statistics, quarterly statistics etc. counts work ticket;Operation order can be counted by dispatch command, by operation fare ticket type
Type statistics, by operation order statistic, monthly statistics, quarterly statistics, per year count, by self defined time section statistics etc. projects
To be counted.
2) job result is judged
System is by before and after operation, and the real time data variation of operating equipment indices and equipment are after operation in a period of time
Operating condition, realizes the Accurate Analysis such as repair history and the service life situation of part of appliance, and to this subjob into and work
Class member carries out personnel's integrating skills and judges, associated with of that month people's money examination, realizes intelligentized Comprehensive Evaluation.
Claims (1)
1. a kind of applied to two bill system of intelligent graphic electronics of the wind-powered electricity generation industry system, which is characterized in that realize graphical
Steps are as follows for the mode that electronics is made out an invoice:
1) generate, select position and the type of operation:
1. the tower of Wind turbines and Wind turbines, cabin, blade, wheel hub, generator, variable pitch, yaw, the big portion of hydraulic system
Part, the change of Wind turbines case, the structural data of wind power plant booster stations, unstructured data are by data acquisition, storage, processing etc.
After process, be uploaded to centralized monitoring system, using centralized control center big data platform collection machine learning algorithm platform to data into
Row filtering and Comprehensive Evaluation, centralized monitoring system realize electrical to wind power plant and Wind turbines fault messages, warning message
Screening;
2. the operation that centralized control system does not monitor or other needs are made out an invoice, then be directly entered graphical billing system;
2) Risk Identification and intelligence, which are moved, makes out an invoice:
1. the failure and alarm integrated information screened by centralized control system are uploaded in graphical billing system, system is given birth to automatically
At corresponding electron work ticket and electronic operational ticket, and realizes and relevant safety measure and wind are formed according to different parts and operation
The information such as danger identification, risk pre-control measure, enable Field Force quickly to make out an invoice;
It is that 2. centralized control system does not monitor or other need the operation made out an invoice, blower directly in graphical billing system,
Case becomes, in booster stations graphical model, and selection needs position and the homework type of operation, and system automatically forms relevant safety measure
With the information such as Risk Identification, risk pre-control measure;
3) operation process is managed:
Two tickets work responsible person is remotely monitored and is tested to two ticket executive conditions by booster stations and blower video monitoring system
It receives, realizes the process of work of On-line monitor operating personnel, observe blower indices in time, it is ensured that the work of staff
Efficiency and safety guarantee;
4) job result is evaluated:
After operation, centralized control system is by carrying out the realization of equipment operating parameter situation of change to equipment operation condition after operation
Tracking, which is recorded, to be recorded, and will record information and operating personnel's information feedback into graphical billing system, is realized to Wind turbines portion
The accurate statistics of situations such as repair history and service life of part and the station equipment that boosts, and realize the examination of work teams and groups personnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811136083.1A CN109544086A (en) | 2018-09-28 | 2018-09-28 | A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811136083.1A CN109544086A (en) | 2018-09-28 | 2018-09-28 | A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109544086A true CN109544086A (en) | 2019-03-29 |
Family
ID=65843612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811136083.1A Pending CN109544086A (en) | 2018-09-28 | 2018-09-28 | A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109544086A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111416831A (en) * | 2020-03-31 | 2020-07-14 | 中国能源建设集团广东省电力设计研究院有限公司 | Fan platform operation supervision system for offshore wind farm |
CN111738675A (en) * | 2020-05-29 | 2020-10-02 | 南京华盾电力信息安全测评有限公司 | Intelligent two-ticket implementation method and system |
CN112270496A (en) * | 2020-11-16 | 2021-01-26 | 河北云酷科技有限公司 | Industrial field on-site operation risk pre-control method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102169570A (en) * | 2011-05-12 | 2011-08-31 | 东北电力大学 | Two tickets combined inference billing method of power grid based on work task analysis |
CN103441570A (en) * | 2013-06-18 | 2013-12-11 | 国家电网公司 | One-button type sequential control operation control method based on integrated information platform |
CN105117830A (en) * | 2015-08-11 | 2015-12-02 | 中节能港建(甘肃)风力发电有限公司 | Wind farm production operation and maintenance information collection application system and method |
CN105809416A (en) * | 2016-03-31 | 2016-07-27 | 山东创德软件技术有限公司 | Electronic template and correlation method thereof on basis of wind power generation enterprise tour-inspection, two tickets and work packages |
CN106022730A (en) * | 2016-05-31 | 2016-10-12 | 华电国际宁夏新能源发电有限公司 | Movable cooperative working platform system based on wind power generation operation maintenance and operation method thereof |
CN106372786A (en) * | 2016-08-29 | 2017-02-01 | 长园共创电力安全技术股份有限公司 | "Two ticket" operation safety management and control system and method |
CN107659572A (en) * | 2017-10-09 | 2018-02-02 | 内蒙古瑞特优化科技股份有限公司 | Intelligent and safe managing and control system based on information fusion |
CN107885170A (en) * | 2016-09-30 | 2018-04-06 | 珠海优特电力科技股份有限公司 | The method of safety in production control device, system and management and control of keeping the safety in production |
-
2018
- 2018-09-28 CN CN201811136083.1A patent/CN109544086A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102169570A (en) * | 2011-05-12 | 2011-08-31 | 东北电力大学 | Two tickets combined inference billing method of power grid based on work task analysis |
CN103441570A (en) * | 2013-06-18 | 2013-12-11 | 国家电网公司 | One-button type sequential control operation control method based on integrated information platform |
CN105117830A (en) * | 2015-08-11 | 2015-12-02 | 中节能港建(甘肃)风力发电有限公司 | Wind farm production operation and maintenance information collection application system and method |
CN105809416A (en) * | 2016-03-31 | 2016-07-27 | 山东创德软件技术有限公司 | Electronic template and correlation method thereof on basis of wind power generation enterprise tour-inspection, two tickets and work packages |
CN106022730A (en) * | 2016-05-31 | 2016-10-12 | 华电国际宁夏新能源发电有限公司 | Movable cooperative working platform system based on wind power generation operation maintenance and operation method thereof |
CN106372786A (en) * | 2016-08-29 | 2017-02-01 | 长园共创电力安全技术股份有限公司 | "Two ticket" operation safety management and control system and method |
CN107885170A (en) * | 2016-09-30 | 2018-04-06 | 珠海优特电力科技股份有限公司 | The method of safety in production control device, system and management and control of keeping the safety in production |
CN107659572A (en) * | 2017-10-09 | 2018-02-02 | 内蒙古瑞特优化科技股份有限公司 | Intelligent and safe managing and control system based on information fusion |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111416831A (en) * | 2020-03-31 | 2020-07-14 | 中国能源建设集团广东省电力设计研究院有限公司 | Fan platform operation supervision system for offshore wind farm |
CN111738675A (en) * | 2020-05-29 | 2020-10-02 | 南京华盾电力信息安全测评有限公司 | Intelligent two-ticket implementation method and system |
CN112270496A (en) * | 2020-11-16 | 2021-01-26 | 河北云酷科技有限公司 | Industrial field on-site operation risk pre-control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113450065B (en) | Production operation management system and method for wind power plant | |
CN109544086A (en) | A kind of two bill system of intelligent graphic electronics applied to wind-powered electricity generation industry | |
CN107092222B (en) | Based on the integrated power grid regulation operational administrative system of anti-error check analysis | |
DE212016000186U1 (en) | simulation system | |
CN110428135A (en) | A kind of pipe gallery equipment condition monitoring management system | |
CN108074197B (en) | Control method of fan fault data analysis system | |
CN113763203A (en) | Intelligent transformer substation safety monitoring system and field operation safety control method | |
CN103078403B (en) | On-line state evaluation method for secondary system of intelligent substation | |
EP2706422B1 (en) | Method for computer-implemented monitoring of the operation of a technical system, in particular an electrical energy production assembly | |
CN103441572A (en) | Method for monitoring transformer substation device | |
CN109450098A (en) | Power regulation integral system warning information optimization method | |
CN102999815A (en) | Multi-dimensional risk assessment and control method for power system safety and model | |
CN114881808B (en) | Big data-based accurate identification method for electric power larceny and electric power larceny prevention system | |
CN103208049B (en) | Abnormality alarming quick accident analysis method and system | |
CN107947367A (en) | One kind protection equipment on-line monitoring and intelligent diagnosis system | |
CN113568328A (en) | Safety monitoring method and device for personnel entering transformer substation to work | |
CN115393142A (en) | Intelligent park management method and management platform | |
CN104700477A (en) | Method and device for safety control of nuclear power plants | |
CN116366002A (en) | Intelligent operation and maintenance system and method for photovoltaic power station | |
CN209842394U (en) | Intelligent monitoring system for rail-side machine room of 5T equipment | |
Peters et al. | Continuous reliability enhancement for wind (CREW) database: wind plant reliability benchmark | |
CN117728568A (en) | Method for monitoring power failure of platform region and guaranteeing safe operation based on big data fusion | |
Zhang et al. | Development of the monitoring system in the smart distribution substation in Guangzhou, China | |
CN108090692A (en) | For a monitoring management system for inspection lifting equipment safe operation | |
Tang et al. | A Bayesian network approach for human reliability analysis of power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190329 |