CN109537664A - A kind of civil air defense constructions and installations building backfilling apparatus - Google Patents

A kind of civil air defense constructions and installations building backfilling apparatus Download PDF

Info

Publication number
CN109537664A
CN109537664A CN201811486318.XA CN201811486318A CN109537664A CN 109537664 A CN109537664 A CN 109537664A CN 201811486318 A CN201811486318 A CN 201811486318A CN 109537664 A CN109537664 A CN 109537664A
Authority
CN
China
Prior art keywords
horizontal frame
foundation pit
air defense
civil air
backfilling apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811486318.XA
Other languages
Chinese (zh)
Inventor
甘伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Civil Air Defense Architectural Design Institute
Original Assignee
Anhui Civil Air Defense Architectural Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Civil Air Defense Architectural Design Institute filed Critical Anhui Civil Air Defense Architectural Design Institute
Priority to CN201811486318.XA priority Critical patent/CN109537664A/en
Publication of CN109537664A publication Critical patent/CN109537664A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/22Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling
    • E02F5/223Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling for back-filling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of civil air defense constructions and installations to build backfilling apparatus, including foundation pit, the bottom of the foundation pit is equipped with a pair of of cushion cap, the top of the cushion cap is provided with frame column along its short transverse, the guiding tool of backfilling apparatus is provided with above the foundation pit, the guiding tool includes horizontal frame, hopper housing and idler wheel, wherein the hopper housing is set at the center of the horizontal frame.The utility model has the advantages that overcoming the defect that tradition gets rid of earthen backfill by the guiding tool of setting, the failure for causing waterproof protective layer because of earthwork impact is avoided, backfill quality is improved and efficiency, reduction is done over again, reduce later period leak stopping cost;In addition, combining using drinking-water pipe and water pump, solve the problems, such as foundation pit region internal water accumulation, at the same solve backfill region area it is narrow, backfill machinery be inconvenient to the problem of walking;And then make the progress of engineering without any confusion, and the construction period is not influenced, it is practical.

Description

A kind of civil air defense constructions and installations building backfilling apparatus
Technical field
The present invention relates to Technology for Civil Air Defence Projects fields more particularly to a kind of civil air defense constructions and installations to build backfilling apparatus.
Background technique
The beneath protective construction and combined ground that civil air defense constructions and installations refers to support personnel and goods and materials masking and individually builds are built The basement that can be used for air defense built is built, commander's communication use can be divided into according to purposes, personnel's masking is used, medical, rescue Stand, warehouse is used and garage etc., currently, can encounter some backfill regions during basement backfilling of earthwork, area is narrow Small, the frame intercolumniation in the especially region is smaller, and earthmoving machinery can not walk between frame column, and due to drop in foundation pit Rain can have ponding, and ponding can not be discharged, etc. naturally dries, influence the construction period.In addition, when narrow Deep Foundation Pit Excavation backfills only The mode for getting rid of earthen backfill can be taken, the waterproof protective layer that soil inevitably impacts underground main structure in the process is got rid of, causes The damage of waterproof protective layer and coiled material increases the process and cost of later period plugging operations;Earthen backfill is got rid of simultaneously improves labour by force Degree reduces backfill efficiency and quality.
Summary of the invention
For the problems in the relevant technologies, the present invention proposes a kind of civil air defense constructions and installations building backfilling apparatus, to overcome existing phase Above-mentioned technical problem present in the technology of pass.
The technical scheme of the present invention is realized as follows:
A kind of civil air defense constructions and installations building backfilling apparatus, including foundation pit, the bottom of the foundation pit are equipped with a pair of of cushion cap, the cushion cap Top be provided with frame column along its short transverse, the guiding tool of backfilling apparatus is provided with above the foundation pit, it is described Guiding tool includes horizontal frame, hopper housing and idler wheel, wherein the hopper housing is set to the center of the horizontal frame Place, and the surface of the horizontal frame is run through at the both ends of the hopper housing, the idler wheel is respectively set by rolling wheel support In the bottom surface four corners of the horizontal frame, the idler wheel is located in earth's surface.
Further, the guiding tool further includes stiffener plate, and the stiffener plate is respectively arranged at the idler wheel branch Between the side of frame and the horizontal frame.
Further, the upper surface of the horizontal frame is provided with water pump, and the water pump is located at a left side for the hopper housing Side.
Further, the delivery end of the water pump is provided with connecting tube, and the connecting tube is passed through far from one end of the water pump It wears the surface of the horizontal frame and extends to the lower section of the horizontal frame and be connected with one end of tee tube.
Further, the right end of the tee tube is connected with aqueduct, the one end of the aqueduct far from the tee tube It is connected with the first drinking-water pipe, the bottom end of the tee tube is connected with the second drinking-water pipe, and first drinking-water pipe and described second The end of drawing water of drinking-water pipe all extends to the bottom of the foundation pit.
Further, the both ends of the aqueduct are connected by fastener with the bottom of the horizontal frame.
Further, the top of the hopper housing is provided with storage bin(hopper).
The beneficial effects of the present invention are: overcome tradition by the guiding tool of setting and get rid of the defect of earthen backfill, avoid because Cubic metre of earth impact and cause the failure of waterproof protective layer, improve backfill quality and efficiency, reduction done over again, reduce later period leak stopping at This;In addition, combining using drinking-water pipe and water pump, solves the problems, such as foundation pit region internal water accumulation, while solving backfill region Area is narrow, and backfill machinery is inconvenient to the problem of walking;And then make the progress of engineering without any confusion, and the construction period is not influenced, it is real It is strong with property.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the structural schematic diagram that a kind of civil air defense constructions and installations builds backfilling apparatus.
In figure:
1, foundation pit;2, cushion cap;3, frame column;4, the second drinking-water pipe;5, tee tube;6, rolling wheel support;7, horizontal frame;8, Guiding tool;9, water pump;10, connecting tube;11, hopper housing;12, storage bin(hopper);13, aqueduct;14, fastener;15, reinforcing rib Plate;16, idler wheel;17, earth's surface;18, the first drinking-water pipe.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
According to an embodiment of the invention, providing a kind of civil air defense constructions and installations building backfilling apparatus.
Referring to Fig.1, civil air defense constructions and installations according to an embodiment of the present invention builds backfilling apparatus, including foundation pit 1, the foundation pit 1 Bottom is equipped with a pair of of cushion cap 2, and the top of the cushion cap 2 is provided with frame column 3, the top of the foundation pit 1 along its short transverse It is provided with the guiding tool 8 of backfilling apparatus, the guiding tool 8 includes horizontal frame 7, hopper housing 11 and idler wheel 16, wherein The hopper housing 11 is set at the center of the horizontal frame 7, and the water is run through at the both ends of the hopper housing 11 The surface of flat frame 7, the idler wheel 16 is respectively arranged at the bottom surface four corners of the horizontal frame 7 by rolling wheel support 6, described Idler wheel 16 is located in earth's surface 17.
In one embodiment, the guiding tool 8 further includes stiffener plate 15, and the stiffener plate 15 is respectively arranged at Between the side and the horizontal frame 7 of the rolling wheel support 6.
In one embodiment, the upper surface of the horizontal frame 7 is provided with water pump 9, and the water pump 9 is located at the funnel The left side of cavity 11.
In one embodiment, the delivery end of the water pump 9 is provided with connecting tube 10, and the connecting tube 10 is far from the water One end of pump 9 runs through the surface of the horizontal frame 7 and extends to the lower section of the horizontal frame 7 and one end phase of tee tube 5 Connection.
In one embodiment, the right end of the tee tube 5 is connected with aqueduct 13, and the aqueduct 13 is far from described three One end of siphunculus 5 is connected with the first drinking-water pipe 18, and the bottom end of the tee tube 5 is connected with the second drinking-water pipe 4, and described first takes out The end of drawing water of water pipe 18 and second drinking-water pipe 4 all extends to the bottom of the foundation pit 1.
In one embodiment, the both ends of the aqueduct 13 pass through the bottom phase of fastener 14 and the horizontal frame 7 Connection.
In one embodiment, the top of the hopper housing 11 is provided with storage bin(hopper) 12.
In addition, in the specific implementation process, by the guiding tool 8 of setting, the guiding tool 8 is passed through described Idler wheel 16 moves to the top of the foundation pit 1, before being backfilled, is matched by the water pump 9 with drinking-water pipe, to the base Water in hole 1 is extracted;Then it is fed by the storage bin(hopper) 12, and by the hopper housing 11 to the foundation pit 1 is backfilled, and the defect that tradition gets rid of earthen backfill is overcome, and is avoided the failure for causing waterproof protective layer because of earthwork impact, is improved Backfill quality and efficiency, reduction are done over again, and later period leak stopping cost is reduced;In addition, combined using drinking-water pipe and the water pump 9, It solves the problems, such as foundation pit region internal water accumulation, while solving that backfill region area is narrow, backfill is mechanical asking of being inconvenient to walk Topic, and then make the progress of engineering without any confusion, the construction period is not influenced, it is practical.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of civil air defense constructions and installations builds backfilling apparatus, which is characterized in that including foundation pit (1), the bottom of the foundation pit (1) is equipped with one To cushion cap (2), the top of the cushion cap (2) is provided with frame column (3) along its short transverse, is set above the foundation pit (1) It is equipped with the guiding tool (8) of backfilling apparatus, the guiding tool (8) includes horizontal frame (7), hopper housing (11) and idler wheel (16), wherein the hopper housing (11) is set at the center of the horizontal frame (7), and the hopper housing (11) The surface of the horizontal frame (7) is run through at both ends, and the idler wheel (16) is respectively arranged at the level by rolling wheel support (6) The bottom surface four corners of frame (7), the idler wheel (16) are located on earth's surface (17).
2. a kind of civil air defense constructions and installations according to claim 1 builds backfilling apparatus, which is characterized in that the guiding tool (8) Further include stiffener plate (15), the stiffener plate (15) be respectively arranged at the rolling wheel support (6) side and the level Between frame (7).
3. a kind of civil air defense constructions and installations according to claim 1 builds backfilling apparatus, which is characterized in that the horizontal frame (7) Upper surface be provided with water pump (9), the water pump (9) is located at the left side of the hopper housing (11).
4. a kind of civil air defense constructions and installations according to claim 3 builds backfilling apparatus, which is characterized in that the water pump (9) it is defeated Sending end is provided with connecting tube (10), and the one end of the connecting tube (10) far from the water pump (9) is through the horizontal frame (7) The surface and lower section for extending to the horizontal frame (7) is connected with one end of tee tube (5).
5. a kind of civil air defense constructions and installations according to claim 4 builds backfilling apparatus, which is characterized in that the tee tube (5) Right end is connected with aqueduct (13), and the aqueduct (13) is connected with the first drinking-water pipe far from the one end of the tee tube (5) (18), the bottom end of the tee tube (5) is connected with the second drinking-water pipe (4), and first drinking-water pipe (18) and described second is taken out The end of drawing water of water pipe (4) all extends to the bottom of the foundation pit (1).
6. a kind of civil air defense constructions and installations according to claim 5 builds backfilling apparatus, which is characterized in that the aqueduct (13) Both ends are connected by fastener (14) with the bottom of the horizontal frame (7).
7. a kind of civil air defense constructions and installations according to claim 1 builds backfilling apparatus, which is characterized in that the hopper housing (11) Top be provided with storage bin(hopper) (12).
CN201811486318.XA 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations building backfilling apparatus Pending CN109537664A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811486318.XA CN109537664A (en) 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations building backfilling apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811486318.XA CN109537664A (en) 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations building backfilling apparatus

Publications (1)

Publication Number Publication Date
CN109537664A true CN109537664A (en) 2019-03-29

Family

ID=65853107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811486318.XA Pending CN109537664A (en) 2018-12-06 2018-12-06 A kind of civil air defense constructions and installations building backfilling apparatus

Country Status (1)

Country Link
CN (1) CN109537664A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359514A (en) * 2019-07-30 2019-10-22 中建城市建设发展有限公司 A kind of backfill hopper wagon
CN110409531A (en) * 2019-07-13 2019-11-05 四川玖壹建设工程有限公司 Pipeline water shakes sand backfill operation platform and its method under town road restricted clearance
CN111519681A (en) * 2020-04-02 2020-08-11 中建四局第六建设有限公司 Tool and method for backfilling fertilizer groove of deep foundation pit
CN111827393A (en) * 2020-08-21 2020-10-27 天津凉笙科技有限公司 Backfill device for civil air defense engineering building
CN115354710A (en) * 2022-08-23 2022-11-18 四川昌泰建筑工程有限公司 Earthwork backfilling equipment for construction of gymnasium and backfilling method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098578A (en) * 1999-10-04 2001-04-10 Araoka Teruo Hopper device
US20020044830A1 (en) * 2000-04-03 2002-04-18 Munie Michael J. Backfill and grading apparatus
CN206844126U (en) * 2017-06-07 2018-01-05 李国臣 Civil air defense constructions and installations builds backfilling apparatus
CN207079609U (en) * 2017-08-21 2018-03-09 崔海敏 A kind of new foundation ditch backfill structure
CN207277344U (en) * 2017-10-09 2018-04-27 上海宝冶集团有限公司 Guiding tool for the backfill of narrow Deep Foundation Pit Excavation
KR101887490B1 (en) * 2017-03-08 2018-09-10 김진국 Movable soil supply apparatus for backfill
CN208023593U (en) * 2018-03-29 2018-10-30 中冶成都勘察研究总院有限公司 A kind of foundation pit fertilizer slot backfill structure in sponge city
CN209603218U (en) * 2018-12-06 2019-11-08 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations building backfilling apparatus

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098578A (en) * 1999-10-04 2001-04-10 Araoka Teruo Hopper device
US20020044830A1 (en) * 2000-04-03 2002-04-18 Munie Michael J. Backfill and grading apparatus
KR101887490B1 (en) * 2017-03-08 2018-09-10 김진국 Movable soil supply apparatus for backfill
CN206844126U (en) * 2017-06-07 2018-01-05 李国臣 Civil air defense constructions and installations builds backfilling apparatus
CN207079609U (en) * 2017-08-21 2018-03-09 崔海敏 A kind of new foundation ditch backfill structure
CN207277344U (en) * 2017-10-09 2018-04-27 上海宝冶集团有限公司 Guiding tool for the backfill of narrow Deep Foundation Pit Excavation
CN208023593U (en) * 2018-03-29 2018-10-30 中冶成都勘察研究总院有限公司 A kind of foundation pit fertilizer slot backfill structure in sponge city
CN209603218U (en) * 2018-12-06 2019-11-08 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations building backfilling apparatus

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409531A (en) * 2019-07-13 2019-11-05 四川玖壹建设工程有限公司 Pipeline water shakes sand backfill operation platform and its method under town road restricted clearance
CN110359514A (en) * 2019-07-30 2019-10-22 中建城市建设发展有限公司 A kind of backfill hopper wagon
CN111519681A (en) * 2020-04-02 2020-08-11 中建四局第六建设有限公司 Tool and method for backfilling fertilizer groove of deep foundation pit
CN111519681B (en) * 2020-04-02 2021-11-16 中建四局第六建设有限公司 Tool and method for backfilling fertilizer groove of deep foundation pit
CN111827393A (en) * 2020-08-21 2020-10-27 天津凉笙科技有限公司 Backfill device for civil air defense engineering building
CN115354710A (en) * 2022-08-23 2022-11-18 四川昌泰建筑工程有限公司 Earthwork backfilling equipment for construction of gymnasium and backfilling method thereof

Similar Documents

Publication Publication Date Title
CN109537664A (en) A kind of civil air defense constructions and installations building backfilling apparatus
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN209444350U (en) Shield launching wears existing shield tunnel barrel vault advanced support structure under being
CN113153308B (en) Construction method for collapse section of double-arch tunnel
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN204212167U (en) Lowering level of ground water structure
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN202247899U (en) Foundation pit support air bag
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN211500658U (en) Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground
CN209603218U (en) A kind of civil air defense constructions and installations building backfilling apparatus
CN107152042A (en) Churning clump of piles occlusion reinforcing engineering method is tilted for wearing the micro-disturbance in house under shield
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN106401618A (en) Basin-shaped freezing water-stop system for water-enriched sandy gravel stratum deep-buried metro station
CN109779640A (en) A kind of shield launching portal breaking construction method
CN108252307A (en) A kind of foundation pit construction method for underground tunnel upper
CN210712894U (en) Underground garage outer wall decompression drainage device
CN107905259A (en) Box culvert advancing monitoring device and its construction method
CN105804049A (en) Anti-hole-collapsing foundation reinforced structure during underground diaphragm wall construction
CN106351675A (en) Total-depth curtain freezing and water stopping system of water and sand rich sandy gravel formation deeply-buried station excavated in concealed mode
CN104594367B (en) A kind of combined type cofferdam structure and construction method
CN206655715U (en) A kind of efficient drainage arrangement in tunnel
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination