CN109534205A - Integrated become a full member in week automatically hangs cucurbit and its mounting structure - Google Patents

Integrated become a full member in week automatically hangs cucurbit and its mounting structure Download PDF

Info

Publication number
CN109534205A
CN109534205A CN201811526650.4A CN201811526650A CN109534205A CN 109534205 A CN109534205 A CN 109534205A CN 201811526650 A CN201811526650 A CN 201811526650A CN 109534205 A CN109534205 A CN 109534205A
Authority
CN
China
Prior art keywords
cucurbit
chain
host
full member
hook assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811526650.4A
Other languages
Chinese (zh)
Other versions
CN109534205B (en
Inventor
卢向阳
覃英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Ju Bang Science And Technology Ltd
Original Assignee
Guangxi Ju Bang Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Ju Bang Science And Technology Ltd filed Critical Guangxi Ju Bang Science And Technology Ltd
Priority to CN201811526650.4A priority Critical patent/CN109534205B/en
Publication of CN109534205A publication Critical patent/CN109534205A/en
Application granted granted Critical
Publication of CN109534205B publication Critical patent/CN109534205B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/12Chain or like hand-operated tackles with or without power transmission gearing between operating member and lifting rope, chain or cable
    • B66D3/16Chain or like hand-operated tackles with or without power transmission gearing between operating member and lifting rope, chain or cable operated by an endless chain passing over a pulley or a sprocket
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Hooks, Suction Cups, And Attachment By Adhesive Means (AREA)

Abstract

The present invention provides a kind of automatic become a full member in week of integration and hangs cucurbit, including cucurbit host, ring chain, tail chain hook assembly, top spring, lower hook assembly and intermediate suspension centre component;The ring chain passes around on the cucurbit host, tail chain hook assembly, intermediate suspension centre component and lower hook assembly so that climbing frame is moved with the rotation of ring chain;Become a full member in week automatically the invention also discloses above-mentioned integration and hang the mounting structure of cucurbit, climbing frame frame body, the attached wall upgrade block being detachably secured on wall and integration including being equipped with upper hanging point and lower hanging point are become a full member in week automatically hangs cucurbit.Cucurbit host is just hung and is set by the present invention, can prevent from polluting with effective protection cucurbit, and does not need dismounting cucurbit in lifting process, it is only necessary to which having enough to meet the need intermediate suspension centre component can be realized the lifting of climbing frame, reduce manual operation amount.

Description

Integrated become a full member in week automatically hangs cucurbit and its mounting structure
Technical field
The invention belongs to climbing frame lifting system fields, and in particular to a kind of automatic become a full member in week of integration hangs cucurbit and its installation Structure.
Background technique
Climbing frame is a kind of attachment type raise scaffold, is a kind of outer climbing type protective frame on construction site, via half Steel climbing frame develops to all steel climbing frame, converts office operation, safety, beauty for high altitude operation.
The cucurbit used on building climbing frame at present has positive extension cucurbit and two kinds of projecting cucurbit, and traditional positive extension cucurbit installs knot Structure can protect cucurbit host, but its chain is not closed circulation link chain, and every one layer of the lifting of climbing frame needs mutual disassembly calabash Reed simultaneously moves to one layer or next layer is reinstalled, and compares and takes a lot of work, and structure is as shown in Figure 1, promote principle such as Fig. 2 institute Show;Although the chain of projecting cucurbit is the chain of closed circulation, can be realized automatic turnover, but since cucurbit host is projecting , shield can not be installed to cucurbit host and be protected, cucurbit host and sprocket wheel are easy to be polluted by cement etc. and caused card Chain or chain rupture.
Summary of the invention
Based on above-mentioned technical background, the present invention is intended to provide a kind of can be realized the positive extension cucurbit having enough to meet the need automatically and its installation Structure, climbing frame does not need dismounting cucurbit in lifting process, easy to operate, and the pollution cucurbit such as can be avoided cement mortar, prolongs Long life.
In order to achieve the above objectives, technical scheme is as follows:
Integrated become a full member in week automatically hangs cucurbit, including cucurbit host, ring chain, tail chain hook assembly, top spring, under Hook assembly and intermediate suspension centre component;The ring chain is passed around in the cucurbit host, tail chain hook assembly, intermediate suspension centre So that climbing frame is moved with the rotation of ring chain on component and lower hook assembly;
Wherein, the cucurbit host and tail chain hook assembly are provided separately so that the cucurbit host, intermediate suspension centre component And the stress of lower hook assembly is point-blank.
Wherein, the cucurbit host includes the host suspension hook being located on cucurbit host and the use connecting with cucurbit host In the host driving wheel that ring chain passes around.
Wherein, the tail chain hook assembly include tail chain suspension hook and be located on the tail chain suspension hook for endless chain The tail chain sprocket wheel that item passes around.
Wherein, the intermediate suspension centre component includes under fixed point under ring chain, fixed point on ring chain, intermediate suspension centre Sprocket wheel, intermediate suspension centre upper sprocket wheel.
Wherein, the lower hook assembly includes lower suspension hook and is located at wearing on the lower suspension hook for ring chain side by side Around the left sprocket wheel of lower suspension hook and the lower right sprocket wheel of suspension hook.
Wherein, first endpoint of the ring chain is fixed on fixed point under ring chain, and successively bypasses lower suspension hook Through annular after left sprocket wheel, intermediate suspension centre lower sprocket, the right sprocket wheel of lower suspension hook, host driving wheel, intermediate suspension centre upper sprocket wheel, tail chain sprocket wheel Another endpoint of chain is fixed on ring chain on fixed point.
In order to achieve the above object, invention additionally discloses integrated become a full member in week automatically to hang cucurbit mounting structure, including is equipped with The climbing frame frame body of upper hanging point and lower hanging point, the attached wall upgrade block being detachably secured on wall and the automatic extension of becoming a full member in week of integration Cucurbit, the integration becomes a full member the cucurbit host for hanging cucurbit week automatically and tail chain hook assembly is hung on frame body at hanging point, under hang Hook assembly is hung under frame body at hanging point, and intermediate suspension centre component and attached wall upgrade block are detachably connected will load stress and be transmitted to wall Body.
Wherein, the tail chain hook assembly is connect by top spring with upper hanging point.
Compared with prior art, the present invention has the effect that
1, integration of the invention is become a full member to hang cucurbit and just hang cucurbit host automatically and be set in week, and cucurbit can be effectively protected Host prevents from polluting, to extend the service life of cucurbit, and the present invention does not need dismounting cucurbit in Circularly liftable process, only Needing to have enough to meet the need suspension centre component among dismounting can be realized the lifting of climbing frame, reduce manual operation amount;2, cucurbit host of the invention It is provided separately with tail chain hook assembly, i.e., cucurbit host and ring chain tail chain is separated, the cucurbit host, centre can be made The stress of suspension centre component and lower hook assembly point-blank, guarantees that cucurbit does not deflect, so that entire cucurbit power System is steady, works normally;3, ring chain of the invention passes around mode, so that the stress of calabash electrical machinery is only actual bearer The 1/4 of power reduces the fatigue damage of calabash electrical machinery, prolongs the service life.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment and description of the prior art Needed in attached drawing be briefly described.
Fig. 1 is the structural schematic diagram for just hanging cucurbit in the prior art;
Fig. 2 is just to hang cucurbit in the prior art to promote schematic illustration;
Fig. 3 is that automatic become a full member in week of integration hangs the structural schematic diagram of cucurbit in the embodiment of the present invention;
Fig. 4 is that integration becomes a full member automatically and hangs the ring chain of cucurbit and pass around schematic diagram in week in the embodiment of the present invention;
Fig. 5 is that automatic become a full member in week of integration hangs the schematic diagram of cucurbit mounting structure in the embodiment of the present invention;
Fig. 6 is that automatic become a full member in week of integration hangs cucurbit promotion schematic illustration in the embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Existing projecting cucurbit may be implemented the function having enough to meet the need automatically, but due to its cucurbit host be it is projecting, can not It is protected to cucurbit host installation shield, cucurbit host is easy to be polluted by cement etc. and caused card chain or chain rupture.In addition Traditional positive extension cucurbit mounting structure schematic diagram is as shown in Figure 1, include cucurbit host and gourd hook, chain is not closed Circulation link chain is promoted on hanging seat during promoting climbing frame as shown in Fig. 2, cucurbit host is fixed on attached wall, every lifting one Layer, it is necessary to mutual disassembly's cucurbit host, and move to one layer or next layer is reinstalled, it is more time-consuming.
In view of the above problem, the present embodiment provides integrated become a full member in week automatically to hang cucurbit, as shown in figure 3, including cucurbit Host 1, ring chain 2, tail chain hook assembly 3, top spring 4, intermediate suspension centre component 5 and lower hook assembly 6;The annular Chain 2 pass around the cucurbit host 1, tail chain hook assembly 3, intermediate suspension centre component 5, lower hook assembly 6 so that climbing frame with The rotation of ring chain 2 and move.Cucurbit host 1 is just being hung and is setting and can prevent from polluting with effective protection cucurbit host 1, thus Extend the service life of cucurbit;Dismounting calabash electrical machinery 1 is not needed in lifting process, it is only necessary to which turnover dismounts intermediate suspension centre component 5 The lifting of climbing frame can be realized, reduce manual operation amount.
Stress in order to make cucurbit host 1, intermediate suspension centre component 5 and lower hook assembly 6 point-blank guarantees one Become a full member in bodyization automatic week and hang cucurbit and do not deflect, in the present embodiment, cucurbit host 1 and the separation of tail chain hook assembly 3 are set Set, the cucurbit host 1 includes the host suspension hook 101 that is located on cucurbit host, and connect with cucurbit host 1 for annular The host driving wheel 102 that chain 2 passes around, the tail chain hook assembly 3 include tail chain suspension hook 301 and are located at the tail chain and hang The tail chain sprocket wheel 302 passed around for ring chain 2 on hook 301.
In the present embodiment, the intermediate suspension centre component 5 includes fixed point 501 under ring chain, fixation on ring chain Point 502, intermediate suspension centre lower sprocket 503 and intermediate suspension centre upper sprocket wheel 504;The lower hook assembly 6 include lower suspension hook 603 and The left sprocket wheel 602 of lower suspension hook and the right sprocket wheel 601 of lower suspension hook passed around for ring chain 2 being located on the lower suspension hook 603 side by side.
In the present embodiment, the ring chain 2 to pass around mode as shown in Figure 4: first endpoint of ring chain 2 is solid It is scheduled under ring chain on fixed point 501, then bypasses the right sprocket wheel 601 of lower suspension hook down, then up around chain under intermediate suspension centre Wheel 503, then the left sprocket wheel 602 of lower suspension hook is bypassed down, then up bypass host driving wheel 102, then down around on intermediate suspension centre Sprocket wheel 504, then tail chain sprocket wheel 302 is up bypassed, another endpoint of ring chain 2 is finally fixed on ring chain down On upper fixed point 502.The left sprocket wheel 602 of lower suspension hook and the right sprocket wheel 601 of lower suspension hook on lower suspension hook 603 are equivalent to two movable pulleys, 4 chains passed around in the left sprocket wheel 602 of lower suspension hook and the right sprocket wheel 601 of lower suspension hook are riding cable, have been equivalent to four riding cables, Every riding cable averraged load, and wherein three riding cables bypass the intermediate suspension centre component 5 fixed with wall, this three by The power of riding chain is transmitted on building by intermediate suspension centre component 5, another root riding cable connects with host driving wheel 102 upwards Connect, the bearing capacity of such cucurbit host 1 about entirely load 1/4, can significantly mitigate the fatigue damage of cucurbit host 1, So as to extend the service life of cucurbit.And other 3 chains on intermediate 5 top of suspension centre component do not stress, and are solely subjected to top spring 4 Tensile force, it is ensured that ring chain 2 is tightened, not card chain.
It hangs the use of cucurbit in order to become a full member in week automatically to integration of the invention and is described in detail, the present embodiment also provides Integrated become a full member in week automatically hangs the mounting structure of cucurbit, as shown in figure 5, including the climbing frame frame equipped with upper hanging point 7 and lower hanging point 8 Body and integration become a full member automatically and hang cucurbit in week, and the integration is become a full member in week automatically hangs the cucurbit host 1 of cucurbit and hung by host Hook 101 is hung at suspension centre 7, and tail chain hook assembly 3 is hung at suspension centre 7 by top spring 4, under lower hook assembly 6 passes through Suspension hook 603 is hung at the lower hanging point 8, and intermediate suspension centre component 5 is detachably fixed by attached wall upgrade block 9 with wall.
The principle promoted using the mounting structure of the present embodiment is as shown in fig. 6, starting cucurbit host 1, cucurbit host 1 Host driving wheel 102 drive ring chain 2 to rotate, relative motion occurs for climbing frame and intermediate suspension centre component 5, due to intermediate suspension centre Component 5 is fixed on motionless on building, only climbing frame movement, to realize the lifting of climbing frame.When climbing frame rise one layer after, will in Between suspension centre component 5 separated with attached wall upgrade block 9, and by attached wall upgrade block 9 disassembly, bring Forward fixation, then start electric hoist 1, intermediate suspension centre component 5 is also brought Forward, finally again connects intermediate suspension centre component 5 and attached wall upgrade block 9, for next time Promotion is prepared.
It should be pointed out that for those of ordinary skill in the art, without departing from the concept of the premise of the invention, Various modifications and improvements can be made, and these are all within the scope of protection of the present invention.

Claims (9)

1. integrated become a full member in week automatically hangs cucurbit, for promoting climbing frame, which is characterized in that including cucurbit host (1), ring chain (2), tail chain hook assembly (3), top spring (4), intermediate suspension centre component (5) and lower hook assembly (6);The ring chain (2) pass around on the cucurbit host (1), tail chain hook assembly (3), intermediate suspension centre component (5), lower hook assembly (6) so that Climbing frame is moved with the rotation of ring chain (2).
2. integration according to claim 1 becomes a full member automatically and hangs cucurbit in week, which is characterized in that the cucurbit host (1) with Tail chain hook assembly (3) is provided separately so that the cucurbit host (1), intermediate suspension centre component (5) and lower hook assembly (6) Stress is point-blank.
3. integration according to claim 1 is become a full member in week automatically hangs cucurbit, which is characterized in that cucurbit host (1) packet The host driving wheel (102) for including the host suspension hook (101) connecting with cucurbit host (1) and being passed around for ring chain (2).
4. integration according to claim 1 is become a full member in week automatically hangs cucurbit, which is characterized in that the tail chain hook assembly (3) include tail chain suspension hook (301) and be located at the tail chain sprocket wheel (302) passed around on tail chain suspension hook (301) for ring chain (2).
5. integration according to claim 1 is become a full member in week automatically hangs cucurbit, which is characterized in that the intermediate suspension centre component (5) include fixed point under ring chain (501), fixed point (502) on ring chain, intermediate suspension centre lower sprocket (503) and in Between suspension centre upper sprocket wheel (504).
6. integration according to claim 1 is become a full member in week automatically hangs cucurbit, which is characterized in that the lower hook assembly (6) The right chain of lower suspension hook passed around for ring chain (2) being located on the lower suspension hook (603) including lower suspension hook (603) and side by side Take turns (601) and the lower left sprocket wheel of suspension hook (602).
7. integration according to claim 6 is become a full member in week automatically hangs cucurbit, which is characterized in that the ring chain (2) One endpoint is fixed on fixed point under ring chain (501), and successively around under the left sprocket wheel of lower suspension hook (602), intermediate suspension centre Sprocket wheel (503), the right sprocket wheel of lower suspension hook (601), host driving wheel (102), intermediate suspension centre upper sprocket wheel (504), tail chain sprocket wheel (302) Another endpoint of ring chain (2) is fixed on fixed point on ring chain (502) afterwards.
8. integrated become a full member in week automatically hangs cucurbit mounting structure, which is characterized in that including being equipped with upper hanging point (7) and lower hanging point (8) Climbing frame frame body, be detachably located at attached wall upgrade block (9) on wall and integration as claimed in claim 1 to 7 from Become a full member in dynamic week and hang cucurbit, the integration becomes a full member the cucurbit host (1) for hanging cucurbit week automatically and tail chain hook assembly (3) hangs over institute It states at hanging point (7), lower hook assembly (6) hangs at the lower hanging point (8), and intermediate suspension centre component (5) and the attached wall are promoted Seat (9) is detachably connected will load stress and be transmitted on wall.
9. integration according to claim 8 is become a full member in week automatically hangs cucurbit mounting structure, which is characterized in that the tail chain is hung Hook assembly (3) is connect by top spring (4) with upper hanging point (7).
CN201811526650.4A 2018-12-13 2018-12-13 Integrated automatic turnover normal hanging hoist and mounting structure thereof Active CN109534205B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811526650.4A CN109534205B (en) 2018-12-13 2018-12-13 Integrated automatic turnover normal hanging hoist and mounting structure thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811526650.4A CN109534205B (en) 2018-12-13 2018-12-13 Integrated automatic turnover normal hanging hoist and mounting structure thereof

Publications (2)

Publication Number Publication Date
CN109534205A true CN109534205A (en) 2019-03-29
CN109534205B CN109534205B (en) 2024-05-03

Family

ID=65855141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811526650.4A Active CN109534205B (en) 2018-12-13 2018-12-13 Integrated automatic turnover normal hanging hoist and mounting structure thereof

Country Status (1)

Country Link
CN (1) CN109534205B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002241085A (en) * 2001-02-19 2002-08-28 Hitachi Ltd Electric hoist gear
JP2003095585A (en) * 2001-09-20 2003-04-03 Hitachi Plant Eng & Constr Co Ltd Detachable type drive device for chain block and manual chain block
CN204676872U (en) * 2015-06-02 2015-09-30 王德宇 A kind of lifting scaffold hoisting mechanism
CN206753012U (en) * 2017-05-06 2017-12-15 湖南慧盛模板脚手架工程有限公司 A kind of attachment type raise scaffold just hangs hanging apparatus
CN207110428U (en) * 2017-08-17 2018-03-16 厦门安科科技有限公司 A kind of positive sheet chain block mounting structure of climbing frame
CN108756199A (en) * 2018-08-20 2018-11-06 云南建投建筑机械有限公司 Attached lifting scaffold lifting gear
CN208200117U (en) * 2018-03-29 2018-12-07 北京市凌鹰起重机械厂 A kind of positive hung type endless-chain electric hoist
CN209601997U (en) * 2018-12-13 2019-11-08 广西巨邦科技有限公司 Integrated become a full member in week automatically hangs cucurbit and its mounting structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002241085A (en) * 2001-02-19 2002-08-28 Hitachi Ltd Electric hoist gear
JP2003095585A (en) * 2001-09-20 2003-04-03 Hitachi Plant Eng & Constr Co Ltd Detachable type drive device for chain block and manual chain block
CN204676872U (en) * 2015-06-02 2015-09-30 王德宇 A kind of lifting scaffold hoisting mechanism
CN206753012U (en) * 2017-05-06 2017-12-15 湖南慧盛模板脚手架工程有限公司 A kind of attachment type raise scaffold just hangs hanging apparatus
CN207110428U (en) * 2017-08-17 2018-03-16 厦门安科科技有限公司 A kind of positive sheet chain block mounting structure of climbing frame
CN208200117U (en) * 2018-03-29 2018-12-07 北京市凌鹰起重机械厂 A kind of positive hung type endless-chain electric hoist
CN108756199A (en) * 2018-08-20 2018-11-06 云南建投建筑机械有限公司 Attached lifting scaffold lifting gear
CN209601997U (en) * 2018-12-13 2019-11-08 广西巨邦科技有限公司 Integrated become a full member in week automatically hangs cucurbit and its mounting structure

Also Published As

Publication number Publication date
CN109534205B (en) 2024-05-03

Similar Documents

Publication Publication Date Title
CN107651546B (en) The main replacing lifting ropes of multi-rope technique of vertical
CN201495048U (en) Double movable-arm crane used for iron tower installation
CN100519396C (en) Gin pole integrated dismounting method for tower crane
CN110877852A (en) System and method for quickly replacing rope of vertical shaft friction type elevator
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN104499723A (en) Movable safety net and installation method thereof
CN209601997U (en) Integrated become a full member in week automatically hangs cucurbit and its mounting structure
CN102659043B (en) Improved dismounting device for buttress rod of tower crane
CN206753012U (en) A kind of attachment type raise scaffold just hangs hanging apparatus
CN109534205A (en) Integrated become a full member in week automatically hangs cucurbit and its mounting structure
CN102849622B (en) Mast-based section-by-section vertical lifting assembling method of tower
CN211113222U (en) Bridge bent cap top construction safety faces device of limit protection
CN206418752U (en) A kind of attachment type raise scaffold automatic cycle hanging apparatus
CN206693031U (en) A kind of large-span suspension bridge cable crane load bearing system of head-rope parallel structure
CN109322251A (en) A kind of fixed structure and fixing means of suspension cable bridge section lifting hoisting platform
CN205666547U (en) Rack and pinion formula unwrapping wire coaster
CN210246126U (en) Obstacle-crossing wiring aerodyne
CN208345716U (en) A kind of nacelle device
CN104860209B (en) Movable arm tower crane height space-variant arm method
CN209926862U (en) Efficient and labor-saving trolley entering and exiting device under heat-insulating cover of sintering machine
CN205637536U (en) A carry and hang device for climbing frame
CN110448820A (en) A kind of underground workshop escape device
CN215854581U (en) Building climbing frame lifting device
CN210140380U (en) Novel automatic unhooking equipment
CN108824213A (en) Protection operation hoistable platform for the installation of round end type solid pier hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant