CN109526364A - A kind of harvester convenient for delivery chute and ceding of Taiwan installation - Google Patents
A kind of harvester convenient for delivery chute and ceding of Taiwan installation Download PDFInfo
- Publication number
- CN109526364A CN109526364A CN201811547859.9A CN201811547859A CN109526364A CN 109526364 A CN109526364 A CN 109526364A CN 201811547859 A CN201811547859 A CN 201811547859A CN 109526364 A CN109526364 A CN 109526364A
- Authority
- CN
- China
- Prior art keywords
- ceding
- taiwan
- delivery chute
- fixing port
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 61
- 230000005484 gravity Effects 0.000 claims abstract description 8
- 238000003032 molecular docking Methods 0.000 claims description 29
- 230000007704 transition Effects 0.000 claims description 9
- 239000007787 solid Substances 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 9
- 238000000034 method Methods 0.000 description 12
- 238000010586 diagram Methods 0.000 description 8
- 238000009826 distribution Methods 0.000 description 4
- 240000008042 Zea mays Species 0.000 description 2
- 235000005824 Zea mays ssp. parviglumis Nutrition 0.000 description 2
- 235000002017 Zea mays subsp mays Nutrition 0.000 description 2
- 235000005822 corn Nutrition 0.000 description 2
- 239000000047 product Substances 0.000 description 2
- 239000013589 supplement Substances 0.000 description 2
- 240000000111 Saccharum officinarum Species 0.000 description 1
- 235000007201 Saccharum officinarum Nutrition 0.000 description 1
- 210000000481 breast Anatomy 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01D—HARVESTING; MOWING
- A01D41/00—Combines, i.e. harvesters or mowers combined with threshing devices
- A01D41/06—Combines with headers
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01D—HARVESTING; MOWING
- A01D41/00—Combines, i.e. harvesters or mowers combined with threshing devices
- A01D41/12—Details of combines
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01D—HARVESTING; MOWING
- A01D41/00—Combines, i.e. harvesters or mowers combined with threshing devices
- A01D41/12—Details of combines
- A01D41/14—Mowing tables
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01D—HARVESTING; MOWING
- A01D57/00—Delivering mechanisms for harvesters or mowers
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Jigging Conveyors (AREA)
- Chutes (AREA)
Abstract
The present invention relates to a kind of harvester convenient for delivery chute and ceding of Taiwan installation, the harvester includes conveying bowl assembly, ceding of Taiwan component, attachment device;The attachment device establishes datum level for conveying bowl assembly and ceding of Taiwan component, and can overcome conveying bowl assembly self gravity, realizes the Fast Installation of conveying bowl assembly and ceding of Taiwan component;The attachment device includes ceding of Taiwan connecting plate, delivery chute connecting plate, connection bolt assembly;Ceding of Taiwan connecting plate is installed on the ceding of Taiwan component;The conveying bowl assembly is equipped with delivery chute connecting plate;The ceding of Taiwan connecting plate and delivery chute connecting plate is fixed by connecting bolt assembly.Its advantage is shown: a kind of attachment device convenient for delivery chute and ceding of Taiwan installation of the invention can be realized and rapidly and efficiently install, and it is definite to install fixed effect.
Description
Technical field
The present invention relates to harvester technical fields, specifically, being a kind of harvester convenient for delivery chute and ceding of Taiwan installation.
Background technique
With the raising of productivity and the progress of science and technology, agricultural gradually moves towards modernization.It is raw in the agricultural of modernization
In production, harvester is one of common agricultural machinery, it can help people largely to get rid of heavy manual labor, mention
High efficiency.
Delivery chute and the ceding of Taiwan are the important components on harvester, however, the peace about delivery chute and the ceding of Taiwan in the prior art
The following defects and deficiencies exist for dress:
Firstly, delivery chute in the prior art and ceding of Taiwan component are not easy to Fast Installation, because delivery chute and ceding of Taiwan component are equal
It is the more complicated component of structure, is not easy to establish datum level, is not easy to realize the Fast Installation of delivery chute and the ceding of Taiwan.
Secondly, under delivery chute and ceding of Taiwan installation condition, delivery chute is needed to be in tilted layout because structure limits, consequently facilitating
Receive the material of the ceding of Taiwan.Because delivery chute tilts, need to be influenced in junction by gravity that during installation tilting force can be generated, it is inconvenient
In the Fast Installation for realizing delivery chute and the ceding of Taiwan.
In addition, touching size when the installation of delivery chute and the ceding of Taiwan, thick to install, can screw sequence etc. be also that obtain
The key link of Fast Installation, and in the prior art about output magazine and ceding of Taiwan attachment device, contact area size is not considered, slightly
Installation, screw sequence etc. are not easy to realize the Fast Installation of the delivery chute ceding of Taiwan.
Chinese patent literature CN200620081675.4, the applying date 20060307, patent name are as follows: small-sized corn joint is received
Cutting mill discloses a kind of small corn combine-harvester.It is that have sugarcane leaf machine at left side rear portion, is mounted on bracket above
Storage bin, there is delivery chute in centre, and there is the ceding of Taiwan on the right side.Clutch part is that clamping plate is mounted on rear bracket with axis, and handle is mounted in folder
In plate, centre is inserted with pin, there is wirerope on handle, wirerope by it pulley be connected on bracket, on the right of it
It is also connected on bracket on the left of spring, right side is hung on the pulling plate on delivery chute, and on supporting plate, the left end of bracket is equipped with bracket
Pinch roller.Diesel engine main axis drives guide shaft rotation, pulling chain, snapping bar, delivery chute movement by belt.
The harvester of above patent document operates motor-driven, flexible.But about a kind of convenient for the quick of delivery chute and the ceding of Taiwan
The technical solution of installation then has no corresponding disclosure.
In conclusion a kind of harvester convenient for delivery chute and the Fast Installation of the ceding of Taiwan is needed, and about this harvester
It yet there are no report.
Summary of the invention
The purpose of the present invention is aiming at the shortcomings in the prior art, provide a kind of Fast Installation convenient for delivery chute and the ceding of Taiwan
Harvester.
To achieve the above object, the technical solution adopted by the present invention is that:
It is a kind of convenient for delivery chute and the ceding of Taiwan installation harvester, the harvester include conveying bowl assembly, ceding of Taiwan component,
Attachment device;The attachment device establishes datum level for conveying bowl assembly and ceding of Taiwan component, and can overcome conveying bowl assembly certainly
Body gravity realizes the Fast Installation of conveying bowl assembly and ceding of Taiwan component;The attachment device includes ceding of Taiwan connecting plate, delivery chute
Connecting plate, connection bolt assembly;Ceding of Taiwan connecting plate is installed on the ceding of Taiwan component;The conveying bowl assembly is equipped with conveying
Slot connecting plate;The ceding of Taiwan connecting plate and delivery chute connecting plate is fixed by connecting bolt assembly.
As a kind of perferred technical scheme, the ceding of Taiwan connecting plate includes ceding of Taiwan benchmark plate body;The ceding of Taiwan base
Quasi- plate body is made of main part and extension, and main part and extension are Integratively formed, the edge and main body of extension
The edge in portion is connected using arc transition;The lower section of the ceding of Taiwan benchmark plate body is equipped with hang plate, and the bottom of ceding of Taiwan benchmark plate body
Portion is fixed on ceding of Taiwan component by hang plate.
As a kind of perferred technical scheme, the ceding of Taiwan benchmark plate body be equipped with the first bolt hole, the second bolt hole,
Third bolt hole, the 4th bolt hole, the 5th bolt hole;First bolt hole and the second bolt hole is arranged under main part
Edge;The top edge of main part is arranged in the third bolt hole and the 4th bolt hole;The 5th bolt hole setting exists
On extension.
As a kind of perferred technical scheme, the delivery chute connecting plate includes delivery chute benchmark plate body;Described is defeated
Slot benchmark plate body is sent to be made of docking section and assisted parts, and docking section and assisted parts are Integratively formed, an edge of assisted parts
It is connect with the edge of docking section using arc transition;The top of the delivery chute benchmark plate body is equipped with oblique tube, and delivery chute
The bottom of benchmark plate body is fixed on conveying bowl assembly by oblique tube.
As a kind of perferred technical scheme, the delivery chute benchmark plate body is fixed equipped with the first fixing port, second
Mouth, third fixing port, the 4th fixing port, the 5th fixing port;First fixing port and the second fixing port are arranged in docking section
Lower edge;The top edge of docking section is arranged in the third fixing port, the 4th fixing port;The 5th fixing port setting
On assisted parts.
As a kind of perferred technical scheme, first fixing port, the second fixing port, third fixing port are fluting
Formula structure.
As a kind of perferred technical scheme, the connection bolt assembly includes positive connection bolt and Opposite direction connection spiral shell
Bolt;The positive connection bolt is first placed in from ceding of Taiwan connecting plate, and the direction installation being pierced by from delivery chute connecting plate is fixed;
The Opposite direction connection bolt is placed in from delivery chute connecting plate, and the direction installation being pierced by from ceding of Taiwan connecting plate is fixed.
As a kind of perferred technical scheme, the area coverage of the main part and the area coverage of docking section are equal,
The area coverage of assisted parts is greater than the area coverage of extension.
As a kind of perferred technical scheme, in the mounted state, the first bolt hole is corresponding with the first fixing port, and pacifies
Fill Opposite direction connection bolt;Second bolt hole is corresponding with the second fixing port, and installs Opposite direction connection bolt;Third bolt hole and
Three fixing ports are corresponding, and install positive connection bolt;4th bolt hole is corresponding with the 4th fixing port, and installs positive connection
Bolt;5th bolt hole is corresponding with the 5th fixing port, and installs positive connection bolt.
The invention has the advantages that:
1, a kind of attachment device convenient for delivery chute and ceding of Taiwan installation of the invention, can be realized and rapidly and efficiently install, and
It is definite that fixed effect is installed.
2, it is equipped with attachment device, so that bowl assembly and ceding of Taiwan component establish datum level, and conveying bowl assembly itself can be overcome
Gravity realizes the Fast Installation of conveying bowl assembly and ceding of Taiwan component.
3, ceding of Taiwan benchmark plate body and delivery chute benchmark plate body are docking together, and establish datum level using plank frame,
It realizes and is installed by way of datum level, stationarity is good, while increasing the area of datum level.
4, ceding of Taiwan benchmark plate body is made of main part and extension, and the conveying bowl assembly is by docking section and assisted parts group
At, in the mounted state, main part and docking section are corresponding, establish datum level convenient for slightly walking, and extension and assisted parts are corresponding,
It is a supporting role, is convenient for Fast Installation.
5, the area coverage of main part and the area coverage of docking section are equal, wherein the area coverage of assisted parts, which is greater than, prolongs
The area coverage of extending portion, the design method increase the contact area of conveying bowl assembly installation, enable conveying bowl assembly fast
Fast and stable installation.
6, the positive connection bolt of connection bolt assembly protection and Opposite direction connection bolt, the design method make erection sequence clever
It is living, it realizes be fixedly mounted from different directions, be conducive to Fast Installation.
7, the first fixing port, the second fixing port, third fixing port are open flume type structure.The design method, being convenient for will just
It is quickly placed in connection bolt, improves installation effectiveness, fixed effect is definite.
Detailed description of the invention
Attached drawing 1 is a kind of structural schematic diagram convenient for delivery chute and the harvester of ceding of Taiwan installation of the invention.
Attached drawing 2 is the distribution schematic diagram of ceding of Taiwan connecting plate Yu ceding of Taiwan component.
Attached drawing 3 is the distribution schematic diagram of delivery chute connecting plate and conveying bowl assembly.
Attached drawing 4 is the partial structural diagram of ceding of Taiwan component and conveying bowl assembly in connected state.
Specific embodiment
It elaborates with reference to the accompanying drawing to specific embodiment provided by the invention.
Appended drawing reference involved in attached drawing and component part are as follows:
1. conveying 2. ceding of Taiwan component of bowl assembly
3. 31. ceding of Taiwan connecting plate of attachment device
311. sprocket hole, 312. main part
313. extension, 314. hang plate
315. first bolt hole, 316. second bolt hole
The 4th bolt hole of 317. third bolt hole 318.
319. the 5th bolt hole, 32. delivery chute connecting plate
321. delivery port, 322. docking section
323. assisted parts, 324. oblique tube
325. first fixing port, 326. second fixing port
The 4th fixing port of 327. third fixing port 328.
329. the 5th fixing ports 33. connect bolt assembly
331. positive connection 332. Opposite direction connection bolts of bolt
Fig. 1 is please referred to, Fig. 1 is a kind of structural schematic diagram convenient for delivery chute and the harvester of ceding of Taiwan installation of the invention.
A kind of harvester convenient for delivery chute and ceding of Taiwan installation, the harvester include conveying bowl assembly 1, ceding of Taiwan component 2, connection dress
Set 3;The attachment device 3 establishes datum level for conveying bowl assembly 1 and ceding of Taiwan component 2, and can overcome conveying bowl assembly 1 itself
Gravity realizes the Fast Installation of conveying bowl assembly 1 and ceding of Taiwan component 2;The attachment device 3 includes ceding of Taiwan connecting plate 31, defeated
Send slot connecting plate 32, connection bolt assembly 33;Ceding of Taiwan connecting plate 31 is installed on the ceding of Taiwan component 2;The delivery chute group
Part 1 is equipped with delivery chute connecting plate 32;The ceding of Taiwan connecting plate 31 and delivery chute connecting plate 32 passes through connection bolt assembly 33
It is fixed.
Referring to figure 2., Fig. 2 is the distribution schematic diagram of ceding of Taiwan connecting plate 31 Yu ceding of Taiwan component 2.The ceding of Taiwan connecting plate 31
Including ceding of Taiwan benchmark plate body;The ceding of Taiwan benchmark plate body is made of main part 312 and extension 313, and main part 312 and is prolonged
Extending portion 313 is Integratively formed, and an edge of extension 313 is connect with the edge of main part 312 using arc transition;Described
The center of ceding of Taiwan benchmark plate body is equipped with sprocket hole 311;The lower section of the ceding of Taiwan benchmark plate body is equipped with hang plate 314, and ceding of Taiwan base
The bottom of quasi- plate body is fixed on ceding of Taiwan component 2 by hang plate 314;The ceding of Taiwan benchmark plate body is equipped with the first bolt hole
315, the second bolt hole 316, third bolt hole 317, the 4th bolt hole 318, the 5th bolt hole 319;First bolt hole
315 and second bolt hole 316 lower edge of main part 312 is set;The third bolt hole 317 and the 4th bolt hole 318
The top edge of main part 312 is set;5th bolt hole 319 is arranged on extension 313.
Referring to figure 3., Fig. 3 is the distribution schematic diagram of delivery chute connecting plate 32 and conveying bowl assembly 1.The delivery chute connects
Fishplate bar 32 includes delivery chute benchmark plate body;The delivery chute benchmark plate body is made of docking section 322 and assisted parts 323, and right
Socket part 322 and assisted parts 323 are Integratively formed, and an edge of assisted parts 323 and the edge of docking section 322 use arc transition
Connection;The center of the delivery chute benchmark plate body is equipped with delivery port 321;The top of the delivery chute benchmark plate body, which is equipped with, inclines
Oblique part 324, and the bottom of delivery chute benchmark plate body is fixed on conveying bowl assembly 1 by oblique tube 324;The delivery chute base
It is fixed that quasi- plate body is equipped with the first fixing port 325, the second fixing port 326, third fixing port 327, the 4th fixing port the 328, the 5th
Mouth 329;The lower edge of docking section 322 is arranged in first fixing port 325 and the second fixing port 326;The third is solid
Determine mouth 327, the top edge of docking section 322 is arranged in the 4th fixing port 328;5th fixing port 329 is arranged in assisted parts
On 323;First fixing port 325, the second fixing port 326, third fixing port 327 are open flume type structure.
Referring to figure 4., Fig. 4 is the partial structural diagram of ceding of Taiwan component 2 and conveying bowl assembly 1 in connected state.Institute
The connection bolt assembly 33 stated includes positive connection bolt 331 and Opposite direction connection bolt 332;The positive connection bolt 331
It is first placed in from ceding of Taiwan connecting plate 31, and the direction installation being pierced by from delivery chute connecting plate 32 is fixed;The Opposite direction connection spiral shell
Bolt 332 is placed in from delivery chute connecting plate 32, and the direction installation being pierced by from ceding of Taiwan connecting plate 31 is fixed.
The embodiment it should be understood that
The design of attachment device 3 so that bowl assembly and ceding of Taiwan component 2 establish datum level, and can overcome conveying bowl assembly 1 certainly
Body gravity realizes the Fast Installation of conveying bowl assembly 1 and ceding of Taiwan component 2.
In the mounted state, ceding of Taiwan benchmark plate body and delivery chute benchmark plate body are docking together, using plank frame
Datum level is established, realizes and is installed by way of datum level, stationarity is good, while increasing the area of datum level.
The ceding of Taiwan benchmark plate body is made of main part 312 and extension 313, and the conveying bowl assembly 1 is by docking
Portion 322 and assisted parts 323 form, and in the mounted state, main part 312 and docking section 322 are corresponding, establish benchmark convenient for slightly walking
Face, extension 313 and assisted parts 323 are corresponding, are a supporting role, and are convenient for Fast Installation.
One edge of extension 313 is connect with the edge of main part 312 using arc transition;One edge of assisted parts 323
It is connect with the edge of docking section 322 using arc transition.The design method has the technical effect that;The connection type of arc transition,
Mechanical property is good, avoids in the case where installing squeezed state, and in edge, stress is concentrated and damages bosom.
The area coverage of the main part 312 and the area coverage of docking section 322 are equal, wherein assisted parts 323 covers
Capping product is greater than the area coverage of extension 313, which increases the contact area that conveying bowl assembly 1 is installed, so that
Convey the installation that bowl assembly 1 can be quick and stable.
The lower section of the ceding of Taiwan benchmark plate body is equipped with hang plate 314, and the bottom of ceding of Taiwan benchmark plate body passes through hang plate 314
It is fixed on ceding of Taiwan component 2;The top of the delivery chute benchmark plate body is equipped with oblique tube 324, and delivery chute benchmark plate body
Bottom is fixed on conveying bowl assembly 1 by oblique tube 324.The design method enables ceding of Taiwan connecting plate 31 to be obliquely installed
On ceding of Taiwan component 2, delivery chute connecting plate 32 can be inclined on conveying bowl assembly 1, to establish inclined benchmark
Face meets the use demand under delivery chute is in tilted layout.
The ceding of Taiwan benchmark plate body is equipped with the first bolt hole 315, the second bolt hole 316, third bolt hole 317, the
Four bolts hole 318, the 5th bolt hole 319;The delivery chute benchmark plate body is equipped with the first fixing port 325, the second fixing port
326, third fixing port 327, the 4th fixing port 328, the 5th fixing port 329.In the mounted state, the first bolt hole 315 and
One fixing port 325 is corresponding, and installs Opposite direction connection bolt 332;Second bolt hole 316 is corresponding with the second fixing port 326, and
Opposite direction connection bolt 332 is installed;Third bolt hole 317 is corresponding with third fixing port 327, and installs positive connection bolt 331;
4th bolt hole 318 is corresponding with the 4th fixing port 328, and installs positive connection bolt 331;5th bolt hole 319 and the 5th
Fixing port 329 is corresponding, and installs positive connection bolt 331.Having the technical effect that for the design method is solid using five-point type installation
Fixed, fixed effect is definite, and the 5th bolt hole 319 is corresponding with the 5th fixing port 329, and installs positive connection bolt 331, tool
There is pre-determined bit installation function, convenient for installation rapidly.
The connection bolt assembly 33 protects positive connection bolt 331 and Opposite direction connection bolt 332, the design method to make
It is flexible to obtain erection sequence, realizes be fixedly mounted from different directions, be conducive to Fast Installation.
First fixing port 325, the second fixing port 326, third fixing port 327 are open flume type structure.The design
Mode improves installation effectiveness, fixed effect is definite convenient for forward direction connection bolt 331 to be quickly placed in.
A kind of attachment device 3 convenient for delivery chute and ceding of Taiwan installation of the invention, can be realized and rapidly and efficiently install, and pacify
It is definite to fill fixed effect;Equipped with attachment device 3, so that bowl assembly and ceding of Taiwan component 2 establish datum level, and delivery chute group can be overcome
1 self gravity of part realizes the Fast Installation of conveying bowl assembly 1 and ceding of Taiwan component 2;Ceding of Taiwan benchmark plate body and delivery chute benchmark plate body
It is docking together, datum level is established using plank frame, realize and installed by way of datum level, stationarity is good, simultaneously
Increase the area of datum level;Ceding of Taiwan benchmark plate body is made of main part 312 and extension 313, the conveying bowl assembly 1 by
Docking section 322 and assisted parts 323 form, and in the mounted state, main part 312 and docking section 322 are corresponding, establish convenient for thick step
Datum level, extension 313 and assisted parts 323 are corresponding, are a supporting role, and are convenient for Fast Installation;The covering surface of main part 312
Product is equal with the area coverage of docking section 322, wherein and the area coverage of assisted parts 323 is greater than the area coverage of extension 313,
The design method increases the contact area that conveying bowl assembly 1 is installed, the peace for enabling conveying bowl assembly 1 quick and stable
Dress;Connection bolt assembly 33 protects positive connection bolt 331 and Opposite direction connection bolt 332, the design method to make erection sequence
Flexibly, it realizes and is fixedly mounted from different directions, be conducive to Fast Installation;First fixing port 325, the second fixing port 326, third are solid
Determining mouth 327 is open flume type structure.The design method improves installation effectiveness convenient for forward direction connection bolt 331 to be quickly placed in,
Fixed effect is definite.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
Member, under the premise of not departing from the method for the present invention, can also make several improvement and supplement, these are improved and supplement also should be regarded as
Protection scope of the present invention.
Claims (9)
1. it is a kind of convenient for delivery chute and the ceding of Taiwan installation harvester, which is characterized in that the harvester include conveying bowl assembly,
Ceding of Taiwan component, attachment device;The attachment device establishes datum level for conveying bowl assembly and ceding of Taiwan component, and can overcome conveying
Bowl assembly self gravity realizes the Fast Installation of conveying bowl assembly and ceding of Taiwan component;The attachment device includes ceding of Taiwan connection
Plate, delivery chute connecting plate, connection bolt assembly;Ceding of Taiwan connecting plate is installed on the ceding of Taiwan component;The conveying bowl assembly
It is equipped with delivery chute connecting plate;The ceding of Taiwan connecting plate and delivery chute connecting plate is fixed by connecting bolt assembly.
2. the harvester according to claim 1 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that the ceding of Taiwan connects
Fishplate bar includes ceding of Taiwan benchmark plate body;The ceding of Taiwan benchmark plate body is made of main part and extension, and main part and extension
Integratively formed, an edge of extension and the edge of main part are connected using arc transition;The ceding of Taiwan benchmark plate body
Lower section is equipped with hang plate, and the bottom of ceding of Taiwan benchmark plate body is fixed on ceding of Taiwan component by hang plate.
3. the harvester according to claim 2 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that the ceding of Taiwan base
Quasi- plate body is equipped with the first bolt hole, the second bolt hole, third bolt hole, the 4th bolt hole, the 5th bolt hole;Described first
The lower edge of main part is arranged in bolt hole and the second bolt hole;The third bolt hole and the 4th bolt hole are arranged in main body
The top edge in portion;5th bolt hole is arranged on extension.
4. the harvester according to claim 3 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that the delivery chute
Connecting plate includes delivery chute benchmark plate body;The delivery chute benchmark plate body is made of docking section and assisted parts, and docking section and
Assisted parts is Integratively formed, and an edge of assisted parts and the edge of docking section are connected using arc transition;The delivery chute
The top of benchmark plate body is equipped with oblique tube, and the bottom of delivery chute benchmark plate body is fixed on conveying bowl assembly by oblique tube.
5. the harvester according to claim 4 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that the delivery chute
Benchmark plate body is equipped with the first fixing port, the second fixing port, third fixing port, the 4th fixing port, the 5th fixing port;Described
The lower edge of docking section is arranged in one fixing port and the second fixing port;The third fixing port, the 4th fixing port are arranged right
The top edge of socket part;5th fixing port is arranged on assisted parts.
6. the harvester according to claim 5 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that described first is solid
Determining mouth, the second fixing port, third fixing port is open flume type structure.
7. the harvester according to claim 5 or 6 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that the company
Connecting bolt component includes positive connection bolt and Opposite direction connection bolt;The positive connection bolt is first set from ceding of Taiwan connecting plate
Enter, and the direction installation being pierced by from delivery chute connecting plate is fixed;The Opposite direction connection bolt is placed in from delivery chute connecting plate,
And the direction installation being pierced by from ceding of Taiwan connecting plate is fixed.
8. the harvester according to claim 4 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that the main part
Area coverage and docking section area coverage it is equal, the area coverage of assisted parts is greater than the area coverage of extension.
9. the harvester according to claim 7 convenient for delivery chute and ceding of Taiwan installation, which is characterized in that in installation condition
Under, the first bolt hole is corresponding with the first fixing port, and installs Opposite direction connection bolt;Second bolt hole is opposite with the second fixing port
It answers, and Opposite direction connection bolt is installed;Third bolt hole is corresponding with third fixing port, and installs positive connection bolt;4th spiral shell
Keyhole is corresponding with the 4th fixing port, and installs positive connection bolt;5th bolt hole is corresponding with the 5th fixing port, and installs
Forward direction connection bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811547859.9A CN109526364B (en) | 2018-12-18 | 2018-12-18 | Harvester convenient to conveyer trough and header installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811547859.9A CN109526364B (en) | 2018-12-18 | 2018-12-18 | Harvester convenient to conveyer trough and header installation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109526364A true CN109526364A (en) | 2019-03-29 |
CN109526364B CN109526364B (en) | 2022-04-05 |
Family
ID=65855257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811547859.9A Active CN109526364B (en) | 2018-12-18 | 2018-12-18 | Harvester convenient to conveyer trough and header installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109526364B (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101160489A (en) * | 2005-04-18 | 2008-04-09 | 圣戈班帕姆公司 | Raccord tubulaire a angle variable |
CN201167483Y (en) * | 2008-03-04 | 2008-12-24 | 中机南方机械股份有限公司 | Grain barrel-removing mechanism of combine-harvester |
CN203505067U (en) * | 2013-06-19 | 2014-04-02 | 奇瑞重工股份有限公司 | Combine harvester structure |
CN203684404U (en) * | 2013-12-30 | 2014-07-02 | 中国十七冶集团有限公司 | Fast mounting connection device for square steel tubular pillars |
CN302874007S (en) * | 2014-07-09 | |||
CN104089118A (en) * | 2014-06-27 | 2014-10-08 | 北京华美聚合物有限公司 | Flange |
EP2989882A1 (en) * | 2014-08-29 | 2016-03-02 | Deere & Company | Feederhouse arrangement for mounting a header to a combine |
CN105508500A (en) * | 2015-12-01 | 2016-04-20 | 北汽福田汽车股份有限公司 | Torsion damper and to-be-verified transmission system |
CN205266258U (en) * | 2015-12-30 | 2016-06-01 | 爱科大丰(兖州)农业机械有限公司 | Harvester header locking device |
CN205320579U (en) * | 2014-12-09 | 2016-06-22 | Ls美创有限公司 | Combine's cutting unit |
CN206237809U (en) * | 2016-10-14 | 2017-06-13 | 新乡市花溪机械制造有限公司 | A kind of cutting bench for harvesting and delivery chute Quick Connect Kit |
US20170276273A1 (en) * | 2016-03-28 | 2017-09-28 | Capital Hardware Supply, Inc. | Flange and method of attaching flange portions to duct members |
-
2018
- 2018-12-18 CN CN201811547859.9A patent/CN109526364B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN302874007S (en) * | 2014-07-09 | |||
CN101160489A (en) * | 2005-04-18 | 2008-04-09 | 圣戈班帕姆公司 | Raccord tubulaire a angle variable |
CN201167483Y (en) * | 2008-03-04 | 2008-12-24 | 中机南方机械股份有限公司 | Grain barrel-removing mechanism of combine-harvester |
CN203505067U (en) * | 2013-06-19 | 2014-04-02 | 奇瑞重工股份有限公司 | Combine harvester structure |
CN203684404U (en) * | 2013-12-30 | 2014-07-02 | 中国十七冶集团有限公司 | Fast mounting connection device for square steel tubular pillars |
CN104089118A (en) * | 2014-06-27 | 2014-10-08 | 北京华美聚合物有限公司 | Flange |
EP2989882A1 (en) * | 2014-08-29 | 2016-03-02 | Deere & Company | Feederhouse arrangement for mounting a header to a combine |
CN205320579U (en) * | 2014-12-09 | 2016-06-22 | Ls美创有限公司 | Combine's cutting unit |
CN105508500A (en) * | 2015-12-01 | 2016-04-20 | 北汽福田汽车股份有限公司 | Torsion damper and to-be-verified transmission system |
CN205266258U (en) * | 2015-12-30 | 2016-06-01 | 爱科大丰(兖州)农业机械有限公司 | Harvester header locking device |
US20170276273A1 (en) * | 2016-03-28 | 2017-09-28 | Capital Hardware Supply, Inc. | Flange and method of attaching flange portions to duct members |
CN206237809U (en) * | 2016-10-14 | 2017-06-13 | 新乡市花溪机械制造有限公司 | A kind of cutting bench for harvesting and delivery chute Quick Connect Kit |
Also Published As
Publication number | Publication date |
---|---|
CN109526364B (en) | 2022-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108709936B (en) | Wall hollowing detection maintenance device | |
CN210100328U (en) | Tubular pile mould convenient to dismouting | |
CN101781975B (en) | Screwing and buckling clamp for connecting and disassembling drill rod and sleeve pipe | |
CN107171139A (en) | A kind of bridge construction equipment | |
CN101824972B (en) | Mechanism for connecting and disconnecting drill rod and casing | |
CN109526364A (en) | A kind of harvester convenient for delivery chute and ceding of Taiwan installation | |
CN207841159U (en) | A kind of outdoor machine of air-conditioner assembly wrench | |
CN205873291U (en) | Robotic arm is got to multi freedom's material clamp | |
CN105058276B (en) | Clamp for oil pump transmission shaft support | |
CN210762974U (en) | Feeding device | |
CN207846502U (en) | Durable type digs hook rock arm forearm | |
CN210026230U (en) | Automatic feeding system | |
CN208884919U (en) | Gusseted aluminium alloy keelson | |
CN211449587U (en) | Gear fixing structure | |
CN210124869U (en) | Livestock blood collection device | |
CN207989450U (en) | A kind of connection structure for combined furniture | |
CN207986057U (en) | A kind of two push plate automatic charging machines | |
CN204173761U (en) | A kind of automatic hanging hook for pile tube | |
CN205567134U (en) | Green feed harvester header hanging mechanism | |
CN213900365U (en) | Jack support structure | |
CN202321495U (en) | Simple scraper conveyor tail push-and-pull device | |
CN201043467Y (en) | Gantry type intermediate haulage conveyor of heading machine | |
CN207926511U (en) | A kind of connector for solar photovoltaic assembly | |
CN208025287U (en) | A kind of lamps and lanterns | |
CN220789892U (en) | Improved quick connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20190329 Assignee: CHONGQING MEICHENG MACHINERY PARTS CO.,LTD. Assignor: CHONGQING SHINERAY AGRICULTURAL MACHINERY Co.,Ltd. Contract record no.: X2024980009005 Denomination of invention: A harvester that facilitates the installation of conveyor troughs and cutting platforms Granted publication date: 20220405 License type: Common License Record date: 20240705 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
OL01 | Intention to license declared |