CN109523421A CN201811355204.1A CN201811355204A CN109523421A CN 109523421 A CN109523421 A CN 109523421A CN 201811355204 A CN201811355204 A CN 201811355204A CN 109523421 A CN109523421 A CN 109523421A
Authority
CN
China
Prior art keywords
accident
case
construction
accident case
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811355204.1A
Other languages
Chinese (zh)
Inventor
杨再强
陈才平
杨再江
田茂琴
吕昌勇
黄光兵
杨秀宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zunyi Huazheng Cable Bridge Stand Co Ltd
Original Assignee
Zunyi Huazheng Cable Bridge Stand Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zunyi Huazheng Cable Bridge Stand Co Ltd filed Critical Zunyi Huazheng Cable Bridge Stand Co Ltd
Priority to CN201811355204.1A priority Critical patent/CN109523421A/en
Publication of CN109523421A publication Critical patent/CN109523421A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • G06Q50/205Education administration or guidance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Educational Technology (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Computer Graphics (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of power construction maintenance training system, at present field of electricity construction exist because the carrying out measures that powers failure, electrical verification, installing are grounded and fence etc. is most basic are not in place and caused by power construction accident.By summarizing existing power construction accident case, carry out the building of power construction case, it include project under construction and the link that disaster may occur in case, it is operated for user, it is final to carry out result judgement, achieve the purpose that carry out carrying out safety education by accident, avoids the generation again of accident.Wherein the building of case enhances the experience feeling of immersion of system by the way of three-dimensional simulation, and wherein power construction accident is summarized by database, and carries out movement decomposition, and case building person is made to complete whole case building by the selection of micromotion.

Description

A kind of power construction maintenance training system
Technical field
The present invention relates to power domain, in particular to a kind of power construction safeguards training system.
Background technique
Power engineering (electric power engineering), i.e., with the production of electric energy, conveying, the related work of distribution Journey broadly further includes the engineering that electricity is applied in multiple fields as power and energy.It is understood that simultaneously and send power transformation industry Expand engineering.In order to complete power engineering, the on-site construction operations of power worker are needed.Along with the risk of power construction, because Operation does not meet related regulation and there is a situation where accidents to happen occasionally.Number of patent application in the prior art are as follows: A kind of power grid disaster relief auxiliary decision-making support system based on GIS is referred in 201310747527.6 patent application, by whole Weather information is closed, the prediction of electric power meteorological disaster is carried out, and carries out the assessment and solution of disaster.Number of patent application are as follows: A kind of electric power safety technical ability emulation training device is proposed in the patent application of 201711201173.X, is carried out by visual illustration The understanding of voltage-stablizer correlation step learns, and increases associated safety consciousness.
The prediction and reply occurred in disaster accident that focus mostly on is used for the integration of electric power accident information in the prior art The solution of measure and electrical equipment fault, and for solution that the generation of electric power accident is not integrated targetedly Mode, or only single training can not cover hair Partial security accident.
In view of the above problems of the prior art, the application uses following technical scheme.
Summary of the invention
In order to solve the above technical problems, the invention is realized by the following technical scheme:
A kind of power construction maintenance training system, which is characterized in that specifically includes the following steps: accident case summarizes mould Block, accident case movement dismantling module, three-dimensional modeling module, accident case training building module and server.
Accident case summarizing module, which is characterized in that the electric power accident case in set period of time is carried out by internet Summarize, while also including the artificial increase for carrying out power construction accident case.
Accident case summarizing module, which is characterized in that after being collected into accident case written material, carry out according to training system The format that system requires is summarized, and the format is engineering project title, category work, engineering time, construction number, accident hair Raw time, number of injured people, accident equipment, cause of accident, casualty effect.
Accident case movement dismantling module, which is characterized in that wanted according to the format that meets that accident case summarizing module provides The accident case asked carries out accident case movement dismantling, and main includes construction logical design, emergency logic design, place model Design.
Accident case movement dismantling module, which is characterized in that construction logical design carries out sequence of construction according to project under construction The programming of operating process Rule of judgment is carried out with operating instruction;Emergency logic design is really situation according to accident generation, carries out accident Occurrence condition programming, for restoring the real causes of field accident generation;Place modelling, according to the true ring of construction site The various power equipments that border and accident are related to carry out the reduction of place equal proportion, complete various place equipment sizes and position Calculating.
Further, training system, which is characterized in that three-dimensional modeling module, the equipment and accident being related to according to project The range of generation carries out scene equal proportion in kind and models reduction.
Further, training system, which is characterized in that accident case training constructs module, is torn open according to accident case movement Construction logic and emergency logic that module provides are solved, in conjunction with the model of three-dimensional modeling module, carries out scene load and logic load, Complete accident case building.
Further, training system, which is characterized in that the server is used to carry out operator and scenario building end Interactive and multi-user shared interaction of accident case.
The beneficial effects of the present invention are:
1, by carrying out summarizing for safety accident after integrating existing power construction accident case formation database.
2, it is disassembled, is reconfigured by the transfer of accident case, effectively avoid the generation of new safety accident, risen To better educational function.
3, in such a way that three-dimensional modeling is simulated, the education feeling of immersion of safety accident is improved.
Detailed description of the invention
Working-flow figure Fig. 1 of the invention
System database storage table figure Fig. 2 of the invention
The present invention provides a kind of power construction maintenance training system, at present field of electricity construction exist because power failure, electrical verification, Installing ground line and fence etc. it is most basic carrying out measures it is not in place and caused by power construction accident.By summarizing existing electricity Power construction accident case carries out the building of power construction case, includes project under construction and the ring that disaster may occur in case Section, operates for user, finally carries out result judgement, achievees the purpose that carry out carrying out safety education by accident, avoid The generation again of accident.Wherein the building of case enhances the experience feeling of immersion of system, wherein electric power by the way of three-dimensional simulation Construction accident is summarized by database, and carries out movement decomposition, completes case building person by the selection of micromotion Whole case building.
Specific embodiment
Below in conjunction with specific embodiment, the present invention is described in further detail, but embodiments of the present invention are not It is limited to this, in the absence of conflict, the feature in embodiment and embodiment in the present invention can be combined with each other:
A kind of power construction maintenance training system, which is characterized in that specifically includes the following steps: accident case summarizes mould Block, accident case movement dismantling module, three-dimensional modeling module, accident case training building module and server.
Accident case summarizing module, which is characterized in that the electric power accident case in set period of time is carried out by internet Summarize, while also including the artificial increase for carrying out power construction accident case.
Further, server of the invention includes data base administration, and the storage of accident case is wherein carried out in database, Be defined by accident case format of the database to storage, at the same by database can carry out accident case retrieval and Inquiry, ensure that the quick obtaining of case.Database and each intermodule carry out the communication of data simultaneously.Such as 2 institute of Figure of description The table data store design for showing database resource storage section, including the storage management for carrying out accident essential information, and It is related to the information management of engineering, is related to the management of threedimensional model including engineering is carried out, while further including cause of accident and thing Therefore result and accident are related to the data management of specific equipment, wherein include depositing in cause of accident to accident movement and logic Storage carries out model load by 3 d rendering engine, and the cloth of entire engineering accident scene is completed by carrying out emergency logic load It postpones, for carrying out accident case examination, analysis is commented on.
Further, case includes but is not limited to the links that power equipment construction and Maintenance and Repair are related to, In include powers failure, electrical verification, install ground line, the basic measures such as fence, thing caused by wrong choice installation opportunity and construction equipment Therefore occur.News can be automatically grabbed by internet, thing can also be carried out by way of manually uploading accident case information Therefore case summarizes.
Accident case summarizing module, which is characterized in that after being collected into accident case written material, carry out according to training system The format that system requires is summarized, and the format is engineering project title, category work, engineering time, construction number, accident hair Raw time, number of injured people, accident equipment, cause of accident, casualty effect.
Further, summarize according to specified format, carry out movement dismantling and logical design convenient for subsequent, wherein accident case The communication of summarizing module and accident case movement dismantling module is completed by server.
Accident case movement dismantling module, which is characterized in that wanted according to the format that meets that accident case summarizing module provides The accident case asked carries out accident case movement dismantling, and main includes construction logical design, emergency logic design, place model Design.
Construction logic and emergency logic once design completion, and classified and stored will be carried out by server, subsequent if any similar The construction of type or accident case will transfer the building of logic progress accident case automatically.
Accident case movement dismantling module, which is characterized in that construction logical design carries out sequence of construction according to project under construction The programming of operating process Rule of judgment is carried out with operating instruction;Emergency logic design is really situation according to accident generation, carries out accident Occurrence condition programming, for restoring the real causes of field accident generation;Place modelling, according to the true ring of construction site The various power equipments that border and accident are related to carry out the reduction of place equal proportion, complete various place equipment sizes and position Calculating.
The emergency logic design of the accident case still further comprises the logical design for avoid accident to occur, and works as use Person triggers after the accident according to emergency logic, can be relearned after accident, understands the accident effectively avoided and occurs Operating method.
Further, training system, which is characterized in that three-dimensional modeling module, the equipment and accident being related to according to project The range of generation carries out scene equal proportion in kind and models reduction.
Further, training system, which is characterized in that accident case training constructs module, is torn open according to accident case movement Construction logic and emergency logic that module provides are solved, in conjunction with the model of three-dimensional modeling module, carries out scene load and logic load, Complete accident case building.
Further, training system, which is characterized in that the server is used to carry out operator and scenario building end Interactive and multi-user shared interaction of accident case.
The preferred embodiment of the present invention has been described in detail above, but the present invention is not limited to embodiment, Those skilled in the art can also make on the premise of not violating the inventive spirit of the present invention various equivalent modification or Replacement, these equivalent variation or replacement are all contained in scope of the present application.

Claims (8)

1. a kind of power construction safeguards training system, which is characterized in that specifically includes the following steps: accident case summarizing module, Accident case movement dismantling module, three-dimensional modeling module, accident case training building module and server.
2. accident case summarizing module as described in claim 1, which is characterized in that carried out in set period of time by internet Electric power accident case summarize, while also including the artificial increase for carrying out power construction accident case.
3. accident case summarizing module as claimed in claim 2, which is characterized in that when being collected into accident case written material Afterwards, it carries out being summarized according to the format that training system requires, when the format is engineering project title, category work, engineering Between, construction number, traffic injury time, number of injured people, accident equipment, cause of accident, casualty effect.
4. accident case movement dismantling module as described in claim 1, which is characterized in that mentioned according to accident case summarizing module The accident case for meeting call format supplied carries out accident case movement dismantling, and main includes construction logical design, emergency logic Design, place modelling.
5. accident case movement dismantling module as claimed in claim 4, which is characterized in that construction logical design is according to construction item Mesh carries out sequence of construction and operating instruction carries out the programming of operating process Rule of judgment;Emergency logic design occurs true according to accident It is situation, carries out the programming of accident occurrence condition, for restores the real causes of field accident generation;Place modelling, according to The various power equipments that the true environment and accident of construction site are related to carry out the reduction of place equal proportion, complete various fields The calculating of ground equipment size and position.
6. training system as described in claim 1, which is characterized in that three-dimensional modeling module, according to the equipment that project is related to And the range that accident occurs carries out scene equal proportion modeling reduction in kind.
7. training system as described in claim 1, which is characterized in that accident case training constructs module, according to accident case The construction logic and emergency logic that movement dismantling module provides carry out scene load and patrol in conjunction with the model of three-dimensional modeling module Load is collected, accident case building is completed.
8. training system as described in claim 1, which is characterized in that the server is for carrying out operator and scene structure The shared interaction of the accident case of the interaction and multi-user of building end.
CN201811355204.1A 2018-11-14 2018-11-14 A kind of power construction maintenance training system Pending CN109523421A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811355204.1A CN109523421A (en) 2018-11-14 2018-11-14 A kind of power construction maintenance training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811355204.1A CN109523421A (en) 2018-11-14 2018-11-14 A kind of power construction maintenance training system

Publications (1)

Publication Number Publication Date
CN109523421A true CN109523421A (en) 2019-03-26

Family

ID=65777738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811355204.1A Pending CN109523421A (en) 2018-11-14 2018-11-14 A kind of power construction maintenance training system

Country Status (1)

Country Link
CN (1) CN109523421A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636116A (en) * 2018-11-14 2019-04-16 遵义华正电缆桥架有限公司 A kind of equipment of security power construction
CN109657911A (en) * 2018-11-14 2019-04-19 遵义华正电缆桥架有限公司 System is instructed in a kind of assessment of power construction
CN110047344A (en) * 2019-04-18 2019-07-23 南京理工大学 Livewire work virtual reality
CN112216154A (en) * 2020-09-03 2021-01-12 国网山东省电力公司建设公司 Training teaching system and method based on intelligent glasses

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030233245A1 (en) * 2002-06-17 2003-12-18 Zemore Michael G. System safety analysis process and instruction
US20090222744A1 (en) * 2008-02-28 2009-09-03 Chevron U.S.A. Inc. Methods and Systems for Conducting a Meeting in a Virtual Environment
JP2013238749A (en) * 2012-05-16 2013-11-28 Mitsubishi Electric Corp Training simulator targeting power system facility
CN104318483A (en) * 2014-09-22 2015-01-28 国家电网公司 Virtual electric power urgent repair plan training system
CN104794950A (en) * 2014-12-31 2015-07-22 国网电力科学研究院武汉南瑞有限责任公司 Simulation training system and simulation training method for electric power operation accident case simulation
CN106202507A (en) * 2016-07-20 2016-12-07 广东电网有限责任公司东莞供电局 Electric power first-aid rehearsal analogue system and method
CN107480292A (en) * 2017-08-29 2017-12-15 广东电网有限责任公司中山供电局 A kind of security incident Training Methodology and system based on fuzzy algorithmic approach
CN107680433A (en) * 2017-11-27 2018-02-09 福州亿富人才服务有限公司 A kind of electric power safety technical ability emulation training device
KR101830295B1 (en) * 2017-06-23 2018-03-29 주식회사 주빅스 INTELLIGENT ACCIDENT PREVENTION TRAINING SELECTION DECISION SYSTEM OF TOXIC SUBSTANCE BUSINESS USING IoT SENSOR
CN108022039A (en) * 2017-11-21 2018-05-11 国家电网公司 A kind of Substation Training Simulator based on augmented reality
CN108038910A (en) * 2017-11-10 2018-05-15 广东电网有限责任公司教育培训评价中心 The implementation method of substation's main equipment Virtual Reality Demonstration
KR20180064065A (en) * 2016-12-05 2018-06-14 주식회사 네비웍스 Apparatus for marine rescue simulation and control method thereof

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030233245A1 (en) * 2002-06-17 2003-12-18 Zemore Michael G. System safety analysis process and instruction
US20090222744A1 (en) * 2008-02-28 2009-09-03 Chevron U.S.A. Inc. Methods and Systems for Conducting a Meeting in a Virtual Environment
JP2013238749A (en) * 2012-05-16 2013-11-28 Mitsubishi Electric Corp Training simulator targeting power system facility
CN104318483A (en) * 2014-09-22 2015-01-28 国家电网公司 Virtual electric power urgent repair plan training system
CN104794950A (en) * 2014-12-31 2015-07-22 国网电力科学研究院武汉南瑞有限责任公司 Simulation training system and simulation training method for electric power operation accident case simulation
CN106202507A (en) * 2016-07-20 2016-12-07 广东电网有限责任公司东莞供电局 Electric power first-aid rehearsal analogue system and method
KR20180064065A (en) * 2016-12-05 2018-06-14 주식회사 네비웍스 Apparatus for marine rescue simulation and control method thereof
KR101830295B1 (en) * 2017-06-23 2018-03-29 주식회사 주빅스 INTELLIGENT ACCIDENT PREVENTION TRAINING SELECTION DECISION SYSTEM OF TOXIC SUBSTANCE BUSINESS USING IoT SENSOR
CN107480292A (en) * 2017-08-29 2017-12-15 广东电网有限责任公司中山供电局 A kind of security incident Training Methodology and system based on fuzzy algorithmic approach
CN108038910A (en) * 2017-11-10 2018-05-15 广东电网有限责任公司教育培训评价中心 The implementation method of substation's main equipment Virtual Reality Demonstration
CN108022039A (en) * 2017-11-21 2018-05-11 国家电网公司 A kind of Substation Training Simulator based on augmented reality
CN107680433A (en) * 2017-11-27 2018-02-09 福州亿富人才服务有限公司 A kind of electric power safety technical ability emulation training device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚凡等: "基于Torque引擎的电力安规虚拟交互培训***", 《电力***及其自动化学报》 *
陈晓英等: "电气工程专业虚拟仿真实验平台的研究与实践", 《中国教育技术装备》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636116A (en) * 2018-11-14 2019-04-16 遵义华正电缆桥架有限公司 A kind of equipment of security power construction
CN109657911A (en) * 2018-11-14 2019-04-19 遵义华正电缆桥架有限公司 System is instructed in a kind of assessment of power construction
CN110047344A (en) * 2019-04-18 2019-07-23 南京理工大学 Livewire work virtual reality
CN112216154A (en) * 2020-09-03 2021-01-12 国网山东省电力公司建设公司 Training teaching system and method based on intelligent glasses

Similar Documents

Publication Publication Date Title
CN109523421A (en) A kind of power construction maintenance training system
CN105225566B (en) A kind of electric network emergency drills visual simulating deduction system
CN101894488B (en) Distributed three-dimensional simulation training system for regional power system transformer station
CN105005658A (en) Logic simulation method of comprehensive automation system equipment of transformer substation
CN109191591A (en) Substation Training Simulator construction method based on augmented reality
CN104835376B (en) There is the dispatcher training system system of prepared auto restart automatic safety device action simulation
Cagnan et al. Discrete event simulation of the post-earthquake restoration process for electric power systems
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN106056302A (en) Modeling method based on petrochemical enterprise industrial site hazard source and risk information
CN104835078B (en) Consider that the trend of prepared auto restart action determines method in static security analysis system
CN110490361A (en) The digital emergency planning system and its design method of urban distribution network contingency management
CN104463465B (en) A kind of real time monitoring clustering methods based on distributed model
CN104809659B (en) Intelligent advanced application system suitable for districted dispatch system
CN105976682A (en) Simulation platform used for power grid training
CN102064602A (en) Operating method of B/S framework networked electronic simulation drawing board system
Gomes et al. Energy analyzer emulator for microgrid implementation and demonstration and respective gateway
CN104898460B (en) Suitable for the online static security analysis system of districted dispatch system
Dong et al. Urban rail emergency response using pedestrian dynamics
Uddin et al. Disaster management system for southwestern Indiana
CN104318833A (en) Working method for of power grid dispatching automation training system
CN202650332U (en) Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks
CN110765575A (en) Emergency simulation device, computer equipment and storage medium for power system
Gao et al. The Research and Development of Integrated Operation-Maintenance Simulation Training System [J]
Wachtel et al. Sandia's Integrated Methodology for Energy and Infrastructure Resilience Analysis
CN113158317A (en) Civil engineering virtual model and modeling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190326

RJ01 Rejection of invention patent application after publication