CN109523173A CN201811386916.XA CN201811386916A CN109523173A CN 109523173 A CN109523173 A CN 109523173A CN 201811386916 A CN201811386916 A CN 201811386916A CN 109523173 A CN109523173 A CN 109523173A
Authority
CN
China
Prior art keywords
ship
container
truck
stockyard
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811386916.XA
Other languages
Chinese (zh)
Inventor
鲁渤
王乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University
Original Assignee
Dalian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University filed Critical Dalian University
Priority to CN201811386916.XA priority Critical patent/CN109523173A/en
Publication of CN109523173A publication Critical patent/CN109523173A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Operations Research (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of container hargour production scheduling method, belongs to electronic information technical field.Technical solution: steps are as follows: application stop processing;Vessel berth operation;Loading and unloading container is to truck;Truck transports container to stockyard;It mentions container and goes out harbour from stockyard.The utility model has the advantages that advanced practical information technology application is built and is operated in modern port by container hargour production scheduling method of the present invention, improve Port Logistics Service quality, with computer assisted Port Production Schedule plan than manually relying on the plan of experience more scientific, it can take into account more multifactor, keep the benefit of production higher, risk is smaller.

Description

A kind of container hargour production scheduling method
Technical field
The present invention relates to electronic information technical field more particularly to a kind of container hargour production scheduling methods.
Background technique
Under the background of the traffic of a port steeply risen, Container Transport brings new problem to harbour.On the one hand, Container ship is more and more large-scale, to meet the needs of world container operation.As ship is constantly towards the side of enlargement To development, container terminal is faced with a series of challenge in terms of the scheduling of resource and configuration and managed operation.On the other hand, With increasing sharply for World Port container throughput, the market competitiveness for how improving harbour gradually becomes each collection in the whole world The problem of vanning harbour is paid close attention to the most, and this mainly passes through raising rate of return on investment and service level is realized.In harbor service Amount increases sharply, production-scale continuous enlargement, and the information explosion formula in production process increases, and harbour organization of production tends to Under complicated background, carrying out Port Production Schedule by traditional manual decision, oneself becomes more difficult.For this purpose, allow computer and The cooperation of its tool manually completes Port Production Schedule operation, realizes that harbour informationization just becomes more and more important.
Summary of the invention
In order to be carried out to the time and position stopped to port ship needed for the Container Transport inside arrangement and this harbour The progress such as equipment, human resources, haulage time reasonably arrange that a kind of container hargour production is provided and is adjusted with distribution, the present invention Advanced practical information technology application is built and is operated in modern port by degree method, this method, improves Port Logistics Service Quality, with computer assisted Port Production Schedule plan than manually rely on experience plan it is more scientific, can take into account it is more because Element keeps the benefit of production higher, and risk is smaller.The technical solution is as follows:
Technical solution is as follows:
A kind of container hargour production scheduling method, steps are as follows:
S1, application stop processing;
S2, vessel berth operation;
S3, loading and unloading container to truck;
S4, truck transport container to stockyard;
S5, it mentions container and goes out harbour from stockyard.
Further, specific step is as follows by step S1:
S1.1, the time of pulling in shore proposed according to ship, the offshore time, the length of ship, draft, type of merchandize is loaded Decide whether that receiving stop processing records ship information if receiving, for formulating the plan of berthing;
S1.2, receive after stopping, plan situation according to same day items real time information and port resources, establishment is round the clock using meter It draws;
S1.3, according to harbour round the clock production plan and application stop hang ship shipping data, ship header tank position, ship it is total Times digit formulates ship and stops all plans, monthly plan, plans in ten days;
S1.4, it is according to boat length, shipping draft, shipping container handling the stockyard position of application dock vessels Dock vessels formulate the route that berths.
Further, in step S2, type, the container loading type of merchandize, container of container are loaded as needed Weight, which is formulated, loads ship production plan.
Further, specific step is as follows by step S3:
The load-carrying weight for the ship that S3.1, basis are collected into, clean ship position of centre of gravity, ship draft, loads goods at light weight Species type, the distributed intelligence of operation bridge crane are monitored ship loading and unloading stability;
S3.2, being moored a boat according to harbour loads needs, foundation suspension bridge operating efficiency highest, the highest principle of operation rate of machinery, And the factor of turnround of a ship limitation, reasonable suspension bridge quantity is distributed for vessel at anchor;
S3.3, being moored a boat according to harbour loads needs, according to truck utilization rate highest, the truck original nearest from service stockyard Then and the factor of turnround of a ship limitation, reasonable truck number is distributed for vessel at anchor.
Further, specific step is as follows by step S4:
S4.1, according to container type, empty van will be exported, export loaded van, be put in front of pier storage yard, and reserve channel, For truck and mechanical work;By transfer loaded van, transfer empty van is put among pier storage yard, and keeps suitable with other types container Work as distance;Inlet box and specific bin are arranged in pier storage yard rear, and keep suitable distance with other types container, is stayed Channel out, for truck and mechanical work;
S4.2, suitcase projected conditions are sticked into according to work team's loading, unloading ship and outer collection, first macroscopic view considers substantially walking for general machine To and determine operation keypoint, then organize work around operation keypoint;
S4 deploys mechanical Relatively centralized toward EXPORT CARTON area if 3, EXPORT CARTON on duty is loaded onto ship, inlet is more;If It is on duty unloading, suitcase it is more, then Relatively centralized is in inlet box area.
Further, specific step is as follows by step S5:
S5.1, suitcase formality is handled, inlet box suitcase voucher is checked, voucher is provided to EXPORT CARTON;And to outlet Case is numbered and classifies, and is the suitable stockyard of container arrangement;
S5.2, the truck to access to the ports is checked;
S5.3, the position serviced between stockyard and service bridge crane according to truck are with truck distance covered recently for principle Truck formulates track route;
S5.4, registration, the special object of typing are monitored to the special article for being entered or being exported by this harbour may be equipped with The details of product.
Further, it loads ship production plan and follows following principle:
(1) the mixed port phenomenon loaded in mixture without different port discharge containers;
(2) phenomenon of overstocking a harbour for arriving first port is pressed to port without after;
(3) position that dangerous material case, extraordinary case are strictly specified by ship is with ship;
(4) container matches ship, except ship requires or in addition to taking special measure, it is necessary to follow that small not press big, weight not press light Principle.
The beneficial effects of the present invention are:
Container hargour production scheduling method of the present invention is by advanced practical information technology application in modernization port Mouth construction and running, improve Port Logistics Service quality, have computer assisted Port Production Schedule plan ratio is artificial to rely on The plan of experience is more scientific, can take into account it is more multifactor, make production benefit it is higher, risk is smaller.
Detailed description of the invention
Fig. 1 is the topology theory figure of container hargour Production Scheduling System of the invention.
Specific embodiment
Embodiment 1
A kind of container hargour Production Scheduling System, comprising: ship stops schedule module, prestowage monitoring module, stockyard prison Control module and road junction monitoring module.The ship stops schedule module and is mainly characterized by processing ship stop application, and formulation stops Pool, berthing schedule and establishment production plan round the clock;The prestowage monitoring module predominantly guarantees container terminal prestowage planning Both having met laden container ship has airworthiness of appropriateness etc. is specific to require, and meets wanting for harbour organization of production again It asks;The stockyard monitoring module major function is that rationally, effectively allotment storage yard operation is mechanical, is guaranteeing that raising harbour is external Under the premise of service level and the other production runnings of harbour are unaffected, so that the links at scene are harmonious, Ge Xiangzuo Industry be able to it is smooth, orderly, quick, safely, effectively complete;The road junction monitoring module major function is to guarantee that container exists The stacking quality of harbour guarantees prestowage and the operating efficiency of ship.
Further, it includes that processing module, round the clock production plan system are stopped in ship application that the ship, which stops schedule module, Cover half block and berthing schedule formulate module;The prestowage monitoring module includes loading ship production plan module, stability of ship prison Control module, suspension bridge plan of distribution formulates module and truck plan of distribution formulates module;The stockyard monitoring module includes mechanical makees Industry monitoring module and stockyard storage plan formulate module;The road junction monitoring module include disengaging case suitcase check-in module, Truck passes in and out stockyard monitoring module, truck route planning arranges module and special article passes in and out stockyard monitoring module.
Further, the container hargour Production Scheduling System needs to be divided into three according to what function and information management were transmitted Layer, first layer are total activation center, and the information of this layer of main management second layer simultaneously exercises supervision to the operation of the second layer;Second The modules of layer are to be responsible for the production department of different business during container ship application is accommodated to container and is extracted Door, and there is undertaking effect in business, in addition, the second layer is also managed and supervises to the information of third layer, while also bearing Blame the intercommunication between third layer information;The functional module of third layer is classified by operation object, although their function is different, It is to be substantially to be broadly divided into plan and monitoring for an operation object or an operation purpose, the operation of third layer Two big functions.
Internet Tele monitoring system is combined together with marine system, mooring monitoring system is formed, code can be monitored The information such as the cable stress situation of head mooring ship and steamer amount of exercise solve weak, the disconnected cable of artificial mooring operability and fill out therefore pass through The problem of often occurring.
Embodiment 2
Container hargour Production Scheduling System of the invention considers that Port Production Schedule system requirements information flowability is special by force Point uses centralized design mode, as shown in Figure 1, comprising: ship stops schedule module, prestowage monitoring module, stockyard monitoring mould Block and road junction monitoring module.
The ship, which stops schedule module and is mainly characterized by processing ship, stops application, formulation berths, berthing schedule and Work out production plan round the clock;It is laden that the prestowage monitoring module predominantly guarantees that container terminal prestowage planning had both met Container ship has airworthiness of appropriateness etc. is specific to require, and meets the requirement of harbour organization of production again;The stockyard Monitoring module major function is that rationally, effectively allotment storage yard operation is mechanical, is guaranteeing to improve the external service level of harbour and code Under the premise of other productions runnings are unaffected so that the links at scene are harmonious, every operation be able to smoothly, have Sequence quickly, safely, effectively is completed;The road junction monitoring module major function is to guarantee container in the stacking matter of harbour Amount, guarantees prestowage and the operating efficiency of ship.
It includes that ship application is stopped processing module, round the clock production plan formulation module and leaned on that the ship, which stops schedule module, Moor plan module;The prestowage monitoring module includes loading ship production plan module, stability of ship monitoring module, suspension bridge Plan of distribution formulates module and truck plan of distribution formulates module;The stockyard monitoring module include mechanical work monitoring module and Stockyard storage plan formulates module;The road junction monitoring module include disengaging case suitcase check-in module, truck disengaging stockyard Monitoring module, truck route planning arrange module and special article to pass in and out stockyard monitoring module.
The container hargour Production Scheduling System needs to be divided into three layers according to what function and information management were transmitted, first layer For total activation center, the information of this layer of main management second layer simultaneously exercises supervision to the operation of the second layer;The second layer it is each Module is to be responsible for the production division of different business, and in industry during container ship application is accommodated to container and is extracted There is undertaking effect in business, in addition, the second layer is also managed and supervises to the information of third layer, while being also responsible for third layer letter Intercommunication between breath;Classifying by operation object for the functional module of third layer, although their function is different, is substantially For an operation object or an operation purpose, the operation of third layer is broadly divided into two big functions of plan and monitoring.
The length of time of pulling in shore, offshore time and ship that the ship application stop processing module is proposed according to ship, Draft is mounted in the information such as type of merchandize, decides whether to receive stop processing, if receiving, it will record ship information in detail, For formulating the plan of berthing;The production plan round the clock formulates module and plans feelings according to same day items real time information and port resources Condition, establishment include the application plan round the clock to resources such as library field, equipment, goods and materials, water power, manpowers;The berthing schedule formulates mould Root tuber stops to hang total times of marine data, ship header tank position, ship digit formulation ship according to harbour production plan and application round the clock Oceangoing ship stops all plans, monthly plan, ten days plan, according further to boat length, shipping draft, the ship collection of application dock vessels The information such as vanning handling stockyard position, formulate the route that berths for dock vessels.
The type for loading ship production plan module and loading container as needed, such as Container Dimensions, container dress Loading species, Container Weight etc., it then follows container matches ship, in addition to ship requires or takes special measure, it is necessary to follow It is small that big, weight is not pressed or not the principles such as light, it prevents unreasonable stockyard and takes the feelings such as case mould turnover, unreasonable operation road intersection Condition;The stability of ship monitoring module function is the load-carrying weight of collecting ship, light weight, clean ship position of centre of gravity, and ship is eaten Water depth etc., and cargo type is loaded, the distributed intelligence of operation bridge crane supervises ship loading and unloading stability according to certain standard Control;The suspension bridge plan of distribution formulates module and loads needs mooring a boat according to harbour, according to suspension bridge operating efficiency highest, mechanical benefit It is limited with rate highest and turnround of a ship, is that every vessel at anchor distributes reasonable suspension bridge quantity;The truck plan of distribution Module is formulated according to harbour in useful load needs of mooring a boat, truck utilization rate highest, truck is nearest from service stockyard and ship exists ETA estimated time of arrival limitation is that every vessel at anchor distributes reasonable truck number.
The mechanical work monitoring module sticks into suitcase projected conditions according to work team's loading, unloading ship and outer collection, and first macroscopic view considers The substantially trend of general machine simultaneously determines operation keypoint, then organizes work around operation keypoint, should be in line with nearest, energy-efficient original It then and according to the busy extent in case area deploys mechanical;The stockyard storage plan is formulated functions of modules and is according to container class Type will export empty van, exports loaded van, is put in the appropriate place in front of pier storage yard, by transfer loaded van, transfer empty van is put in harbour Among stockyard, inlet box and some specific bins (such as refrigerating box, dangerous material case, empty van) are arranged in the rear of pier storage yard, And suitable distance is kept with other types container, channel is reserved, for truck and mechanical work.
The disengaging case suitcase module that check-ins is module that harbour is directly contacted with agent or trustee, this Module is responsible for the verification of inlet box suitcase voucher, EXPORT CARTON voucher granting, and EXPORT CARTON is numbered and is classified, to be packaging Case arranges suitable stockyard;Truck disengaging stockyard monitoring module checks the truck to access to the ports, this peace for harbour Entirely, and maintenance harbour normal operation order has extremely important effect;Truck route planning arranges module to be taken according to truck Best track route is formulated for truck with truck distance covered recently for principle in the position being engaged between stockyard and service bridge crane;It is special Different article disengaging stockyard monitoring module is frangible to may be equipped with the special article such as dangerous material for being entered or being exported by this harbour Product, or the container of the article with specific use, are monitored registration, need the details of typing special article, such as Trustee's information, article purposes, Container Yard position, into or out stockyard when, whether article has the carry out such as breakage detailed Record.
Container hargour Production Scheduling System work of the invention is summarized as follows:
Application stop processing → vessel berth operation → loading and unloading container to truck → truck fortune container to stockyard → It mentions container and goes out harbour from stockyard
1, application stop processing
It is executed in this link in the case where ship stops schedule module.
When ship stops time of pulling in shore, the offshore that the ship application stop processing module in schedule module is proposed according to ship Between and the length of ship, draft, load the information such as type of merchandize, decide whether to receive stop processing, if receiving, it will Record ship information in detail, for formulating the plan of berthing.
Receive after stopping, production plan, which will formulate module, round the clock to plan feelings according to same day items real time information and port resources Condition works out application plan round the clock.
Then, according to harbour, production plan and application stop hanging marine data, ship berthing schedule formulation module round the clock Total times of oceangoing ship header tank position, ship digit formulate ship and stop all plans, monthly plan, ten days plan, according further to application dock vessels The information such as boat length, shipping draft, shipping container handling stockyard position, formulate the route that berths for dock vessels.
2, vessel berth operates
This link carries out vessel berth operation according to the plan of berthing of above-mentioned formulation, after smoothly berthing, monitors mould by prestowage Loading ship production plan module in block loads the type of container, such as Container Dimensions, container loading cargo as needed Type, the formulations such as Container Weight load ship production plan.
It wherein loads ship production plan and needs to follow following principle:
(1) the mixed port phenomenon loaded in mixture without different port discharge containers.
(2) phenomenon of overstocking a harbour for arriving first port is pressed to port without after.
(3) position that dangerous material case, extraordinary case are strictly specified by ship is with ship.
(4) container matches ship, except ship requires or in addition to taking special measure, it is necessary to follow that small not press big, weight not press light Principle.
3, loading and unloading container is to truck
This link carries out under prestowage monitoring module.
During loading and unloading container to truck, by the stability of ship monitoring module under prestowage monitoring module according to collection The load-carrying weight of the ship arrived, light weight, clean ship position of centre of gravity, ship draft etc. and load cargo type, operation bridge crane Distributed intelligence is monitored ship loading and unloading stability according to certain standard.
Suspension bridge plan of distribution formulates module and loads needs mooring a boat according to harbour, mechanical according to suspension bridge operating efficiency highest Utilization rate highest and turnround of a ship limitation, distribute reasonable suspension bridge quantity for vessel at anchor.
Truck plan of distribution formulates module according to harbour in useful load needs of mooring a boat, and truck utilization rate highest, truck is from clothes Being engaged in, stockyard is nearest and turnround of a ship limits, and distributes reasonable truck number for vessel at anchor.
4, truck transports container to stockyard
This link carries out under the monitoring module of stockyard.
Stockyard storage plan formulates module according to container type, will export empty van, loaded van is exported, before being put in pier storage yard The appropriate place of side, and channel is reserved, for truck and mechanical work.By transfer loaded van, transfer empty van is put among pier storage yard, And suitable distance is kept with other types container, in order to distinguish and hauling operation.(such as by inlet box and some specific bins Refrigerating box, dangerous material case, empty van) it is arranged in the rear of pier storage yard, and suitable distance is kept with other types container, it reserves Channel, for truck and mechanical work.
Mechanical work monitoring module sticks into suitcase projected conditions according to work team's loading, unloading ship and outer collection, and first macroscopic view considers overall Mechanical substantially trend simultaneously determines operation keypoint, then organizes work around operation keypoint, such as EXPORT CARTON on duty shipment, inlet compared with More, in scheduling job machinery, mechanical Relatively centralized should be deployed toward EXPORT CARTON area as far as possible consciously;, whereas if working as Class's unloading, suitcase are more, then Relatively centralized is in inlet box area.It, should be in line with nearest, energy-efficient principle, as far as possible when allotment is mechanical Avoid the frequent steering and the conversion of case area of Work machine.Due to the particularity of case area layout, operating efficiency and peace are being considered Wheel should be arranged to lift up into the area Hang Zhengxiang (mono-/bis-number wheel is hung with the area mono-/bis-Shuo Xiang) operation when full property as far as possible.In addition, due to each machinery Driver's level of operation is irregular, also Work machine should be exchanged in due course according to the busy extent in case area, to improve operating efficiency.
5, it mentions container and goes out harbour from stockyard
All containers that disengaging pier storage yard is transported by truck, it is necessary to pass through harbour inspection socket.So link is in road It is carried out under mouth monitoring model.
Harbour and agent or trustee handle suitcase formality by passing in and out the case suitcase module that check-ins, and pass in and out case and mention The case module that check-ins checks inlet box suitcase voucher, provides voucher to EXPORT CARTON.And to EXPORT CARTON be numbered with Classification is the suitable stockyard of container arrangement.
Truck disengaging stockyard monitoring module checks the truck to access to the ports.
Truck route planning arrange module according to truck service stockyard and service bridge crane between position, with truck walk away from From being recently principle, best track route is formulated for truck.
Special article passes in and out stockyard monitoring module and carries out to that may be equipped with the special article for being entered or being exported by this harbour Monitoring registration, the details of typing special article, such as trustee's information, article purposes, Container Yard position, disengaging heap Whether article has breakage etc. when field.
The present invention program also has the following characteristics that
Convenient for providing better service for client.System concentrates operation, can provide skill for internal system uniform service process Art is supported, will be can ensure that the client in system transacting business, is enjoyed the business service of system unified flow, uniform level.Visitor The business that family is handled in different harbours can be handled in the unified production business management system of system and declare, document, dynamically look into The business such as inquiry.
Convenient for Work Flow Optimizing and improve system wealth material centralized management efficiency.System pooled applications, be conducive to be from now on The adjustment and implementation of large-scale Work Flow Optimizing strategies such as the handling of system are specialized, cargo service concentration is handled etc., are improved System general headquarters wealth, material, business resource centralized management efficiency.
Upgrading and technical support convenient for safeguarding.The main software and hardware system in backstage concentrates on system general headquarters, maintenance and technology branch In holding force quantity set, when system upgrade, need to only be paid close attention at one.Convenient for the hardware and software device maintenance of system scale and system upgrade.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art within the technical scope of the present disclosure, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of container hargour production scheduling method, which is characterized in that steps are as follows:
S1, application stop processing;
S2, vessel berth operation;
S3, loading and unloading container to truck;
S4, truck transport container to stockyard;
S5, it mentions container and goes out harbour from stockyard.
2. container hargour production scheduling method as described in claim 1, which is characterized in that specific step is as follows by step S1:
S1.1, the time of pulling in shore proposed according to ship, the offshore time, the length of ship, draft, type of merchandize decision is loaded Whether receiving stop is handled, if receiving, ship information is recorded, for formulating the plan of berthing;
S1.2, receive after stopping, situation is planned according to same day items real time information and port resources, works out application plan round the clock;
S1.3, stopped to hang shipping data, total times of the ship header tank position, ship position of ship according to harbour production plan and application round the clock Numeral system determines ship and stops all plans, monthly plan, ten days plan;
S1.4, stockyard position is loaded and unloaded according to the boat length, shipping draft, shipping container of application dock vessels to stop Ship formulates the route that berths.
3. container hargour production scheduling method as described in claim 1, which is characterized in that in step S2, fill as needed The type, container loading type of merchandize, Container Weight for carrying container, which are formulated, loads ship production plan.
4. container hargour production scheduling method as described in claim 1, which is characterized in that specific step is as follows by step S3:
The load-carrying weight for the ship that S3.1, basis are collected into, clean ship position of centre of gravity, ship draft, loads cargo class at light weight Type, the distributed intelligence of operation bridge crane are monitored ship loading and unloading stability;
S3.2, being moored a boat according to harbour loads needs, according to suspension bridge operating efficiency highest, the highest principle of operation rate of machinery, and The factor of turnround of a ship limitation distributes reasonable suspension bridge quantity for vessel at anchor;
S3.3, being moored a boat according to harbour loads needs, according to truck utilization rate highest, the truck principle nearest from service stockyard, with And the factor of turnround of a ship limitation, reasonable truck number is distributed for vessel at anchor.
5. container hargour production scheduling method as described in claim 1, which is characterized in that specific step is as follows by step S4:
S4.1, according to container type, empty van will be exported, export loaded van, be put in front of pier storage yard, and reserve channel, for collection Card and mechanical work;By transfer loaded van, transfer empty van is put among pier storage yard, and with other types container keep suitably away from From;Inlet box and specific bin are arranged in pier storage yard rear, and keep suitable distance with other types container, is reserved logical Road, for truck and mechanical work;
S4.2, suitcase projected conditions are sticked into according to work team's loading, unloading ship and outer collection, first macroscopic view considers the substantially trend of general machine simultaneously It determines operation keypoint, then organizes work around operation keypoint;
S4 deploys mechanical Relatively centralized toward EXPORT CARTON area if 3, EXPORT CARTON on duty is loaded onto ship, inlet is more;If on duty Unloading, suitcase are more, then Relatively centralized is in inlet box area.
6. container hargour production scheduling method as described in claim 1, which is characterized in that specific step is as follows by step S5:
S5.1, suitcase formality is handled, inlet box suitcase voucher is checked, voucher is provided to EXPORT CARTON;And to EXPORT CARTON into Row number and classification are the suitable stockyard of container arrangement;
S5.2, the truck to access to the ports is checked;
S5.3, stockyard is serviced according to truck and services the position between bridge crane, be truck with truck distance covered recently for principle Formulate track route;
S5.4, registration is monitored to the special article for being entered or being exported by this harbour may be equipped with, typing special article Details.
7. container hargour production scheduling method as claimed in claim 3, which is characterized in that load ship production plan follow with Lower principle:
(1) the mixed port phenomenon loaded in mixture without different port discharge containers;
(2) phenomenon of overstocking a harbour for arriving first port is pressed to port without after;
(3) position that dangerous material case, extraordinary case are strictly specified by ship is with ship;
(4) container matches ship, except ship requires or in addition to taking special measure, it is necessary to follow and small big, weight not pressed or not light principle.
CN201811386916.XA 2018-11-20 2018-11-20 A kind of container hargour production scheduling method Pending CN109523173A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811386916.XA CN109523173A (en) 2018-11-20 2018-11-20 A kind of container hargour production scheduling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811386916.XA CN109523173A (en) 2018-11-20 2018-11-20 A kind of container hargour production scheduling method

Publications (1)

Publication Number Publication Date
CN109523173A true CN109523173A (en) 2019-03-26

Family

ID=65778137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811386916.XA Pending CN109523173A (en) 2018-11-20 2018-11-20 A kind of container hargour production scheduling method

Country Status (1)

Country Link
CN (1) CN109523173A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111137693A (en) * 2019-12-27 2020-05-12 唐山哈船科技有限公司 Automatic port container handling vehicle and using method thereof
CN111932203A (en) * 2020-08-03 2020-11-13 上海海勃物流软件有限公司 Automatic position selection and distribution method, terminal and medium for turning containers in container area
CN112150073A (en) * 2020-09-28 2020-12-29 南京联迪信息***股份有限公司 Port logistics intelligent scheduling information management and control system based on Internet of things and operation method thereof
CN113033929A (en) * 2019-12-24 2021-06-25 江苏金风科技有限公司 Method and device for calculating landing time of offshore wind turbine generator
CN116403441A (en) * 2023-06-09 2023-07-07 广船国际有限公司 Scheduling method, device, equipment and medium for ship arrival and departure
CN117592703A (en) * 2023-11-17 2024-02-23 哪吒港航智慧科技(上海)有限公司 Ship monitoring and operation method, system and equipment for cargo owner wharf

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458788A (en) * 2008-12-19 2009-06-17 天津市市政工程设计研究院 Container terminal physical distribution emulation optimizing system
CN101587571A (en) * 2008-05-20 2009-11-25 上海海事大学 Container terminal yard optimization system
CN103020783A (en) * 2012-12-25 2013-04-03 天津港(集团)有限公司 Control method for allocating yard trailers of container terminal
CN105913208A (en) * 2016-04-13 2016-08-31 北京优弈数据科技有限公司 Whole-yard automatic combined scheduling method of container harbor
CN107133737A (en) * 2017-05-03 2017-09-05 大连大学 A kind of container terminal intelligent operation management system and management method
CN107146055A (en) * 2017-05-03 2017-09-08 大连大学 A kind of container terminal BPM information system and management method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101587571A (en) * 2008-05-20 2009-11-25 上海海事大学 Container terminal yard optimization system
CN101458788A (en) * 2008-12-19 2009-06-17 天津市市政工程设计研究院 Container terminal physical distribution emulation optimizing system
CN103020783A (en) * 2012-12-25 2013-04-03 天津港(集团)有限公司 Control method for allocating yard trailers of container terminal
CN105913208A (en) * 2016-04-13 2016-08-31 北京优弈数据科技有限公司 Whole-yard automatic combined scheduling method of container harbor
CN107133737A (en) * 2017-05-03 2017-09-05 大连大学 A kind of container terminal intelligent operation management system and management method
CN107146055A (en) * 2017-05-03 2017-09-08 大连大学 A kind of container terminal BPM information system and management method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113033929A (en) * 2019-12-24 2021-06-25 江苏金风科技有限公司 Method and device for calculating landing time of offshore wind turbine generator
CN113033929B (en) * 2019-12-24 2022-07-12 江苏金风科技有限公司 Method and device for calculating landing time of offshore wind turbine generator
CN111137693A (en) * 2019-12-27 2020-05-12 唐山哈船科技有限公司 Automatic port container handling vehicle and using method thereof
CN111932203A (en) * 2020-08-03 2020-11-13 上海海勃物流软件有限公司 Automatic position selection and distribution method, terminal and medium for turning containers in container area
CN111932203B (en) * 2020-08-03 2021-06-22 上海海勃物流软件有限公司 Automatic position selection and distribution method, terminal and medium for turning containers in container area
CN112150073A (en) * 2020-09-28 2020-12-29 南京联迪信息***股份有限公司 Port logistics intelligent scheduling information management and control system based on Internet of things and operation method thereof
CN116403441A (en) * 2023-06-09 2023-07-07 广船国际有限公司 Scheduling method, device, equipment and medium for ship arrival and departure
CN116403441B (en) * 2023-06-09 2023-11-10 广船国际有限公司 Scheduling method, device, equipment and medium for ship arrival and departure
CN117592703A (en) * 2023-11-17 2024-02-23 哪吒港航智慧科技(上海)有限公司 Ship monitoring and operation method, system and equipment for cargo owner wharf
CN117592703B (en) * 2023-11-17 2024-06-11 哪吒港航智慧科技(上海)有限公司 Ship monitoring and operation method, system and equipment for cargo owner wharf

Similar Documents

Publication Publication Date Title
CN109409779A (en) A kind of container hargour Production Scheduling System
CN109523173A (en) A kind of container hargour production scheduling method
Murty et al. Hongkong International Terminals gains elastic capacity using a data-intensive decision-support system
CN110147069A (en) A kind of the harbour real-time monitoring system and its working method twin based on number
CN107545366A (en) The shipment dispatching method and system of full-automatic container terminal
Chen et al. Container port drayage operations and management: Past and future
Li et al. Modeling and simulation of container terminal logistics systems using Harvard architecture and agent-based computing
CN112070296B (en) Fuzzy reasoning based truck-mounted dispatching method
Sahara Analysis of factors causing delay in unloading imported goods
Hu et al. Optimal strategies for the yard truck scheduling in container terminal with the consideration of container clusters
CN108845496A (en) A kind of automatic dock AGV dispatching method and system
Naumov et al. Model of multimodal transport node functioning
Naeem et al. A comprehensive review and directions for future research on the integrated scheduling of quay cranes and automated guided vehicles and yard cranes in automated container terminals
CN1330545C (en) Crab bucket ship unloading new technology
Li et al. Container terminal oriented logistics generalized computational complexity
Lun et al. An analytical framework for managing container terminals
CN115860161A (en) Method and device for selecting position of incoming container and readable medium
WO2022013966A1 (en) Container storage planning device, container storage planning system, and container storage planning method
CN107220737A (en) Harbour container boat Feeder Network optimization method under a kind of Hub spoke patterns
Chen et al. Optimization research of joint quay crane scheduling and block selection in container terminals
Jobran et al. Examining the Efficiency of Automation in Container Terminals
Lin et al. Optimization Research of Port Yard Overturning Operation Based on Simulation Technology
CN107487647A (en) Marine container is from port of shipment CY(Containing entrepot)To the unloading vertical combined traffics of port CY
Garrido et al. Modeling the internal transport system in a containerport
Zhao et al. Management of Vessel Loading Operations in the Container Terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190326

RJ01 Rejection of invention patent application after publication