CN109519116B - Fast drilling process for hard stratum in mineral resource exploration - Google Patents

Fast drilling process for hard stratum in mineral resource exploration Download PDF

Info

Publication number
CN109519116B
CN109519116B CN201710849438.0A CN201710849438A CN109519116B CN 109519116 B CN109519116 B CN 109519116B CN 201710849438 A CN201710849438 A CN 201710849438A CN 109519116 B CN109519116 B CN 109519116B
Authority
CN
China
Prior art keywords
drilling
bit
drill bit
diamond
speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710849438.0A
Other languages
Chinese (zh)
Other versions
CN109519116A (en
Inventor
何远东
何远洪
何高
何高松
高波
尹江林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Yuandong Brothers Drilling Co ltd
Original Assignee
Guizhou Yuandong Brothers Drilling Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Yuandong Brothers Drilling Co ltd filed Critical Guizhou Yuandong Brothers Drilling Co ltd
Priority to CN201710849438.0A priority Critical patent/CN109519116B/en
Publication of CN109519116A publication Critical patent/CN109519116A/en
Application granted granted Critical
Publication of CN109519116B publication Critical patent/CN109519116B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/46Drill bits characterised by wear resisting parts, e.g. diamond inserts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a mineral resource exploration drilling process method, in particular to a hard stratum rapid drilling process method, which is characterized in that a diamond-impregnated bit with a hard matrix is used, the hardness of the matrix is HRC25-30 degrees, the mesh number of diamond is 60-80 meshes, the drilling speed of the first drilling round of a new bit put into a drill hole is firstly confirmed, when the drilling speed is gradually reduced and is less than 1-3 times of the drilling speed of the first drilling round, the supply of flushing fluid is cut off, the bit is dried and ground at the bottom of the hole, when the drilling torque is increased by 10-15 percent and the revolving pressure is increased by 1-2Mpa, the flushing fluid is opened to cool the bit and rock powder at the bottom of the bit is discharged, and normal drilling is resumed, the invention does not need frequent tripping to replace the bit in the drilling process, effectively reduces the drilling cost and improves the drilling efficiency, is a very fast and practical hard formation fast drilling process method.

Description

Fast drilling process for hard stratum in mineral resource exploration
Technical Field
The invention relates to a mineral resource exploration drilling process method, in particular to a hard stratum rapid drilling process method.
Background
In mineral resource exploration, prospecting engineering is an indispensable means, and during sampling and drilling of a rock core, hard strata are frequently encountered, the drilling speed is slow, and is 1-20 times slower than normal drilling.
The method implemented at home at present is as follows: using an impregnated diamond drill bit with small diamond particles and a matrix with larger mesh number and low hardness; meanwhile, the rotating speed and the pressure of the drilling tool can be properly improved, and the times and the pressure for carving rocks in unit time of each diamond are increased.
One method is to put broken glass, broken ceramic or hard quartz particles, quartz sand, broken diamond blocks, etc. into the hole when the drilling speed is reduced. After the diamond bit and the feed are ground and corroded at the bottom of the hole for a period of time, the rotating speed can be increased, the pressure is increased, and normal drilling is recovered.
The other method is to erode the diamond matrix with strong acid or directly grind the diamond bit with a grinding wheel or other tools to promote the diamond to be edged so as to achieve the purpose of improving the drilling speed.
The method improves the drilling speed for people, but also causes the problems of short service life of the drill bit and frequent drill bit tripping and replacing, increases a large amount of auxiliary working time and labor intensity of workers, greatly reduces the drilling efficiency and greatly increases the drilling cost.
Disclosure of Invention
The invention aims to provide a process method for rapidly drilling a hard stratum in mineral resource exploration, aiming at solving the problem of slow drilling speed of the hard stratum in mineral resource exploration.
In order to solve the technical problems, the adopted technical scheme is as follows:
1. using an impregnated diamond bit with high matrix hardness, wherein the hardness is 25-30 degrees generally, and the diamond mesh number is 60-80 meshes;
2. when the drilling speed is reduced to be 1-3 times less than that of the first drilling time and before the phenomenon of skidding does not occur, the supply of flushing liquid is cut off, so that the drill bit is dried and ground at the bottom of the hole;
3. when the drilling torque is increased by 10-15% and the rotary pressure is increased by 1-2Mpa, opening flushing fluid to cool the drill bit and discharging rock powder at the bottom of the drill bit, wherein the original diamond particles with the particle size of only 0.25 mm are burnt and ground, and new diamond particles with edges and corners appear at the moment, so that normal drilling is resumed.
Compared with the prior art: the invention does not need to frequently trip and replace the drill bit, reduces a large amount of auxiliary working time, reduces the labor intensity of workers, improves the drilling efficiency and effectively reduces the drilling cost.
Detailed Description
The method comprises the following implementation steps:
1. determining the drilling speed of the first drilling return time when a new drill bit is put into the drill hole; because the exposed diamonds on the surface of the new drill bit are sharp edges and corners, the new drill bit can be pressed strongly under the same drilling pressure, can be cut into rocks and has high drilling speed; along with the drilling, the diamond edges and corners are ground flat, but the tire bodies wrapping the diamond edges and corners are not ground off at the same time, the pressure is reduced sharply, and the rock cannot be taken out more quickly until the phenomenon of skidding occurs;
2. when the drilling efficiency gradually slows to the point that the drilling rod does not advance, and the drilling speed is reduced to 1-3 times of the drilling speed of the first drilling cycle, cutting off the supply of flushing liquid, and enabling the drill bit to be dried and ground at the bottom of the hole;
3. when the drilling torque is increased by 10-15% and the rotary pressure is increased by 1-2Mpa, opening flushing fluid to cool the drill bit and discharging rock powder at the bottom of the drill bit, and recovering normal drilling. At this time, the diamond particles which are originally ground flat are burnt and ground off, and new diamond particles with edges and corners are exposed again, so that normal drilling is resumed.
The rapid drilling process method for the hard stratum in mineral resource exploration, provided by the invention, has the advantages that: the drill bit does not need to be replaced by frequently tripping the drill bit, so that the drilling cost is effectively reduced, the drilling efficiency is improved, and the method is a very quick and practical hard formation quick drilling process method.

Claims (1)

1. A hard stratum fast drilling process method in mineral resource exploration is characterized in that: firstly, confirming the drilling speed of a new drill bit which is put into a drill hole for the first drilling time; secondly, when the drilling efficiency gradually slows down to the point that the drilling is not carried to scale and the drilling speed is reduced to 1-3 times of the drilling speed of the first drilling time, cutting off the supply of flushing liquid to dry-burn and grind the drill bit at the bottom of the hole; thirdly, when the drilling torque is increased by 10-15% and the rotary pressure is increased by 1-2Mpa, opening flushing fluid to cool the drill bit and discharging rock powder at the bottom of the drill bit, and recovering normal drilling;
the drill bit is an impregnated diamond drill bit with a hard matrix, the hardness of the matrix is HRC25-30 degrees, and the mesh number of the diamond is 60-80 meshes.
CN201710849438.0A 2017-09-20 2017-09-20 Fast drilling process for hard stratum in mineral resource exploration Active CN109519116B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710849438.0A CN109519116B (en) 2017-09-20 2017-09-20 Fast drilling process for hard stratum in mineral resource exploration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710849438.0A CN109519116B (en) 2017-09-20 2017-09-20 Fast drilling process for hard stratum in mineral resource exploration

Publications (2)

Publication Number Publication Date
CN109519116A CN109519116A (en) 2019-03-26
CN109519116B true CN109519116B (en) 2020-12-25

Family

ID=65768473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710849438.0A Active CN109519116B (en) 2017-09-20 2017-09-20 Fast drilling process for hard stratum in mineral resource exploration

Country Status (1)

Country Link
CN (1) CN109519116B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2464924Y (en) * 2000-12-13 2001-12-12 王效勤 Multi-stage combined dimond composite piece drill
CA2794094C (en) * 2012-10-31 2020-02-18 Resource Energy Solutions Inc. Methods and systems for improved drilling operations using real-time and historical drilling data
US9022140B2 (en) * 2012-10-31 2015-05-05 Resource Energy Solutions Inc. Methods and systems for improved drilling operations using real-time and historical drilling data
CN103742101B (en) * 2014-01-02 2016-04-13 中国石油集团川庆钻探工程有限公司长庆钻井总公司 A kind of technique of casing off stratum
CN106988781B (en) * 2017-04-25 2019-10-01 中煤科工集团西安研究院有限公司 Coal mine down-hole tunnel is precisely to wearing draining hole construction method

Also Published As

Publication number Publication date
CN109519116A (en) 2019-03-26

Similar Documents

Publication Publication Date Title
WO2011097575A4 (en) Shaped cutting elements on drill bits and other earth-boring tools, and methods of forming same
CN109810687B (en) Environment-friendly acidizing working fluid suitable for increasing yield of low-permeability coal bed gas reservoir
CN103867133A (en) Self-sharpening artificial-diamond-impregnated bit with continuous crushing capacity
CN204476409U (en) Development machine combined type cut breaks rock and is split up device
WO2011049864A4 (en) Cutting structures for casing component drillout and earth-boring drill bits including same
CN109519116B (en) Fast drilling process for hard stratum in mineral resource exploration
CN104060996A (en) Combined shield cutter disk for mutual intrusion composite rock strata with uneven hardness
CN202143853U (en) Diamond micron powder crushing and screening machine
CN104646674A (en) Method for manufacturing wear-resistant part by compounding diamond with metal blank body and product produced by same
CN103939011A (en) Method for drilling hard granite
CN204729010U (en) A kind of pyramidal diamond composite sheet
CN102513645B (en) Deep water casing cutting device based on electric arc cutting
CN109812265A (en) A kind of marble cave adopts method for fetching
CN203804285U (en) Environment-friendly thin-walled drill bit
CN208513646U (en) A kind of cemented tungsten carbide carcass cutter ring
CN207988952U (en) A kind of diamond bit containing hard brittleness abrasive grain
CN208870535U (en) Drill bit for air leg rock drill
CN204843511U (en) Quartering hammer cylinder body centre bore volume of going to mill lathe
CN209761438U (en) Shield cutter with good base metal wear resistance
CN216008403U (en) Combined drill bit for complex stratum
CN204843072U (en) Quartering hammer cylinder body valve opening processing frock
CN211474009U (en) Small-size rock drill locomotive
CN202220560U (en) Steel type diamond-impregnated bit
EP3004546B1 (en) A method for removing a material extracted from mines in a single piece
CN113738378B (en) Chemical rock breaking medium and chemical auxiliary rock breaking method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant