CN109518722A - The short underpass structure and its construction method of newly-built basement and existing subway station - Google Patents

The short underpass structure and its construction method of newly-built basement and existing subway station Download PDF

Info

Publication number
CN109518722A
CN109518722A CN201910058091.7A CN201910058091A CN109518722A CN 109518722 A CN109518722 A CN 109518722A CN 201910058091 A CN201910058091 A CN 201910058091A CN 109518722 A CN109518722 A CN 109518722A
Authority
CN
China
Prior art keywords
construction
underpass
horizontal beam
injected hole
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910058091.7A
Other languages
Chinese (zh)
Inventor
王长录
王剑非
李振雄
许艳苗
何毅
吴勇
彭云
姚继红
李文艳
沈雁波
刘轩
周麟
王晓燕
雷春燕
桂跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Third Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction Investment Third Construction Co Ltd
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Third Construction Co Ltd, Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction Investment Third Construction Co Ltd
Priority to CN201910058091.7A priority Critical patent/CN109518722A/en
Publication of CN109518722A publication Critical patent/CN109518722A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of short underpass structure that newly-built basement is connect with existing subway station, the structure includes several horizontal beams and two collar tie beams, horizontal beam extends along underpass excavation direction and is uniformly distributed in the upside and the left and right sides of excavated section, and collar tie beam is located on the section at horizontal beam both ends.The present invention further provides the construction methods of a kind of newly-built basement and the short underpass structure of existing subway station.The present invention solves the connectivity problem of newly-built basement Yu existing subway station, construction method belongs to subsurface excavation method, it avoids the possible traffic jam of open-cut, earth volume huge and the series of problems such as noise is big, more secure working face is provided for engineering construction, effectively enhance the stability in tunnel.

Description

The short underpass structure and its construction method of newly-built basement and existing subway station
Technical field
The invention belongs to construction technology in geotechnical engineering field, it is related to the short underpass knot connected between two underground structures Structure and construction method, and in particular to the short underpass between a kind of newly-built basement and existing subway station is connected to and its construction party Method.
Background technique
Develop people to utilizing more and more, social development with causing city overhead on city space with society Between heavy congestion, people in order to improve this crowded space, constantly build high buildings and large mansions while also sufficiently city The underground space uses.Generally high-rise and super high rise building can all build underground structure such as underground parking, underground Commercial street, underground supermarket etc., have also built subway in city in order to alleviate the traffic problems of congestion, and subway will also tend to and week The underground structure on side is closely linked.But subway and the building on periphery are not often to build together, it is mostly built At underground structure construction when often the connection with subway is not taken into account, in order to be built with periphery when subway station is built It builds object underground and generates connection, generally require to connect with periphery underground structure by underpass.
However, often surrounding enviroment are complicated, and such as doing cut and cover tunneling tunnel can break when being built in city and building subterranean tunnel Bad earth's surface traffic brings great congestion to urban transportation, does shallow mining method tunnel its stability of strict control again, to applying Work brings great challenge.Therefore, by pre-grouting reinforcing must be done around tunneling, consolidating surrounding soil in advance in advance It is significant in Tunnel Engineering construction.
Summary of the invention
In order to overcome the shortage of prior art, the present invention provides a kind of construction skill that newly-built basement is connected to existing subway station Art, the construction of connection underpass is difficult between two underground structures to solve in Practical Project construction, and when constructing tunnel exists very big The problem of security risk and its stability problem, keep engineering practice of construction more secure etc..
The present invention realizes that the technical solution of above-mentioned purpose is as follows:
A kind of short underpass structure of newly-built basement and existing subway station, which is characterized in that the structure includes several Horizontal beam and two collar tie beams, the horizontal beam along underpass excavate direction extends and be uniformly distributed in the upside of excavated section with The left and right sides, the collar tie beam are located on the section at horizontal beam both ends.
Further, the horizontal beam is connected with collar tie beam, and horizontal beam is vertical with collar tie beam cross section, and horizontal beam is transversal Face is circle, and horizontal beam diameter is 150-300mm, and the center of horizontal beam is not away from being preferably greater than 2.0 times of its diameter.
Further, the length of the short underpass structure is not more than 15 meters.
Further, the ring beam reinforcing steel bar should meet existing national standards " Code for design of concrete structures " GB 50010 Constructional reinforcement requirement to beam.
Further, the horizontal beam is mainly made of injected hole, fashioned iron and the slurries of solidification, and the fashioned iron is inserted into slip casting Then Kong Zhong injects slurries in injected hole.
The fashioned iron is selected from H profile steel or channel steel, and fashioned iron is arranged along injected hole central axes.
Preferably, injected hole 150-300mm, preferably 200mm are protruded in the fashioned iron both ends, and connect with collar tie beam.
It is highly preferred that being disposed on fashioned iron to middle bracket, the quantity and specification of the centering bracket are according to injected hole Length and size determine.
Further, the section of the short underpass is box, round or ellipse.
The present invention further provides the construction method of a kind of newly-built basement and the short underpass structure of existing subway station, Specifically:
1) drilling of the injected hole of underpass and horizontal beam is determined first between existing subway station and newly-built basement Position;
2) rigging up carries out the drilling construction of single injected hole;
3) fashioned iron is inserted into injected hole;
4) Grouting Pipe is arranged in and is formed by progress slip casting operation in injected hole, and plug-hole forms horizontal beam;
And 4) 5) step 2), 3) is repeated, until setting horizontal beam number is completed in construction;
6) after grout curing in all injected holes, the construction of collar tie beam is carried out according to code requirement;
7) underpass is excavated according to code requirement after collar tie beam reaches requirement of strength design, until excavating to the ground of setting Layer strengthening length.
In the present invention, to prevent string hole, the 2) into the 4) step, the method for taking the job-hopping construction of one hole of interval is that is, complete After the drilling construction in first slip casting duct and slip casting operation, the position for being spaced a duct carries out repeating construction and operation, Until completing slip casting duct drilling construction and the slip casting operation of all settings.
The present invention, the drilling construction include that the upside that section is moved towards along engineering excavation and the left and right sides carry out and set Count the construction method of the parallel directional drilling in tunnel and scarfing cinder formation duct.
The 3) fashioned iron described in step be selected from H profile steel or channel steel.
Wherein, the 4) slip casting operation specific method described in step be: slurries observation is reserved at the top of injected hole entrance end Hole, carry out slip casting using grouting pump: one end low from injected hole is toward high one end slip casting, until in the slurries peep hole of entrance end Until flowing out denseer slurries, the injected hole for two sides of first constructing, to intermediate direction propelling construction.
Further, the slip casting operation can be handled for single fluid grouting or two fluid grouting.
Further, the slip casting operation is once grouting or multiple slip casting.
In the present invention, the construction method of the collar tie beam is that processing assembling reinforcement first, then installation template, pacifies to template After the completion of dress, casting concrete, form removal when concrete strength reaches 2.5Mpa, last curing concrete, concrete support Shield covers sprinkling maintenance using plastic cloth or geotextiles, keeps wet.
The beneficial effects of the present invention are: the present invention solves newly-built basement and existing subway station connectivity problem, solve The problems such as cut and cover tunneling is to earth's surface bring traffic jam and noise, more secure working face is provided for engineering construction, is led to The working face that staff is safer in Practical Project construction can be provided by crossing the application, effectively enhance the stability in tunnel.
Detailed description of the invention
Fig. 1 is box schematic diagram of underground passage structure.
Fig. 2 is the A-A' sectional view of Fig. 1;
Fig. 3 is horizontal beam drawing;
In figure, the ground 1-;2- underpass;3- horizontal beam;4- collar tie beam;The existing subway station of 5-;6- creates basement;7- type Steel;8- slurries;9- centering bracket.
Specific embodiment
Structure of the invention is further detailed with reference to the accompanying drawing, these attached drawings are of the invention preferred Specific embodiment is not limitation of the present invention.
The short underpass structure of a kind of newly-built basement and existing subway station as shown in Figs. 1-2, if the structure includes Solid carbon dioxide flat-topped ridge 3 and two collar tie beams 4, horizontal beam 3 along underpass 2 excavate direction extends and be uniformly distributed on the upside of excavated section with The left and right sides, collar tie beam 4 are located on the section at 3 both ends of horizontal beam, and horizontal beam 3 is connected with collar tie beam 4.
Horizontal beam drawing as shown in Figure 3, horizontal beam 3 are mainly made of the slurries 8 of injected hole, fashioned iron 7 and solidification, type Steel 7 is inserted into injected hole, and slurries 8 are then injected in injected hole, and fashioned iron 7 is arranged along injected hole central axes.
The diameter of horizontal beam 3 is 150mm, and the center of horizontal beam 3 is away from for 300mm;Fashioned iron 7 is H profile steel, fashioned iron specification are as follows: Duct 200mm is protruded at 100*100*6*8, Unit Weight 17.2kg/m, area of section 21.9mm2,7 both ends of fashioned iron;Circle 4 width of beam is 300mm, is highly 200mm.
With reference to the accompanying drawing to the construction party of newly-built basement of the invention and the short underpass structure of existing subway station Method is specifically described, construction method are as follows:
1) underpass 2 and injected hole bore position are determined first between existing subway station 5 and newly-built basement 6;
2) rigging up carries out the drilling construction of single injected hole;
3) fashioned iron 7 is inserted into injected hole;
4) Grouting Pipe is arranged in and is formed by progress slip casting operation in injected hole, and plug-hole forms horizontal beam;
And 4) 5) step 2), 3) is repeated, until the quantity of setting horizontal beam 3 is completed in construction;
6) after the solidification of all injected hole slurries 8, the construction of collar tie beam 4 is carried out according to code requirement;
7) underpass 2 is excavated according to code requirement after collar tie beam 4 reaches requirement of strength design, until excavating to setting Stratum consolidation length.
The present invention can also have other a variety of specific embodiments, without deviating from the spirit and substance of the present invention, Those skilled in the art can make various corresponding changes and modifications, but these corresponding changes and change according to the present invention Shape all should belong to the protection scope of the claims in the present invention.

Claims (10)

1. the short underpass structure of a kind of newly-built basement and existing subway station, which is characterized in that if the structure includes solid carbon dioxide Flat-topped ridge and two collar tie beams, the horizontal beam extend along underpass excavation direction and are uniformly distributed in the upside and a left side of excavated section Right two sides, the collar tie beam are located on the section at horizontal beam both ends.
2. short underpass structure according to claim 1, which is characterized in that the horizontal beam is connected with collar tie beam, Horizontal beam is vertical with collar tie beam cross section.
3. short underpass structure according to claim 1 or 2, which is characterized in that the horizontal beam cross section is circle Shape, horizontal beam diameter are 150-300mm, and the center of horizontal beam is away from 2.0 times no more than its diameter.
4. short underpass structure according to claim 1, which is characterized in that the underpass structure length is not more than 15 meters.
5. short underpass structure according to claim 1, which is characterized in that the horizontal beam is mainly by injected hole, type Steel and the slurries of solidification composition, the fashioned iron are inserted into injected hole, slurries are then injected in injected hole, the fashioned iron both ends are convex Injected hole 150-300mm out, and connect with collar tie beam, it is disposed on fashioned iron to middle bracket.
6. a kind of construction method of short underpass structure as described in claim 1, which is characterized in that specifically:
1) the injected hole bore position of underpass and horizontal beam is determined first between existing subway station and newly-built basement;
2) rigging up carries out the drilling construction of single injected hole;
3) fashioned iron is inserted into injected hole;
4) Grouting Pipe is arranged in progress slip casting operation in injected hole, and plug-hole forms horizontal beam;
And 4) 5) step 2), 3) is repeated, until setting horizontal beam number is completed in construction;
6) after all injected holes are grout curing, the construction of collar tie beam is carried out according to code requirement;
7) underpass is excavated according to code requirement after collar tie beam reaches requirement of strength design, added until excavating to the stratum of setting Gu length.
7. construction method according to claim 6, which is characterized in that the 2) into the 4) step, one hole of interval is taken to jump The method of slot construction, that is, after drilling construction and the slip casting operation of completing first duct, the position for being spaced a duct carries out weight Multiple construction and operation, until completing injected hole drilling construction and the slip casting operation of all settings.
8. construction method according to claim 6, which is characterized in that the drilling construction includes walking along engineering excavation The directional drilling parallel with design tunnel is carried out to the upside of section and the left and right sides and scarfing cinder forms the construction method of injected hole.
9. construction method according to claim 6, which is characterized in that the slip casting operation specific method is: in slip casting Slurries peep hole is reserved at the top of the entrance end of hole, and slip casting is carried out using grouting pump: being infused toward high one end one end low from injected hole Slurry, until the denseer slurries of outflow in the slurries peep hole of entrance end, the injected hole for two sides of first constructing is pushed away to intermediate direction Into construction.
10. construction method according to claim 6, which is characterized in that the construction method of the collar tie beam is that processing first is tied up It wire-ties, then installation template, after template is installed, casting concrete, dismounting when concrete strength reaches 2.5Mpa Template, last curing concrete, concrete curing cover sprinkling maintenance using plastic cloth or geotextiles, keep wet.
CN201910058091.7A 2019-01-22 2019-01-22 The short underpass structure and its construction method of newly-built basement and existing subway station Pending CN109518722A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910058091.7A CN109518722A (en) 2019-01-22 2019-01-22 The short underpass structure and its construction method of newly-built basement and existing subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910058091.7A CN109518722A (en) 2019-01-22 2019-01-22 The short underpass structure and its construction method of newly-built basement and existing subway station

Publications (1)

Publication Number Publication Date
CN109518722A true CN109518722A (en) 2019-03-26

Family

ID=65799211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910058091.7A Pending CN109518722A (en) 2019-01-22 2019-01-22 The short underpass structure and its construction method of newly-built basement and existing subway station

Country Status (1)

Country Link
CN (1) CN109518722A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110486019A (en) * 2019-07-22 2019-11-22 上海建工一建集团有限公司 The excavating construction method in subterranean communication road is added between new and old building
CN110512644A (en) * 2019-07-22 2019-11-29 上海建工一建集团有限公司 The open cutting construction method in subterranean communication road is added between new and old building
CN112942441A (en) * 2021-04-28 2021-06-11 中铁十八局集团有限公司 Pre-grouting water-stop construction method for water-rich silt stratum

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1127820A (en) * 1995-09-27 1996-07-31 化学工业部地质勘探公司河北地质勘探大队 Hole-forming technology for club-footed pier pile in sand gravel stratum by chemical grouting and curtain protection of wall
KR101041919B1 (en) * 2010-08-05 2011-06-15 주식회사 서웅이엔씨 Rainwater station
CN103993885A (en) * 2014-05-28 2014-08-20 北京市政建设集团有限责任公司 Construction method for underground excavation tunnel side-direction hole opening supporting system
CN203846503U (en) * 2014-04-30 2014-09-24 中国建筑一局(集团)有限公司 Foundation pit supporting system of open excavation section between two built metro tunnels
CN104929648A (en) * 2015-06-03 2015-09-23 西华大学 Method for constructing branch guide pits of tunnels
CN105569049A (en) * 2015-12-18 2016-05-11 深圳市福田建安建设集团有限公司 Construction method of high-pressure-bearing water-depth foundation pit supporting anchor rod
CN105714834A (en) * 2016-03-01 2016-06-29 江苏东合南岩土科技股份有限公司 Construction process for grouting H-shaped steel pile after pre-forming hole in hard stratum
CN205742215U (en) * 2016-05-12 2016-11-30 昆明理工大学 A kind of reusable pipe gallery pattern foundation pit supporting structure and structure external mold combinative structure
CN209636858U (en) * 2019-01-22 2019-11-15 云南省建设投资控股集团有限公司 A kind of short underpass structure of newly-built basement and existing subway station

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1127820A (en) * 1995-09-27 1996-07-31 化学工业部地质勘探公司河北地质勘探大队 Hole-forming technology for club-footed pier pile in sand gravel stratum by chemical grouting and curtain protection of wall
KR101041919B1 (en) * 2010-08-05 2011-06-15 주식회사 서웅이엔씨 Rainwater station
CN203846503U (en) * 2014-04-30 2014-09-24 中国建筑一局(集团)有限公司 Foundation pit supporting system of open excavation section between two built metro tunnels
CN103993885A (en) * 2014-05-28 2014-08-20 北京市政建设集团有限责任公司 Construction method for underground excavation tunnel side-direction hole opening supporting system
CN104929648A (en) * 2015-06-03 2015-09-23 西华大学 Method for constructing branch guide pits of tunnels
CN105569049A (en) * 2015-12-18 2016-05-11 深圳市福田建安建设集团有限公司 Construction method of high-pressure-bearing water-depth foundation pit supporting anchor rod
CN105714834A (en) * 2016-03-01 2016-06-29 江苏东合南岩土科技股份有限公司 Construction process for grouting H-shaped steel pile after pre-forming hole in hard stratum
CN205742215U (en) * 2016-05-12 2016-11-30 昆明理工大学 A kind of reusable pipe gallery pattern foundation pit supporting structure and structure external mold combinative structure
CN209636858U (en) * 2019-01-22 2019-11-15 云南省建设投资控股集团有限公司 A kind of short underpass structure of newly-built basement and existing subway station

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110486019A (en) * 2019-07-22 2019-11-22 上海建工一建集团有限公司 The excavating construction method in subterranean communication road is added between new and old building
CN110512644A (en) * 2019-07-22 2019-11-29 上海建工一建集团有限公司 The open cutting construction method in subterranean communication road is added between new and old building
CN110512644B (en) * 2019-07-22 2021-03-02 上海建工一建集团有限公司 Open excavation construction method for additionally arranging underground communication channel between new building and old building
CN112942441A (en) * 2021-04-28 2021-06-11 中铁十八局集团有限公司 Pre-grouting water-stop construction method for water-rich silt stratum

Similar Documents

Publication Publication Date Title
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN103835729B (en) Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN103758123B (en) The construction method of manually digging hole filling pile retaining wall lining
CN106907159A (en) A kind of Shallow Covered Metro Station separates open type structure and its construction method
CN108005660A (en) A kind of Optimization of Expressway Tunnel Construction method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN106968690A (en) The method for tunnel construction for soil property of caving in
CN104653188B (en) A kind of large-diameter shield that arranges in tunneling air channel receives and the method for starting well
CN107091101A (en) Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN102748040A (en) Main structure for metro long-span station and pillar arching construction method thereof
CN104612696A (en) Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method
CN103993885A (en) Construction method for underground excavation tunnel side-direction hole opening supporting system
CN107401161A (en) High ferro shield tunnel construction method is worn under pipe-roof method and MJS method joint reinforcements
CN110259490A (en) A kind of Underground Subway Station construction method
CN109488329A (en) A kind of broken water drenching country rock administering method of Deep Soft Rock Tunnel large deformation
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN109518722A (en) The short underpass structure and its construction method of newly-built basement and existing subway station
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN108374674B (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN112031801B (en) Settlement control method for underground tunnel to pass through existing operation line
CN209636858U (en) A kind of short underpass structure of newly-built basement and existing subway station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination