CN109492251A - The BIM parametric modeling method of sled sled racing track - Google Patents

The BIM parametric modeling method of sled sled racing track Download PDF

Info

Publication number
CN109492251A
CN109492251A CN201811154908.2A CN201811154908A CN109492251A CN 109492251 A CN109492251 A CN 109492251A CN 201811154908 A CN201811154908 A CN 201811154908A CN 109492251 A CN109492251 A CN 109492251A
Authority
CN
China
Prior art keywords
fixture
sled
work
model
coordinate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811154908.2A
Other languages
Chinese (zh)
Inventor
王春林
杨凤祥
段孟
王俪葳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201811154908.2A priority Critical patent/CN109492251A/en
Publication of CN109492251A publication Critical patent/CN109492251A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)

Abstract

The present invention relates to the BIM parametric modeling method of specifically sled sled racing track;It is characterized in that: including with Grasshopper software parameterization batch in-depth fixture drawings;According to the fixture drawings after in-depth, with Rhino software parameter metaplasia at accurately fixture 3D Modifying model fixture;Fixture model automatically extracts the space coordinate and mileage coordinate of all fixtures, cooperates the correction work of fixture installment work and 3D surveying party in space orientation to absolute coordinate position;Automatic segmentation cutting, number work and the processing drawing for exporting pipe cutting of automatic end conduit overall length.This method completes the in-depth of drawing by Rhino software parameterization, reduces modeling degree of participation by hand, improves the accuracy of model and data, while can complete the strong and complicated work of logicality in batches, improves working efficiency, guarantee making smooth advances for project.

Description

The BIM parametric modeling method of sled sled racing track
Technical field
The present invention relates to the fields of building of complicated high-accuracy shaped component, specifically the BIM parametrization of sled sled racing track Modeling method.
Background technique
Design scheme precision ± the 5mm of sled sled racing track, this requires very BIM design work and site operation link Strictly, an effective scheme must be strictly formulated from being designed into construction, just can guarantee that the construction precision of project reaches and set Meter requires.Wherein, for how lifting clamp drawing precision and ensure the prefabricated work of fixture, extract 1490000 groups of space coordinates Ensure that fixture installation positioning is a technical problem.
Summary of the invention
The object of the present invention is to provide a kind of BIM of sled sled racing track that can satisfy above-mentioned requirements parametrizations to build Mould method.
In order to achieve the above object, the present invention is implemented as follows:
A kind of BIM parametric modeling method of sled sled racing track, including
Step 1 deepens fixture drawings with Grasshopper software parameterization batch, and fixture drawings is made to meet the high-precision of fixture The prefabricated work of laser integral cutting of degree;
Step 2, according to the fixture drawings after in-depth, with Rhino software parameter metaplasia at accurately fixture 3D model Stp or Obj formatted file and with 3D scan incision at the point cloud model of actual chuck compare, to control mismachining tolerance, process ring Section amendment fixture;
Step 3, fixture model in space orientation to absolute coordinate position, automatically extract the space coordinate XYZ of all fixtures with it is inner Journey coordinate SHL data cooperate the correction work of fixture installment work and 3D surveying party;
Step 4, using Grasshoppe program according to step 3 gained coordinate, the automatic segmentation cutting of automatic end conduit overall length is compiled Number work and export the processing drawing of pipe cutting.
This method completes the in-depth of drawing by Rhino software parameterization, reduces modeling degree of participation by hand, improves model And the accuracy of data, while the strong and complicated work of logicality can be completed in batches, BIM working efficiency is greatly improved, is mentioned in batches Control coordinate data is taken, construction precision is controlled, strong technical support is provided to project construction, guarantees making smooth advances for project.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of BIM parametric modeling method of sled sled racing track, including
Step 1 deepens fixture drawings with Grasshopper software parameterization batch, and fixture drawings is made to meet the high-precision of fixture The prefabricated work of laser integral cutting of degree;
Step 2, according to the fixture drawings after in-depth, with Rhino software parameter metaplasia at accurately fixture 3D model Stp or Obj formatted file and with 3D scan incision at the point cloud model of actual chuck compare, to control mismachining tolerance, process ring Section amendment fixture;
Step 3, fixture model in space orientation to absolute coordinate position, automatically extract the space coordinate XYZ of all fixtures with it is inner Journey coordinate SHL data cooperate the correction work of fixture installment work and 3D surveying party;
Step 4, using Grasshoppe program according to step 3 gained coordinate, the automatic segmentation cutting of automatic end conduit overall length is compiled Number work and export the processing drawing of pipe cutting.
This method completes the in-depth of drawing by Rhino software parameterization, reduces modeling degree of participation by hand, improves model And the accuracy of data, while the strong and complicated work of logicality can be completed in batches, BIM working efficiency is greatly improved, is mentioned in batches Control coordinate data is taken, construction precision is controlled, strong technical support is provided to project construction, guarantees making smooth advances for project.

Claims (1)

1. a kind of BIM parametric modeling method of sled sled racing track, it is characterized in that: including
Step 1 deepens fixture drawings with Grasshopper software parameterization batch, and fixture drawings is made to meet the high-precision of fixture The prefabricated work of laser integral cutting of degree;
Step 2, according to the fixture drawings after in-depth, with Rhino software parameter metaplasia at accurately fixture 3D model Stp or Obj formatted file and with 3D scan incision at the point cloud model of actual chuck compare, to control mismachining tolerance, process ring Section amendment fixture;
Step 3, fixture model in space orientation to absolute coordinate position, automatically extract the space coordinate XYZ of all fixtures with it is inner Journey coordinate SHL data cooperate the correction work of fixture installment work and 3D surveying party;
Step 4, using Grasshoppe program according to step 3 gained coordinate, the automatic segmentation cutting of automatic end conduit overall length is compiled Number work and export the processing drawing of pipe cutting.
CN201811154908.2A 2018-09-30 2018-09-30 The BIM parametric modeling method of sled sled racing track Pending CN109492251A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811154908.2A CN109492251A (en) 2018-09-30 2018-09-30 The BIM parametric modeling method of sled sled racing track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811154908.2A CN109492251A (en) 2018-09-30 2018-09-30 The BIM parametric modeling method of sled sled racing track

Publications (1)

Publication Number Publication Date
CN109492251A true CN109492251A (en) 2019-03-19

Family

ID=65690762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811154908.2A Pending CN109492251A (en) 2018-09-30 2018-09-30 The BIM parametric modeling method of sled sled racing track

Country Status (1)

Country Link
CN (1) CN109492251A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080062A (en) * 2019-05-16 2019-08-02 上海宝冶建筑工程有限公司 A kind of complex space hyperboloid racing track line type control net method for building up
CN110717214A (en) * 2019-10-18 2020-01-21 中交 (天津) 生态环保设计研究院有限公司 Dredging engineering building parameterized modeling method based on graphical programming
CN110826129A (en) * 2019-10-31 2020-02-21 上海宝冶集团有限公司 Application method of parametric modeling in installation of special-shaped structural member
CN110826130A (en) * 2019-10-31 2020-02-21 上海宝冶集团有限公司 Application method of BIM modeling in design and construction of special-shaped curved surface structure body
CN110851899A (en) * 2019-10-31 2020-02-28 上海宝冶集团有限公司 Application method of parametric modeling in special-shaped structural member design
CN111368355A (en) * 2019-10-31 2020-07-03 上海宝冶集团有限公司 Rapid generation method of parameterized modeling drawing of refrigeration pipeline
CN113987630A (en) * 2021-10-15 2022-01-28 上海宝冶冶金工程有限公司 Method and system for carrying out statistics on engineering quantity of polyurethane heat-insulating layer of racetrack by using BIM
CN115795594A (en) * 2022-10-21 2023-03-14 中山市水利水电勘测设计咨询有限公司 BIM modeling method applied to design of gate station special-shaped curved surface water inlet and outlet flow channel

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016034027A1 (en) * 2014-09-01 2016-03-10 深圳汇林达科技有限公司 Method and system for formwork matching of three-dimensional spatial software
CN106761798A (en) * 2017-01-13 2017-05-31 同济大学 A kind of large diameter shield tunnel face management system based on BIM
CN106777831A (en) * 2017-02-10 2017-05-31 深圳瑞和建筑装饰股份有限公司 A kind of construction and decoration method based on BIM
CN107092720A (en) * 2017-03-21 2017-08-25 中国建筑股份有限公司 A kind of BIM model building methods that node repository is parameterized based on two-stage
CN107480380A (en) * 2017-08-17 2017-12-15 广东工业大学 A kind of engineering drawing generation method based on template
CN107633133A (en) * 2017-09-18 2018-01-26 中建局集团第二建筑有限公司 The construction method of antidetonation suspension and support based on BIM+3D scanning techniques
CN107967399A (en) * 2017-12-19 2018-04-27 广东建远建筑装配工业有限公司 A kind of assembled architecture Deepen Design method based on BIM softwares
CN108010092A (en) * 2017-12-26 2018-05-08 哈尔滨工业大学 A kind of city high density area Solar use potential evaluation method based on low altitude photogrammetry

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016034027A1 (en) * 2014-09-01 2016-03-10 深圳汇林达科技有限公司 Method and system for formwork matching of three-dimensional spatial software
CN106761798A (en) * 2017-01-13 2017-05-31 同济大学 A kind of large diameter shield tunnel face management system based on BIM
CN106777831A (en) * 2017-02-10 2017-05-31 深圳瑞和建筑装饰股份有限公司 A kind of construction and decoration method based on BIM
CN107092720A (en) * 2017-03-21 2017-08-25 中国建筑股份有限公司 A kind of BIM model building methods that node repository is parameterized based on two-stage
CN107480380A (en) * 2017-08-17 2017-12-15 广东工业大学 A kind of engineering drawing generation method based on template
CN107633133A (en) * 2017-09-18 2018-01-26 中建局集团第二建筑有限公司 The construction method of antidetonation suspension and support based on BIM+3D scanning techniques
CN107967399A (en) * 2017-12-19 2018-04-27 广东建远建筑装配工业有限公司 A kind of assembled architecture Deepen Design method based on BIM softwares
CN108010092A (en) * 2017-12-26 2018-05-08 哈尔滨工业大学 A kind of city high density area Solar use potential evaluation method based on low altitude photogrammetry

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080062A (en) * 2019-05-16 2019-08-02 上海宝冶建筑工程有限公司 A kind of complex space hyperboloid racing track line type control net method for building up
CN110080062B (en) * 2019-05-16 2021-05-07 上海宝冶建筑工程有限公司 Complex space hyperboloid racing track linear control network establishing method
CN110717214A (en) * 2019-10-18 2020-01-21 中交 (天津) 生态环保设计研究院有限公司 Dredging engineering building parameterized modeling method based on graphical programming
CN110826129A (en) * 2019-10-31 2020-02-21 上海宝冶集团有限公司 Application method of parametric modeling in installation of special-shaped structural member
CN110826130A (en) * 2019-10-31 2020-02-21 上海宝冶集团有限公司 Application method of BIM modeling in design and construction of special-shaped curved surface structure body
CN110851899A (en) * 2019-10-31 2020-02-28 上海宝冶集团有限公司 Application method of parametric modeling in special-shaped structural member design
CN111368355A (en) * 2019-10-31 2020-07-03 上海宝冶集团有限公司 Rapid generation method of parameterized modeling drawing of refrigeration pipeline
CN110826130B (en) * 2019-10-31 2024-06-07 上海宝冶集团有限公司 Application method of BIM modeling in design and construction of special-shaped curved surface structural body
CN113987630A (en) * 2021-10-15 2022-01-28 上海宝冶冶金工程有限公司 Method and system for carrying out statistics on engineering quantity of polyurethane heat-insulating layer of racetrack by using BIM
CN115795594A (en) * 2022-10-21 2023-03-14 中山市水利水电勘测设计咨询有限公司 BIM modeling method applied to design of gate station special-shaped curved surface water inlet and outlet flow channel
CN115795594B (en) * 2022-10-21 2023-10-20 中山市水利水电勘测设计咨询有限公司 BIM modeling method applied to gate station special-shaped curved surface water inlet and outlet channel design

Similar Documents

Publication Publication Date Title
CN109492251A (en) The BIM parametric modeling method of sled sled racing track
CN110411338B (en) Welding gun tool parameter three-dimensional scanning calibration method for robot arc additive repair
CN106777779B (en) Railway culvert design method based on BIM
CN103760821A (en) Complex casting machining process datum determination method
CN104715117A (en) Method for locating continuous box girder prestressed pipeline based on BIM
CN110886186A (en) BIM technology-based manufacturing and installation construction method for complex space curved surface special-shaped steel box girder
CN109469333B (en) Multi-angle multi-bracket complex node inclined hanging column accurate positioning method
CN111475897B (en) Volute model creation method based on Revit and Dynamo
CN109782692A (en) A kind of method of 3C Product housing transition machining path Adaptive Planning
CN204007587U (en) A kind of automatic measurement guidance system about jacking construction
CN104216283B (en) Rapid generation method of aircraft conduit processing files
CN103454972A (en) Tool five-axis numerical control grinding automatic programming method based on UG NX API
CN102855362B (en) A kind of method that inspection pipeline based on computer-aided design (CAD) assembles
CN108120418A (en) A kind of measuring method of guide vane leaving area
CN111914338B (en) Method for establishing BIM model of parameterized tunnel open cut tunnel lining structure
CN102601567A (en) Method for welding special-shaped flange pipelines and welding tool
CN102205480B (en) Method for manufacturing spatial curved surface spiral box type component
CN106247931A (en) Guidance method is revised by the variance analysis of a kind of large complicated deformed steel member and factory
CN107175479A (en) Injection mold manufacture method
CN103631982A (en) Reverse engineering digital model reconstruction method based on PRO/E
CN110990923A (en) Rapid engineering calculation method, system and medium for hyperbolic arch dam of water conservancy and hydropower engineering
CN104199383B (en) Aviation engine case part milling blank automatic generation method
CN111354069A (en) Method for pre-assembling modules by using 3D scanning technology
CN103252376B (en) A kind of extrusion metal dimorphism mould shaping mould and preparation method thereof
CN103624761A (en) Boiler cylinder body pipe hole face mold and manufacturing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination