CN109488330A - The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft - Google Patents

The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft Download PDF

Info

Publication number
CN109488330A
CN109488330A CN201811597927.2A CN201811597927A CN109488330A CN 109488330 A CN109488330 A CN 109488330A CN 201811597927 A CN201811597927 A CN 201811597927A CN 109488330 A CN109488330 A CN 109488330A
Authority
CN
China
Prior art keywords
tunnel
solution cavity
raft
open cut
passing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811597927.2A
Other languages
Chinese (zh)
Inventor
舒东利
周林峰
余大龙
王磊
朱麟晨
王佳
康芮
宋洋
廖余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201811597927.2A priority Critical patent/CN109488330A/en
Publication of CN109488330A publication Critical patent/CN109488330A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of open cut tunnels for passing through half Packing character solution cavity to add the tunnel bottom hardened structure of raft, and including the pile foundation for passing through lower part Packing character solution cavity, only pulpboard and raft plate, and open cut tunnel and shield arch for passing through top sky solution cavity, open cut tunnel encircles with shield to be located on raft plate.Invention additionally discloses its construction methods, including determine open cut tunnel and pile foundation range, and construct left side barricade and right side barricade;The pile foundation constructed for passing through lower part Packing character solution cavity;Concrete is applied at the top of pile foundation stops pulpboard;The reinforcing bar of construction raft plate, and raft plate and pile foundation connect a batch reinforcing bar, are placed at the top of pile foundation, finally pour the concrete of raft plate;Left side shield arch Extended chemotherapy and right side shield arch Extended chemotherapy are applied on raft plate, then apply shield arch;Open cut tunnel is applied after the completion of shield arch applies;After shield arch and open cut tunnel reach structure design strength, in the two sides of shield arch and top backfill stone and packing reality is rammed, in the two sides fill concrete of Extended chemotherapy;Drainage hole is applied in tunnel two sides.

Description

The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft
Technical field
The present invention relates to Environment in Railway Engineering Construction technical field, in particular to a kind of open cut tunnel for passing through half Packing character solution cavity adds tunnel The bottom stake hardened structure of raft.
Background technique
In Southwest Mountainous Areas, railway construction can drive along local economic development, have important social economic value.But west Nanshan District's complicated geology, karsts developing area is more, and route selection can not avoid completely karst region, by design cost and precision control System, even if geotechnical boring drills at spacing intervals, it is also not possible to the solution cavity that route passes through is disclosed completely, it can only be to be onstructed After disclosing solution cavity, then special treatment is carried out to solution cavity.Karst cave treatment it is the most key be guarantee the structure construction phase and the operation phase peace Entirely, construction period mainly prevents sky solution cavity chip off-falling from influencing tunnel substructure construction, since solution cavity is usually underground aquaporin, It then needs to solve the problems, such as tunnel perimeter ground water discharge during operation.So, large-scale half Packing character solution cavity how is reasonably passed through, It is construction of railway project urgent problem at this stage.
Summary of the invention
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, one kind is provided and passes through half filling karst The open cut tunnel in hole adds the tunnel bottom stake hardened structure of raft.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of open cut tunnel passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft, including for passing through lower part Packing character solution cavity Pile foundation, only pulpboard and raft plate, and open cut tunnel for passing through top sky solution cavity and shield arch, the open cut tunnel and shield arch are located at described On raft plate.
The present invention setting shield arch, open cut tunnel and the hardened structure of tunnel bottom pile foundation raft in the large-scale half Packing character solution cavity in tunnel, establish A kind of open cut tunnel passing through half Packing character solution cavity adds tunnel bottom stake raft structure.Pile foundation, only pulpboard and raft plate together form stability fundamental, For passing through lower part Packing character solution cavity, and play the role of supporting top shield arch and open cut tunnel;Shield arch can prevent top sky solution cavity Chip off-falling damages main structure, can safely and steadly pass through top sky solution cavity, therefore, this invention ensures that passing through solution cavity The safety of region tunnel structure, the huge construction investment of indirect saving.The present invention is the tunnel of large-scale half Packing character solution cavity section Structure design provides scientific basis, ensure that constructing tunnel and operation security, make the design of tunnel solution cavity section more rationally, peace Entirely, reliably.
Preferably, insertion bottom basement rock depth is greater than or equal to 2m, pile foundation when the pile foundation passes through lower part Packing character solution cavity According to tunnel span and solution cavity range, transverse direction and longitudinal direction arranged for interval, cast-in-situ bored pile is can be used in pile foundation, to form stable base Plinth structure.
Preferably, the only pulpboard is concrete structure, and the thickness of the only pulpboard is greater than or equal to 50cm, only pulpboard It can prevent from seeping softening basis under slurries.
Preferably, the raft plate is reinforced concrete structure, and thickness is greater than or equal to 2.5m, and along tunnel, axis vertical is poured It builds, and the indirect stubble of the pile foundation and raft plate has reinforcing bar, forms the stronger tunnel bottom stake raft structure of overall stiffness.
Preferably, raft plate two sides further respectively have left side barricade and right side barricade, two lateral retaining walls to tunnel bottom structure and Open-cut tunnel structure, which provides, stable applies space.
Preferably, the top and two sides of the shield arch are backfilled with backfill stone.
Preferably, it is reserved with drainage hole in the backfill stone, solves tunnel and crosses water, drainage problem, avoid solution cavity Structure caused by section underground water is destroyed and construction risk.
Preferably, shield arch bottom is equipped with left side shield arch Extended chemotherapy and right side shield arch Extended chemotherapy, and Extended chemotherapy is set On the raft plate, Extended chemotherapy is to support shield to encircle.
The invention also discloses the construction method that a kind of open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft, packets Include following steps:
Step 1: determining open cut tunnel and pile foundation range, and construct left side barricade and right side barricade;
Step 2: the pile foundation constructed for passing through lower part Packing character solution cavity, wherein the pile foundation is embedded in bottom basement rock depth More than or equal to 2m, according to tunnel span and solution cavity range, the pile foundation transverse direction and longitudinal direction arranged for interval;
Step 3: applying concrete at the top of the pile foundation and stop pulpboard, wherein the thickness of the only pulpboard is greater than or waits In 50cm;
Step 4: the reinforcing bar of construction raft plate, and raft plate and the pile foundation connect a batch reinforcing bar, are placed at the top of the pile foundation, most The concrete of raft plate described in after-pouring;
Step 5: applying left side shield arch Extended chemotherapy and right side shield arch Extended chemotherapy on the raft plate, then apply shield arch, The shield arch is placed on Extended chemotherapy;
Step 6: open cut tunnel is applied after the completion of shield arch applies, and reserves one of deformation joint every 10m;
Step 7: two sides and top backfill stone after shield arch and open cut tunnel reach structure design strength, in shield arch And packing reality is rammed, in the two sides fill concrete of Extended chemotherapy;
Step 8: drainage hole on the left of constructing between backfill stone and left side lateral sulcus on the left of tunnel, in right side backfill stone Right side drainage hole is applied between flat pilot tunnel.
Compared with prior art, open cut tunnel of the present invention add tunnel bottom stake the hardened structure of raft the utility model has the advantages that
The present invention setting shield arch, open cut tunnel and the hardened structure of tunnel bottom pile foundation raft in the large-scale half Packing character solution cavity in tunnel, establish A kind of open cut tunnel passing through half Packing character solution cavity adds tunnel bottom stake raft structure.Pile foundation, only pulpboard and raft plate together form stability fundamental, For passing through lower part Packing character solution cavity, and play the role of supporting top shield arch and open cut tunnel;Shield arch can prevent top sky solution cavity Chip off-falling damages main structure, can safely and steadly pass through top sky solution cavity, therefore, this invention ensures that passing through solution cavity The safety of region tunnel structure, the huge construction investment of indirect saving.The present invention is the tunnel of large-scale half Packing character solution cavity section Structure design provides scientific basis, ensure that constructing tunnel and operation security, make the design of tunnel solution cavity section more rationally, peace Entirely, reliably.
Compared with prior art, open cut tunnel of the present invention add tunnel bottom stake the hardened structure of raft construction method the utility model has the advantages that
The present invention provides a kind of in such a way that pile foundation raft foundation adds novel open-cut tunnel structure to pass through large-scale solution cavity, to solve The processing scheme design of the large-scale half filling solution cavity of Tunnel Passing provides scientific basis.The present invention can safely and steadly pass through large size Solution cavity section ensure that the safety of tunnel structure, solves tunnel and crosses water, drainage problem, avoids solution cavity section underground water and causes to tie The problems such as structure destruction, construction risk, risk of drawing water.
Detailed description of the invention:
Fig. 1 is the cross section that a kind of open cut tunnel for passing through half Packing character solution cavity of the present invention adds the tunnel bottom stake hardened structure of raft Figure.
Fig. 2 is the vertical section that a kind of open cut tunnel for passing through half Packing character solution cavity of the present invention adds the tunnel bottom stake hardened structure of raft Figure.
Marked in the figure: the top 11- sky solution cavity, the lower part 12- Packing character solution cavity, 13- pile foundation, 14- stops pulpboard, 15- raft plate, Barricade on the left of 16a-, the right side 16b- barricade, 17a- left side concrete backfill, 17b- right side concrete backfill, 18- open cut tunnel, 19- shield Arch, the left side 20a- shield arch Extended chemotherapy, the right side 20b- shield encircle Extended chemotherapy, 21- sky solution cavity and Packing character solution cavity line of demarcation, 22- Backfill stone, the left side 23- drainage hole, the right side 24- drainage hole, the flat pilot tunnel of 25-, the dark hole in 26- open cut tunnel front, 27- open cut tunnel rear are dark Hole, 28- deformation joint.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
Embodiment 1
As Figure 1-Figure 2, large-scale half Packing character solution cavity includes top sky solution cavity 11 and lower part Packing character solution cavity 12, the two Between there is empty solution cavity and Packing character solution cavity line of demarcation 21.When tunnel passes through large-scale half Packing character solution cavity, the present invention provides A kind of open cut tunnel passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft, including the pile foundation for passing through lower part Packing character solution cavity 12 13, stop pulpboard 14 and raft plate 15, and open cut tunnel 18 and shield arch 19 for passing through top sky solution cavity 11, the open cut tunnel 18 and shield arch 19 are located on the raft plate 15.Left side barricade 16a and right side barricade are further respectively had in the two sides of pile foundation and shield arch 19 16b, the stabilization for forming tunnel bottom structure and open-cut tunnel structure apply space.
Insertion bottom basement rock depth is greater than or equal to 2m when the pile foundation 13 passes through lower part Packing character solution cavity 12, according to tunnel Span and solution cavity range, 13 transverse direction and longitudinal direction arranged for interval of pile foundation, pile foundation 13 use cast-in-situ bored pile, apply at the top of pile foundation 13 50cm thickness C20 concrete stops pulpboard 14, and softening basis is seeped under slurries to prevent.The raft plate 15 uses armored concrete knot Structure, thickness 2.5m, along tunnel, axis vertical is poured, and is placed in the top of lower part pile foundation 13, and indirect stubble reinforcing bar, formation overall stiffness Stronger tunnel bottom stake raft structure.
On raft plate 15 be equipped with left side shield arch Extended chemotherapy 20a and right side shield arch Extended chemotherapy 20b, Extended chemotherapy it It is equipped with shield arch 19, shield arch 19 uses concrete structure, and interior outside is embedded in I-steel, to prevent 11 chip off-falling pair of top sky solution cavity It is destroyed caused by main structure.
18 structure of open cut tunnel uses reinforced concrete structure, is tunnel main structure, applies after the completion of shield arch 19 applies Make, and reserves one of deformation joint 28 every 10m.26 be hole dark in front of open cut tunnel in figure, and 27 be the dark hole in open cut tunnel rear.Shield arch 19 and After 18 structure of open cut tunnel reaches design strength, open cut tunnel 18 and shield 19 two sides of arch and top are backfilled using backfill stone 22 and ram packing Real, Extended chemotherapy two sides use left side concrete backfill 17a, right side concrete 17b backfill.
Left side drainage hole 23, excretion left side underground water are reserved on the left of tunnel between backfill stone 22 and left side lateral sulcus.Right side Right side drainage hole 24 is formed using drilling between backfill stone 22 and flat pilot tunnel 25, right side underground water is discharged by flat pilot tunnel 25 Outside hole.
Embodiment 2
A kind of open cut tunnel passing through half Packing character solution cavity adds the construction method of the tunnel bottom stake hardened structure of raft, comprising the following steps:
Step 1: determining 13 range of open cut tunnel 18 and pile foundation, and the left side barricade 16a and right side barricade 16b that constructs, barricade use Mortar flag stone structure, barricade provide for tunnel bottom structure and open-cut tunnel structure and stable apply space;
Step 2: the pile foundation 13 constructed for passing through lower part Packing character solution cavity 12, wherein the pile foundation 13 is embedded in bottom base Rock depth is greater than or equal to 2m, according to tunnel span and solution cavity range, the 13 transverse direction and longitudinal direction arranged for interval of pile foundation, and pile foundation 13 Using cast-in-situ bored pile;
Step 3: applying concrete at the top of the pile foundation 13 and stop pulpboard 14, wherein the thickness of the only pulpboard 14 is big In or equal to 50cm;
Step 4: the reinforcing bar of construction raft plate 15, and raft plate 15 and the pile foundation 13 connect a batch reinforcing bar, are placed in the pile foundation 13 Top, finally pours the concrete of the raft plate 15, the raft plate 15 with a thickness of 2.5m, along tunnel, axis vertical is poured;
Step 5: applying left side shield arch Extended chemotherapy 20a and right side shield arch Extended chemotherapy 20b on the raft plate 15, then Shield arch 19 is applied, the shield arch 19 is placed on Extended chemotherapy, and shield arch 19 uses concrete structure, and interior outside is embedded in I-steel, For preventing 11 chip off-falling of top sky solution cavity from damaging to main structure;
Step 6: open cut tunnel 18 is applied after the completion of shield arch 19 applies, and reserves one of deformation joint 28, open cut tunnel 18 every 10m It is tunnel main structure using reinforced concrete structure;
Step 7: it after shield arch 19 and open cut tunnel 18 reach structure design strength, is returned in the two sides of shield arch 19 and top Banket stone and ram packing reality, in the two sides fill concrete of Extended chemotherapy;
Step 8: drainage hole 23 on the left of constructing between backfill stone 22 and left side lateral sulcus on the left of tunnel backfills on right side Right side drainage hole 24 is applied between native stone 22 and flat pilot tunnel 25, so that underground water be excluded outside hole.
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention Case and its improvement, are intended to be within the scope of the claims of the invention.

Claims (10)

1. a kind of open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft, which is characterized in that including for passing through lower part The pile foundation (13) of Packing character solution cavity (12), only pulpboard (14) and raft plate (15), and for passing through the bright of top sky solution cavity (11) Hole (18) and shield arch (19), the open cut tunnel (18) and shield arch (19) are located on the raft plate (15).
2. a kind of open cut tunnel for passing through half Packing character solution cavity according to claim 1 adds the tunnel bottom stake hardened structure of raft, feature exists In insertion bottom basement rock depth is greater than or equal to 2m when the pile foundation (13) passes through lower part Packing character solution cavity (12).
3. a kind of open cut tunnel for passing through half Packing character solution cavity according to claim 1 adds the tunnel bottom stake hardened structure of raft, feature exists In described only pulpboard (14) are concrete structure, and the thickness of only pulpboard (14) is greater than or equal to 50cm.
4. a kind of open cut tunnel for passing through half Packing character solution cavity according to claim 1 adds the tunnel bottom stake hardened structure of raft, feature exists Be reinforced concrete structure in, the raft plate (15), thickness is greater than or equal to 2.5m, and the pile foundation (13) and raft plate (15) it Indirect stubble has reinforcing bar.
5. a kind of open cut tunnel for passing through half Packing character solution cavity according to claim 1 adds the tunnel bottom stake hardened structure of raft, feature exists In raft plate (15) two sides further respectively have left side barricade (16a) and right side barricade (16b).
6. a kind of open cut tunnel for passing through half Packing character solution cavity according to claim 1 adds the tunnel bottom stake hardened structure of raft, feature exists In the top and two sides of the shield arch (19) are backfilled with backfill stone (22).
7. a kind of open cut tunnel for passing through half Packing character solution cavity according to claim 6 adds the tunnel bottom stake hardened structure of raft, feature exists In being reserved with drainage hole in the backfill stone (22).
8. a kind of -7 any open cut tunnels for passing through half Packing character solution cavity add the tunnel bottom stake hardened structure of raft according to claim 1, It is characterized in that, the pile foundation (13) is cast-in-situ bored pile.
9. a kind of -7 any open cut tunnels for passing through half Packing character solution cavity add the tunnel bottom stake hardened structure of raft according to claim 1, It is characterized in that, the shield arch (19) bottom is equipped with left side shield arch Extended chemotherapy (20a) and right side shield arch Extended chemotherapy (20b), expands Big basis is placed on the raft plate (15).
10. a kind of open cut tunnel for passing through half Packing character solution cavity add tunnel bottom stake the hardened structure of raft construction method, which is characterized in that including with Lower step:
Step 1: determining open cut tunnel (18) and pile foundation (13) range, and construct left side barricade (16a) and right side barricade (16b);
Step 2: the pile foundation (13) constructed for passing through lower part Packing character solution cavity (12), wherein the pile foundation (13) is embedded in bottom Basement rock depth is greater than or equal to 2m, according to tunnel span and solution cavity range, pile foundation (13) the transverse direction and longitudinal direction arranged for interval;
Step 3: applying concrete at the top of the pile foundation (13) and stop pulpboard (14), wherein the thickness of only pulpboard (14) More than or equal to 50cm;
Step 4: the reinforcing bar of construction raft plate (15), and raft plate (15) and the pile foundation (13) connect a batch reinforcing bar, are placed in the pile foundation (13) top, finally pours the concrete of the raft plate (15);
Step 5: applying left side shield arch Extended chemotherapy (20a) and right side shield arch Extended chemotherapy (20b) on the raft plate (15), Shield arch (19) is applied again, and the shield arch (19) is placed on Extended chemotherapy;
Step 6: it is applied open cut tunnel (18) after the completion of shield arch (19) applies, and reserves one of deformation joint (28) every 10m;
Step 7: after shield arch (19) and open cut tunnel (18) reach structure design strength, in the two sides and top of shield arch (19) Backfill stone simultaneously rams packing reality, in the two sides fill concrete of Extended chemotherapy;
Step 8: the construction left side drainage hole (23) between backfill stone (22) and left side lateral sulcus on the left of tunnel backfills on right side Right side drainage hole (24) is applied between native stone (22) and flat pilot tunnel (25).
CN201811597927.2A 2018-12-25 2018-12-25 The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft Pending CN109488330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811597927.2A CN109488330A (en) 2018-12-25 2018-12-25 The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811597927.2A CN109488330A (en) 2018-12-25 2018-12-25 The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft

Publications (1)

Publication Number Publication Date
CN109488330A true CN109488330A (en) 2019-03-19

Family

ID=65712094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811597927.2A Pending CN109488330A (en) 2018-12-25 2018-12-25 The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft

Country Status (1)

Country Link
CN (1) CN109488330A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882205A (en) * 2019-03-28 2019-06-14 中铁二院工程集团有限责任公司 It is a kind of to pass through large-scale suspention backfill structure and construction method without filling solution cavity tunnel
CN111075471A (en) * 2019-12-29 2020-04-28 中铁二院工程集团有限责任公司 Large karst cavity top filling type tunnel rockfall prevention structure and construction method
CN111119904A (en) * 2019-12-18 2020-05-08 浙江大学城市学院 Construction method of soft surrounding rock karst section tunnel
CN111218942A (en) * 2020-02-29 2020-06-02 中铁二院工程集团有限责任公司 Thick-layer soil foundation tunnel open cut tunnel high-fill structure and construction method
CN111396095A (en) * 2020-04-21 2020-07-10 中铁二院工程集团有限责任公司 Tunnel simply-supported arch open cut tunnel structure penetrating through giant karst cave and construction method thereof
CN111502748A (en) * 2020-04-21 2020-08-07 中铁二院工程集团有限责任公司 Construction method for backfilling foundation of railway crossing giant karst cave
CN111560940A (en) * 2020-05-09 2020-08-21 中铁二十局集团第三工程有限公司 Treatment method of karst tunnel
CN111577383A (en) * 2020-05-11 2020-08-25 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region
CN111794755A (en) * 2020-06-30 2020-10-20 中铁二院工程集团有限责任公司 Tunnel bottom combined type reinforcement processing method for penetrating through large-scale full-filling karst cave
CN111810185A (en) * 2020-06-30 2020-10-23 中铁二院工程集团有限责任公司 Tunnel bottom pre-reinforcement construction method
CN112443342A (en) * 2020-12-22 2021-03-05 中铁五局集团成都工程有限责任公司 Construction method for treating extra-large karst cave of karst developing long and large tunnel
CN111119938B (en) * 2019-12-30 2022-02-11 中交路桥华南工程有限公司 Method for processing karst cave at upper part of tunnel
CN114182723A (en) * 2021-12-25 2022-03-15 中铁二局集团有限公司 Karst tunnel foundation pile raft structure construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790959A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Shallowly buried small-spacing rock soil tunnel construction method
CN106193082A (en) * 2016-07-14 2016-12-07 中铁五局集团有限公司 Stake raft construction technology in a kind of Shallow-buried soft plastomer Karst Tunnel
CN108547643A (en) * 2018-03-21 2018-09-18 中南大学 A kind of construction method for handling tunnel top large size cavity solution cavity shield arch
CN209195427U (en) * 2018-12-25 2019-08-02 中铁二院工程集团有限责任公司 The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790959A (en) * 2015-04-03 2015-07-22 核工业井巷建设公司 Shallowly buried small-spacing rock soil tunnel construction method
CN106193082A (en) * 2016-07-14 2016-12-07 中铁五局集团有限公司 Stake raft construction technology in a kind of Shallow-buried soft plastomer Karst Tunnel
CN108547643A (en) * 2018-03-21 2018-09-18 中南大学 A kind of construction method for handling tunnel top large size cavity solution cavity shield arch
CN209195427U (en) * 2018-12-25 2019-08-02 中铁二院工程集团有限责任公司 The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘彬;: "宜万铁路鲁竹坝2号隧道"+960"溶洞治理技术", 铁道标准设计, no. 08, pages 127 - 130 *
浙江省交通设计院编: "公路隧道设计规范 JTJ026-90 条文说明", vol. 1, 人民交通出版社, pages: 40 - 41 *
陈双庆;: "宜万铁路下村坝隧道大型溶洞处理", 铁道标准设计, vol. 1, no. 07, pages 122 - 123 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882205B (en) * 2019-03-28 2024-01-19 中铁二院工程集团有限责任公司 Suspension backfill structure penetrating through large filling-free karst cave tunnel and construction method
CN109882205A (en) * 2019-03-28 2019-06-14 中铁二院工程集团有限责任公司 It is a kind of to pass through large-scale suspention backfill structure and construction method without filling solution cavity tunnel
CN111119904B (en) * 2019-12-18 2021-03-30 浙江大学城市学院 Construction method of soft surrounding rock karst section tunnel
CN111119904A (en) * 2019-12-18 2020-05-08 浙江大学城市学院 Construction method of soft surrounding rock karst section tunnel
CN111075471A (en) * 2019-12-29 2020-04-28 中铁二院工程集团有限责任公司 Large karst cavity top filling type tunnel rockfall prevention structure and construction method
CN111119938B (en) * 2019-12-30 2022-02-11 中交路桥华南工程有限公司 Method for processing karst cave at upper part of tunnel
CN111218942A (en) * 2020-02-29 2020-06-02 中铁二院工程集团有限责任公司 Thick-layer soil foundation tunnel open cut tunnel high-fill structure and construction method
CN111502748A (en) * 2020-04-21 2020-08-07 中铁二院工程集团有限责任公司 Construction method for backfilling foundation of railway crossing giant karst cave
CN111502748B (en) * 2020-04-21 2021-08-31 中铁二院工程集团有限责任公司 Construction method for backfilling foundation of railway crossing giant karst cave
CN111396095A (en) * 2020-04-21 2020-07-10 中铁二院工程集团有限责任公司 Tunnel simply-supported arch open cut tunnel structure penetrating through giant karst cave and construction method thereof
CN111396095B (en) * 2020-04-21 2024-05-24 中铁二院工程集团有限责任公司 Tunnel simple arch open cut tunnel structure penetrating through huge karst cave and construction method thereof
CN111560940A (en) * 2020-05-09 2020-08-21 中铁二十局集团第三工程有限公司 Treatment method of karst tunnel
CN111577383A (en) * 2020-05-11 2020-08-25 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region
CN111577383B (en) * 2020-05-11 2021-04-09 中铁一局集团有限公司 Method for treating tunnel leakage water in alpine region
CN111794755A (en) * 2020-06-30 2020-10-20 中铁二院工程集团有限责任公司 Tunnel bottom combined type reinforcement processing method for penetrating through large-scale full-filling karst cave
CN111810185A (en) * 2020-06-30 2020-10-23 中铁二院工程集团有限责任公司 Tunnel bottom pre-reinforcement construction method
CN111794755B (en) * 2020-06-30 2021-10-26 中铁二院工程集团有限责任公司 Tunnel bottom combined type reinforcement processing method for penetrating through large-scale full-filling karst cave
CN111810185B (en) * 2020-06-30 2022-04-05 中铁二院工程集团有限责任公司 Tunnel bottom pre-reinforcement construction method
CN112443342A (en) * 2020-12-22 2021-03-05 中铁五局集团成都工程有限责任公司 Construction method for treating extra-large karst cave of karst developing long and large tunnel
CN114182723A (en) * 2021-12-25 2022-03-15 中铁二局集团有限公司 Karst tunnel foundation pile raft structure construction method

Similar Documents

Publication Publication Date Title
CN109488330A (en) The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft
CN209195427U (en) The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft
CN102704957B (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN110017144B (en) Loess tunnel three-step construction method considering substrate reinforcement treatment
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN105370304A (en) High stress strong disturbance coal seam gob-side entry retaining multistage reinforcing method
CN111851597B (en) Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method
CN108797620A (en) A kind of OPT construction method of interlocking pile
CN205778879U (en) Super-large-section tunnel drilling and blasting method enlarging constructing structure in situ
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN101838957A (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN213143117U (en) Assembled keyway basis retaining wall structure
CN108930544A (en) A kind of broken ground underground large space method of construction
CN111706366A (en) Tunnel lining structure penetrating through large full-filling karst cave and construction method
CN107780942A (en) The new prefabricated assembled pipe canopy and its manufacture craft of a kind of soft soil tunnel pre-reinforcement
CN111576479A (en) Retaining structure of filling slope and construction method
CN208815566U (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction
CN209760299U (en) light and shade of avoiding house to tear open and move is dug and is combined subway station structure
CN108691559A (en) One kind helping hard and soft cooperative control method for gob side entry coal column
CN209260748U (en) A kind of stepped tower crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination