CN109487989A - The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete - Google Patents
The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete Download PDFInfo
- Publication number
- CN109487989A CN109487989A CN201811345446.2A CN201811345446A CN109487989A CN 109487989 A CN109487989 A CN 109487989A CN 201811345446 A CN201811345446 A CN 201811345446A CN 109487989 A CN109487989 A CN 109487989A
- Authority
- CN
- China
- Prior art keywords
- air hose
- special
- shaped air
- buried
- abnormity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/04—Air-ducts or air channels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The present invention provides the fixation brackets and its installation method of abnormity air hose pre-buried in a kind of super thick concrete, the present invention is fixed special-shaped air hose by horizontal pressure pin, and special-shaped air hose is limited by limiting steel plate, and the vertical height for wearing the hole of the tail end of special-shaped air hose is higher than by the vertical height at the hole of the head end for wearing special-shaped air hose, while satisfaction to special-shaped air hose reliable location, guarantee that the special-shaped air hose in proton cabin needs to form the requirement of drop.In addition, having carried out three-dimensional modeling using BIM technology is pre-buried to special-shaped air hose, instructs batch production prefabricated with threedimensional model, facilitate in-site installation to construct, meet environment protection requirement;By special-shaped air hose modeling Simulation, the positional relationship mutual at air hose special-shaped in wall is solved;It is constructed using three-dimensional simulation, solves special-shaped air hose, the overlap joint of reinforcing bar and the successive sequence of construction of fixed frame, effectively save construction cost.
Description
Technical field
The present invention relates to the fixation brackets and its installation method of abnormity air hose pre-buried in a kind of super thick concrete.
Background technique
Proton therapeutic is the current state-of-the-art tumour radiotherapy technology in the whole world, by the way that big energy is released to neoplastic disease
Stove destroys cancer cell or even eliminates tumour, all less to the injury of periphery normal cell and side effect, in incidence, ophthalmology, chest
Portion, tumor in digestive tract and Children with Solid Tumors etc. have a clear superiority.External clinical treatment statistics indicate that, proton therapeutic tumour
Effective percentage reaches 95% or more, and five-year survival rate is up to 80%, is evaluated as that curative effect is best, secondary work by high-energy physics circle and medical field
With least treatment method.Since Proton therapy system is that most advanced and most expensive ultra-large type tip is cured in the world at present
Treat equipment, establish proton therapy center investment it is huge, technical requirements are also high.To prevent treatment proton radiation to extraneous shadow
It rings, therapeutic equipment generally uses super thick concrete to be protected.
In concrete construction, conventional air hose sleeve pipe pre-embedding, usually linear casing, in Embedment Construction
Fixed form is generally directly anchored on structure reinforcing bars.Since the thickness of super thick concrete is within the scope of 1.8~2.3 meters, much
It is intermediate vertically relatively more with lateral reinforcing bar level greater than conventional concrete, it is brought to the air hose arrangement of disengaging treatment tank
Certain difficulty, and prevent from radiating as an important ring, all pipelines in proton cabin directly cannot horizontally or vertically enter, therefore
It cannot be passed in and out using traditional linear casing.
Summary of the invention
The purpose of the present invention is to provide a kind of fixation bracket of abnormity air hose pre-buried in super thick concrete and its installation sides
Method, the pre-buried mode for being able to solve existing linear casing are unsatisfactory for the air hose in proton cabin and need to form the requirement of the gradient
Problem.
To solve the above problems, the present invention provides a kind of fixation bracket of pre-buried special-shaped air hose in super thick concrete, comprising:
Fixed frame;
More horizontal pressure pins, the horizontal pressure pin are fixed on the fixed frame, the head end and tail of every special-shaped air hose
End is set up in respectively on the horizontal pressure pin;
Limit steel plate, the limit Interal fixation is on the fixed frame, the limit steel plate and the level
Pressure pin is adjacent, and the hole of the positioning for the special-shaped air hose, the head end of every special-shaped air hose are offered on the limit steel plate
Be each passed through corresponding hole on the limit steel plate with tail end, wherein for wear the head end of special-shaped air hose hole hang down
Straight height is higher than the vertical height for wearing the hole of the tail end of special-shaped air hose.
Further, in above-mentioned fixed bracket, the fixed frame includes:
The vertical bar of 4 Symmetrical verticals setting, the bottom end of every vertical bar are provided with for the interconnecting piece fixed with ground;
More cross bars, every cross bar are connected between two adjacent vertical bars.
Further, in above-mentioned fixed bracket, the vertical bar is I-steel.
Further, in above-mentioned fixed bracket, the cross bar is angle steel.
Further, in above-mentioned fixed bracket, every horizontal pressure pin is connected between two adjacent vertical bars.
Further, in above-mentioned fixed bracket, the horizontal pressure pin is C word steel.
Further, in above-mentioned fixed bracket, the shape of the abnormity air hose is S-shaped.
Further, it in above-mentioned fixed bracket, is arranged in parallel between more special-shaped air hoses.
Another side according to the present invention provides a kind of support bracket fastened peace of pre-buried special-shaped air hose in above-mentioned super thick concrete
Dress method, comprising:
Each special-shaped air hose is modeled using BIM technology, obtains the model of special-shaped air hose;
According to the corresponding fixed frame model of the modelling of special-shaped air hose, according to the model and fixed frame of special-shaped air hose
Model carries out special-shaped air hose and fixed frame prefabricated;
The reinforcing bar for passing through region to the special-shaped air hose carries out three-dimensional modeling, rebar model is obtained, by the rebar model
Built-up pattern is synthesized with special-shaped air hose model;
Special-shaped air hose in the built-up pattern is adjusted with the position that reinforcing bar intersects, the combination die after being adjusted
Type;
According to built-up pattern adjusted, the prefabricated of reinforcing bar is carried out;
According to the length of special-shaped air hose, the size using limit steel plate and horizontal pressure pin is determined, according to limit steel plate and water
The size production limit steel plate and horizontal pressure pin for lifting bar, by the size of space of every special-shaped air hose, on the limit steel plate
Open up the hole for the positioning of special-shaped air hose;
Fit structure construction, installs prefabricated fixed frame, by the limit steel plate made and horizontal pressure pin in structure
It is mounted on the fixed frame, is then mounted on limit steel plate for the top of prefabricated special-shaped air hose is corresponding with tail end by root
And on horizontal pressure pin, and fixed with angle iron flange;
After the installation is completed, prefabricated reinforcing bar is pacified according to the built-up pattern adjusted in all special-shaped air hoses
Dress;
Pouring for concrete is carried out to the structure to smash.
Compared with prior art, the present invention is fixed special-shaped air hose by horizontal pressure pin, and passes through limit steel plate pair
Special-shaped air hose is limited, and is higher than by the vertical height at the hole of the head end for wearing special-shaped air hose for wearing abnormity
The vertical height at the hole of the tail end of air hose while satisfaction to special-shaped air hose reliable location, guarantees the special-shaped air hose in proton cabin
Need to form the requirement of drop.In addition, three-dimensional modeling has been carried out using BIM technology is pre-buried to special-shaped air hose, with threedimensional model
It instructs batch production prefabricated, in-site installation is facilitated to construct, meet environment protection requirement;By special-shaped air hose modeling Simulation, solve at
The mutual positional relationship of special-shaped air hose in wall;It is constructed using three-dimensional simulation, solves special-shaped air hose, the overlap joint of reinforcing bar and solid
The successive sequence of construction for determining frame, effectively saves construction cost.
Detailed description of the invention
Fig. 1 is the support bracket fastened tomograph of pre-buried abnormity air hose in the super thick concrete of one embodiment of the invention;
Fig. 2 is the support bracket fastened construction profile of pre-buried abnormity air hose in the super thick concrete of one embodiment of the invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
As illustrated in fig. 1 and 2, the present invention provides a kind of fixation bracket of pre-buried special-shaped air hose in super thick concrete, comprising:
Fixed frame;
More horizontal pressure pins 2, the horizontal pressure pin 2 are fixed on the fixed frame, the head end of every special-shaped air hose 3 and
Tail end is set up in respectively on the horizontal pressure pin;
Steel plate 4 is limited, the limit steel plate 4 is fixed on the fixed frame, the limit steel plate and the water
It lifts that bar is adjacent, offers the hole of the positioning for the special-shaped air hose 3 on the limit steel plate, every special-shaped air hose 3
Head end and tail end are each passed through corresponding hole on the limit steel plate, wherein for wearing the hole of the head end of special-shaped air hose
Vertical height be higher than vertical height for wearing the hole of the tail end of special-shaped air hose.
Here, the present invention is fixed special-shaped air hose by horizontal pressure pin, and by limit steel plate to special-shaped air hose into
Row limit, and the tail end for wearing special-shaped air hose is higher than by the vertical height at the hole of the head end for wearing special-shaped air hose
Hole vertical height, while satisfaction to special-shaped air hose reliable location, guarantee that the special-shaped air hose in proton cabin is needed to form and fallen
The requirement of difference.
In super thick concrete of the invention in one embodiment of fixation bracket of pre-buried abnormity air hose, the fixed frame packet
It includes:
The vertical bar 11 of 4 Symmetrical verticals setting, the bottom end of every vertical bar are provided with for the interconnecting piece fixed with ground;
More cross bars 12, every cross bar is connected between two adjacent vertical bars 11, to guarantee bonding strength.
As illustrated in fig. 1 and 2, in super thick concrete of the invention in one embodiment of fixation bracket of pre-buried abnormity air hose, institute
Stating vertical bar 11 is I-steel, to guarantee bonding strength.
As illustrated in fig. 1 and 2, in super thick concrete of the invention in one embodiment of fixation bracket of pre-buried abnormity air hose, institute
Stating cross bar 12 is angle steel, to guarantee bonding strength.
As illustrated in fig. 1 and 2, in super thick concrete of the invention in one embodiment of fixation bracket of pre-buried abnormity air hose, often
The horizontal pressure pin 2 of root is connected between two adjacent vertical bars 11, to guarantee bonding strength.
As illustrated in fig. 1 and 2, in super thick concrete of the invention in one embodiment of fixation bracket of pre-buried abnormity air hose, institute
Stating horizontal pressure pin 2 is C word steel, to guarantee bonding strength.
As illustrated in fig. 1 and 2, in super thick concrete of the invention in one embodiment of fixation bracket of pre-buried abnormity air hose, institute
The shape for stating special-shaped air hose 3 is S-shaped, to meet the requirement of the oblique formation drop of the pipeline in proton cabin.
As illustrated in fig. 1 and 2, more in super thick concrete of the invention in one embodiment of fixation bracket of pre-buried abnormity air hose
It is arranged in parallel between root abnormity air hose 3, to meet the pipeline installation requirement in proton cabin.
As illustrated in fig. 1 and 2, the present invention also provides the support bracket fastened peaces of abnormity air hose pre-buried in another super thick concrete
Dress method, using the fixation bracket of abnormity air hose pre-buried in above-mentioned super thick concrete, which comprises
Step S1 models each special-shaped air hose using BIM technology, obtains the model of special-shaped air hose 3;
Step S2, according to the corresponding fixed frame model of the modelling of special-shaped air hose, according to the model of special-shaped air hose and
Fixed frame model carries out special-shaped air hose 3 and fixed frame prefabricated;
Step S3, the reinforcing bar for passing through region to the special-shaped air hose carry out three-dimensional modeling, rebar model are obtained, by the steel
Muscle model synthesizes built-up pattern with special-shaped air hose model;
Step S4 is adjusted the special-shaped air hose in the built-up pattern with the position that reinforcing bar intersects, after being adjusted
Built-up pattern;
Step S5 carries out the prefabricated of reinforcing bar according to built-up pattern adjusted;
Step S6 determines the size using limit steel plate 4 and horizontal pressure pin 2, according to limit according to the length of special-shaped air hose 3
The size of position steel plate and horizontal pressure pin production limit steel plate 4 and horizontal pressure pin 2, by the size of space of every special-shaped air hose, in institute
State the hole opened up on limit steel plate for the positioning of special-shaped air hose;
Step S7, fit structure construction, installs prefabricated fixed frame, 4 He of limit steel plate that will be made in structure
Horizontal pressure pin 2 is mounted on the fixed frame, then by root by the top of prefabricated special-shaped air hose it is corresponding with tail end installation
On limit steel plate and horizontal pressure pin, and fixed with angle iron flange;
Step S8, all special-shaped air hoses 3 after the installation is completed, according to the built-up pattern adjusted to prefabricated steel
Muscle is installed;
Step S9 carries out pouring for concrete to the structure and smashes.
Here, having carried out three-dimensional modeling using BIM technology is pre-buried to special-shaped air hose, instruct batch production pre- with threedimensional model
System, facilitates in-site installation to construct, meets environment protection requirement;By special-shaped air hose modeling Simulation, solve into wind special-shaped in wall
Manage mutual positional relationship;It is constructed using three-dimensional simulation, solves the successive of special-shaped air hose, the overlap joint of reinforcing bar and fixed frame
Sequence of construction effectively saves construction cost.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the invention is also intended to include including these modification and variations.
Claims (9)
1. the fixation bracket of pre-buried abnormity air hose in a kind of super thick concrete characterized by comprising
Fixed frame;
More horizontal pressure pins, the horizontal pressure pin are fixed on the fixed frame, the head end and tail end point of every special-shaped air hose
It is not set up on the horizontal pressure pin;
Limit steel plate, the limit Interal fixation is on the fixed frame, the limit steel plate and the horizontal pressure pin
It is adjacent, the hole of the positioning for the special-shaped air hose, the head end and tail of every special-shaped air hose are offered on the limit steel plate
End is each passed through corresponding hole on the limit steel plate, wherein for wearing the vertical height at the hole of the head end of special-shaped air hose
Degree is higher than the vertical height for wearing the hole of the tail end of special-shaped air hose.
2. the fixation bracket of pre-buried abnormity air hose in super thick concrete as described in claim 1, which is characterized in that the fixation
Frame includes:
The vertical bar of 4 Symmetrical verticals setting, the bottom end of every vertical bar are provided with for the interconnecting piece fixed with ground;
More cross bars, every cross bar are connected between two adjacent vertical bars.
3. the fixation bracket of pre-buried abnormity air hose in super thick concrete as claimed in claim 2, which is characterized in that the vertical bar
For I-steel.
4. the fixation bracket of pre-buried abnormity air hose in super thick concrete as claimed in claim 2, which is characterized in that the cross bar
For angle steel.
5. the fixation bracket of pre-buried abnormity air hose in super thick concrete as claimed in claim 2, which is characterized in that every level
Pressure pin is connected between two adjacent vertical bars.
6. the fixation bracket of pre-buried abnormity air hose in super thick concrete as claimed in claim 2, which is characterized in that the level
Pressure pin is C word steel.
7. the fixation bracket of pre-buried abnormity air hose in super thick concrete as claimed in claim 2, which is characterized in that the abnormity
The shape of air hose is S-shaped.
8. the fixation bracket of pre-buried abnormity air hose in super thick concrete as claimed in claim 2, which is characterized in that more abnormity
It is arranged in parallel between air hose.
9. the support bracket fastened installation of pre-buried abnormity air hose in a kind of super thick concrete as described in any one of claims 1 to 8
Method characterized by comprising
Each special-shaped air hose is modeled using BIM technology, obtains the model of special-shaped air hose;
According to the corresponding fixed frame model of the modelling of special-shaped air hose, according to the model of special-shaped air hose and fixed frame mould
Type carries out special-shaped air hose and fixed frame prefabricated;
The reinforcing bar for passing through region to the special-shaped air hose carries out three-dimensional modeling, obtains rebar model, by the rebar model with it is different
Shape air hose model synthesizes built-up pattern;
Special-shaped air hose in the built-up pattern is adjusted with the position that reinforcing bar intersects, the built-up pattern after being adjusted;
According to built-up pattern adjusted, the prefabricated of reinforcing bar is carried out;
According to the length of special-shaped air hose, the size using limit steel plate and horizontal pressure pin is determined, held in the palm according to limit steel plate with horizontal
The size production limit steel plate of bar and horizontal pressure pin are opened up on the limit steel plate by the size of space of every special-shaped air hose
Hole for the positioning of special-shaped air hose;
Fit structure construction, installs prefabricated fixed frame in structure, and the limit steel plate made and horizontal pressure pin are installed
On the fixed frame, be mounted on corresponding with tail end of the top of prefabricated special-shaped air hose is then limited into steel plate and water by root
It lifts on bar, and is fixed with angle iron flange;
After the installation is completed, prefabricated reinforcing bar is installed according to the built-up pattern adjusted in all special-shaped air hoses;
Pouring for concrete is carried out to the structure to smash.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811345446.2A CN109487989A (en) | 2018-11-13 | 2018-11-13 | The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811345446.2A CN109487989A (en) | 2018-11-13 | 2018-11-13 | The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109487989A true CN109487989A (en) | 2019-03-19 |
Family
ID=65694290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811345446.2A Pending CN109487989A (en) | 2018-11-13 | 2018-11-13 | The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109487989A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4550582A (en) * | 1980-02-04 | 1985-11-05 | Kawasaki Steel Corporation | Method of producing steel H-sheet pile |
EP1865271A1 (en) * | 2006-06-08 | 2007-12-12 | Rockwool International A/S | Metal sheet ventilation/smoke duct section and manufacturing method thereof |
CN203741866U (en) * | 2013-12-06 | 2014-07-30 | 国家电网公司 | Fixing frame structure for pre-buried screws in concrete foundation |
CN106786267A (en) * | 2016-12-14 | 2017-05-31 | 上海建工建集团有限公司 | The fixing device and installation method of a kind of super thick concrete abnormity line pipe in a row |
CN206888468U (en) * | 2017-03-31 | 2018-01-16 | 青建集团股份公司 | A kind of vertical wind pipe fixing device |
CN107902545A (en) * | 2017-11-29 | 2018-04-13 | 南通市中南建工设备安装有限公司 | A kind of riding track air hose lifting construction device and construction |
CN108412208A (en) * | 2018-04-27 | 2018-08-17 | 上海建工四建集团有限公司 | A kind of construction method with special-shaped hole wall |
CN108532947A (en) * | 2018-06-05 | 2018-09-14 | 中国五冶集团有限公司 | For the service sleeve structure and its construction method in shear wall, floor |
CN209538600U (en) * | 2018-11-13 | 2019-10-25 | 上海建工五建集团有限公司 | The fixation bracket of pre-buried abnormity air hose in super thick concrete |
-
2018
- 2018-11-13 CN CN201811345446.2A patent/CN109487989A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4550582A (en) * | 1980-02-04 | 1985-11-05 | Kawasaki Steel Corporation | Method of producing steel H-sheet pile |
EP1865271A1 (en) * | 2006-06-08 | 2007-12-12 | Rockwool International A/S | Metal sheet ventilation/smoke duct section and manufacturing method thereof |
CN203741866U (en) * | 2013-12-06 | 2014-07-30 | 国家电网公司 | Fixing frame structure for pre-buried screws in concrete foundation |
CN106786267A (en) * | 2016-12-14 | 2017-05-31 | 上海建工建集团有限公司 | The fixing device and installation method of a kind of super thick concrete abnormity line pipe in a row |
CN206888468U (en) * | 2017-03-31 | 2018-01-16 | 青建集团股份公司 | A kind of vertical wind pipe fixing device |
CN107902545A (en) * | 2017-11-29 | 2018-04-13 | 南通市中南建工设备安装有限公司 | A kind of riding track air hose lifting construction device and construction |
CN108412208A (en) * | 2018-04-27 | 2018-08-17 | 上海建工四建集团有限公司 | A kind of construction method with special-shaped hole wall |
CN108532947A (en) * | 2018-06-05 | 2018-09-14 | 中国五冶集团有限公司 | For the service sleeve structure and its construction method in shear wall, floor |
CN209538600U (en) * | 2018-11-13 | 2019-10-25 | 上海建工五建集团有限公司 | The fixation bracket of pre-buried abnormity air hose in super thick concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016095631A1 (en) | Support structure for tunnel having ultra-large variable section | |
CN104109999B (en) | The construction method of bridge tower thwart beam | |
CN209538600U (en) | The fixation bracket of pre-buried abnormity air hose in super thick concrete | |
CN109487989A (en) | The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete | |
CN106894826A (en) | The supporting construction and method for protecting support of section of being caved in a kind of hole | |
CN109610466A (en) | The asynchronous construction method of the built irregular deep basal pit in subway station two sides and structure | |
CN105756287B (en) | Stiffness steel frame beam supporting steel bar is counter to hang cloth muscle construction method | |
CN107761975B (en) | A kind of CL integrated plate for heat insulation positioned internal bracket | |
CN106786267B (en) | The fixation device and installation method of a kind of super thick concrete special-shaped line pipe in a row | |
CN206332405U (en) | A kind of fixing device of super thick concrete special-shaped line pipe in a row | |
CN106545349A (en) | A kind of node apparatus and installation method suitable for tunnel arch Automated assembly | |
CN107269016A (en) | The novel joint that a kind of existing reinforced concrete post is connected with newly-increased reinforced beam | |
CN107558483A (en) | A kind of building foundation and its construction method for installing wallboard | |
CN209211877U (en) | Steel platform of climbing support device | |
CN104389348B (en) | A kind of installation method with covering arch structure | |
CN207160599U (en) | Overhanging unloading platform | |
CN206971564U (en) | Reinforcing bar apparatus for correcting | |
CN107587723B (en) | Top plate spool protective device and its construction method | |
CN207143746U (en) | Support beam template system under concrete support trestle plate | |
CN109024649A (en) | Bottom plate multilayer Large-size rebar installs system and construction method | |
CN207469534U (en) | For the exterior finish modeling structure of two-sided prefabricated overlapping wall | |
CN104847090B (en) | Construction method of small-section-size ventilating duct | |
CN208251172U (en) | The double-deck sealing belt construction limiting card | |
CN106638715A (en) | Construction method of steel-edged water stop belt for segmented pouring of concrete | |
CN207418218U (en) | A kind of hung moving platform for Steel Structure Installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |