CN109487891A - A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings - Google Patents

A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings Download PDF

Info

Publication number
CN109487891A
CN109487891A CN201811444502.8A CN201811444502A CN109487891A CN 109487891 A CN109487891 A CN 109487891A CN 201811444502 A CN201811444502 A CN 201811444502A CN 109487891 A CN109487891 A CN 109487891A
Authority
CN
China
Prior art keywords
shaped
wedge
cylinder
gully
pit shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811444502.8A
Other languages
Chinese (zh)
Inventor
刘培正
匡玉生
王湘桂
喻六平
***
王春贤
兰舟
郝学冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201811444502.8A priority Critical patent/CN109487891A/en
Publication of CN109487891A publication Critical patent/CN109487891A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of continous way gullys suitable for the sedimentation water discharge of Tailings Dam fine tailings, containing gully basic (1), cylinder-shaped pit shaft (2), the cylinder-shaped pit shaft (2) reserves the integrated steel reinforced concrete cylindrical shape structures of window hole (3) using one-stage completion periphery;Window hole (3) is pressed spiral formula along the barrel of cylinder-shaped pit shaft (2) from bottom to top and is laid, the shape of window hole (3) is outer big, interior small flat wedge-shaped hole, and adjacent two wedge-shaped holes connect or partly overlap in vertical height;Wedge-shaped hole below the Tailings Dam overflow water surface on cylinder-shaped pit shaft (2) barrel of part is filled in using prefabricated wedge-shaped concrete plug to be blocked, and wedge-shaped concrete plug is corresponding with the shape of wedge-shaped hole on cylinder-shaped pit shaft (2) barrel.The present invention have many advantages, such as it is safe and reliable, continuous it is balanced drain, easily block, manage it is easy to operate.

Description

A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings
Technical field
The present invention relates to a kind of Tailings Dam drainage structures, and in particular to a kind of window type draining of Tailings Dam draining Well settles the discharge of water especially suitable for the fine tailings that tailing granularity in Tailings Dam is -0.074mm grain size content >=80%, Belong to Tailings Dam field of engineering technology.
Background technique
Mainly have the parts such as tailing dam and flood drainage system in tailings facilities, wherein drainage system with other parts not Together, it is to be not involved in mining production but have consequence in Tailings Dam again, is guarantee of its safety.Cause This, Tailings Dam flood drainage system is designed as the most important thing in Tailings Dam design.
Water inlet structures of the Tailings Dam gully as Tailings Dam drainage system, are made of well bore and well seat two parts.Well As water inlet portion, well seat is the part that well is connected with drainpipe.Tailings Dam gully have window type, frame-type, building-brick type and Four seed type of walling crib formula, wherein with window type gully be it is more, window type gully is mostly reinforced concrete structure, and height is less Masonry structure can also be used in person.Well bore is mostly cylindrical shape, which is provided with multilayer spilling water window, every layer there are about 4~8 windows.Well Body good integrity, rigidity is big, and window blocks simplicity, but displacement is smaller, the Tailings Dam little suitable for the amount of drainning off floodwaters.
The common cartridge type concrete structure increased step by step of existing Tailings Dam drainage structures gully, i.e. overflow water are more than well On cylinder after certain altitude, add one layer of cylinder ring (circle);The gully of this superposing type tube structure uses, operation is inconvenient. For example, during increasing, since the specification (diameter, height) of one layer of cylinder ring (circle) is big, weight is big, need with lifting appliance into Row installation, and lifting appliance transports to Tailings Dam drainage structures gully scene, it is very difficult, it takes a lot of work, arduously, and very numerous It is trivial.Moreover, the gully of existing superposing type tube structure is interruption draining, draining is discontinuous or does not drain or each layer Spilling water window drain simultaneously, displacement increases suddenly, is easy to produce and runs muddy phenomenon.
In order to meet Tailings Dam flood discharge requirement, " certain Tailings Dam capacity expansion project that " green structural material " in August, 2016 is delivered In the design of a flood drainage system " text, calculated by Calculation of Flood, flood drainage system discharge capacity, design uses two sets of wells one and manages Formula flood drainage system, gully use one frame convolution gully of window, which can effectively take into account flood discharge and return Water.But the gully remains interruption draining, successively increases the inconvenient disadvantage of installation, and structure is complicated for gully, makes Valence is high.
Summary of the invention
The purpose of the present invention is to successively increase existing for existing Tailings Dam gully, need lifting appliance install and Drain discontinuous problem, and provide it is a kind of installation, it is easy to use, suitable for Tailings Dam fine tailings sedimentation water discharge continous way Gully.
Above-mentioned purpose to realize the present invention, the present invention provide a kind of suitable for the sedimentation water discharge of Tailings Dam fine tailings Technical solution used by continous way gully is:
A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings of the present invention, contains gully base Plinth, cylinder-shaped pit shaft, the main reinforcement on gully basis go deep into the anchorage length in built position rock stratum not less than 1.0m, cylinder-shaped well The bottom water outlet of cylinder is connected to water discharge tunnel or culvert pipe.Its main feature is that: the cylinder-shaped pit shaft uses one-stage completion periphery The integrated steel reinforced concrete cylindrical shape structures of reserved window hole, the integrated steel reinforced concrete cylindrical shape structures can be with It disposably casts near Tailings Dam dam facing, Tailings Dam or in workshop, and is disposably mounted on the basis of gully;Institute The window hole stated is laid by spiral formula from bottom to top along the barrel of cylinder-shaped pit shaft, the shape of the window hole For outer big, interior small flat wedge-shaped hole, adjacent two wedge-shaped holes connect or partly overlap in vertical height, with It is continuous by window hole convenient for Tailings Dam overflow water, enter gully incessantly;The part below the Tailings Dam overflow water surface Cylinder-shaped shaft wall on wedge-shaped hole fill in and blocked using prefabricated wedge-shaped concrete plug, the wedge shape is mixed Solidifying soil plug is corresponding with the shape of wedge-shaped hole on cylinder-shaped shaft wall.
In order to accomplish balanced draining, the wedge-shaped hole along cylinder-shaped pit shaft circumference to, axial equidistant lay It is preferred.
Under normal circumstances, the quantity of the wedge-shaped hole on the barrel of cylinder-shaped pit shaft from bottom to top each circle helix is 6~10.That is, when cylinder-shaped pit shaft height is identical, the quantity for the wedge-shaped hole being arranged on continous way gully of the present invention is 1.2~1.5 times of the spilling water number of windows being arranged on existing window type gully.
As tailing, the overflow water stored up in the continuous discharge of tailing and Tailings Dam constantly increase, using this wedge shape Hole, convenient for that the corresponding wedge-shaped concrete plug of shape will fill in wedge-shaped hole and block from bottom to top therewith in time.
A kind of present invention height of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings, gully Internal diameter is designed according to the design height of Tailings Dam, displacement and the water pressure born and soil pressure;The ruler of wedge-shaped hole Very little and quantity is determined according to the size of designed displacement with the requirement of balanced draining.
With existing Tailings Dam drainage structures --- step by step compared with superposing type cartridge type gully, the present invention is a kind of to be suitable for tailing The continous way gully that library fine tailings settle water discharge has safe and reliable, continuous balanced draining, easily blocks, management operation The advantages that facilitating.Specific following good effect:
(1) cylinder-shaped pit shaft is constructed using the integrated steel reinforced concrete cylindrical shape that window hole is reserved on one-stage completion periphery Object, it is disposable to cast, it is disposable to install, the existing cartridge type gully of superposing type step by step installation, disadvantage inconvenient for use are avoided, it is full Foot production actual demand.
(2) shape of window hole is designed as outer big, interior small flat wedge-shaped hole, and along cylinder-shaped pit shaft Barrel presses the laying of spiral formula from bottom to top, and adjacent two wedge-shaped holes connect or partly overlap in vertical height, can It successively, steadily can be balancedly discharged with the overflow water guaranteed in Tailings Dam, avoid each layer of the prior art of spilling water The muddy phenomenon of race caused by window drains simultaneously, displacement increases suddenly.
(3) when cylinder-shaped pit shaft height is identical, the quantity for the wedge-shaped hole being arranged on continous way gully of the present invention is 1.2~1.5 times of the spilling water number of windows being arranged on existing window type gully, it is ensured that in heavy rain season Quick drainage, Guarantee the flood discharge safety of Tailings Dam.
Detailed description of the invention
Fig. 1 is a kind of formal structure for the continous way gully that water discharge is settled suitable for Tailings Dam fine tailings of the present invention Schematic diagram;
Fig. 2 is a kind of plan structure of the continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings of the present invention Schematic diagram.
Appended drawing reference are as follows: 1- gully basis, 2- cylindrical shape pit shaft, 3- window hole.
Specific embodiment
To further describe the present invention, it is suitable for Tailings Dam fine tailings to the present invention with reference to the accompanying drawings and examples to settle The continous way gully of water discharge is described further.
A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings of the present invention as shown in Figure 1 is just Formula structural schematic diagram simultaneously finds out that a kind of continous way suitable for the sedimentation water discharge of Tailings Dam fine tailings of the present invention is arranged in conjunction with Fig. 2 Well, containing gully basis 1, cylinder-shaped pit shaft 2, the anchoring that the main reinforcement on gully basis 1 is goed deep into built position rock stratum is long Degree is not less than 1.0m, and the bottom water outlet of cylinder-shaped pit shaft 2 is connected to water discharge tunnel or culvert pipe.The cylinder-shaped pit shaft 2 is adopted The integrated steel reinforced concrete cylindrical shape structures of window hole 3 are reserved with one-stage completion periphery;The window hole 3 along The barrel of cylinder-shaped pit shaft 2 presses the circumference of spiral formula to, axial equidistant uniformly distributed, described window hole from bottom to top The shape in hole 3 is outer big, interior small flat wedge-shaped hole, adjacent two wedge-shaped holes connect in vertical height or It partly overlaps;Wedge-shaped hole below the Tailings Dam overflow water surface on 2 barrel of cylinder-shaped pit shaft of part uses prefabricated wedge shape Concrete plug, which is filled in, to be blocked, the shape of the wedge-shaped hole on 2 barrel of the wedge-shaped concrete plug and cylinder-shaped pit shaft Shape is corresponding.The quantity of wedge-shaped hole when cylinder-shaped pit shaft (2) height is identical is laid on existing window type gully 1.2~1.5 times of spilling water number of windows, cylinder-shaped pit shaft 2 barrel from bottom to top it is each circle helix on wedge-shaped hole Quantity be generally 6~10.
In practice, Tailings Dam draining is laid in the appropriate location setting apart from Tailings Dam sand pipe outlet farthest Well system, gully basis 1 at rock mass (soil) supporting course requirement it is reliable and stable, concrete foundation main reinforcement gos deep into the anchor in rock Gu length is not less than 1.0m;Water discharge tunnel or culvert pipe (small-scale tailing ponds draw water for immersible pump) are located at the bottom of gully.It is arranging The cylinder-shaped pit shaft 2 for reserving window hole 3 in one-stage completion periphery is installed on well basis 1.Sedimentation clear water in Tailings Dam passes through Window hole 3 flows into cylinder-shaped pit shaft 2 one by one from bottom to top, when the overflow water surface is more than each window hole one by one from bottom to top When the mid-height in hole 3, is filled in the window hole 3 and blocked using prefabricated wedge-shaped concrete plug, i.e., in Tailings Dam The sedimentation clean water overflow water surface each window hole 3 below successively blocked.
The present invention carries out verification experimental verification in certain Tailings Dam drainage system, achieves ideal application effect.

Claims (4)

1. a kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings contains gully basic (1), cylinder Shape pit shaft (2), the main reinforcement on gully basis (1) go deep into the anchorage length in built position rock stratum not less than 1.0m, cylinder-shaped well The bottom water outlet of cylinder (2) is connected to water discharge tunnel or culvert pipe, it is characterised in that: the cylinder-shaped pit shaft (2) is using primary Build up the integrated steel reinforced concrete cylindrical shape structures that window hole (3) are reserved on periphery;The window hole (3) is along circle The barrel of tubular pit shaft (2) presses the laying of spiral formula from bottom to top, and the shape of the window hole (3) is outer big, interior small Flat wedge-shaped hole, adjacent two wedge-shaped holes connect or partly overlap in vertical height;In Tailings Dam overflow Wedge-shaped hole on cylinder-shaped pit shaft (2) barrel of part below the water surface is filled in using prefabricated wedge-shaped concrete plug to be sealed Stifled, the wedge-shaped concrete plug is corresponding with the shape of wedge-shaped hole on cylinder-shaped pit shaft (2) barrel.
2. a kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings as described in claim 1, special Sign is: the wedge-shaped hole along cylinder-shaped pit shaft (2) circumference to, axial equidistant lay.
3. a kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings as claimed in claim 1 or 2, Be characterized in that: the quantity of the wedge-shaped hole when cylinder-shaped pit shaft (2) height is identical is laid on existing window type gully 1.2~1.5 times of spilling water number of windows.
4. a kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings as claimed in claim 1 or 2, Be characterized in that: cylinder-shaped pit shaft (2) barrel from bottom to top it is each circle helix on wedge-shaped hole quantity be 6~10 It is a.
CN201811444502.8A 2018-11-29 2018-11-29 A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings Pending CN109487891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811444502.8A CN109487891A (en) 2018-11-29 2018-11-29 A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811444502.8A CN109487891A (en) 2018-11-29 2018-11-29 A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings

Publications (1)

Publication Number Publication Date
CN109487891A true CN109487891A (en) 2019-03-19

Family

ID=65698662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811444502.8A Pending CN109487891A (en) 2018-11-29 2018-11-29 A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings

Country Status (1)

Country Link
CN (1) CN109487891A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2004127779A (en) * 2004-09-20 2006-02-20 Государственное образовательное учреждение высшего профессионального образовани "Кузбасский государственный технический университет" (ГУ КузГТУ) (RU) METHOD FOR MOUNTING MINING PRODUCTION
CN201546231U (en) * 2009-11-12 2010-08-11 灵宝市金源矿业有限责任公司 Spiral drainage well
CN102094452A (en) * 2009-12-14 2011-06-15 贵阳铝镁设计研究院 Flood discharge structure for red mud filter cake storage yard
CN103924652A (en) * 2014-04-06 2014-07-16 金建工程设计有限公司 Window-type drainage well and construction method thereof
CN206308788U (en) * 2016-12-22 2017-07-07 中冶沈勘秦皇岛工程设计研究总院有限公司 A kind of multifunctional assembled gully
CN207959461U (en) * 2018-03-06 2018-10-12 长沙有色冶金设计研究院有限公司 A kind of combined water-drainage well and Tailings Dam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2004127779A (en) * 2004-09-20 2006-02-20 Государственное образовательное учреждение высшего профессионального образовани "Кузбасский государственный технический университет" (ГУ КузГТУ) (RU) METHOD FOR MOUNTING MINING PRODUCTION
CN201546231U (en) * 2009-11-12 2010-08-11 灵宝市金源矿业有限责任公司 Spiral drainage well
CN102094452A (en) * 2009-12-14 2011-06-15 贵阳铝镁设计研究院 Flood discharge structure for red mud filter cake storage yard
CN103924652A (en) * 2014-04-06 2014-07-16 金建工程设计有限公司 Window-type drainage well and construction method thereof
CN206308788U (en) * 2016-12-22 2017-07-07 中冶沈勘秦皇岛工程设计研究总院有限公司 A kind of multifunctional assembled gully
CN207959461U (en) * 2018-03-06 2018-10-12 长沙有色冶金设计研究院有限公司 A kind of combined water-drainage well and Tailings Dam

Similar Documents

Publication Publication Date Title
CN203947484U (en) Foundation pit drainage and circulating water utilization system
CN102116033B (en) Method and device for dewatering and draining water collecting well of blind drain of deep foundation pit
CN103993611B (en) A kind of deep layer rotating spraying cement-soil plate and anchor pole combine the construction method of anti-floating pile raft structure
CN208328950U (en) A kind of In-pit water drainage friction pile suitable for dregs loose structure slope
CN106193132B (en) Pressure relief anti-floating system for bottom plate of deep foundation pit high-water-level building and pressure relief anti-floating method thereof
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN104499560B (en) Combined rainwater seepage well and construction method
CN102953389A (en) Novel side slope retainer anchor anti-sliding pile
CN208168933U (en) A kind of buried Underwater Traffic Tunnel wastewater disposal basin dischargeable capacity optimization structure of Mining Method
CN108757027A (en) Multi-functional lobby water system in a kind of tunnel
CN210315613U (en) Foundation ditch blind ditch drainage construction structure
CN109487891A (en) A kind of continous way gully suitable for the sedimentation water discharge of Tailings Dam fine tailings
CN202450501U (en) Bricking drainage structure for stilling pool
CN205591201U (en) Water treatment system is gushed to interior refuse dump
CN107701231B (en) Underground sump system with intensive integral structure and construction method thereof
CN202247922U (en) Water lowering and discharging device for water collecting well in blind ditch with deep base pit
CN101363217A (en) Dam construction method of red mud permeable dam by sintering process
CN203891785U (en) Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well
CN209211595U (en) A kind of window type concrete gully for capableing of balanced draining
CN212175794U (en) Deep basal pit falls and arranges two unification sump pit structures
CN201144458Y (en) Overflow type recharging well of wet red mud disposal site
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever
CN108179677A (en) Sponge urban water-through pavement
CN208949889U (en) Deep basal pit karst base lime rock stratum groundwater treatment system
CN211312560U (en) Simple and easy core section of thick bamboo stepping water conservancy diversion drainage structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319