CN109473882B - 一种便于检修的高低压配电柜 - Google Patents
一种便于检修的高低压配电柜 Download PDFInfo
- Publication number
- CN109473882B CN109473882B CN201811584508.5A CN201811584508A CN109473882B CN 109473882 B CN109473882 B CN 109473882B CN 201811584508 A CN201811584508 A CN 201811584508A CN 109473882 B CN109473882 B CN 109473882B
- Authority
- CN
- China
- Prior art keywords
- distribution cabinet
- switch board
- power distribution
- plate
- overhaul
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/30—Cabinet-type casings; Parts thereof or accessories therefor
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Patch Boards (AREA)
Abstract
一种便于检修的高低压配电柜,包括由顶板、底板以及固定连接顶板与底板四个对应的角的竖直支撑杆组成的装配框架以及设置在框架四周的前门、后门和两个侧板,所述顶板与底板相对于侧板的边均安装有水平的滑槽,所述侧板通过滑槽与所述装配框架滑移连接。当配电柜内部器件的损坏或线路问题出现时,检修人员不但可以通过前门和后门对配电柜进行检修,当所需要检修的位置,通过前门和后门检修都不方便的时候,可讲侧板眼转配框架滑移,从而是的配电柜四周全部裸露,进而方便检修。特别是在配电柜摆放紧密的位置,沿顶板或底板的边滑移,也会影响到周围的配电柜。
Description
技术领域
本发明涉及高低压配电柜领域,尤其是涉及一种便于检修的高低压配电柜。
背景技术
随着电力行业的快速发展,安装电气仪器的配电柜必不可少,高低压配电柜顾名思义就是电力供电***中用于进行电能分配、控制、计量以及连接线缆的配电设备,一般供电局、变电所都是用高压开关柜,然后经变压器降压低压侧引出到低压配电柜,低压配电柜在到各个用电的配电盘,控制箱,开关箱,里面就是通过将一些开关、断路器、熔断器、按钮、指示灯、仪表、电线之类保护器件组装成一体达到设计功能要求的配电装置的设备。
然而,无论是在配电柜装配检验过程中,还是配电柜使用过程中,由于柜体内部器件的损坏或线路问题,会需要工作人员打开柜体对配电柜内部器件进行检修。
现有的配电柜均为三侧面封死,一侧面为门的结构,如需检修配电柜,则只能将柜门打开,通过柜门进入配电柜检修线路或器件,而柜体内的器件以及柜体结构的设计会影响到配电柜的检修,影响检修的效率。
发明内容
本发明的目的是提供一种便于检修的高低压配电柜,该配电柜能够提升配电柜的检修与装配效率。
本发明的上述发明目的是通过以下技术方案得以实现的:
一种便于检修的高低压配电柜,包括由顶板、底板以及固定连接顶板与底板四个对应的角的竖直支撑杆组成的装配框架以及设置在框架四周的前门、后门和两个侧板,所述顶板与底板相对于侧板的边均安装有水平的滑槽,所述侧板通过滑槽与所述装配框架滑移连接。
通过采用上述技术方案,当配电柜内部器件的损坏或线路问题出现时,检修人员不但可以通过前门和后门对配电柜进行检修,当所需要检修的位置,通过前门和后门检修都不方便的时候,可将 侧板沿装 配框架滑移,从而使得 配电柜四周全部裸露,进而方便检修。特别是在配电柜摆放紧密的位置,沿顶板或底板的边滑移,也会影响到周围的配电柜。
所述侧板四个角均固定安装有与滑槽配合的滑轮,位于顶板位置的滑槽向下开口,位于底板位置的滑槽向上开口。
通过采用上述技术方案,以滑轮配合滑槽的滑移方式,不但降低了器件的磨损,同时也方便了检修人员移动侧板。
所述滑槽靠近配电柜的内壁设置有限位槽,所述限位槽位于相应滑槽的两端,并与滑轮大小配合,所述滑轮通过转轴固定连接所述侧板。
通过采用上述技术方案,限位槽的设置不但实现了对滑轮的容纳,同时也通过滑轮起到了对侧板的限位和固定,进而提高了配电柜整体结构的稳定性。
所述滑槽凸出设置于配电柜外侧,所述侧板四周朝向配电柜弯折形成密封边。
通过采用上述技术方案,使滑槽凸出于配电柜外侧,方便了对侧板的滑动,密封边的设置起到了提高配电柜密封性的作用。
所述支撑杆设置有螺纹孔,所述侧板设置有与螺纹孔配合的固定孔。
通过采用上述技术方案,螺纹孔以及固定孔的设置,实现了对侧板的进一步固定。
所述侧板远离配电柜的外侧面设置有用于移动侧板的把手。
通过采用上述技术方案,把手的设置方便了检修人员将侧板从限位槽内拉出,同时也方便了对配电柜的移动。
滑槽朝向前门的端部敞口设置。
通过采用上述技术方案,大多配电柜的前门为操作界面或零件,如开关或工控机,后门为检修人员检修线路最多的位置,由于滑槽朝向前门的端部敞口设置,使得侧门只能向前门方向滑动,从而预留出后门的检修位置,进一步的方便了检修人员的工作。
综上所述,本发明的有益技术效果为:
1.检修方便,由于侧门与滑槽的设置,使得侧门能够沿顶板或底板的边水平滑动,方便对配电柜的检修;
2.节省空间,由于侧门沿滑槽滑动过程中不会对配电柜两侧的空间产生干扰。
附图说明
图1是配电柜整体结构示意图一;
图2是配电柜整体结构示意图二;
图3是侧板与配电柜安装结构示意图;
图4是图3中的A部放大图;
图5是滑轮与滑槽结构示意图。
图中,1、顶板;2、底板; 4、侧板;41、滑轮;42、转轴;43、密封边;5、前门;6、后门;7、滑槽;71、限位槽。
具体实施方式
以下结合附图对本发明作进一步详细说明。
参照图1和图2,一种便于检修的高低压配电柜,包括由顶板1、底板2以及固定连接顶板1与底板2四个对应的角的竖直支撑杆3组成的装配框架以及设置在装配框架四周的前门5、后门6和两个侧板4。其中,前门5为单开门,且前门5设置有若干安装孔,用于安装显示器件 ,前门5底部设置有散热窗;后门6为双开门,用于接线安装。配电柜整体采用冷轧钢板制作而成。
在如图3所示,配电柜的两个侧板4均与装配框架滑移连接。如图3和图4所示,顶板1与底板2相对于侧板4的边均安装有水平的滑槽7,位于顶板1位置的滑槽7向下开口,位于底板2位置的滑槽7向上开口,侧板4朝向装配框架的四个角均安装有与滑槽7配合的滑轮41。其中,滑槽7凸出设置于配电柜外侧,侧板4四周朝向配电柜弯折形成密封边43,使得侧板4盖在配电柜侧面时,能够与装配框架配合,以提高侧板4与装配框架之间连接的封闭性。进一步的,密封边43固定粘贴有密封条。
再参照图5,上述滑轮41通过以转轴42连接侧板4,使得滑轮41与转轴42之间具有一定的空间。滑槽7靠近配电柜的内壁设置有限位槽71,限位槽71位于相应滑槽7的两端,并与滑轮41大小配合。当侧板4的密封边43贴合装配框架时,侧板4朝向配电柜的面与滑槽7外侧壁贴合,且 滑轮41嵌在 限位槽71中。
滑槽7朝向前门5的端部敞口设置。当需要安装侧板4时,将 滑轮41滑入滑槽7中,沿滑槽7移动侧板4,使得滑轮41的位置与限位槽71的位置对应,然后推动侧板4,使得侧板4朝向装配框架移动,将滑轮41嵌入限位槽71中。侧板4远离配电柜的外侧面设置有用于移动侧板4的把手,当需要将侧板4滑出时,可通过把手拉动侧板4,从而将滑轮41从限位槽71中拉出。
进一步的,为了加强侧板4与装配框架之间的固定连接,支撑杆3设置有螺纹孔,侧板4设置有与螺纹孔配合的固定孔,通过穿过螺纹孔和固定孔,实现对侧板4的进一步固定。
由以上所述内容可知,当需要对配电柜内的线路和器件进行检修时。首先可通过前门5和后门6对配电柜内一些容易检修的位置进行检修。当需要检修的位置,通过前门5或后门6不容易检修时,可将侧板4上的螺丝卸下,拉动把手,使滑轮41脱离限位槽71,再通过把手,将侧板4沿滑槽7滑动,从而方便检修人员通过侧板4所在位置对配电柜内部进行检修。
本具体实施方式的实施例均为本发明的较佳实施例,并非依此限制本发明的保护范围,故:凡依本发明的结构、形状、原理所做的等效变化,均应涵盖于本发明的保护范围之内。
Claims (5)
1.一种便于检修的高低压配电柜,包括由顶板(1)、底板(2)以及固定连接顶板(1)与底板(2)四个对应的角的竖直支撑杆(3)组成的装配框架以及设置在框架四周的前门(5)、后门(6)和两个侧板(4),其特征在于:所述顶板(1)与底板(2)相对于侧板(4)的边均安装有水平的滑槽(7),所述侧板(4)通过滑槽(7)与所述装配框架滑移连接;用于承载同一侧板(4)的一组滑槽(7)同一侧的端部敞口,另一侧封闭;所述侧板(4)四个角设置有与所述滑槽(7)水平滑移配合的滑轮(41);所述滑槽(7)两端靠近所述配电柜内壁一侧设置有限位槽(71),所述限位槽(71)供所述滑轮(41)朝向所述配电柜内卡入。
2.根据权利要求1所述的一种便于检修的高低压配电柜,其特征在于:所述滑槽(7)凸出设置于配电柜外侧,所述侧板(4)四周朝向配电柜弯折形成密封边(43)。
3.根据权利要求1所述的一种便于检修的高低压配电柜,其特征在于:所述支撑杆(3)设置有螺纹孔,所述侧板(4)设置有与螺纹孔配合的固定孔。
4.根据权利要求3所述的一种便于检修的高低压配电柜,其特征在于:所述侧板(4)远离配电柜的外侧面设置有用于移动侧板(4)的把手。
5.根据权利要求4所述的一种便于检修的高低压配电柜,其特征在于:滑槽(7)朝向前门(5)的端部敞口设置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811584508.5A CN109473882B (zh) | 2018-12-24 | 2018-12-24 | 一种便于检修的高低压配电柜 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811584508.5A CN109473882B (zh) | 2018-12-24 | 2018-12-24 | 一种便于检修的高低压配电柜 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109473882A CN109473882A (zh) | 2019-03-15 |
CN109473882B true CN109473882B (zh) | 2021-05-14 |
Family
ID=65676594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811584508.5A Expired - Fee Related CN109473882B (zh) | 2018-12-24 | 2018-12-24 | 一种便于检修的高低压配电柜 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109473882B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110459966A (zh) * | 2019-05-14 | 2019-11-15 | 重庆菲昊科技有限责任公司 | 一种云端电源控制装置 |
CN111029938A (zh) * | 2019-12-10 | 2020-04-17 | 国网内蒙古东部电力有限公司兴安供电公司 | 一种户外安全型小型电力柜 |
CN111817150B (zh) * | 2020-06-11 | 2022-07-26 | 阜阳腾冠电力科技有限公司 | 一种便于维护检修的配电柜 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07222311A (ja) * | 1994-01-31 | 1995-08-18 | Matsushita Electric Works Ltd | 分電盤 |
CN104319650A (zh) * | 2014-11-19 | 2015-01-28 | 许天浩 | 新型控制柜 |
CN205693181U (zh) * | 2016-06-20 | 2016-11-16 | 中国重汽集团济南动力有限公司 | 一种电气设备箱 |
CN206059934U (zh) * | 2016-08-26 | 2017-03-29 | 山东通力电力电气有限公司 | 一种便于维修的电力柜 |
CN108493824A (zh) * | 2018-04-23 | 2018-09-04 | 佛山市博知盾识科技有限公司 | 一种便于塑壳断路器更换修理的抽出式装置 |
-
2018
- 2018-12-24 CN CN201811584508.5A patent/CN109473882B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07222311A (ja) * | 1994-01-31 | 1995-08-18 | Matsushita Electric Works Ltd | 分電盤 |
CN104319650A (zh) * | 2014-11-19 | 2015-01-28 | 许天浩 | 新型控制柜 |
CN205693181U (zh) * | 2016-06-20 | 2016-11-16 | 中国重汽集团济南动力有限公司 | 一种电气设备箱 |
CN206059934U (zh) * | 2016-08-26 | 2017-03-29 | 山东通力电力电气有限公司 | 一种便于维修的电力柜 |
CN108493824A (zh) * | 2018-04-23 | 2018-09-04 | 佛山市博知盾识科技有限公司 | 一种便于塑壳断路器更换修理的抽出式装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109473882A (zh) | 2019-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109473882B (zh) | 一种便于检修的高低压配电柜 | |
CN204349280U (zh) | 一种电气元件的安装面板可翻转的配电箱 | |
CN112038907B (zh) | 一种开关柜的布线机构 | |
CN215681397U (zh) | 一种便于维修的户外箱式高低压成套设备 | |
CN209948412U (zh) | 一种内置可移动式模块的开关柜 | |
CN212392482U (zh) | 一种高低压配电柜箱体 | |
CN205282901U (zh) | 一种箱式高压开关柜 | |
CN211508213U (zh) | 一种电气安全开关柜 | |
CN207910282U (zh) | 一种新型低压开关装置 | |
CN204179613U (zh) | 一种变电站通风型电缆沟盖板 | |
CN206332426U (zh) | 新型电缆分支箱 | |
CN207442240U (zh) | 圆柱体型500kV断路器汇控柜 | |
CN102946063B (zh) | 移开式交流金属封闭开关柜专用断路器手车 | |
CN206313315U (zh) | 一种多功能抽屉柜 | |
CN206992525U (zh) | 电气设备自动化控制柜 | |
CN219435416U (zh) | 一种便携式电工故障排除实训设备 | |
CN111212545A (zh) | 一种工业自动控制柜 | |
CN219144760U (zh) | 一种预装式交流箱式变电站 | |
CN219067567U (zh) | 一种便于安装的电表箱 | |
CN218161448U (zh) | 一种高压开关柜柜体散热结构 | |
CN204793706U (zh) | 一种电气配电箱 | |
CN204720843U (zh) | 一种变电柜 | |
CN214849712U (zh) | 一种便于维护的电力控制柜结构 | |
CN209249934U (zh) | 一种隔离式低压开关柜 | |
CN213460686U (zh) | 一种带有l型活动滑轨式安装板的配电箱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210514 Termination date: 20211224 |
|