CN109472548A - A kind of CFG pile foundation digitlization construction management plateform system - Google Patents
A kind of CFG pile foundation digitlization construction management plateform system Download PDFInfo
- Publication number
- CN109472548A CN109472548A CN201811213307.4A CN201811213307A CN109472548A CN 109472548 A CN109472548 A CN 109472548A CN 201811213307 A CN201811213307 A CN 201811213307A CN 109472548 A CN109472548 A CN 109472548A
- Authority
- CN
- China
- Prior art keywords
- construction
- data
- pile foundation
- cfg pile
- construction management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009430 construction management Methods 0.000 title claims abstract description 17
- 238000010276 construction Methods 0.000 claims abstract description 61
- 238000013500 data storage Methods 0.000 claims abstract description 9
- 238000013480 data collection Methods 0.000 claims abstract description 5
- 238000005516 engineering process Methods 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 3
- 238000013079 data visualisation Methods 0.000 claims description 3
- 230000000007 visual effect Effects 0.000 claims 1
- 238000012544 monitoring process Methods 0.000 abstract description 4
- 238000007726 management method Methods 0.000 description 13
- 238000000034 method Methods 0.000 description 6
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000007689 inspection Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of CFG pile foundations to digitize construction management plateform system, including data collection system, and the data collection system is based on UDP message transport protocol real-time reception site operation data;Data storage system, the data storage system use MySql database purchase construction data information;Data analyzing system, the data analyzing system is for parsing the data of storage;Result display system, for showing to the data of parsing, the present invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both ensure that construction quality also reduces construction cost.
Description
Technical field
The present invention relates to the fields such as the communications of electronic information, information calculating, and in particular to arrives a kind of CFG pile foundation number
Word construction management plateform system.
Background technique
There is always personnel monitoring in traditional construction process requirement construction site and records construction information, time-consuming and laborious, there is also
Manual record error;Owner, unit in charge of construction and management can not know construction speed and construction quality at the first time;Owner, construction
Unit and management can only generally know a construction results data, have no way of finding out about it for procedural information;Customer-centric, it is maximum
Construction cost is reduced in degree, it is ensured that construction quality.Product of the present invention solves the problems, such as above-mentioned elaboration.
Summary of the invention
In order to solve above-mentioned insufficient defect, the present invention provides a kind of CFG pile foundations to digitize construction management plateform system,
Overcome the shortcomings of above-mentioned prior art, the present invention is based on Centimeter Level Differential positioning base station, Beidou high accuracy positioning antenna, electric current are mutual
Sensor, double-axis tilt sensor, the terminals software and hardware such as data sampling sensor carry out construction data acquisition and processing, real-time radio
Transmit data to background server.Based on existing javaWeb Development Framework, MySql data storage technology realizes that web terminal data are read
It takes, parse and shows.
The present invention provides a kind of CFG pile foundations to digitize construction management plateform system, including data collection system, the number
UDP message transport protocol real-time reception site operation data are based on according to acquisition system;Data storage system, the data storage system
System uses MySql database purchase construction data information;Data analyzing system, the data analyzing system are used for the number to storage
According to being parsed;Result display system, for being shown to the data of parsing.
Above-mentioned management platform system, wherein the data analyzing system uses Spring+SpringMVC+MyBatis
Technology builds java platform framework, and visualizes library personalized customization data visualization chart using Echarts, and use
Three.js builds construction three-dimensional animation model.
Above-mentioned management platform system, wherein the result display system is applied using the end Web website mode Building Digital
Work manages platform.
Above-mentioned management platform system, wherein using Echarts chart the current construction of mode real-time exhibition into
Degree, same day construction stake number, every mechanical same day construction stake number, the construction details of the same day every pile, the daily construction stake number system of history
Information is counted, the condition of construction of each stake is very clear.
Above-mentioned management platform system, wherein the construction results information of each stake is shown from different construction dimensions.
Above-mentioned management platform system, wherein it can show pile sinking depth in every pile work progress, the cement amount of pouring into,
The instant change curve of pipe-pulling speed.
The present invention provides a kind of CFG pile foundation digitlization construction management plateform systems to have the advantages that 1, realizes
Round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both ensure that construction quality also reduces
Construction cost;Owner, unit in charge of construction and management can pass through the grasp site operation situation of computer promptly and accurately whenever and wherever possible;Industry
Main, unit in charge of construction and management both will appreciate that every pile final result information, and also will appreciate that the work progress information of every pile;Chart
In conjunction with data exhibition method make the quality of every pile and integral construction quality very clear;Construction daily paper and customized report
Function can meet owner, the inspection declaration demand of unit in charge of construction and management;Three-dimensional animation model construction simulation process.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, the present invention and its feature, outer
Shape and advantage will become more apparent upon.Identical label indicates identical part in all the attached drawings.Not deliberately proportionally
Draw attached drawing, it is preferred that emphasis is show the gist of the present invention.
Fig. 1 is that a kind of CFG pile foundation provided by the invention digitizes construction management plateform system workflow schematic diagram.
Specific embodiment
In the following description, a large amount of concrete details are given so as to provide a more thorough understanding of the present invention.So
And it is obvious to the skilled person that the present invention may not need one or more of these details and be able to
Implement.In other examples, in order to avoid confusion with the present invention, for some technical characteristics well known in the art not into
Row description.
In order to thoroughly understand the present invention, detailed step and detailed structure will be proposed in following description, so as to
Illustrate technical solution of the present invention.Presently preferred embodiments of the present invention is described in detail as follows, however other than these detailed descriptions, this
Invention can also have other embodiments.
Shown in referring to Fig.1, a kind of CFG pile foundation digitlization construction management plateform system provided by the invention, including data are adopted
Collecting system, the data collection system are based on UDP message transport protocol real-time reception site operation data;Data storage system,
The data storage system uses MySql database purchase construction data information;Data analyzing system, the data analyzing system
For being parsed to the data of storage;Result display system, for being shown to the data of parsing.
For the present invention one preferably rather than in the embodiment of limitation, data analyzing system uses Spring+SpringMVC+
MyBatis technology builds java platform framework, and visualizes library personalized customization data visualization chart using Echarts,
And construction three-dimensional animation model is built using Three.js.
For the present invention one preferably rather than in the embodiment of limitation, result display system builds number using the end Web website mode
Change construction management platform.
The present invention one is preferably rather than in the embodiment of limitation, current using the mode real-time exhibition of Echarts chart
Construction speed, same day construction stake number, every mechanical same day construction stake number, the construction details of the same day every pile, history are constructed daily
Stake number statistical information, the condition of construction of each stake are very clear.
The present invention one shows the construction results of each stake from different construction dimensions preferably rather than in the embodiment of limitation
Information.
The present invention one can show pile sinking depth in every pile work progress, cement preferably rather than in the embodiment of limitation
The amount of pouring into, the instant change curve of pipe-pulling speed.
The present invention realizes round-the-clock monitoring construction in 24 hours, is not necessarily to on-the-spot record personnel, avoids human error, both guaranteed
Construction quality also reduces construction cost;Owner, unit in charge of construction and management can whenever and wherever possible by computer promptly and accurately
Grasp site operation situation;Owner, unit in charge of construction and management both will appreciate that every pile final result information, also will appreciate that every pile
Work progress information;The data exhibition method that chart combines makes the quality of every pile and integral construction quality very clear;
Construction daily paper and customized function of reporting can meet owner, the inspection declaration demand of unit in charge of construction and management;Three-dimensional animation model simulation
Work progress.
Presently preferred embodiments of the present invention is described above.It is to be appreciated that the invention is not limited to above-mentioned
Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field
It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, all using the disclosure above
Methods and technical content many possible changes and modifications are made to technical solution of the present invention, or be revised as equivalent variations etc.
Embodiment is imitated, this is not affected the essence of the present invention.Therefore, anything that does not depart from the technical scheme of the invention, foundation
Technical spirit of the invention any simple modifications, equivalents, and modifications made to the above embodiment, still fall within the present invention
In the range of technical solution protection.
Claims (6)
1. a kind of CFG pile foundation digitizes construction management plateform system, which is characterized in that including data collection system, the data
Acquisition system is based on UDP message transport protocol real-time reception site operation data;Data storage system, the data storage system
Using MySql database purchase construction data information;Data analyzing system, the data analyzing system are used for the data to storage
It is parsed;Result display system, for being shown to the data of parsing.
2. a kind of CFG pile foundation as described in claim 1 digitizes construction management plateform system, which is characterized in that the data
Resolution system builds java platform framework using Spring+SpringMVC+MyBatis technology, and visual using Echarts
Change library personalized customization data visualization chart, and construction three-dimensional animation model is built using Three.js.
3. a kind of CFG pile foundation as described in claim 1 digitizes construction management plateform system, which is characterized in that the result
Display system uses the end Web website mode Building Digital construction management platform.
4. a kind of CFG pile foundation as claimed in claim 3 digitizes construction management plateform system, which is characterized in that use
The current construction speed of the mode real-time exhibition of Echarts chart, same day construction stake number, every mechanical same day construction stake number,
The construction details of the same day every pile, the daily construction stake number statistical information of history, the condition of construction of each stake are very clear.
5. a kind of CFG pile foundation as claimed in claim 4 digitizes construction management plateform system, which is characterized in that from different
Construction dimension shows the construction results information of each stake.
6. a kind of CFG pile foundation as claimed in claim 5 digitizes construction management plateform system, which is characterized in that can show
Pile sinking depth in every pile work progress, the cement amount of pouring into, the instant change curve of pipe-pulling speed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811213307.4A CN109472548A (en) | 2018-10-18 | 2018-10-18 | A kind of CFG pile foundation digitlization construction management plateform system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811213307.4A CN109472548A (en) | 2018-10-18 | 2018-10-18 | A kind of CFG pile foundation digitlization construction management plateform system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109472548A true CN109472548A (en) | 2019-03-15 |
Family
ID=65664157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811213307.4A Pending CN109472548A (en) | 2018-10-18 | 2018-10-18 | A kind of CFG pile foundation digitlization construction management plateform system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109472548A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111161098A (en) * | 2019-12-02 | 2020-05-15 | 中铁建设集团有限公司 | Pile foundation construction machine account management system and method |
CN113469840A (en) * | 2021-06-16 | 2021-10-01 | 浙江华东建设工程有限公司 | Intelligent management system for pile foundation construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106919644A (en) * | 2017-01-17 | 2017-07-04 | 中交第二航务工程局有限公司 | bridge construction real-time monitoring system |
EP3223200A1 (en) * | 2016-03-22 | 2017-09-27 | Hexagon Technology Center GmbH | Construction site management |
CN107943823A (en) * | 2017-10-17 | 2018-04-20 | 杨勇 | The real-time big data processing platform of digitlization construction |
CN108184220A (en) * | 2018-02-23 | 2018-06-19 | 长安大学 | A kind of long-spiral drilling machine pile foundation construction parameter monitoring system and monitoring method |
CN108460573A (en) * | 2018-01-30 | 2018-08-28 | 广东建海工程项目管理有限公司 | Project supervision manages system |
-
2018
- 2018-10-18 CN CN201811213307.4A patent/CN109472548A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3223200A1 (en) * | 2016-03-22 | 2017-09-27 | Hexagon Technology Center GmbH | Construction site management |
CN106919644A (en) * | 2017-01-17 | 2017-07-04 | 中交第二航务工程局有限公司 | bridge construction real-time monitoring system |
CN107943823A (en) * | 2017-10-17 | 2018-04-20 | 杨勇 | The real-time big data processing platform of digitlization construction |
CN108460573A (en) * | 2018-01-30 | 2018-08-28 | 广东建海工程项目管理有限公司 | Project supervision manages system |
CN108184220A (en) * | 2018-02-23 | 2018-06-19 | 长安大学 | A kind of long-spiral drilling machine pile foundation construction parameter monitoring system and monitoring method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111161098A (en) * | 2019-12-02 | 2020-05-15 | 中铁建设集团有限公司 | Pile foundation construction machine account management system and method |
CN113469840A (en) * | 2021-06-16 | 2021-10-01 | 浙江华东建设工程有限公司 | Intelligent management system for pile foundation construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mirshokraei et al. | A web-based BIM–AR quality management system for structural elements | |
Scianna et al. | Structure monitoring with BIM and IoT: The case study of a bridge beam model | |
Meng et al. | Developing iot sensing system for construction-induced vibration monitoring and impact assessment | |
Zhu et al. | Developing key safety management factors for construction projects in China: A resilience perspective | |
CN109472548A (en) | A kind of CFG pile foundation digitlization construction management plateform system | |
CN109447487A (en) | A kind of cement mixing pile pile foundation digitlization construction management plateform system | |
Yum et al. | Assessing the risk of natural disaster-induced losses to tunnel-construction projects using empirical financial-loss data from South Korea | |
Specht | Consistency of the empirical distributions of navigation positioning system errors with theoretical distributions—comparative analysis of the DGPS and EGNOS systems in the years 2006 and 2014 | |
Hultquist et al. | Integration of crowdsourced images, USGS networks, remote sensing, and a model to assess flood depth during hurricane florence | |
Kim et al. | Loss assessment for sustainable industrial infrastructure: Focusing on bridge construction and financial losses | |
Musella et al. | Open BIM standards: a review of the processes for managing existing structures in the pre-and post-earthquake phases | |
Figueiredo et al. | Smartphone Application for Structural Health Monitoring of Bridges | |
Zatelli et al. | Relevance of the cell neighborhood size in landscape metrics evaluation and free or open source software implementations | |
Wang et al. | Research on non-contact and non-fixed cable force measurement based on smartphone | |
Wu et al. | A real-time recording model of key indicators for energy consumption and carbon emissions of sustainable buildings | |
Reguzzoni et al. | GNSS-based dam monitoring: The application of a statistical approach for time series analysis to a case study | |
CN109636332A (en) | A kind of subgrade compaction digitlization construction system | |
Vantas et al. | Robustness spatiotemporal clustering and trend detection of rainfall erosivity density in Greece | |
CN109408524A (en) | A kind of screw rod pile pile foundation digitlization construction management plateform system | |
CN109688206A (en) | A kind of pavement compaction digitlization construction system | |
Pinto et al. | A cellular automata model for integrated simulation of land use and transport interactions | |
Goda et al. | Fault-source-based probabilistic seismic hazard and risk analysis for victoria, british columbia, canada: A case of the leech river valley fault and devil’s mountain fault system | |
Supangkat et al. | Implementation of digital geotwin-based mobile crowdsensing to support monitoring system in smart city | |
Maree et al. | The primacy of as-built drawings in the management of underground utility operations: A New Zealand study | |
Ližbetin et al. | Possibilities of using bluetooth low energy beacon technology to locate objects internally: A case study |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190315 |