CN109465130A CN201811372959.2A CN201811372959A CN109465130A CN 109465130 A CN109465130 A CN 109465130A CN 201811372959 A CN201811372959 A CN 201811372959A CN 109465130 A CN109465130 A CN 109465130A
Authority
CN
China
Prior art keywords
mounting plate
cable bridge
spray painting
hanger structure
fixed link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811372959.2A
Other languages
Chinese (zh)
Inventor
王辉平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG HUACHI ELECTRICAL APPLIANCE CO Ltd
Original Assignee
ZHENJIANG HUACHI ELECTRICAL APPLIANCE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG HUACHI ELECTRICAL APPLIANCE CO Ltd filed Critical ZHENJIANG HUACHI ELECTRICAL APPLIANCE CO Ltd
Priority to CN201811372959.2A priority Critical patent/CN109465130A/en
Publication of CN109465130A publication Critical patent/CN109465130A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • B05B13/0264Overhead conveying means, i.e. the object or other work being suspended from the conveying means; Details thereof, e.g. hanging hooks

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses the hanger structures in a kind of cable bridge spray painting pipeline, including the first mounting plate, the second mounting plate, attachment base and fixed link, first mounting plate is hinged with the second mounting plate by bolt, two attachment bases are respectively fixedly connected on the first mounting plate and the second mounting plate, two fixed links be respectively fixedly connected on the lower end surface of the first mounting plate on the lower end surface of the second mounting plate.The configuration of the present invention is simple, it is easy to use, can be in order to the longer cable bridge of delivery size, using effect is good.

Description

A kind of hanger structure in cable bridge spray painting pipeline
Technical field:
The present invention relates to the hanger structures in a kind of cable bridge spray painting pipeline.
Background technique:
Existing cable bridge is in spray painting, the suspender since cable bridge length is longer, in existing spray painting pipeline Cable bridge cannot be lifted, it is therefore desirable to which a kind of suspender is easy to lift cable bridge, and in the corner of pipeline, suspender The corner of pipeline can smoothly be tided over.
Summary of the invention:
The present invention is provided in a kind of cable bridge spray painting pipeline to solve the above-mentioned problems of the prior art Hanger structure.
The technical solution adopted in the present invention has: the hanger structure in a kind of cable bridge spray painting pipeline, including first Mounting plate, the second mounting plate, attachment base and fixed link, first mounting plate are hinged with the second mounting plate by bolt, Two attachment bases are respectively fixedly connected on the first mounting plate and the second mounting plate, and two fixed links are respectively fixedly connected with first On the lower end surface of mounting plate and on the lower end surface of the second mounting plate.
Further, the bottom end of the fixed link is equipped with hanging rod, and the top of hanging rod is equipped with threaded shank, and threaded shank is connected to solid In fixed pole, nut is threadedly coupled in threaded shank, and hanging rod is positioned in fixed link.
Further, the attachment base is equipped with lifting hole(eyelet).
Further, the left end of first mounting plate is equipped with first step portion, is equipped with the in the right end of the second mounting plate Two stage portions, first step portion and the mutual split in second step portion, and be hinged by bolt.
The invention has the following beneficial effects:
The configuration of the present invention is simple, it is easy to use, can be in order to the longer cable bridge of delivery size, using effect is good.
Detailed description of the invention:
Fig. 1 is structure of the invention figure.
Fig. 2 is application structure figure of the present invention.
Specific embodiment:
The present invention will be further described below with reference to the drawings.
Such as Fig. 1 and Fig. 2, hanger structure in a kind of cable bridge spray painting pipeline of the present invention, including the first mounting plate 41, Second mounting plate 42, attachment base 43 and fixed link 44, the first mounting plate 41 are hinged with the second mounting plate 42 by bolt, and two A attachment base 43 is respectively fixedly connected on the first mounting plate 41 and the second mounting plate 42, is connected in pipeline hanging on idler wheel Bar 34 is connected in attachment base 43, and two fixed links 44 are respectively fixedly connected on the lower end surface of the first mounting plate 41 and the second peace On the lower end surface of loading board 42.
It is equipped with hanging rod 45 in the bottom end of fixed link 44, the top of hanging rod 45 is equipped with threaded shank, and threaded shank is connected to fixed link On 44, nut is threadedly coupled in threaded shank, and hanging rod 45 is positioned in fixed link 44.Hanging rod 45 is equipped with hanging hole, hanging rod 45 can be rotated with relatively fixed bar 44.
Lifting hole(eyelet) is equipped on attachment base 43, the diameter of the lifting hole(eyelet) is greater than the diameter of sunpender 34.Suspender is connected by attachment base 43 It connects on sunpender 34, and suspender can be rotated relative to sunpender 34.
The first mounting plate 41 in suspender can be relatively rotated with the second mounting plate 42, be set in the left end of the first mounting plate 41 There is first step portion 411, is equipped with second step portion 432, first step portion 411 and second step in the right end of the second mounting plate 42 The mutual split in portion 432, and be hinged by bolt.
When in use, cable bridge to be painted is hung on the hanging rod of suspender by lifting rope, since hanging rod 45 can be with It is rotated relative to fixed bar 44, the first mounting plate 41 in suspender can be relatively rotated with the second mounting plate 42, and suspender can phase Sunpender 34 is rotated, therefore when conveying longer cable bridge, even if nor affecting on cable bridge in the corner of guide rail 1 The conveying of frame.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art It for member, can also make several improvements without departing from the principle of the present invention, these improvement also should be regarded as of the invention Protection scope.

Claims (4)

1. the hanger structure in a kind of cable bridge spray painting pipeline, it is characterised in that: including the first mounting plate (41), the second peace Loading board (42), attachment base (43) and fixed link (44), first mounting plate (41) pass through bolt phase with the second mounting plate (42) Mutually hinged, two attachment bases (43) are respectively fixedly connected on the first mounting plate (41) and the second mounting plate (42), two fixations Bar (44) be respectively fixedly connected on the lower end surface of the first mounting plate (41) on the lower end surface of the second mounting plate (42).
2. the hanger structure in cable bridge spray painting pipeline as described in claim 1, it is characterised in that: the fixed link (44) bottom end is equipped with hanging rod (45), and the top of hanging rod (45) is equipped with threaded shank, and threaded shank is connected on fixed link (44), in spiral shell It is threadedly coupled nut in bar portion, and hanging rod (45) is positioned on fixed link (44).
3. the hanger structure in cable bridge spray painting pipeline as described in claim 1, it is characterised in that: the attachment base (43) it is equipped with lifting hole(eyelet).
4. the hanger structure in cable bridge spray painting pipeline as described in claim 1, it is characterised in that: first installation The left end of plate (41) is equipped with first step portion (411), is equipped with second step portion (432) in the right end of the second mounting plate (42), the One stage portion (411) and second step portion (432) mutual split, and be hinged by bolt.
CN201811372959.2A 2018-11-19 2018-11-19 A kind of hanger structure in cable bridge spray painting pipeline Pending CN109465130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811372959.2A CN109465130A (en) 2018-11-19 2018-11-19 A kind of hanger structure in cable bridge spray painting pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811372959.2A CN109465130A (en) 2018-11-19 2018-11-19 A kind of hanger structure in cable bridge spray painting pipeline

Publications (1)

Publication Number Publication Date
CN109465130A true CN109465130A (en) 2019-03-15

Family

ID=65674024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811372959.2A Pending CN109465130A (en) 2018-11-19 2018-11-19 A kind of hanger structure in cable bridge spray painting pipeline

Country Status (1)

Country Link
CN (1) CN109465130A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2657635B2 (en) * 1995-03-29 1997-09-24 ジェイティ物流株式会社 Open bottom flexible sheet container
CN2747194Y (en) * 2004-12-02 2005-12-21 福州泰康机械制造有限公司 Conveyer chain of suspension transportation-line
CN200985244Y (en) * 2006-10-16 2007-12-05 青岛港(集团)有限公司 Large-scale board discharging fastening tool
CN202296806U (en) * 2011-10-09 2012-07-04 北汽福田汽车股份有限公司 Automobile body transfer lifting hook device
CN102774737A (en) * 2012-08-03 2012-11-14 上海电气电站设备有限公司 Multi-claw hanger capable of adjusting positions of lifting claws synchronously
CN204369419U (en) * 2014-12-31 2015-06-03 东风襄阳旅行车有限公司 Long head school bus vehicle body hanging apparatus
CN104722699A (en) * 2015-03-31 2015-06-24 东风设计研究院有限公司 Hook automatic-return type longitudinal beam riveting production line
CN106044553A (en) * 2016-06-29 2016-10-26 合肥禾盛新型材料有限公司 Composite steel plate production and transportation equipment
CN106984471A (en) * 2017-06-05 2017-07-28 南京胜捷电机制造有限公司 A kind of conveying mechanism in electric motor end cap spray painting pipeline
CN107042177A (en) * 2017-06-05 2017-08-15 南京胜捷电机制造有限公司 A kind of gear unit in motor paint-spraying line

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2657635B2 (en) * 1995-03-29 1997-09-24 ジェイティ物流株式会社 Open bottom flexible sheet container
CN2747194Y (en) * 2004-12-02 2005-12-21 福州泰康机械制造有限公司 Conveyer chain of suspension transportation-line
CN200985244Y (en) * 2006-10-16 2007-12-05 青岛港(集团)有限公司 Large-scale board discharging fastening tool
CN202296806U (en) * 2011-10-09 2012-07-04 北汽福田汽车股份有限公司 Automobile body transfer lifting hook device
CN102774737A (en) * 2012-08-03 2012-11-14 上海电气电站设备有限公司 Multi-claw hanger capable of adjusting positions of lifting claws synchronously
CN204369419U (en) * 2014-12-31 2015-06-03 东风襄阳旅行车有限公司 Long head school bus vehicle body hanging apparatus
CN104722699A (en) * 2015-03-31 2015-06-24 东风设计研究院有限公司 Hook automatic-return type longitudinal beam riveting production line
CN106044553A (en) * 2016-06-29 2016-10-26 合肥禾盛新型材料有限公司 Composite steel plate production and transportation equipment
CN106984471A (en) * 2017-06-05 2017-07-28 南京胜捷电机制造有限公司 A kind of conveying mechanism in electric motor end cap spray painting pipeline
CN107042177A (en) * 2017-06-05 2017-08-15 南京胜捷电机制造有限公司 A kind of gear unit in motor paint-spraying line

Similar Documents

Publication Publication Date Title
CN204847764U (en) Prefabricated component production is with hoist and mount frame
CN109465130A (en) A kind of hanger structure in cable bridge spray painting pipeline
CN204096832U (en) Elevator used in small machine room compensated chain guide piece
CN103303772A (en) Ultra-long wall attaching device of construction lift
CN205555864U (en) Automatic a tower section of thick bamboo of adjusting stands up hoist
CN208378295U (en) Lift by crane the hanger of concrete prefabricated board class component
CN209156196U (en) A kind of cable bridge spray painting pipeline
CN103306618A (en) Casing and drilling tool conveying cableway device
CN109225724A (en) A kind of cable bridge spray painting pipeline
CN203865822U (en) Large-scale crankshaft horizontal lifting appliance
CN203319445U (en) Super-long wall attaching device of construction elevator
CN209306748U (en) One kind being used for steel strand wires preservative treatment actinobacillus device
CN207185637U (en) One kind is portable to catch chicken device
CN207276049U (en) A kind of gantry crane
CN205076674U (en) Gantry crane's assembly auxiliary device
CN105621298B (en) Sundries is hung
CN204643670U (en) Split type arm tower crane Shears structure
CN204897147U (en) Horizontal panel hoist
CN204079227U (en) A kind of suspender with tooth form control apparatus
CN209242540U (en) Suspension centre truss structure under a kind of climbing frame
CN208103710U (en) A kind of suspension hook for building convenient for being bonded
CN207758219U (en) A kind of Anti-fall die assembly
CN208500193U (en) The lifting of blower high-speed brake
CN206464124U (en) VCI bimetallics coating intelligently sprays wiring shaped piece hanger
CN206735568U (en) A kind of elevator compensation chain stress quick release adjusting means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315

RJ01 Rejection of invention patent application after publication