CN109462227A - One kind being based on primary frequency modulation rapidity evaluation method - Google Patents

One kind being based on primary frequency modulation rapidity evaluation method Download PDF

Info

Publication number
CN109462227A
CN109462227A CN201811239467.6A CN201811239467A CN109462227A CN 109462227 A CN109462227 A CN 109462227A CN 201811239467 A CN201811239467 A CN 201811239467A CN 109462227 A CN109462227 A CN 109462227A
Authority
CN
China
Prior art keywords
seconds
frequency
absolute value
value
frequency modulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811239467.6A
Other languages
Chinese (zh)
Other versions
CN109462227B (en
Inventor
赵毅
张长志
李浩然
倪玮晨
***
周连升
甘智勇
张应田
郑卫洪
曹晓男
杜岩
郭凌旭
鄂志君
陈天恒
杨晓静
段建勋
冯长强
张志良
沙威
欧阳佳慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd, Electric Power Research Institute of State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811239467.6A priority Critical patent/CN109462227B/en
Publication of CN109462227A publication Critical patent/CN109462227A/en
Application granted granted Critical
Publication of CN109462227B publication Critical patent/CN109462227B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to one kind to be based on primary frequency modulation rapidity evaluation method, and response calculates within 15 seconds, and the calculating of theoretical value, as reference, considers the hysteresis of unit frequency quick response using the mean value of preceding 15 seconds frequencies variation;Response calculates within 30 seconds, and the calculating of theoretical value, as reference, avoids falling bring analytical error after rise because of frequency using the peak value of preceding 30 seconds frequencies variation.In the present invention, in order to avoid frequently calculating, according to previous unit frequency modulation test feature, frequency modulation rapid charater can fully demonstrate after 15s, so setting evaluation period shortest length, can be improved the reasonability of statistical data;Unit is calculated over 15s and is not up to 30 seconds, replaces two item datas only with 15 seconds calculating data;If sampling duration exceeds 30 seconds, epicycle, which is calculated, to be fallen after rise according to actual frequency to could terminate in dead zone, and theoretical action value will be referred to the peak value of entire period.

Description

One kind being based on primary frequency modulation rapidity evaluation method
Technical field
The invention belongs to frequency modulation rapidity assessment technique fields, are evaluated more particularly, to one kind based on primary frequency modulation rapidity Method.
Background technique
As load growth and power grid scale increasingly increase, extra-high voltage grid and interconnection power system under the new situation, Unit primary frequency function can be obviously improved frequency quality of power grid with the mutation of quick response grid power, pacify in power grid Very important effect is played in full stable operation.Correlated performance analysis work is not carried out in the evaluation of primary frequency modulation rapidity at present Make, primary frequency modulation analysis of experiments relies primarily on test data summary and obtains, fails to embody unit real time execution situation, especially in electricity During net frequency fluctuation, frequency modulation rapidity analysis cannot be carried out with authentic and valid data, longer data collection phase and layer by layer Reporting mechanism misses the opportunity of optimized analysis data, and subjective factor is analyzed or had to data, causes for primary frequency modulation analysis all It is mostly difficult, one kind being proposed based on primary frequency modulation rapidity evaluation method, to analyse generating set frequency modulation rapidity scientifically based on this Research provides significant data.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide the data-handling capacities powerful using control system Come solve previous frequcny modulation data not in time, use historical storage mode and search function for further research frequency modulation characteristic provide according to According to one kind be based on primary frequency modulation rapidity evaluation method.
Specific technical solution of the present invention is as follows:
One kind being based on primary frequency modulation rapidity evaluation method, it is characterised in that: the following steps are included:
(1) the grid-connected power generator turbine revolving speed of timing acquiring, is converted to mains frequency for revolving speed;
(2) the deviation of mains frequency and standard frequency is calculated, and result is subjected to signed magnitude arithmetic(al);
(3) when absolute value of the bias is greater than the set value, then next step is entered;
Otherwise, step is returned to (1);
(4) when absolute value of the bias is reduced to setting value, this Phase Evaluation terminates, minute book phases-time length;Otherwise, after Continuous timing;
(5) when time span is greater than 15 seconds, the data of this phase acquisition are analyzed, obtain evaluation number;
When time span is less than or equal to 15 seconds, step is returned to (1);
Setting value is 0.034Hz;
Turbine speed w is converted to mains frequency f:f=w/60;
Mains frequency f and standard frequency f0 absolute value of the bias: Δ f=∣ f-f0 ∣;
Time span h: stop from absolute value of the bias Δ f is greater than the 0.034Hz moment to less than equal to the 0.034Hz moment;
Electricity contributes deviation: Δ p=p-p0;
Electricity contributes 15 seconds peak values: Δ pm15=max ∣ Δ p15 ∣, and wherein Δ p15 indicates that value range is Δ in first 15 seconds P data;
Electricity contributes 30 seconds peak values: Δ pm30=max ∣ Δ p30 ∣, and wherein Δ p30 indicates that value range is Δ in first 30 seconds P data;
Unit rated power is pe, unit MW;
Electricity contributes 75 theoretical peaks: W75=0.3* Δ f1*pe, and wherein Δ f1 is preceding 15 seconds frequency difference average value;
Electricity contributes 90 theoretical peaks: W90=0.36* Δ f2*pe, and wherein Δ f2 is entire evaluation period maximum value;
When mains frequency is greater than standard frequency, electricity contributes 15 seconds peak delta pm15 for negative and when absolute value is greater than W75, Primary frequency modulation 15 seconds correct action frequency k1 of meter increase by 1 time, and 15 seconds malfunction number k2 of primary frequency modulation are constant;Electricity contribution 15 Second peak delta pm15 is positive number or when absolute value is less than W75, and k1 is constant, and k2 increases primary;
When mains frequency is less than standard frequency, electricity contributes 15 seconds peak delta pm15 for positive number and when absolute value is greater than W75, K1 increases by 1 time, and k2 is constant;Electricity contributes 15 seconds peak delta pm15 to be negative or when absolute value is less than W75, and k1 is constant, and k2 increases Add primary;
When mains frequency is greater than standard frequency, electricity contributes 30 seconds peak delta pm30 for negative and when absolute value is greater than W90, Primary frequency modulation 30 seconds correct action frequency k3 of meter increase by 1 time, and 30 seconds malfunction number k4 of primary frequency modulation are constant;Electricity contribution 30 Second peak delta pm30 is positive number or when absolute value is less than W90, and k3 is constant, and k4 increases primary;
When mains frequency is less than standard frequency, electricity contributes 30 seconds peak delta pm30 for positive number and when absolute value is greater than W90, K3 increases by 1 time, and k4 is constant;Electricity contributes 30 seconds peak delta pm30 to be negative or when absolute value is less than W90, and k3 is constant, and k4 increases Add primary;
15 seconds performance factor B=k1/ (k1+k2) of primary frequency modulation;
30 seconds performance factor C=k3/ (k3+k4) of primary frequency modulation, evaluation period h are higher than 15 seconds and are lower than 30 seconds, 30 seconds Performance factor not counts.
The advantages of the present invention are:
In the present invention, previous examination is solved using the powerful data-handling capacity of control system by rapidity evaluation method It is not perfect to test data, search function can be used, provides foundation for further research frequency modulation characteristic;Response calculates within 15 seconds, reason The hysteresis of unit frequency quick response is considered as reference using the mean value of preceding 15 seconds frequencies variation by the calculating of value;30 seconds Response calculates, and the calculating of theoretical value, as reference, avoids falling bring after rise because of frequency using the peak value of preceding 30 seconds frequencies variation Analytical error;In order to avoid frequently calculating, according to previous unit frequency modulation test feature, frequency modulation rapid charater can after 15s It fully demonstrates, so setting evaluation period shortest length, can be improved the reasonability of statistical data;Unit is calculated over 15s not Reach 30 seconds, replaces two item datas only with 15 seconds calculating data;If sampling duration exceed 30 seconds, epicycle calculate according to Actual frequency is fallen after rise to could terminate in dead zone, and theoretical action value will be referred to the peak value of entire period.
Detailed description of the invention
Fig. 1 is the example plot of each data.
Specific embodiment
The present invention is described in further detail by following embodiment, but the technology contents that are described of the present embodiment be it is illustrative, Without being restrictive, protection scope of the present invention should not be limited to according to this.
One kind being based on primary frequency modulation rapidity evaluation method, and innovation of the invention is: the following steps are included:
(1) the grid-connected power generator turbine revolving speed of timing acquiring, is converted to mains frequency for revolving speed;
(2) the deviation of mains frequency and standard frequency is calculated, and result is subjected to signed magnitude arithmetic(al);
(3) when absolute value of the bias is greater than the set value, then next step is entered;
Otherwise, step is returned to (1);
(4) when absolute value of the bias is reduced to setting value, this Phase Evaluation terminates, minute book phases-time length;Otherwise, after Continuous timing;
(5) when time span is greater than 15 seconds, the data for analyzing this phase acquisition include data sampling time length h, wattful power Rate p, power instruction p0 etc.), obtain evaluation number (including 15 seconds movement accuracy B of primary frequency modulation, primary frequency modulation 30 seconds movement just True rate C etc.);
When time span is less than or equal to 15 seconds, step is returned to (1);
Setting value is 0.034Hz;
Turbine speed w is converted to mains frequency f:f=w/60;
Mains frequency f and standard frequency f0 absolute value of the bias: Δ f=∣ f-f0 ∣;
Time span h: stop from absolute value of the bias Δ f is greater than the 0.034Hz moment to less than equal to the 0.034Hz moment;
Electricity contributes deviation: Δ p=p-p0;Electricity contributes 15 seconds peak values: Δ pm15=max ∣ Δ p15 ∣, wherein Δ P15 indicates that value range is Δ p data in first 15 seconds;Electricity contributes 30 seconds peak values: Δ pm30=max ∣ Δ p30 ∣, wherein Δ P30 indicates that value range is Δ p data in first 30 seconds;
Unit rated power is pe, unit MW;
Electricity contributes 75 theoretical peaks: W75=0.3* Δ f1*pe, and wherein Δ f1 is preceding 15 seconds frequency difference average value;
Electricity contributes 90 theoretical peaks: W90=0.36* Δ f2*pe, and wherein Δ f2 is entire evaluation period maximum value;
When mains frequency is greater than standard frequency, electricity contributes 15 seconds peak delta pm15 for negative and when absolute value is greater than W75, Primary frequency modulation 15 seconds correct action frequency k1 of meter increase by 1 time, and 15 seconds malfunction number k2 of primary frequency modulation are constant;Electricity contribution 15 Second peak delta pm15 is positive number or when absolute value is less than W75, and k1 is constant, and k2 increases primary;
When mains frequency is less than standard frequency, electricity contributes 15 seconds peak delta pm15 for positive number and when absolute value is greater than W75, K1 increases by 1 time, and k2 is constant;Electricity contributes 15 seconds peak delta pm15 to be negative or when absolute value is less than W75, and k1 is constant, and k2 increases Add primary;
When mains frequency is greater than standard frequency, electricity contributes 30 seconds peak delta pm30 for negative and when absolute value is greater than W90, Primary frequency modulation 30 seconds correct action frequency k3 of meter increase by 1 time, and 30 seconds malfunction number k4 of primary frequency modulation are constant;Electricity contribution 30 Second peak delta pm30 is positive number or when absolute value is less than W90, and k3 is constant, and k4 increases primary;
When mains frequency is less than standard frequency, electricity contributes 30 seconds peak delta pm30 for positive number and when absolute value is greater than W90, K3 increases by 1 time, and k4 is constant;Electricity contributes 30 seconds peak delta pm30 to be negative or when absolute value is less than W90, and k3 is constant, and k4 increases Add primary;
15 seconds performance factor B=k1/ (k1+k2) of primary frequency modulation;
30 seconds performance factor C=k3/ (k3+k4) of primary frequency modulation, evaluation period h are higher than 15 seconds and are lower than 30 seconds, 30 seconds Performance factor not counts.
In the present invention, previous examination is solved using the powerful data-handling capacity of control system by rapidity evaluation method It is not perfect to test data, search function can be used, provides foundation for further research frequency modulation characteristic;Response calculates within 15 seconds, reason The hysteresis of unit frequency quick response is considered as reference using the mean value of preceding 15 seconds frequencies variation by the calculating of value;30 seconds Response calculates, and the calculating of theoretical value, as reference, avoids falling bring after rise because of frequency using the peak value of preceding 30 seconds frequencies variation Analytical error;In order to avoid frequently calculating, according to previous unit frequency modulation test feature, frequency modulation rapid charater can after 15s It fully demonstrates, so setting evaluation period shortest length, can be improved the reasonability of statistical data;Unit is calculated over 15s not Reach 30 seconds, replaces two item datas only with 15 seconds calculating data;If sampling duration exceed 30 seconds, epicycle calculate according to Actual frequency is fallen after rise to could terminate in dead zone, and theoretical action value will be referred to the peak value of entire period.

Claims (1)

1. one kind is based on primary frequency modulation rapidity evaluation method, it is characterised in that: the following steps are included:
(1) the grid-connected power generator turbine revolving speed of timing acquiring, is converted to mains frequency for revolving speed;
(2) the deviation of mains frequency and standard frequency is calculated, and result is subjected to signed magnitude arithmetic(al);
(3) when absolute value of the bias is greater than the set value, then next step is entered;
Otherwise, step is returned to (1);
(4) when absolute value of the bias is reduced to setting value, this Phase Evaluation terminates, minute book phases-time length;Otherwise, continue to count When;
(5) when time span is greater than 15 seconds, the data of this phase acquisition are analyzed, obtain evaluation number;
When time span is less than or equal to 15 seconds, step is returned to (1);
Setting value is 0.034Hz;
Turbine speed w is converted to mains frequency f:f=w/60;
Mains frequency f and standard frequency f0 absolute value of the bias: Δ f=∣ f-f0 ∣;
Time span h: stop from absolute value of the bias Δ f is greater than the 0.034Hz moment to less than equal to the 0.034Hz moment;
Electricity contributes deviation: Δ p=p-p0;
Electricity contributes 15 seconds peak values: Δ pm15=max ∣ Δ p15 ∣, and wherein Δ p15 indicates that value range is Δ p number in first 15 seconds According to;
Electricity contributes 30 seconds peak values: Δ pm30=max ∣ Δ p30 ∣, and wherein Δ p30 indicates that value range is Δ p number in first 30 seconds According to;
Unit rated power is pe, unit MW;
Electricity contributes 75 theoretical peaks: W75=0.3* Δ f1*pe, and wherein Δ f1 is preceding 15 seconds frequency difference average value;
Electricity contributes 90 theoretical peaks: W90=0.36* Δ f2*pe, and wherein Δ f2 is entire evaluation period maximum value;
When mains frequency is greater than standard frequency, electricity contributes 15 seconds peak delta pm15 for negative and when absolute value is greater than W75, meter one Correct action frequency k1 increases by 1 time within secondary frequency modulation 15 seconds, and 15 seconds malfunction number k2 of primary frequency modulation are constant;Electricity contributes 15 seconds peaks When to be worth Δ pm15 be that positive number or absolute value are less than W75, k1 is constant, and k2 increases primary;
When mains frequency is less than standard frequency, electricity contributes 15 seconds peak delta pm15 for positive number and when absolute value is greater than W75, and k1 increases Add 1 time, k2 is constant;Electricity contributes 15 seconds peak delta pm15 to be negative or when absolute value is less than W75, and k1 is constant, and k2 increases by one It is secondary;
When mains frequency is greater than standard frequency, electricity contributes 30 seconds peak delta pm30 for negative and when absolute value is greater than W90, meter one Correct action frequency k3 increases by 1 time within secondary frequency modulation 30 seconds, and 30 seconds malfunction number k4 of primary frequency modulation are constant;Electricity contributes 30 seconds peaks When to be worth Δ pm30 be that positive number or absolute value are less than W90, k3 is constant, and k4 increases primary;
When mains frequency is less than standard frequency, electricity contributes 30 seconds peak delta pm30 for positive number and when absolute value is greater than W90, and k3 increases Add 1 time, k4 is constant;Electricity contributes 30 seconds peak delta pm30 to be negative or when absolute value is less than W90, and k3 is constant, and k4 increases by one It is secondary;
15 seconds performance factor B=k1/ (k1+k2) of primary frequency modulation;
30 seconds performance factor C=k3/ (k3+k4) of primary frequency modulation, evaluation period h are higher than 15 seconds and are lower than 30 seconds, and 30 seconds correct Movement rate not counts.
CN201811239467.6A 2018-10-23 2018-10-23 Method for evaluating rapidity based on primary frequency modulation Active CN109462227B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811239467.6A CN109462227B (en) 2018-10-23 2018-10-23 Method for evaluating rapidity based on primary frequency modulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811239467.6A CN109462227B (en) 2018-10-23 2018-10-23 Method for evaluating rapidity based on primary frequency modulation

Publications (2)

Publication Number Publication Date
CN109462227A true CN109462227A (en) 2019-03-12
CN109462227B CN109462227B (en) 2022-04-19

Family

ID=65608242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811239467.6A Active CN109462227B (en) 2018-10-23 2018-10-23 Method for evaluating rapidity based on primary frequency modulation

Country Status (1)

Country Link
CN (1) CN109462227B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110797914A (en) * 2019-11-11 2020-02-14 国网河南省电力公司电力科学研究院 Rapid frequency control method and system for new energy station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120232820A1 (en) * 2009-11-18 2012-09-13 Douglas Wilson grid oscillation analysis method and apparatus therefor
CN103545840A (en) * 2013-10-23 2014-01-29 国家电网公司 Method capable of guaranteeing primary frequency modulation action effectiveness of 300MW generator set
CN105445582A (en) * 2015-11-26 2016-03-30 广东电网有限责任公司电力科学研究院 Interconnection power grid primary frequency modulation responding performance assessment method
CN106300389A (en) * 2016-08-22 2017-01-04 国家电网公司 A kind of integrated evaluating method of generating set primary frequency regulation performance
CN107546754A (en) * 2017-09-25 2018-01-05 国网河南省电力公司电力科学研究院 The lower frequency response merit rating method of interconnected network of extra-high voltage high-power missing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120232820A1 (en) * 2009-11-18 2012-09-13 Douglas Wilson grid oscillation analysis method and apparatus therefor
CN103545840A (en) * 2013-10-23 2014-01-29 国家电网公司 Method capable of guaranteeing primary frequency modulation action effectiveness of 300MW generator set
CN105445582A (en) * 2015-11-26 2016-03-30 广东电网有限责任公司电力科学研究院 Interconnection power grid primary frequency modulation responding performance assessment method
CN106300389A (en) * 2016-08-22 2017-01-04 国家电网公司 A kind of integrated evaluating method of generating set primary frequency regulation performance
CN107546754A (en) * 2017-09-25 2018-01-05 国网河南省电力公司电力科学研究院 The lower frequency response merit rating method of interconnected network of extra-high voltage high-power missing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110797914A (en) * 2019-11-11 2020-02-14 国网河南省电力公司电力科学研究院 Rapid frequency control method and system for new energy station
CN110797914B (en) * 2019-11-11 2022-06-03 国网河南省电力公司电力科学研究院 Rapid frequency control method and system for new energy station

Also Published As

Publication number Publication date
CN109462227B (en) 2022-04-19

Similar Documents

Publication Publication Date Title
Yu et al. Nonintrusive appliance load monitoring for smart homes: Recent advances and future issues
CN104220951B (en) MPPT maximum power point tracking (MPPT)
CN106093796B (en) Lithium battery capacity and life-span prediction method in the case of having capacity regeneration based on regression criterion reconstruction in frequency-domain
CN104504509B (en) A kind of thermal power plant's Consumption Difference Analysing System and its method using dynamic benchmark value
JP2013050433A (en) Battery monitoring device
CN105445582A (en) Interconnection power grid primary frequency modulation responding performance assessment method
CN105406521B (en) A kind of computational methods for evaluating unit AGC regulation performance New Sets
CN109861250B (en) Power oscillation type discrimination method based on multi-dimensional characteristics of power system
CN102323550A (en) Primary frequency modulation adjusting performance determination method of generating set
CN102393726B (en) Method for evaluating performance of AGC (automatic gain control) controller of thermal power unit
CN101299052A (en) Electric generator one time frequency modulation real time quantitative analysis method based on phasor measuring technique
JP6032486B2 (en) Power management system and power management method
CN109462227A (en) One kind being based on primary frequency modulation rapidity evaluation method
CN109934493B (en) Method for rapidly determining coal consumption characteristic curve of thermal generator set
CN106130017B (en) A kind of detection method of power grid one piece frequency modulation response time
CN102842906B (en) Method for calculating power ratio of motor in comprehensive load model
CN109728607B (en) Wind power consumption assessment method and device
CN104251184B (en) Automatically recommend the method and system of optimum Wind turbines
CN110286268A (en) Power waveform distortion assessment method based on frequency fluctuation
CN110838725A (en) Parameter setting method and device for wind power plant closed-loop PI controller
CN102354295B (en) CPU (central processing unit) load testing method for equipment in DCS (distributed control system)
CN109378817A (en) One kind being based on primary frequency modulation method for estimating stability
CN104133090B (en) Benefit electricity error detection method and system is moved back during three-phase three-wire electric energy meter decompression
JP2014165934A (en) Method, device and program for estimating variation of total power generation output from natural energy type distributed power source group
Junput et al. Optimal technique for total harmonic distortion detection and estimation for smart meter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: No. 8, Haitai Huake 4th Road, Huayuan Industrial Zone, High tech Zone, Binhai New Area, Tianjin, 300384

Patentee after: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee after: STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: No.8, Haitai Huake 4th Road, Xiqing District, Tianjin 300384

Patentee before: ELECTRIC POWER SCIENCE & RESEARCH INSTITUTE OF STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee before: STATE GRID TIANJIN ELECTRIC POWER Co.

Patentee before: STATE GRID CORPORATION OF CHINA

CP02 Change in the address of a patent holder