CN109446507A - A kind of construction method and device of report - Google Patents
A kind of construction method and device of report Download PDFInfo
- Publication number
- CN109446507A CN109446507A CN201811345821.3A CN201811345821A CN109446507A CN 109446507 A CN109446507 A CN 109446507A CN 201811345821 A CN201811345821 A CN 201811345821A CN 109446507 A CN109446507 A CN 109446507A
- Authority
- CN
- China
- Prior art keywords
- target
- report
- built
- item
- preset
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/186—Templates
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Computational Linguistics (AREA)
- General Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of construction method of report and devices, this method comprises: obtaining each target resolution rules for including in report template to be built;Search target data values corresponding with each target resolution rules;By in each target data values write-in cell corresponding with the report template to be built, target report template to be built is obtained;Target report template to be built is converted into target report.Above-mentioned construction method, by obtaining target data values corresponding with each target resolution rules in report template to be built, and it will be in each target data values write-in cell corresponding with the report template to be built, obtain target report template to be built, target report template to be built is converted into target report, simply by the presence of report template to be built, can automatic report generation, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.
Description
Technical field
The present invention relates to technical field of data processing more particularly to the construction methods and device of a kind of report.
Background technique
During IT application in enterprise, it is often necessary to enterprise is shown and analyzed by report and produces relevant number
According to, including the relevant creation data of raw material semi-finished product finished product, energy production consumption data, inventory data, planning data and technology
Economic indicator data.Not only report form type is various, but also report style complexity is indefinite, and report demand also often changes.In report
In building process, needs application developer to design front end page pattern, writes backstage code, data are inquired from database,
And it is filled into front end page cell or is disposably organized into the Html data form that front end can be illustrated as report from the background.
As information level of the enterprise improves, pattern and complexity to report require also higher and higher, existing report
Building mode needs application developer or has the personnel of programming experience to develop or implement, and wants to the technical level of building personnel
Ask higher.
Summary of the invention
In view of this, the present invention provides a kind of construction method of report and device, to solve report in the prior art
Building mode needs application developer or has the personnel of programming experience to develop or implement, and wants to the technical level of building personnel
Seek higher problem.Concrete scheme is as follows:
A kind of construction method of report, comprising:
Obtain each target resolution rules for including in report template to be built;
Search target data values corresponding with each target resolution rules;
By in each target data values write-in cell corresponding with the report template to be built, obtains target and wait for structure
Build report template;
Target report template to be built is converted into target report.
Above-mentioned method, optionally, further includes:
Each resolution rules are stored in preset template database.
Above-mentioned method optionally obtains each target resolution rules for including in report template to be built, comprising:
Traverse each unit lattice in the report template to be built, judge in each unit lattice with the presence or absence of comprising
The Set cell of preset first identifier;
If so, parsing the target critical item for including in the Set cell and preset second identifier;
Judge whether the target critical item matches with the key item in preset crucial association database;
If so, will be made of the target critical item, the preset first identifier and the preset second identifier
Resolution rules are as the target resolution rules.
Above-mentioned method optionally searches target data values corresponding with each target resolution rules, comprising:
Current goal resolution rules are parsed, the target critical item for including in the current goal resolution rules is obtained;
Judge whether the target critical item belongs to onboard data item;
If so, searching target data values corresponding with the target critical item in preset internal database.
Above-mentioned method, optionally, further includes:
If it is not, judging whether the target critical item is expression formula;
If so, parsing each middle entry for including in the target critical item;
Obtain data value corresponding with each middle entry;
According to each data value, target data values corresponding with the target critical item are calculated.
Above-mentioned method, optionally, further includes:
If it is not, searching and the associated target database of target critical item;
Target data values corresponding with the target critical item are searched in the target database.
A kind of construction device of report, comprising:
Module is obtained, for obtaining each target resolution rules for including in report template to be built;
Searching module, for searching target data values corresponding with each target resolution rules;
Writing module, for by each target data values write-in cell corresponding with the report template to be built
In, obtain target report template to be built;
Conversion module, for target report template to be built to be converted to target report.
Above-mentioned device, optionally, the acquisition module includes:
First judging unit judges each list for traversing each unit lattice in the report template to be built
It whether there is the Set cell comprising preset first identifier in first lattice;
Resolution unit, for if so, parsing the target critical item for including in the Set cell and preset second mark
Know;
Second judgment unit, for judge the target critical item whether with the key item in preset crucial association database
Match;
Determination unit is used for if so, will be by the target critical item, the preset first identifier and described preset the
The resolution rules of two mark compositions are as the target resolution rules.
Above-mentioned device, optionally, the searching module includes:
First acquisition unit obtains in the current goal resolution rules for parsing current goal resolution rules and includes
Target critical item;
Third judging unit, for judging whether the target critical item belongs to onboard data item;
Searching unit is used for if so, searching target corresponding with the target critical item in preset internal database
Data value.
Above-mentioned device, optionally, further includes:
4th judging unit, for if it is not, judging whether the target critical item is expression formula;
Resolution unit, if so, parsing each middle entry for including in the target critical item;
Second acquisition unit, for obtaining data value corresponding with each middle entry;
Computing unit, for target data values corresponding with the target critical item to be calculated according to each data value.
Compared with prior art, the present invention includes the following advantages:
The invention discloses a kind of construction methods of report, comprising: includes by obtaining with report template to be built
Each target resolution rules, search corresponding with each resolution rules target data values, and each target data values are write
Enter in cell corresponding with the report template to be built, obtains target report template to be built, the target is to be built
Report template is converted to target report, in above-mentioned construction method, simply by the presence of report template to be built, so that it may automatically generate
Report, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of construction method flow chart of report disclosed in the embodiment of the present application;
Fig. 2 is a kind of another flow chart of the construction method of report disclosed in the embodiment of the present application;
Fig. 3 is a kind of another flow chart of the construction method of report disclosed in the embodiment of the present application;
Fig. 4 is a kind of another flow chart of the construction method of report disclosed in the embodiment of the present application;
Fig. 5 is a kind of construction device structural block diagram of report disclosed in the embodiment of the present application.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
The invention discloses a kind of construction method of report, the construction method is applied in the building process of report,
In, relevant data instance is produced so that enterprise is shown and analyzed by report, report includes that raw material semi-finished product finished product is related
Creation data, energy production consumes data, inventory data, planning data and technical-economic index data.Not only report form type is numerous
It is more, production report, energy consumption report, performance report, plan sheet, account report including different stages such as each device, workshop, subsidiary factories
Table etc., and report style complexity is indefinite, and report is large number of, and report demand also often changes.The present invention provides a kind of reports
Rapid build report may be implemented in table construction method, and faces quickly and easily safeguard when changes in demand, the building side
The execution process of method as shown in Figure 1, comprising steps of
S101, each target resolution rules for including in report template to be built are obtained;
In the embodiment of the present invention, the report template to be built is the template for currently needing to be converted to target report, wherein
Preferably, the report template to be built is the template for supporting Excel format, general enterprises daily production report, monthly magazine etc.
It can directly use.It also needs to be to carry out template configuration to daily production report, monthly magazine etc., template file is opened, in cell
Configure the special string that can be identified by report construction device.Configuration method of the present invention is opened with preset first identifier " # "
Head is followed by with the data item title pre-defined or obtains the function name and parameter of data, completes described to structure
Build report template.Wherein, to each unit of preset first identifier described in the presence for including in the report template to be built
Resolution rules are screened in lattice, obtain each target resolution rules.
S102, target data values corresponding with each target resolution rules are searched;
In the embodiment of the present invention, data value corresponding with each target resolution rules is searched in corresponding database,
Wherein, the corresponding database can be internal data source, and external data source or both is used as data source, data source simultaneously
Selection it is related with target resolution rules, preset first identifier and at least can be only contained at least one in target resolution rules
One target critical item, it is also possible to which there are preset second identifiers, wherein it is preferred, it is different from the preset first identifier
All marks can be determined as preset second identifier.
S103, by each target data values write-in cell corresponding with the report template to be built, obtain mesh
Mark report template to be built;
In the embodiment of the present invention, target critical item corresponding with each target data values is searched, is written into corresponding
Cell belonging to key item.When a write is completed, target report template to be built is obtained, wherein the target mould to be built
Plate includes target data values corresponding with each target resolution rules.
S104, target report template to be built is converted into target report.
In the embodiment of the present invention, the target report template to be built can not directly be shown in presentation on a web browser, palpus
It could be shown on a web browser after target report to be built is converted into target report.Preferably, the target report can
To be converted into the character string identified by the Canvas technology of Html5.
In the embodiment of the present invention, it is preferred that each resolution rules are stored in preset template database, so as to
It carries out when process is presented in report without parsing once again.
The invention discloses a kind of construction methods of report, comprising: includes by obtaining with report template to be built
Each target resolution rules, search corresponding with each resolution rules target data values, and each target data values are write
Enter in cell corresponding with the report template to be built, obtains target report template to be built, the target is to be built
Report template is converted to target report, in above-mentioned construction method, simply by the presence of report template to be built, so that it may automatically generate
Report, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.
Based on the construction method, constructing report and uniquely working is exactly to configure spy in cell according to certain rules
Different character string makes report template.If later period user changes in use process demand, report template only need to be modified i.e.
It can.
Further, by uploading the report template to be built, report template is automatically parsed, and according in report template
The target resolution rules of configuration obtain corresponding data automatically, are filled into the corresponding unit lattice of the report template to be built,
Final output target report content is presented to the user to browser front end.Above-mentioned construction method is carried out by application developer
The exploitation of customization become being ignorant of program development people can also the such report of simple configuration, report building can be increased substantially
Efficiency can also be supported, without recompiling maintenance, to pass through when user is to changes in demand such as report style change, data increases and decreases
Modification report template can be realized.
In the embodiment of the present invention, the method flow for each target resolution rules for including in report template to be built is obtained such as
Shown in Fig. 2, comprising steps of
Each unit lattice in S201, the traversal report template to be built, judge whether deposit in each unit lattice
In the Set cell comprising preset first identifier;
In the embodiment of the present invention, each cell is traversed, checks in cell that whether be configured with can be with identified pre-
If first identifier, it is preferred that the preset first identifier be " # ".
S202, if so, parsing the target critical item for including in the Set cell and preset second identifier;
In the embodiment of the present invention, the cell of preset first identifier will be present as Set cell, parse the mesh
The target critical item for including in mark cell and preset second identifier, it is preferred that the preset second identifier can be
It can include the preset second identifier that ", ", ": " or other preferred marks, which are not each cell,.The mesh
Mark key item is meaning representated by the data that the show and target critical item is at least one in its corresponding cell.It is excellent
Choosing, the target critical item is chosen in the preset crucial association database, wherein the preset crucial association database
For each key item that may be used in preset different report.
S203, judge whether the target critical item matches with the key item in preset crucial association database;
In the embodiment of the present invention, since the naming method of some cell may also include the preset first identifier,
But target critical item therein may be not belonging to the preset crucial association database, and therefore, it is necessary to judge that the target is closed
Whether key item matches with the key item in preset crucial association database, wherein matched mode can for exact matching or
Person meets preset matching degree threshold value, the selection of preset matching degree threshold value can be empirically value either actual conditions into
Row determines.
S204, if so, will be by the target critical item, the preset first identifier and the preset second identifier group
At resolution rules as the target resolution rules.
In the embodiment of the present invention, if the target critical item and the key item phase in the preset crucial association database
Timing, will be by the target critical item, the resolution rules of the preset first identifier and the preset second identifier composition
As the target resolution rules.Wherein, the preset second identifier for including in the target resolution rules and the target are closed
The quantity of key item is at least one.
Such as: each target resolution rules have been got in preset template database, traverse each target parsing rule
Then, each target critical item is grouped, such as: some cell is configured with " the # device electricity consumption of target resolution rules
Amount ", can parse the cell will show the value of " certain device electricity consumption " the target critical item, judge the target critical item
It whether is onboard data item, if so, obtaining the corresponding target data values of target resolution rules in corresponding internal database;
Alternatively, some cell is configured with target resolution rules " # device electricity consumption, the same period last year ", report resolver
The value of " same period last year " of " certain device electricity consumption " the target critical item will be shown by parsing the cell.The target resolution rules
In be " certain device electricity consumption " and the second target critical item comprising first object key item be " same period last year " two target criticals
Item and preset first identifier " # " and preset second identifier ", ".Can be seen that rule therein: " # " beginning represents the unit
Lattice may show the data of a critical data item, if the subsequent character string of " # ", which then represents the cell comprising ", ", to open up
Show the data of other times window.Judge whether the first object key item in the target resolution rules is onboard data
, if so, judging whether the second target critical item is built-in accumulation type in the target resolution rules, if so, corresponding interior
It sets and searches target data values corresponding with the target resolution rules in database.The process flow diagram of the above process is referring to Fig. 3.Its
In, it whether is interior to each target critical item according to whether each target critical item belongs to preset internal database
Data item is set to be determined.
If the target critical item is not belonging to onboard data item, judge whether the target critical item is expression formula, if so,
It determines each middle entry that the target data item includes, determines data source belonging to each middle entry, the data source
It can be internal database and/or external database, wherein the external database is at least one.When in the data source
When comprising external database, needs to access by corresponding external data interface and extract data with external interface correspondence database
Value obtains data value corresponding with each middle entry, and according to each data value, it is right with the target critical item to be calculated
The target data values answered.By in each target data values write-in cell corresponding with the report template to be built, obtain
Target report template to be built.
If the target critical item is not expression formula, searches in each external database and closed with the target critical item
The target database of connection searches target data values corresponding with the target critical item in the target database.It will be each
In a target data values write-in cell corresponding with the report template to be built, target report template to be built is obtained.On
The process flow for stating process is as shown in Figure 4.
In the embodiment of the present invention, the method that simple configuration is carried out by the report template to Excel format, conversion report reality
Thinking is applied, report enforcement difficulty is greatly lowered, is not necessarily to customized development.Configuration identifier in report cell, program are solved
Related data is obtained after analysis and is written in cell.The mark format of configuration is flexible, extends available enriched data
The ability of item.Such as: it is configured with the function of the data shaped like " 1 generated energy of # device, the same period last year " available other times window
Energy;It is configured with available based on multiple data shaped like " #Index (' 1 generated energy of device ')+Index (' 2 generated energy of device ') "
Item expression formula arithmetic operator value;It is configured with the data item that can be set and obtain text type shaped like " # tabulator ".Pass through expression
Formula computing technique extends the ability that cell obtains data item.
In the embodiment of the present invention, based on the construction method of above-mentioned report, in the embodiment of the present invention, a kind of report is additionally provided
The structural block diagram of table construction device, the construction device is as shown in Figure 5, comprising:
Obtain module 301, searching module 302, writing module 303 and conversion module 304.
Wherein,
The acquisition module 301, for obtaining each target resolution rules for including in report template to be built;
The searching module 302, for searching target data values corresponding with each target resolution rules;
The write module 303, it is corresponding with the report template to be built for being written each target data values
In cell, target report template to be built is obtained;
The conversion module 304, for target report template to be built to be converted to target report.
The invention discloses a kind of construction methods of report, comprising: includes by obtaining with report template to be built
Each target resolution rules, search corresponding with each resolution rules target data values, and each target data values are write
Enter in cell corresponding with the report template to be built, obtains target report template to be built, the target is to be built
Report template is converted to target report, in above-mentioned construction method, simply by the presence of report template to be built, so that it may automatically generate
Report, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.
In the embodiment of the present invention, the acquisition module 301 includes:
First judging unit 305, resolution unit 306, second judgment unit 307 and determination unit 308.
Wherein,
First judging unit 305, for traversing each unit lattice in the report template to be built, described in judgement
It whether there is the Set cell comprising preset first identifier in each unit lattice;
The resolution unit 306, for if so, parsing the target critical item for including in the Set cell and preset
Second identifier;
The second judgment unit 307, for judge the target critical item whether in preset crucial association database
Key item match;
The determination unit 308 is used for if so, will be by the target critical item, the preset first identifier and described
The resolution rules of preset second identifier composition are as the target resolution rules.
In the embodiment of the present invention, the searching module 302 includes:
First acquisition unit 309, third judging unit 310 and searching unit 311.
Wherein,
The first acquisition unit 309 obtains the current goal resolution rules for parsing current goal resolution rules
In include target critical item;
The third judging unit 310, for judging whether the target critical item belongs to onboard data item;
The searching unit 311 is used for if so, searching in preset internal database corresponding with the target critical item
Target data values.
In the embodiment of the present invention, the searching module 302 further include:
4th judging unit 312, resolution unit 313, second acquisition unit 314 and computing unit 315.
Wherein,
4th judging unit 312, for if it is not, judging whether the target critical item is expression formula;
The resolution unit 313, if so, parsing each middle entry for including in the target critical item;
The second acquisition unit 314, for obtaining data value corresponding with each middle entry;
The computing unit 315, for target corresponding with the target critical item to be calculated according to each data value
Data value.
It should be noted that all the embodiments in this specification are described in a progressive manner, each embodiment weight
Point explanation is the difference from other embodiments, and the same or similar parts between the embodiments can be referred to each other.
For device class embodiment, since it is basically similar to the method embodiment, so being described relatively simple, related place ginseng
See the part explanation of embodiment of the method.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by
One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning
Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that
A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged
Except there is also other identical elements in the process, method, article or apparatus that includes the element.
For convenience of description, it is divided into various units when description apparatus above with function to describe respectively.Certainly, implementing this
The function of each unit can be realized in the same or multiple software and or hardware when invention.
As seen through the above description of the embodiments, those skilled in the art can be understood that the present invention can
It realizes by means of software and necessary general hardware platform.Based on this understanding, technical solution of the present invention essence
On in other words the part that contributes to existing technology can be embodied in the form of software products, the computer software product
It can store in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that a computer equipment
(can be personal computer, server or the network equipment etc.) executes the certain of each embodiment or embodiment of the invention
Method described in part.
The construction method and device of a kind of report provided by the present invention are described in detail above, it is used herein
A specific example illustrates the principle and implementation of the invention, and the above embodiments are only used to help understand
Method and its core concept of the invention;At the same time, for those skilled in the art is having according to the thought of the present invention
There will be changes in body embodiment and application range, in conclusion the content of the present specification should not be construed as to the present invention
Limitation.
Claims (10)
1. a kind of construction method of report characterized by comprising
Obtain each target resolution rules for including in report template to be built;
Search target data values corresponding with each target resolution rules;
By in each target data values write-in cell corresponding with the report template to be built, target report to be built is obtained
Table template;
Target report template to be built is converted into target report.
2. the method according to claim 1, wherein further include:
Each resolution rules are stored in preset template database.
3. the method according to claim 1, wherein obtaining each target solution for including in report template to be built
Analysis rule, comprising:
Each unit lattice in the report template to be built are traversed, are judged in each unit lattice with the presence or absence of comprising default
First identifier Set cell;
If so, parsing the target critical item for including in the Set cell and preset second identifier;
Judge whether the target critical item matches with the key item in preset crucial association database;
If so, will be by the target critical item, the parsing of the preset first identifier and the preset second identifier composition
Rule is used as the target resolution rules.
4. the method according to claim 1, wherein searching number of targets corresponding with each target resolution rules
According to value, comprising:
Current goal resolution rules are parsed, the target critical item for including in the current goal resolution rules is obtained;
Judge whether the target critical item belongs to onboard data item;
If so, searching target data values corresponding with the target critical item in preset internal database.
5. according to the method described in claim 4, it is characterized by further comprising:
If it is not, judging whether the target critical item is expression formula;
If so, parsing each middle entry for including in the target critical item;
Obtain data value corresponding with each middle entry;
According to each data value, target data values corresponding with the target critical item are calculated.
6. according to the method described in claim 5, it is characterized by further comprising:
If it is not, searching and the associated target database of target critical item;
Target data values corresponding with the target critical item are searched in the target database.
7. a kind of construction device of report characterized by comprising
Module is obtained, for obtaining each target resolution rules for including in report template to be built;
Searching module, for searching target data values corresponding with each target resolution rules;
Writing module, for obtaining in each target data values write-in cell corresponding with the report template to be built
To target report template to be built;
Conversion module, for target report template to be built to be converted to target report.
8. device according to claim 7, which is characterized in that the acquisition module includes:
First judging unit judges each unit lattice for traversing each unit lattice in the report template to be built
In whether there is the Set cell comprising preset first identifier;
Resolution unit, for if so, parsing the target critical item for including in the Set cell and preset second identifier;
Second judgment unit, for judge the target critical item whether with the key item phase in preset crucial association database
Match;
Determination unit is used for if so, will be by the target critical item, the preset first identifier and preset second mark
The resolution rules of composition are known as the target resolution rules.
9. device according to claim 7, which is characterized in that the searching module includes:
First acquisition unit obtains the mesh for including in the current goal resolution rules for parsing current goal resolution rules
Mark key item;
Third judging unit, for judging whether the target critical item belongs to onboard data item;
Searching unit is used for if so, searching target data corresponding with the target critical item in preset internal database
Value.
10. device according to claim 9, which is characterized in that further include:
4th judging unit, for if it is not, judging whether the target critical item is expression formula;
Resolution unit, if so, parsing each middle entry for including in the target critical item;
Second acquisition unit, for obtaining data value corresponding with each middle entry;
Computing unit, for target data values corresponding with the target critical item to be calculated according to each data value.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811345821.3A CN109446507A (en) | 2018-11-13 | 2018-11-13 | A kind of construction method and device of report |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811345821.3A CN109446507A (en) | 2018-11-13 | 2018-11-13 | A kind of construction method and device of report |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109446507A true CN109446507A (en) | 2019-03-08 |
Family
ID=65552214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811345821.3A Pending CN109446507A (en) | 2018-11-13 | 2018-11-13 | A kind of construction method and device of report |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109446507A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101122899A (en) * | 2007-09-18 | 2008-02-13 | 杭州华三通信技术有限公司 | Report generation method and device |
CN103034553A (en) * | 2012-12-20 | 2013-04-10 | 厦门亿力吉奥信息科技有限公司 | Intelligent verification algorithm, method and device for report designer |
CN103778234A (en) * | 2014-01-26 | 2014-05-07 | 北京恒华伟业科技股份有限公司 | Report form generating method and device |
US20150026178A1 (en) * | 2013-07-18 | 2015-01-22 | International Business Machines Corporation | Subject-matter analysis of tabular data |
CN105868196A (en) * | 2015-01-21 | 2016-08-17 | 张家口沪东电子科技有限公司 | Method for generating industrial data report in server |
CN105868170A (en) * | 2015-01-21 | 2016-08-17 | 上海可鲁***软件有限公司 | Method for generating industrial data report in server |
WO2018161402A1 (en) * | 2017-03-10 | 2018-09-13 | 深圳市科脉技术股份有限公司 | Method and system for processing modular packaged reports |
-
2018
- 2018-11-13 CN CN201811345821.3A patent/CN109446507A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101122899A (en) * | 2007-09-18 | 2008-02-13 | 杭州华三通信技术有限公司 | Report generation method and device |
CN103034553A (en) * | 2012-12-20 | 2013-04-10 | 厦门亿力吉奥信息科技有限公司 | Intelligent verification algorithm, method and device for report designer |
US20150026178A1 (en) * | 2013-07-18 | 2015-01-22 | International Business Machines Corporation | Subject-matter analysis of tabular data |
CN103778234A (en) * | 2014-01-26 | 2014-05-07 | 北京恒华伟业科技股份有限公司 | Report form generating method and device |
CN105868196A (en) * | 2015-01-21 | 2016-08-17 | 张家口沪东电子科技有限公司 | Method for generating industrial data report in server |
CN105868170A (en) * | 2015-01-21 | 2016-08-17 | 上海可鲁***软件有限公司 | Method for generating industrial data report in server |
WO2018161402A1 (en) * | 2017-03-10 | 2018-09-13 | 深圳市科脉技术股份有限公司 | Method and system for processing modular packaged reports |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Xue et al. | BIM integrated LCA for promoting circular economy towards sustainable construction: an analytical review | |
US6687713B2 (en) | Budget information, analysis, and projection system and method | |
CN101477549B (en) | Knowledge base supported spatial database design method and system | |
CN101930481B (en) | Method used for generating CIM model describing power grid change in designated time slot and system thereof | |
CN102023983B (en) | Managing method of statistical space-time database | |
CN109784689B (en) | Power grid infrastructure project report data processing method | |
CN104750496B (en) | A kind of model changes disturbance degree automatic check method | |
CN106156090A (en) | A kind of designing for manufacturing knowledge personalized push method of knowledge based collection of illustrative plates (Man-tree) | |
CN104318481A (en) | Power-grid-operation-oriented holographic time scale measurement data extraction conversion method | |
CN106529028A (en) | Technological procedure automatic generating method | |
CN100485612C (en) | Software requirement acquiring system | |
CN104978411A (en) | Train model development method and apparatus for high-speed train | |
CN103092631A (en) | Database application system development platform and development method | |
CN106325833B (en) | A kind of code generating method for enterprise information management | |
Martínez‐Rojas et al. | An approach for the automatic classification of work descriptions in construction projects | |
CN105760633A (en) | Green architectural design method applicable to information assistance | |
CN108776678A (en) | Index creation method and device based on mobile terminal NoSQL databases | |
CN106354799A (en) | Subject data set multi-layer facet filtration method and system based on data quality | |
CN111046476A (en) | Method and system for coding information model and exchanging data of building foundation pit component | |
CN103020283B (en) | A kind of semantic retrieving method of the dynamic restructuring based on background knowledge | |
CN111126461B (en) | Intelligent auditing method based on machine learning model interpretation | |
Dias et al. | A method for the identification of collaboration in large scientific databases | |
CN102508971A (en) | Method for establishing product function model in concept design stage | |
CN106250456A (en) | Bid winning announcement extraction method and device | |
CN101963993A (en) | Method for fast searching database sheet table record |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190308 |
|
RJ01 | Rejection of invention patent application after publication |