CN109446507A - A kind of construction method and device of report - Google Patents

A kind of construction method and device of report Download PDF

Info

Publication number
CN109446507A
CN109446507A CN201811345821.3A CN201811345821A CN109446507A CN 109446507 A CN109446507 A CN 109446507A CN 201811345821 A CN201811345821 A CN 201811345821A CN 109446507 A CN109446507 A CN 109446507A
Authority
CN
China
Prior art keywords
target
report
built
item
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811345821.3A
Other languages
Chinese (zh)
Inventor
侯卫锋
李志强
张中理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongzhida Technology Co Ltd
Original Assignee
Zhejiang Zhongzhida Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongzhida Technology Co Ltd filed Critical Zhejiang Zhongzhida Technology Co Ltd
Priority to CN201811345821.3A priority Critical patent/CN109446507A/en
Publication of CN109446507A publication Critical patent/CN109446507A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of construction method of report and devices, this method comprises: obtaining each target resolution rules for including in report template to be built;Search target data values corresponding with each target resolution rules;By in each target data values write-in cell corresponding with the report template to be built, target report template to be built is obtained;Target report template to be built is converted into target report.Above-mentioned construction method, by obtaining target data values corresponding with each target resolution rules in report template to be built, and it will be in each target data values write-in cell corresponding with the report template to be built, obtain target report template to be built, target report template to be built is converted into target report, simply by the presence of report template to be built, can automatic report generation, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.

Description

A kind of construction method and device of report
Technical field
The present invention relates to technical field of data processing more particularly to the construction methods and device of a kind of report.
Background technique
During IT application in enterprise, it is often necessary to enterprise is shown and analyzed by report and produces relevant number According to, including the relevant creation data of raw material semi-finished product finished product, energy production consumption data, inventory data, planning data and technology Economic indicator data.Not only report form type is various, but also report style complexity is indefinite, and report demand also often changes.In report In building process, needs application developer to design front end page pattern, writes backstage code, data are inquired from database, And it is filled into front end page cell or is disposably organized into the Html data form that front end can be illustrated as report from the background.
As information level of the enterprise improves, pattern and complexity to report require also higher and higher, existing report Building mode needs application developer or has the personnel of programming experience to develop or implement, and wants to the technical level of building personnel Ask higher.
Summary of the invention
In view of this, the present invention provides a kind of construction method of report and device, to solve report in the prior art Building mode needs application developer or has the personnel of programming experience to develop or implement, and wants to the technical level of building personnel Seek higher problem.Concrete scheme is as follows:
A kind of construction method of report, comprising:
Obtain each target resolution rules for including in report template to be built;
Search target data values corresponding with each target resolution rules;
By in each target data values write-in cell corresponding with the report template to be built, obtains target and wait for structure Build report template;
Target report template to be built is converted into target report.
Above-mentioned method, optionally, further includes:
Each resolution rules are stored in preset template database.
Above-mentioned method optionally obtains each target resolution rules for including in report template to be built, comprising:
Traverse each unit lattice in the report template to be built, judge in each unit lattice with the presence or absence of comprising The Set cell of preset first identifier;
If so, parsing the target critical item for including in the Set cell and preset second identifier;
Judge whether the target critical item matches with the key item in preset crucial association database;
If so, will be made of the target critical item, the preset first identifier and the preset second identifier Resolution rules are as the target resolution rules.
Above-mentioned method optionally searches target data values corresponding with each target resolution rules, comprising:
Current goal resolution rules are parsed, the target critical item for including in the current goal resolution rules is obtained;
Judge whether the target critical item belongs to onboard data item;
If so, searching target data values corresponding with the target critical item in preset internal database.
Above-mentioned method, optionally, further includes:
If it is not, judging whether the target critical item is expression formula;
If so, parsing each middle entry for including in the target critical item;
Obtain data value corresponding with each middle entry;
According to each data value, target data values corresponding with the target critical item are calculated.
Above-mentioned method, optionally, further includes:
If it is not, searching and the associated target database of target critical item;
Target data values corresponding with the target critical item are searched in the target database.
A kind of construction device of report, comprising:
Module is obtained, for obtaining each target resolution rules for including in report template to be built;
Searching module, for searching target data values corresponding with each target resolution rules;
Writing module, for by each target data values write-in cell corresponding with the report template to be built In, obtain target report template to be built;
Conversion module, for target report template to be built to be converted to target report.
Above-mentioned device, optionally, the acquisition module includes:
First judging unit judges each list for traversing each unit lattice in the report template to be built It whether there is the Set cell comprising preset first identifier in first lattice;
Resolution unit, for if so, parsing the target critical item for including in the Set cell and preset second mark Know;
Second judgment unit, for judge the target critical item whether with the key item in preset crucial association database Match;
Determination unit is used for if so, will be by the target critical item, the preset first identifier and described preset the The resolution rules of two mark compositions are as the target resolution rules.
Above-mentioned device, optionally, the searching module includes:
First acquisition unit obtains in the current goal resolution rules for parsing current goal resolution rules and includes Target critical item;
Third judging unit, for judging whether the target critical item belongs to onboard data item;
Searching unit is used for if so, searching target corresponding with the target critical item in preset internal database Data value.
Above-mentioned device, optionally, further includes:
4th judging unit, for if it is not, judging whether the target critical item is expression formula;
Resolution unit, if so, parsing each middle entry for including in the target critical item;
Second acquisition unit, for obtaining data value corresponding with each middle entry;
Computing unit, for target data values corresponding with the target critical item to be calculated according to each data value.
Compared with prior art, the present invention includes the following advantages:
The invention discloses a kind of construction methods of report, comprising: includes by obtaining with report template to be built Each target resolution rules, search corresponding with each resolution rules target data values, and each target data values are write Enter in cell corresponding with the report template to be built, obtains target report template to be built, the target is to be built Report template is converted to target report, in above-mentioned construction method, simply by the presence of report template to be built, so that it may automatically generate Report, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of construction method flow chart of report disclosed in the embodiment of the present application;
Fig. 2 is a kind of another flow chart of the construction method of report disclosed in the embodiment of the present application;
Fig. 3 is a kind of another flow chart of the construction method of report disclosed in the embodiment of the present application;
Fig. 4 is a kind of another flow chart of the construction method of report disclosed in the embodiment of the present application;
Fig. 5 is a kind of construction device structural block diagram of report disclosed in the embodiment of the present application.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.
The invention discloses a kind of construction method of report, the construction method is applied in the building process of report, In, relevant data instance is produced so that enterprise is shown and analyzed by report, report includes that raw material semi-finished product finished product is related Creation data, energy production consumes data, inventory data, planning data and technical-economic index data.Not only report form type is numerous It is more, production report, energy consumption report, performance report, plan sheet, account report including different stages such as each device, workshop, subsidiary factories Table etc., and report style complexity is indefinite, and report is large number of, and report demand also often changes.The present invention provides a kind of reports Rapid build report may be implemented in table construction method, and faces quickly and easily safeguard when changes in demand, the building side The execution process of method as shown in Figure 1, comprising steps of
S101, each target resolution rules for including in report template to be built are obtained;
In the embodiment of the present invention, the report template to be built is the template for currently needing to be converted to target report, wherein Preferably, the report template to be built is the template for supporting Excel format, general enterprises daily production report, monthly magazine etc. It can directly use.It also needs to be to carry out template configuration to daily production report, monthly magazine etc., template file is opened, in cell Configure the special string that can be identified by report construction device.Configuration method of the present invention is opened with preset first identifier " # " Head is followed by with the data item title pre-defined or obtains the function name and parameter of data, completes described to structure Build report template.Wherein, to each unit of preset first identifier described in the presence for including in the report template to be built Resolution rules are screened in lattice, obtain each target resolution rules.
S102, target data values corresponding with each target resolution rules are searched;
In the embodiment of the present invention, data value corresponding with each target resolution rules is searched in corresponding database, Wherein, the corresponding database can be internal data source, and external data source or both is used as data source, data source simultaneously Selection it is related with target resolution rules, preset first identifier and at least can be only contained at least one in target resolution rules One target critical item, it is also possible to which there are preset second identifiers, wherein it is preferred, it is different from the preset first identifier All marks can be determined as preset second identifier.
S103, by each target data values write-in cell corresponding with the report template to be built, obtain mesh Mark report template to be built;
In the embodiment of the present invention, target critical item corresponding with each target data values is searched, is written into corresponding Cell belonging to key item.When a write is completed, target report template to be built is obtained, wherein the target mould to be built Plate includes target data values corresponding with each target resolution rules.
S104, target report template to be built is converted into target report.
In the embodiment of the present invention, the target report template to be built can not directly be shown in presentation on a web browser, palpus It could be shown on a web browser after target report to be built is converted into target report.Preferably, the target report can To be converted into the character string identified by the Canvas technology of Html5.
In the embodiment of the present invention, it is preferred that each resolution rules are stored in preset template database, so as to It carries out when process is presented in report without parsing once again.
The invention discloses a kind of construction methods of report, comprising: includes by obtaining with report template to be built Each target resolution rules, search corresponding with each resolution rules target data values, and each target data values are write Enter in cell corresponding with the report template to be built, obtains target report template to be built, the target is to be built Report template is converted to target report, in above-mentioned construction method, simply by the presence of report template to be built, so that it may automatically generate Report, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.
Based on the construction method, constructing report and uniquely working is exactly to configure spy in cell according to certain rules Different character string makes report template.If later period user changes in use process demand, report template only need to be modified i.e. It can.
Further, by uploading the report template to be built, report template is automatically parsed, and according in report template The target resolution rules of configuration obtain corresponding data automatically, are filled into the corresponding unit lattice of the report template to be built, Final output target report content is presented to the user to browser front end.Above-mentioned construction method is carried out by application developer The exploitation of customization become being ignorant of program development people can also the such report of simple configuration, report building can be increased substantially Efficiency can also be supported, without recompiling maintenance, to pass through when user is to changes in demand such as report style change, data increases and decreases Modification report template can be realized.
In the embodiment of the present invention, the method flow for each target resolution rules for including in report template to be built is obtained such as Shown in Fig. 2, comprising steps of
Each unit lattice in S201, the traversal report template to be built, judge whether deposit in each unit lattice In the Set cell comprising preset first identifier;
In the embodiment of the present invention, each cell is traversed, checks in cell that whether be configured with can be with identified pre- If first identifier, it is preferred that the preset first identifier be " # ".
S202, if so, parsing the target critical item for including in the Set cell and preset second identifier;
In the embodiment of the present invention, the cell of preset first identifier will be present as Set cell, parse the mesh The target critical item for including in mark cell and preset second identifier, it is preferred that the preset second identifier can be It can include the preset second identifier that ", ", ": " or other preferred marks, which are not each cell,.The mesh Mark key item is meaning representated by the data that the show and target critical item is at least one in its corresponding cell.It is excellent Choosing, the target critical item is chosen in the preset crucial association database, wherein the preset crucial association database For each key item that may be used in preset different report.
S203, judge whether the target critical item matches with the key item in preset crucial association database;
In the embodiment of the present invention, since the naming method of some cell may also include the preset first identifier, But target critical item therein may be not belonging to the preset crucial association database, and therefore, it is necessary to judge that the target is closed Whether key item matches with the key item in preset crucial association database, wherein matched mode can for exact matching or Person meets preset matching degree threshold value, the selection of preset matching degree threshold value can be empirically value either actual conditions into Row determines.
S204, if so, will be by the target critical item, the preset first identifier and the preset second identifier group At resolution rules as the target resolution rules.
In the embodiment of the present invention, if the target critical item and the key item phase in the preset crucial association database Timing, will be by the target critical item, the resolution rules of the preset first identifier and the preset second identifier composition As the target resolution rules.Wherein, the preset second identifier for including in the target resolution rules and the target are closed The quantity of key item is at least one.
Such as: each target resolution rules have been got in preset template database, traverse each target parsing rule Then, each target critical item is grouped, such as: some cell is configured with " the # device electricity consumption of target resolution rules Amount ", can parse the cell will show the value of " certain device electricity consumption " the target critical item, judge the target critical item It whether is onboard data item, if so, obtaining the corresponding target data values of target resolution rules in corresponding internal database; Alternatively, some cell is configured with target resolution rules " # device electricity consumption, the same period last year ", report resolver The value of " same period last year " of " certain device electricity consumption " the target critical item will be shown by parsing the cell.The target resolution rules In be " certain device electricity consumption " and the second target critical item comprising first object key item be " same period last year " two target criticals Item and preset first identifier " # " and preset second identifier ", ".Can be seen that rule therein: " # " beginning represents the unit Lattice may show the data of a critical data item, if the subsequent character string of " # ", which then represents the cell comprising ", ", to open up Show the data of other times window.Judge whether the first object key item in the target resolution rules is onboard data , if so, judging whether the second target critical item is built-in accumulation type in the target resolution rules, if so, corresponding interior It sets and searches target data values corresponding with the target resolution rules in database.The process flow diagram of the above process is referring to Fig. 3.Its In, it whether is interior to each target critical item according to whether each target critical item belongs to preset internal database Data item is set to be determined.
If the target critical item is not belonging to onboard data item, judge whether the target critical item is expression formula, if so, It determines each middle entry that the target data item includes, determines data source belonging to each middle entry, the data source It can be internal database and/or external database, wherein the external database is at least one.When in the data source When comprising external database, needs to access by corresponding external data interface and extract data with external interface correspondence database Value obtains data value corresponding with each middle entry, and according to each data value, it is right with the target critical item to be calculated The target data values answered.By in each target data values write-in cell corresponding with the report template to be built, obtain Target report template to be built.
If the target critical item is not expression formula, searches in each external database and closed with the target critical item The target database of connection searches target data values corresponding with the target critical item in the target database.It will be each In a target data values write-in cell corresponding with the report template to be built, target report template to be built is obtained.On The process flow for stating process is as shown in Figure 4.
In the embodiment of the present invention, the method that simple configuration is carried out by the report template to Excel format, conversion report reality Thinking is applied, report enforcement difficulty is greatly lowered, is not necessarily to customized development.Configuration identifier in report cell, program are solved Related data is obtained after analysis and is written in cell.The mark format of configuration is flexible, extends available enriched data The ability of item.Such as: it is configured with the function of the data shaped like " 1 generated energy of # device, the same period last year " available other times window Energy;It is configured with available based on multiple data shaped like " #Index (' 1 generated energy of device ')+Index (' 2 generated energy of device ') " Item expression formula arithmetic operator value;It is configured with the data item that can be set and obtain text type shaped like " # tabulator ".Pass through expression Formula computing technique extends the ability that cell obtains data item.
In the embodiment of the present invention, based on the construction method of above-mentioned report, in the embodiment of the present invention, a kind of report is additionally provided The structural block diagram of table construction device, the construction device is as shown in Figure 5, comprising:
Obtain module 301, searching module 302, writing module 303 and conversion module 304.
Wherein,
The acquisition module 301, for obtaining each target resolution rules for including in report template to be built;
The searching module 302, for searching target data values corresponding with each target resolution rules;
The write module 303, it is corresponding with the report template to be built for being written each target data values In cell, target report template to be built is obtained;
The conversion module 304, for target report template to be built to be converted to target report.
The invention discloses a kind of construction methods of report, comprising: includes by obtaining with report template to be built Each target resolution rules, search corresponding with each resolution rules target data values, and each target data values are write Enter in cell corresponding with the report template to be built, obtains target report template to be built, the target is to be built Report template is converted to target report, in above-mentioned construction method, simply by the presence of report template to be built, so that it may automatically generate Report, do not need by application developer or have the personnel of programming experience come exploitation or implementation construct report.
In the embodiment of the present invention, the acquisition module 301 includes:
First judging unit 305, resolution unit 306, second judgment unit 307 and determination unit 308.
Wherein,
First judging unit 305, for traversing each unit lattice in the report template to be built, described in judgement It whether there is the Set cell comprising preset first identifier in each unit lattice;
The resolution unit 306, for if so, parsing the target critical item for including in the Set cell and preset Second identifier;
The second judgment unit 307, for judge the target critical item whether in preset crucial association database Key item match;
The determination unit 308 is used for if so, will be by the target critical item, the preset first identifier and described The resolution rules of preset second identifier composition are as the target resolution rules.
In the embodiment of the present invention, the searching module 302 includes:
First acquisition unit 309, third judging unit 310 and searching unit 311.
Wherein,
The first acquisition unit 309 obtains the current goal resolution rules for parsing current goal resolution rules In include target critical item;
The third judging unit 310, for judging whether the target critical item belongs to onboard data item;
The searching unit 311 is used for if so, searching in preset internal database corresponding with the target critical item Target data values.
In the embodiment of the present invention, the searching module 302 further include:
4th judging unit 312, resolution unit 313, second acquisition unit 314 and computing unit 315.
Wherein,
4th judging unit 312, for if it is not, judging whether the target critical item is expression formula;
The resolution unit 313, if so, parsing each middle entry for including in the target critical item;
The second acquisition unit 314, for obtaining data value corresponding with each middle entry;
The computing unit 315, for target corresponding with the target critical item to be calculated according to each data value Data value.
It should be noted that all the embodiments in this specification are described in a progressive manner, each embodiment weight Point explanation is the difference from other embodiments, and the same or similar parts between the embodiments can be referred to each other. For device class embodiment, since it is basically similar to the method embodiment, so being described relatively simple, related place ginseng See the part explanation of embodiment of the method.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.
For convenience of description, it is divided into various units when description apparatus above with function to describe respectively.Certainly, implementing this The function of each unit can be realized in the same or multiple software and or hardware when invention.
As seen through the above description of the embodiments, those skilled in the art can be understood that the present invention can It realizes by means of software and necessary general hardware platform.Based on this understanding, technical solution of the present invention essence On in other words the part that contributes to existing technology can be embodied in the form of software products, the computer software product It can store in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that a computer equipment (can be personal computer, server or the network equipment etc.) executes the certain of each embodiment or embodiment of the invention Method described in part.
The construction method and device of a kind of report provided by the present invention are described in detail above, it is used herein A specific example illustrates the principle and implementation of the invention, and the above embodiments are only used to help understand Method and its core concept of the invention;At the same time, for those skilled in the art is having according to the thought of the present invention There will be changes in body embodiment and application range, in conclusion the content of the present specification should not be construed as to the present invention Limitation.

Claims (10)

1. a kind of construction method of report characterized by comprising
Obtain each target resolution rules for including in report template to be built;
Search target data values corresponding with each target resolution rules;
By in each target data values write-in cell corresponding with the report template to be built, target report to be built is obtained Table template;
Target report template to be built is converted into target report.
2. the method according to claim 1, wherein further include:
Each resolution rules are stored in preset template database.
3. the method according to claim 1, wherein obtaining each target solution for including in report template to be built Analysis rule, comprising:
Each unit lattice in the report template to be built are traversed, are judged in each unit lattice with the presence or absence of comprising default First identifier Set cell;
If so, parsing the target critical item for including in the Set cell and preset second identifier;
Judge whether the target critical item matches with the key item in preset crucial association database;
If so, will be by the target critical item, the parsing of the preset first identifier and the preset second identifier composition Rule is used as the target resolution rules.
4. the method according to claim 1, wherein searching number of targets corresponding with each target resolution rules According to value, comprising:
Current goal resolution rules are parsed, the target critical item for including in the current goal resolution rules is obtained;
Judge whether the target critical item belongs to onboard data item;
If so, searching target data values corresponding with the target critical item in preset internal database.
5. according to the method described in claim 4, it is characterized by further comprising:
If it is not, judging whether the target critical item is expression formula;
If so, parsing each middle entry for including in the target critical item;
Obtain data value corresponding with each middle entry;
According to each data value, target data values corresponding with the target critical item are calculated.
6. according to the method described in claim 5, it is characterized by further comprising:
If it is not, searching and the associated target database of target critical item;
Target data values corresponding with the target critical item are searched in the target database.
7. a kind of construction device of report characterized by comprising
Module is obtained, for obtaining each target resolution rules for including in report template to be built;
Searching module, for searching target data values corresponding with each target resolution rules;
Writing module, for obtaining in each target data values write-in cell corresponding with the report template to be built To target report template to be built;
Conversion module, for target report template to be built to be converted to target report.
8. device according to claim 7, which is characterized in that the acquisition module includes:
First judging unit judges each unit lattice for traversing each unit lattice in the report template to be built In whether there is the Set cell comprising preset first identifier;
Resolution unit, for if so, parsing the target critical item for including in the Set cell and preset second identifier;
Second judgment unit, for judge the target critical item whether with the key item phase in preset crucial association database Match;
Determination unit is used for if so, will be by the target critical item, the preset first identifier and preset second mark The resolution rules of composition are known as the target resolution rules.
9. device according to claim 7, which is characterized in that the searching module includes:
First acquisition unit obtains the mesh for including in the current goal resolution rules for parsing current goal resolution rules Mark key item;
Third judging unit, for judging whether the target critical item belongs to onboard data item;
Searching unit is used for if so, searching target data corresponding with the target critical item in preset internal database Value.
10. device according to claim 9, which is characterized in that further include:
4th judging unit, for if it is not, judging whether the target critical item is expression formula;
Resolution unit, if so, parsing each middle entry for including in the target critical item;
Second acquisition unit, for obtaining data value corresponding with each middle entry;
Computing unit, for target data values corresponding with the target critical item to be calculated according to each data value.
CN201811345821.3A 2018-11-13 2018-11-13 A kind of construction method and device of report Pending CN109446507A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811345821.3A CN109446507A (en) 2018-11-13 2018-11-13 A kind of construction method and device of report

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811345821.3A CN109446507A (en) 2018-11-13 2018-11-13 A kind of construction method and device of report

Publications (1)

Publication Number Publication Date
CN109446507A true CN109446507A (en) 2019-03-08

Family

ID=65552214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811345821.3A Pending CN109446507A (en) 2018-11-13 2018-11-13 A kind of construction method and device of report

Country Status (1)

Country Link
CN (1) CN109446507A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122899A (en) * 2007-09-18 2008-02-13 杭州华三通信技术有限公司 Report generation method and device
CN103034553A (en) * 2012-12-20 2013-04-10 厦门亿力吉奥信息科技有限公司 Intelligent verification algorithm, method and device for report designer
CN103778234A (en) * 2014-01-26 2014-05-07 北京恒华伟业科技股份有限公司 Report form generating method and device
US20150026178A1 (en) * 2013-07-18 2015-01-22 International Business Machines Corporation Subject-matter analysis of tabular data
CN105868196A (en) * 2015-01-21 2016-08-17 张家口沪东电子科技有限公司 Method for generating industrial data report in server
CN105868170A (en) * 2015-01-21 2016-08-17 上海可鲁***软件有限公司 Method for generating industrial data report in server
WO2018161402A1 (en) * 2017-03-10 2018-09-13 深圳市科脉技术股份有限公司 Method and system for processing modular packaged reports

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101122899A (en) * 2007-09-18 2008-02-13 杭州华三通信技术有限公司 Report generation method and device
CN103034553A (en) * 2012-12-20 2013-04-10 厦门亿力吉奥信息科技有限公司 Intelligent verification algorithm, method and device for report designer
US20150026178A1 (en) * 2013-07-18 2015-01-22 International Business Machines Corporation Subject-matter analysis of tabular data
CN103778234A (en) * 2014-01-26 2014-05-07 北京恒华伟业科技股份有限公司 Report form generating method and device
CN105868196A (en) * 2015-01-21 2016-08-17 张家口沪东电子科技有限公司 Method for generating industrial data report in server
CN105868170A (en) * 2015-01-21 2016-08-17 上海可鲁***软件有限公司 Method for generating industrial data report in server
WO2018161402A1 (en) * 2017-03-10 2018-09-13 深圳市科脉技术股份有限公司 Method and system for processing modular packaged reports

Similar Documents

Publication Publication Date Title
Xue et al. BIM integrated LCA for promoting circular economy towards sustainable construction: an analytical review
US6687713B2 (en) Budget information, analysis, and projection system and method
CN101477549B (en) Knowledge base supported spatial database design method and system
CN101930481B (en) Method used for generating CIM model describing power grid change in designated time slot and system thereof
CN102023983B (en) Managing method of statistical space-time database
CN109784689B (en) Power grid infrastructure project report data processing method
CN104750496B (en) A kind of model changes disturbance degree automatic check method
CN106156090A (en) A kind of designing for manufacturing knowledge personalized push method of knowledge based collection of illustrative plates (Man-tree)
CN104318481A (en) Power-grid-operation-oriented holographic time scale measurement data extraction conversion method
CN106529028A (en) Technological procedure automatic generating method
CN100485612C (en) Software requirement acquiring system
CN104978411A (en) Train model development method and apparatus for high-speed train
CN103092631A (en) Database application system development platform and development method
CN106325833B (en) A kind of code generating method for enterprise information management
Martínez‐Rojas et al. An approach for the automatic classification of work descriptions in construction projects
CN105760633A (en) Green architectural design method applicable to information assistance
CN108776678A (en) Index creation method and device based on mobile terminal NoSQL databases
CN106354799A (en) Subject data set multi-layer facet filtration method and system based on data quality
CN111046476A (en) Method and system for coding information model and exchanging data of building foundation pit component
CN103020283B (en) A kind of semantic retrieving method of the dynamic restructuring based on background knowledge
CN111126461B (en) Intelligent auditing method based on machine learning model interpretation
Dias et al. A method for the identification of collaboration in large scientific databases
CN102508971A (en) Method for establishing product function model in concept design stage
CN106250456A (en) Bid winning announcement extraction method and device
CN101963993A (en) Method for fast searching database sheet table record

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190308

RJ01 Rejection of invention patent application after publication