CN109441016A - Prefabricated concrete structure column steel pipe socket shell ring point and preparation method thereof - Google Patents
Prefabricated concrete structure column steel pipe socket shell ring point and preparation method thereof Download PDFInfo
- Publication number
- CN109441016A CN109441016A CN201811563804.7A CN201811563804A CN109441016A CN 109441016 A CN109441016 A CN 109441016A CN 201811563804 A CN201811563804 A CN 201811563804A CN 109441016 A CN109441016 A CN 109441016A
- Authority
- CN
- China
- Prior art keywords
- prop
- substrate
- upper prop
- vertical muscle
- connection component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 32
- 239000010959 steel Substances 0.000 title claims abstract description 32
- 239000004567 concrete Substances 0.000 title claims abstract description 28
- 238000002360 preparation method Methods 0.000 title abstract description 5
- 239000000758 substrate Substances 0.000 claims abstract description 101
- 210000003205 muscle Anatomy 0.000 claims abstract description 74
- 239000002002 slurry Substances 0.000 claims abstract description 17
- 239000011374 ultra-high-performance concrete Substances 0.000 claims abstract description 7
- 238000013461 design Methods 0.000 claims abstract description 6
- 238000004519 manufacturing process Methods 0.000 claims description 8
- 239000004574 high-performance concrete Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 17
- 238000009434 installation Methods 0.000 abstract description 4
- 230000003014 reinforcing effect Effects 0.000 description 11
- 239000000463 material Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 230000002787 reinforcement Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 230000033228 biological regulation Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 239000011372 high-strength concrete Substances 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 238000007569 slipcasting Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229920002472 Starch Polymers 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The invention discloses a kind of prefabricated concrete structure column steel pipe socket shell ring points and preparation method thereof, the lower prop connection component of node includes lower substrate and lower column connecting pipe, the lower end of lower column connecting pipe is connected to the upper surface of lower substrate, the lower surface of lower substrate is carried on the upper surface of lower prop, and the reserved vertical muscle of lower prop passes through the vertical muscle hole of lower substrate;Upper prop connection component includes upper substrate, upper prop outer tube and the upper prop inner tube for being entrenched in upper prop outer tube, the lower surface of the upper surface connection upper prop of upper substrate, the reserved vertical muscle of upper prop passes through the vertical muscle hole of upper substrate, the upper end of upper prop outer tube is connected to the lower surface of upper prop substrate, the outer profile of upper prop outer tube is in the outer profile design for adapting to lower substrate, the lower end of upper prop outer tube is connected at the top surface edge of lower substrate, and lower column connecting pipe enters the inner space of upper prop inner tube, the side of upper prop connection component can inject ultra-high performance concrete slurry to form node.The present invention is easy for installation rapidly, can substantially reduce construction time and operation difficulty.
Description
Technical field
The invention patent belongs to prefabricated concrete structure field in civil engineering, is related to a kind of easy for installation rapid, energy
The construction time is substantially reduced, prefabricated concrete structure column steel pipe socket shell ring point of efficiency of construction and preparation method thereof is improved.
Background technique
Assembled architecture has the function of design diversity, modernization, technicalization, production (production) industrialization, construction assembly
The advantages that change, time optimization, systematization, the more personalized and cost of design and efficiency are optimised, develops assembled architecture
It is the important channel for realizing building industrialization, is the direction of China's future architecture industry development, and the heat currently studied both at home and abroad
One of point problem, and the switching performance of prefabricated components intermediate node is the key that influence integrality performance of the structure.
China " prefabricated concrete structure technical regulation " (JGJ1-2014) (referred to as " regulation ") suggestion vertical member (wall,
Column) connection type mainly have reinforcing bar grouting connection and reinforcing bar slurry anchor overlap joint connection etc. modes.Overhanging steel is also reserved in engineering
Muscle forms the concrete joint of assembled integral by rear pouring concrete.
Reinforcing bar grouting connection and reinforcing bar slurry anchor overlap joint connection need in advance to reserve the reinforcing bar of column both ends or one end one section with
Just it docks, however this method is higher to required precision, it is desirable that two end bars or the necessary centering of reinforcing bar and reserving hole, especially
When overlap joint number of steel bars is numerous, grouting connection and reinforcing bar are anchored quality and are difficult to ensure.
The shortcomings that overcome the above technology, the present invention propose the node between a kind of Novel steel telescoping column and column, this section
The square steel sleeve of column one end need to be only inserted into the sleeve of another styletable by point, then be filled out with high-strength grout, in connecting node
The effect of the mutual mechanical snap of concrete and the protrusion being welded in sleeve (shear connector) can guarantee the enough shearing resistance carryings of node
Power.It avoids traditional reinforcing bar grout sleeve connection from needing the process of a large amount of apertures and check and correction hole, decreases the wave of construction auxiliary material
Take.
Summary of the invention
It is easy for installation rapidly that the object of the present invention is to provide one kind, can substantially reduce construction time and operation difficulty, raising
Prefabricated concrete structure column steel pipe socket shell ring point of efficiency of construction and preparation method thereof.
To achieve the goals above, technical solution provided by the invention are as follows: the invention discloses a kind of assembly concretes
Structural column steel pipe socket shell ring point, the node include:
Lower prop connection component, the lower prop connection component include lower substrate and lower column connecting pipe, the lower column connecting pipe
Lower end is connected at the upper face center of the lower substrate, and the lower surface of the lower substrate is carried on the upper surface of lower prop, described
The reserved vertical muscle of lower prop passes through the vertical muscle hole of the lower substrate;
Upper prop connection component, the upper prop connection component include upper substrate, upper prop outer tube and are entrenched in the upper prop outer tube
Internal upper prop inner tube, the lower surface of the upper surface connection upper prop of the upper substrate, the reserved vertical muscle of the upper prop passes through described
The vertical muscle hole of upper substrate, the upper end of the upper prop outer tube are connected to the lower surface of the upper prop substrate, the upper prop outer tube it is outer
For profile in the outer profile design for adapting to the lower substrate, the lower end of the upper prop outer tube is connected to the upper surface side of the lower substrate
At edge, and the lower column connecting pipe enters the inner space of the upper prop inner tube, and the side of the upper prop connection component can be injected
Ultra-high performance concrete slurry is to form the node.
Fluted, the lower end insertion of the upper prop connection component is opened up around the circle of upper surface outer edge one of the lower substrate
It is attached in the groove.
The vertical muscle that the reserved vertical muscle of the upper prop and lower prop are reserved is equipped with external screw thread, and is every reserved vertical muscle configuration two
A stop nut, and the upper substrate and lower substrate are limited by the stop nut respectively.
Several first lateral projections are equably laid with along the lower column connecting pipe outer wall longitudinal gap, and described first is horizontal
To protrusion in being arranged for outer wall one week around the lower column connecting pipe.
Several second lateral projections are equably laid with along the upper prop inner tube wall longitudinal gap, and described second is lateral
Protrusion in being arranged around the upper prop inner tube for inner wall one week.
The side lower end of the upper prop outer tube is equipped with injected hole, and upper end is equipped with slurry outlet.
To achieve the goals above, the invention also discloses a kind of systems of prefabricated concrete structure column steel pipe socket shell ring point
Make method, includes the following steps:
The lower surface of the lower substrate of the lower prop connection component is carried on the upper surface of lower prop, and passed through by step 1
The lower surface of the lower substrate is connected to the lower prop by the vertical muscle hole that the reserved vertical muscle of the lower prop passes through the lower substrate
Upper surface;
Step 2, the lower surface that the upper surface of the upper substrate of the upper prop connection component is connected to the upper prop, it is described on
The lower end of column outer tube is connected at the top surface edge of the lower substrate, and the lower column connecting pipe enters the upper prop inner tube
Inner space, the upper prop connection component are injected laterally ultra-high performance concrete slurry to form the node.
In step 1, further includes: the vertical muscle for reserving the lower prop makes external screw thread, and the reserved vertical muscle of the lower prop passes through
When the vertical muscle hole of the lower substrate, by configuring stop nut on the vertical muscle that the lower prop is reserved, and pass through the limit spiral shell
Mother limits the lower substrate;
In step 2, further includes: the vertical muscle for reserving the upper prop makes external screw thread, and the reserved vertical muscle of the upper prop passes through
When the vertical muscle hole of the upper substrate, by configuring stop nut on the vertical muscle that the upper prop is reserved, and pass through the limit spiral shell
Mother limits the upper substrate.
Beneficial effects of the present invention:
Node connection of the present invention is easy, then upper prop connection component need to be only aligned in splicing by scene with lower prop connection component
Inject grouting material.Reduce a large amount of reinforcing bar reserving hole and steel reinforcement abutting joints process, thus reinforced hole when solving anchor slurry connector
Hole misalignment and bring construction is inconvenient and safety problem.
The present invention inherits the advantages of assembled architecture, precast concrete column pour and the production of steel bushing node is all
It is completed in factory, scene only need to carry out a small amount of construction operation, and it is time saving and energy saving, avoid live welding for steel structure, bolt connects
The process connect.
Steel bushing pipe node can substitute permanent template of the wooden form as rear pouring concrete in the present invention, reduce construction
Expense and difficulty of construction avoid the waste to construction auxiliary material.
Steel bushing pipe node can be referred to as " Qiang Jiedian ", meet Qiang Jiedian in engineering compared with concrete in the present invention,
The earthquake-resistant structure requirement of " weak component ".
Through the following description and in conjunction with the attached drawings, the present invention will become more fully apparent, these attached drawings are used to explain the present invention
Embodiment.
Detailed description of the invention
Fig. 1 show the schematic diagram of the lower prop connection component of prefabricated concrete structure column steel pipe socket shell ring point of the present invention.
Fig. 2 show the schematic diagram of the upper prop connection component of prefabricated concrete structure column steel pipe socket shell ring point of the present invention.
Fig. 3 show the schematic diagram of the section structure of prefabricated concrete structure column steel pipe socket shell ring point of the present invention.
Specific embodiment
The embodiment of the present invention described referring now to the drawings, similar element numbers represent similar element in attached drawing.Such as
Upper described, with reference to 1,2,3, the embodiment of the invention discloses a kind of prefabricated concrete structure column steel pipe socket shell ring point, the sections
It puts and includes:
Lower prop connection component 10, the lower prop connection component 10 include lower substrate 1 and lower column connecting pipe 2, and the lower prop connects
The lower end of adapter tube 2 is connected at the upper face center of the lower substrate 1, and the lower surface of the lower substrate 1 is carried on the upper of lower prop 3
Surface, and be equipped with vertical muscle hole (not showing on figure) through the upper surface and the lower surface of the lower substrate 1, the reserved vertical muscle of the lower prop
4 pass through the vertical muscle hole of the lower substrate 1;The lower column connecting pipe 2 of the lower prop connection component 10 as shown in Figure 1 is steel
Structural tube, the lower substrate 1 is equally steel baseplate, and the lower column connecting pipe 2 is welded on the lower substrate 1, and described
The position that the corresponding vertical muscle of lower substrate 1 stretches out opens up the vertical muscle hole of the lower substrate 1, to allow the vertical muscle to pass through institute
The vertical muscle hole of lower substrate 1 is stated, so that the lower substrate 1 is well secured to the upper surface of the lower prop 3.
Upper prop connection component 20, the upper prop connection component 20 include upper substrate 15, upper prop outer tube 5 and are entrenched on described
Upper prop inner tube 6 inside column outer tube 5, the lower surface of the upper surface connection upper prop 16 of the upper substrate 15, what the upper prop was reserved
Vertical muscle 17 passes through the vertical muscle hole of the upper substrate 15, and the upper end of the upper prop outer tube 5 is connected to the following table of the upper prop substrate 15
Face, the outer profile of the upper prop outer tube 5 is in the outer profile design for adapting to the lower substrate 1, the lower end connection of the upper prop outer tube 5
At the top surface edge of the lower substrate 1, and the lower column connecting pipe 2 enters the inner space of the upper prop inner tube 6, described
The side of upper prop connection component 20 can inject ultra-high performance concrete slurry to form the node.It is as shown in Figure 2 it is described on
Column connection component 20, the upper prop outer tube 5 and upper prop inner tube 6 are steel structure pipes, and the upper prop inner tube 6 is welded on described
It is attached at the inner wall of column outer tube 5.Since the outer profile of the upper prop outer tube 5 is set in the outer profile for adapting to the lower substrate 1
Meter, therefore, when the lower end of the upper prop outer tube 5 is connected at the top surface edge of the lower substrate 1, the lower prop connection component
10 and upper prop connection component 20 connect after, the effect of adaptability transition can be played.
With reference to Fig. 1, the circle of upper surface outer edge one around the lower substrate 1 opens up fluted 7, the upper prop connection component
20 lower end is inserted into the groove 7 and is attached.The shape of the groove 7 is in the outer profile with the upper prop connection component 20
The adaptable setting of shape.The groove 7, which is arranged, can greatly facilitate the fixed and positioned of the upper prop connection component 20, and
Also it can be improved the connection concertedness between the upper prop connection component 20 and the lower prop connection component 10.Specifically, described
The lower end of the upper prop outer tube 5 of upper prop connection component 20 is inserted into the groove 7 and is attached, and the shape of the groove 7 is in
It is adapted with the outer contour shape of the upper prop outer tube 5.So set, the upper prop connection component 20 is enabled to be lifted on institute
When stating on lower prop connection component 10, can be realized it is quick, accurate, position securely, in next step operate, get ready.
With reference to Fig. 1, the vertical muscle 4 that the reserved vertical muscle 17 of the upper prop and lower prop are reserved is equipped with external screw thread, and pre- for every
It stays vertical muscle to configure two stop nuts 8, and the upper substrate 15 and lower substrate 1 is limited by the stop nut 8 respectively
Position.Specifically, the reserved vertical muscle 17 of the upper prop is equipped with external screw thread, and the reserved vertical muscle 17 of the upper prop passes through the upper substrate 1
Vertical muscle hole when, by the lower prop reserve vertical muscle 4 on configuration two stop nuts 8 lower substrate 15 is consolidated
Fixed, the lower substrate 15 is limited between two stop nuts 8.It should be noted that the vertical muscle 17 that the upper prop is reserved
End be arranged external screw thread, to be threadedly coupled between two stop nuts 8, and the upper substrate 15 is limited in institute
It states between two stop nuts 8.It so can greatly reinforce connecting between the upper prop connection component 20 and upper prop 16
Concertedness, it is ensured that the phenomenon that node accurate positioning during the installation process is not in displacement.
Similarly, the reserved vertical muscle 4 of the lower prop is equipped with external screw thread, and the reserved vertical muscle 4 of the lower prop passes through the lower substrate 1
Vertical muscle hole when, by the lower prop reserve vertical muscle 4 on configuration two stop nuts 8 lower substrate 1 is fixed,
The lower substrate 1 is limited between two stop nuts 8.It should be noted that the end for the vertical muscle 4 that the lower prop is reserved
External screw thread is set, to be threadedly coupled between two stop nuts 8, and the lower substrate 1 is limited in described two
Between stop nut 8.It so can greatly reinforce the concertedness connecting between the lower prop connection component 10 and lower prop 3,
The phenomenon that ensuring node accurate positioning during the installation process, being not in displacement.
With reference to Fig. 1 and Fig. 3, it is laterally convex that several first are equably laid with along the lower 2 outer wall longitudinal gap of column connecting pipe
12 are played, and first lateral projection 12 is in being arranged for outer wall one week around the lower column connecting pipe 2.It should be noted that described
The section of lower column connecting pipe 2 can be round or rectangle, and therefore, the shape of first lateral projection 12 should will adapt to institute
The shape setting of lower column connecting pipe 2 is stated, and material can be regular reinforcement, and be welded on the outer wall of the lower column connecting pipe 2
On.
With reference to Fig. 2 and 3, several second lateral projections 11 are equably laid with along the 6 inner wall longitudinal gap of upper prop inner tube,
And second lateral projection 11 is in being arranged for inner wall one week around the upper prop inner tube 6.It should be noted that the upper prop inner tube
6 interior shape can be round or rectangle, and therefore, the shape of second lateral projection 11 should will adapt to the upper prop
The shape of inner tube 6 is arranged, and material can be regular reinforcement, and be welded on the inner wall of the upper prop inner tube 6.
It should be noted that by be arranged on the outer wall of the lower column connecting pipe 2 first lateral projection 12 and it is described on
Second lateral projection 11 is set on the inner wall of column inner tube 6, and first lateral projection 12 and second lateral projection 11 are equal
It can be welded in advance in factory, therefore after cement slurry pours into the node and conserves molding, can greatly improve node
Longitudinal draw knot force, be particularly suitable in the pipeline of ocean engineering or the pillar of high-rise, because of two kinds of applied fields
Pillar in conjunction may due to wave or wind-force effect and by biggish load, and in skyscraper, top post
It may be similarly subjected to great pulling force at node, therefore need since wind-force or seismic factors are by by great pulling force
Want can the great node of tensile strength, can guarantee the safety of node, and node of the invention is due to being provided with described
One lateral projection 12 and the second lateral projection 11 when being used cooperatively with super high strength concrete, act on energy by mutual mechanical snap
Biggish tensile bearing capacity is enough provided, to guarantee that improving node has enough intensity.
It should be noted that the section of first lateral projection 12 and the second lateral projection 11 may each be it is round or
Rectangular protrusion can be welded on the outer wall of the lower column connecting pipe 2 by reinforcing bar coiling into shape is adapted to,
And it is welded on the inner wall of the upper prop inner tube 6.
In one embodiment, as shown in Fig. 2, the side lower end of the upper prop outer tube 5 is equipped with injected hole 13, upper end is equipped with
Starch hole 14.When to intra-node slip casting, ultra-high performance concrete slurry is injected from the injected hole 13, it is ensured that the high property of injection
Energy concrete slurry can fill the entire space of full node, then come out from the slurry outlet 14, can stop slip casting.
To achieve the goals above, the embodiment of the invention also discloses a kind of prefabricated concrete structure column steel pipe socket shell rings
The production method of point, includes the following steps:
Step 1, the lower column connecting pipe that outer wall is equably laid with to first lateral projection be welded in it is described under
On substrate, and open up on the lower substrate the vertical muscle of the lower substrate of the upper surface and the lower surface through the lower substrate
The lower surface of the lower substrate, is carried on the upper surface of lower prop by hole, and by the vertical muscle that the lower prop is reserved pass through it is described under
The lower substrate is bolted in the upper surface of the lower prop by the vertical muscle hole of substrate;It should be noted that described first is lateral
Protrusion is regular reinforcement, and is welded on the outer wall of the lower column connecting pipe, and above each step can be made in advance in factory
Make, and transported after factory makes to construction site, the vertical muscle that the lower prop is reserved passes through the vertical muscle of the lower substrate
The lower surface of the lower substrate is connected to the upper surface of the lower prop by hole, so, it is understood that the lower prop connection group
The in-site installation of part is very simple and efficient, significantly reduces field operation difficulty and labor intensity, and the scene of substantially increasing is
The efficiency of confession.
Step 2, the lower surface that the upper surface of the upper substrate of the upper prop connection component is connected to the upper prop, it is described on
The lower end of column outer tube is connected at the top surface edge of the lower substrate, and the lower column connecting pipe enters the upper prop inner tube
Inner space, the upper prop connection component are injected laterally ultra-high performance concrete slurry to form the node.
It should be noted that the upper prop inner tube welds the second lateral projection, second lateral projection is regular reinforcement,
And it is welded at the inside of the upper prop inner tube, above each step can be made in factory's pre-production in factory
It is transported later to construction site, is directly lifted on upper prop on the lower prop connection component together with the upper prop connection component, and
And it is fluted due to being arranged on the lower substrate, it is convenient for fixed and connects.
It should be noted that the upper prop connection component includes upper prop inner tube and upper prop outer tube, the upper prop inner tube be
Factory is welded in the upper prop outer tube in advance.
Connected it should be noted that the lower end of the upper prop outer tube of the upper prop connection component is inserted into the groove
It connects, the shape of the groove is in be adapted with the outer contour shape of the upper prop outer tube.So set, enabling to the upper prop
When connection component is lifted on the lower prop connection component, can be realized it is quick, accurate, position securely, in next step operate,
It gets ready.
It should be noted that the vertical muscle that can in advance reserve the lower prop makes external screw thread, the lower prop is reserved to be indulged
When muscle passes through the vertical muscle hole of the lower substrate, by the vertical muscle that the lower prop is reserved two stop nuts of configuration under described
Substrate is fixed, and the lower substrate is limited between described two stop nuts.Similarly, the upper prop is reserved in advance
Vertical muscle makes external screw thread, when the reserved vertical muscle of the upper prop passes through the vertical muscle hole of the upper substrate, by reserved in the upper prop
Vertical muscle on configuration two stop nuts the upper substrate is fixed, the upper substrate is limited in described two limit spiral shells
Between mother.
It should be noted that by the way that the first lateral projection and the upper prop is arranged on the outer wall of the lower column connecting pipe
Second lateral projection is set on the inner wall of inner tube, and first lateral projection and second lateral projection can exist in advance
Factory's welding, therefore after cement slurry pours into the node and conserves molding, it can greatly improve longitudinal drawknot of node
Power is particularly suitable in the pipeline of ocean engineering or the pillar of high-rise, because of the pillar in two kinds of applications
May due to wave or wind-force effect and by biggish load, and in skyscraper, top post may be due to
Wind-force or seismic factors are similarly subjected to great pulling force at node, it is therefore desirable to being capable of tension by by great pulling force
The node of intensity maximum can guarantee the safety of node, and node of the invention is due to being provided with first lateral projection
With the second lateral projection, when being used cooperatively with super high strength concrete, it is capable of providing by the effect of mutual mechanical snap biggish anti-
Bearing capacity is drawn, to guarantee that improving node has enough intensity.
It should be noted that the section of first lateral projection and the second lateral projection may each be round or rectangular
Protrusion, can directly be by reinforcing bar coiling into adapt to shape, be welded on the outer wall of the lower column connecting pipe, and weldering
It connects on the inner wall of the upper prop inner tube.
In the production method of prefabricated concrete structure column steel pipe socket shell ring point provided by the invention, significantly reduces and apply
Expenses of labour is used and difficulty of construction, substantially increases construction efficiency, simultaneously because upper prop connection outer tube through the invention is under
Column connects inner tube and forms the cooperation of the protrusion in cavity, also avoids avoiding using outer wooden template to construction auxiliary material
Waste.
The above disclosure is only a preferred embodiment of the invention, cannot limit the right of the present invention with this certainly
Range, therefore according to equivalent variations made by scope of the present invention patent, it is still within the scope of the present invention.
Claims (8)
1. a kind of prefabricated concrete structure column steel pipe socket shell ring point, which is characterized in that the node includes:
Lower prop connection component, the lower prop connection component include lower substrate and lower column connecting pipe, the lower end of the lower column connecting pipe
It is connected at the upper face center of the lower substrate, the lower surface of the lower substrate is carried on the upper surface of lower prop, the lower prop
Reserved vertical muscle passes through the vertical muscle hole of the lower substrate;
Upper prop connection component, the upper prop connection component include upper substrate, upper prop outer tube and are entrenched in the upper prop outer tube
Upper prop inner tube, the lower surface of the upper surface connection upper prop of the upper substrate, the reserved vertical muscle of the upper prop passes through the upper base
The vertical muscle hole of plate, the upper end of the upper prop outer tube are connected to the lower surface of the upper prop substrate, the outer profile of the upper prop outer tube
In the outer profile design for adapting to the lower substrate, the lower end of the upper prop outer tube is connected to the top surface edge of the lower substrate
Place, and the lower column connecting pipe enters the inner space of the upper prop inner tube, the side of the upper prop connection component can be injected super
High performance concrete slurry is to form the node.
2. prefabricated concrete structure column steel pipe socket shell ring point as described in claim 1, which is characterized in that around the lower substrate
The circle of upper surface outer edge one open up fluted, the lower end of the upper prop connection component is inserted into the groove and is attached.
3. prefabricated concrete structure column steel pipe socket shell ring point as described in claim 1, which is characterized in that the upper prop is reserved
Vertical muscle and the reserved vertical muscle of lower prop be equipped with external screw thread, and configure two stop nuts for every reserved vertical muscle, and lead to respectively
The stop nut is crossed to limit the upper substrate and lower substrate.
4. prefabricated concrete structure column steel pipe socket shell ring point as described in claim 1, which is characterized in that connect along the lower prop
Adapter tube outer wall longitudinal gap is equably laid with several first lateral projections, and first lateral projection is in connect around the lower prop
Outer wall one week of adapter tube is arranged.
5. prefabricated concrete structure column steel pipe socket shell ring point as claimed in claim 4, which is characterized in that along the upper prop
Inside pipe wall longitudinal gap is equably laid with several second lateral projections, and second lateral projection is in around the upper prop inner tube
Inner wall one week be arranged.
6. prefabricated concrete structure column steel pipe socket shell ring point as claimed in claim 5, which is characterized in that the upper prop outer tube
Side lower end be equipped with injected hole, upper end be equipped with slurry outlet.
7. a kind of production method of prefabricated concrete structure column steel pipe socket shell ring point as claimed in claim 6, feature exist
In including the following steps:
Step 1, the upper surface that the lower surface of the lower substrate of the lower prop connection component is carried on to lower prop, and by described
The lower surface of the lower substrate is connected to the upper table of the lower prop by the vertical muscle hole that the reserved vertical muscle of lower prop passes through the lower substrate
Face;
Step 2, the lower surface that the upper surface of the upper substrate of the upper prop connection component is connected to the upper prop, outside the upper prop
The lower end of pipe is connected at the top surface edge of the lower substrate, and the lower column connecting pipe enters the inside of the upper prop inner tube
Space, the upper prop connection component are injected laterally ultra-high performance concrete slurry to form the node.
8. production method as claimed in claim 7, which is characterized in that
In step 1, further includes: the vertical muscle for reserving the lower prop makes external screw thread, and the reserved vertical muscle of the lower prop passes through described
When the vertical muscle hole of lower substrate, by configuring stop nut on the vertical muscle that the lower prop is reserved, and pass through the stop nut pair
The lower substrate is limited;
In step 2, further includes: the vertical muscle for reserving the upper prop makes external screw thread, and the reserved vertical muscle of the upper prop passes through described
When the vertical muscle hole of upper substrate, by configuring stop nut on the vertical muscle that the upper prop is reserved, and pass through the stop nut pair
The upper substrate is limited.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811563804.7A CN109441016B (en) | 2018-12-20 | 2018-12-20 | Assembled concrete structure column steel tube sleeve joint and manufacturing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811563804.7A CN109441016B (en) | 2018-12-20 | 2018-12-20 | Assembled concrete structure column steel tube sleeve joint and manufacturing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109441016A true CN109441016A (en) | 2019-03-08 |
CN109441016B CN109441016B (en) | 2024-03-22 |
Family
ID=65559358
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811563804.7A Active CN109441016B (en) | 2018-12-20 | 2018-12-20 | Assembled concrete structure column steel tube sleeve joint and manufacturing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109441016B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113737945A (en) * | 2021-09-17 | 2021-12-03 | 上海大学 | Prefabricated assembled column connection node with hoop steel sleeve plate |
CN114319980A (en) * | 2021-11-23 | 2022-04-12 | 中国能源建设集团安徽省电力设计院有限公司 | Steel pipe concrete and steel pipe conversion node suitable for large-scale power transmission tower |
CN114658097A (en) * | 2022-03-31 | 2022-06-24 | 上海市机械施工集团有限公司 | Combined structure and construction method thereof |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU62622U1 (en) * | 2005-07-19 | 2007-04-27 | Открытое Акционерное Общество "Ленстройдеталь" | REINFORCED REINFORCED CONCRETE STRUCTURE OF A MULTI-STOREY BUILDING, FRAMEWORK CONSTRUCTION OF A FRAME, INTERIOR ELEMENT |
CN205134738U (en) * | 2015-11-02 | 2016-04-06 | 上海市机械施工集团有限公司 | Precast concrete post |
CN106381926A (en) * | 2016-10-28 | 2017-02-08 | 湖南大学 | Detachable assembly type splicing node for reinforced concrete columns |
CN106760054A (en) * | 2017-03-01 | 2017-05-31 | 同济大学 | Precast reinforced concrete shear wall |
CN107327020A (en) * | 2017-07-06 | 2017-11-07 | 能诚集团有限公司 | A kind of concrete component attachment structure |
CN206646642U (en) * | 2016-12-27 | 2017-11-17 | 北京智慧云建科技有限公司 | A kind of assembled architecture post and column connected node |
CN206769051U (en) * | 2017-04-14 | 2017-12-19 | 陈思萍 | A kind of assembled integral column connected node |
CN107989186A (en) * | 2017-11-29 | 2018-05-04 | 厦门合立道工程设计集团股份有限公司 | A kind of prefabricated concrete structure primary steel feather joint node and its construction method |
CN209227902U (en) * | 2018-12-20 | 2019-08-09 | 深圳大学 | Prefabricated concrete structure column steel pipe socket shell ring point |
-
2018
- 2018-12-20 CN CN201811563804.7A patent/CN109441016B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU62622U1 (en) * | 2005-07-19 | 2007-04-27 | Открытое Акционерное Общество "Ленстройдеталь" | REINFORCED REINFORCED CONCRETE STRUCTURE OF A MULTI-STOREY BUILDING, FRAMEWORK CONSTRUCTION OF A FRAME, INTERIOR ELEMENT |
CN205134738U (en) * | 2015-11-02 | 2016-04-06 | 上海市机械施工集团有限公司 | Precast concrete post |
CN106381926A (en) * | 2016-10-28 | 2017-02-08 | 湖南大学 | Detachable assembly type splicing node for reinforced concrete columns |
CN206646642U (en) * | 2016-12-27 | 2017-11-17 | 北京智慧云建科技有限公司 | A kind of assembled architecture post and column connected node |
CN106760054A (en) * | 2017-03-01 | 2017-05-31 | 同济大学 | Precast reinforced concrete shear wall |
CN206769051U (en) * | 2017-04-14 | 2017-12-19 | 陈思萍 | A kind of assembled integral column connected node |
CN107327020A (en) * | 2017-07-06 | 2017-11-07 | 能诚集团有限公司 | A kind of concrete component attachment structure |
CN107989186A (en) * | 2017-11-29 | 2018-05-04 | 厦门合立道工程设计集团股份有限公司 | A kind of prefabricated concrete structure primary steel feather joint node and its construction method |
CN209227902U (en) * | 2018-12-20 | 2019-08-09 | 深圳大学 | Prefabricated concrete structure column steel pipe socket shell ring point |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113737945A (en) * | 2021-09-17 | 2021-12-03 | 上海大学 | Prefabricated assembled column connection node with hoop steel sleeve plate |
CN114319980A (en) * | 2021-11-23 | 2022-04-12 | 中国能源建设集团安徽省电力设计院有限公司 | Steel pipe concrete and steel pipe conversion node suitable for large-scale power transmission tower |
CN114658097A (en) * | 2022-03-31 | 2022-06-24 | 上海市机械施工集团有限公司 | Combined structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109441016B (en) | 2024-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108643367B (en) | A kind of connection structure and connection method of precast reinforced concrete beam column | |
CN106284655B (en) | Precast concrete beam stud connects connecting node and connection method | |
CN103758291B (en) | A kind of shearing enhancement mode half grout sleeve | |
CN109441016A (en) | Prefabricated concrete structure column steel pipe socket shell ring point and preparation method thereof | |
CN205206033U (en) | Frame post connected node suitable for prefabricated assembly building | |
CN108412128A (en) | A kind of connection structure of steel core concrete column | |
CN109025064A (en) | Method for manufacturing and installing prefabricated concrete column and column assembly type connecting node | |
CN105926775A (en) | Novel concrete-filled steel tube beam column joint | |
CN206279628U (en) | A kind of precast concrete reinforcing bar grouting connecting structure | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN108951847B (en) | UHPC-based precast concrete frame structure system and construction method thereof | |
CN107059911A (en) | A kind of prefabricated assembled basis and its assemble method | |
CN105019606A (en) | Precast concrete unit steel bar grouting connecting piece and connecting method | |
CN110593303B (en) | Prefabricated reinforced concrete fixed buttress for thermal pipeline and construction method | |
CN105350641A (en) | Frame column connecting node suitable for prefabricating and assembling building, and construction process thereof | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN209227902U (en) | Prefabricated concrete structure column steel pipe socket shell ring point | |
CN208763204U (en) | A kind of vertical connecting structure of low layer assembled architecture prefabricated panel | |
CN106149878A (en) | Attachment structure at concrete frame structure prefabricated post and beam slab node and method | |
CN102561600A (en) | Steel bar splicing sleeve | |
CN106149877A (en) | Docking structure at concrete frame structure prefabricated post and beam slab node and method | |
CN206844316U (en) | A kind of assembled steel reinforced concrete column with well and post splicing node | |
CN108677731B (en) | Rotary splicing structure and splicing method for capping beam and pier | |
CN104196023A (en) | Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip | |
CN204456670U (en) | Fabricated construction straight screw sleeve connection joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |