CN109440802A - The tamper dentiform pile and its construction method haveing excellent performance - Google Patents

The tamper dentiform pile and its construction method haveing excellent performance Download PDF

Info

Publication number
CN109440802A
CN109440802A CN201811595209.1A CN201811595209A CN109440802A CN 109440802 A CN109440802 A CN 109440802A CN 201811595209 A CN201811595209 A CN 201811595209A CN 109440802 A CN109440802 A CN 109440802A
Authority
CN
China
Prior art keywords
pile
tooth
tamper
dentiform
trapezoidal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811595209.1A
Other languages
Chinese (zh)
Inventor
郭兆泉
胡靚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811595209.1A priority Critical patent/CN109440802A/en
Publication of CN109440802A publication Critical patent/CN109440802A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of tamper dentiform pile haveing excellent performance and its construction method, which includes pile body, and several stepped tooths are equipped at intervals on pile body, and stepped tooth is that trapezoidal narrow tooth or trapezoidal wide tooth are alternately distributed with trapezoidal narrow tooth.Ultimate bearing capacity of single pile of the present invention improves significant, and more conventional tubular pole improves 60% or more, and more cast-in-situ concrete poured stake improves 70% ~ 90%, improves 35% compared with the groove surface drainage pile with tamper, and reliable in quality, controllable.Pile follower depth of the invention can strive for the on-stream time of engineering and greatly shorten the duration, save a large amount of earth and stone digging amount in foundation pit periphery, speed of application is fast, at low cost, is conducive to antidetonation up to 12 ~ 15m.

Description

The tamper dentiform pile and its construction method haveing excellent performance
Technical field
The present invention relates to a kind of dentiform pile, especially a kind of tamper dentiform pile haveing excellent performance further relates to its construction method.
Background technique
Current various stakes are constructed in soft subgrade soil, are all had the following deficiencies:
A. cast-in-situ concrete poured stake (including: long spire, churning driven, vibration sinking tube etc.) is constructed in soft subgrade soil, pile body coagulation Soil is also easy to produce recess, leakage muscle, broken pile and other issues.
B. prestressed-concrete pile is constructed in soft subgrade soil, encounters the big cohesive soil of gravel layer, layer of sand, silty sand ground, hardness When the geological conditions such as layer, then pressure is unable to satisfy design bearing capacity requirement less than projected depth.
Based on above-mentioned deficiency, although the prior art has the groove surface drainage pile with tamper so that ultimate bearing capacity of single pile compared with Tubular pole improves 20% ~ 30%, but there is also Railway Projects:
(a) parameter of tooth is unreasonable on pile body, and test ultimate bearing capacity of single pile improves 20% ~ 30% this data, is sedimentation 4cm Stop, if there is building load, then will not stopping, event that necessarily something terrible happens.
(b) pile body structure design has drainage hole, not only influences production efficiency, has an effect on construction efficiency.
(c) its construction technology is vibration sinking tube pore-forming, with 3 tons or more of weight carries out base expanding and base expanding again, then arranges groove face Water stake is put into immersed tube, and is promoted hopper and poured into tamper between stake and immersed tube inner wall, and immersed tube is finally just extracted.After construction Also every pile is carried out drawing water repeatedly, this construction technology is many and diverse, and speed is too slow.
(d) tamper granularity very little subject to conditions, therefore coefficient of friction is small.
(e) because the frictional resistance of tamper usually pulls up groove surface drainage pile, construction quality can not be ensured.
(f) immersed tube pore-forming and weight base expanding and base expanding technique soil compaction effect are serious.
Summary of the invention
In order to solve the above technical problem, the present invention provides more than a kind of superior performance function tamper dentiform pile and its construction Method, suitable for the soft subgrade soil pile foundation of building, structures, railway, highway build the big soft subgrade soil pile foundation of middle thickness with And the soft subgrade soil pile foundation of all other engineerings.
Technical solution of the present invention is specific as follows:
A kind of tamper dentiform pile haveing excellent performance, including pile body, several stepped tooths are equipped at intervals on pile body, and stepped tooth is trapezoidal narrow Tooth or trapezoidal wide tooth are alternately distributed with trapezoidal narrow tooth.
Further, as an implementation, tamper dentiform pile further includes the vertical rib set on pile body upper and lower surface, is erected To the tooth Gao Xiangtong of rib height and stepped tooth.
Further, as an implementation, the specifically two trapezoidal wide teeth and one trapezoidal narrow of being alternately distributed Tooth is alternately distributed.
Further, the tooth top width of trapezoidal wide tooth is 100 ~ 250mm, and the tooth top width of narrow tooth is 50 ~ 80mm.
Further, the center between stepped tooth is away from being 300 ~ 800mm.
Further, two bevel edges of stepped tooth and pile body in angle of 45 degrees, the tooth of stepped tooth a height of 50 ~ 60.Based in this way Size, lateral pressure of the bevel edge by the soil body generate force resolution, and one is normal stress to pile body, and one is bottom bearing Either withdrawal resistance.
It further, is R10 at the obtuse angle that trapezoidal hypotenuse and pile body are formed, two vertex of stepped tooth are R8.It is such Size has properly handled pile body stress and has concentrated and lead to the problem of crack.
Further, drainage hole is not provided on tamper dentiform pile.Workshop Production efficiency is not only increased, is also improved simultaneously Construction efficiency.
Further, tamper dentiform pile is mixed by centimetre stone and sand in mass ratio 6:4 or so, and the partial size of centimetre stone is 15 ~ 50mm, the partial size of sand are 5mm or less.
The invention further relates to above-mentioned tamper dentiform pile construction method, first pass through long screw auger and draw with diameter overall length Hole, then by embracing press, high pressure apparatus or vibration press piling, pile follower depth is 12 ~ 15m.
Compared with prior art, beneficial effects of the present invention are specific as follows:
(1) ultimate bearing capacity of single pile improves significant: i.e. more conventional tubular pole improves 60% or more, and more cast-in-situ concrete poured stake improves 70% ~ 90%, 35% is improved compared with the groove surface drainage pile with tamper, and reliable in quality, controllable.
(2) several stepped tooths are equipped at intervals on present invention setting pile body, stepped tooth be trapezoidal narrow tooth or trapezoidal wide tooth with Trapezoidal narrow tooth is alternately distributed, and stepped tooth bevel edge is just generated force resolution by after the lateral pressure of the soil body, and one is to pile body Normal stress, one is upward bottom bearing or downward withdrawal resistance, and bottom bearing or withdrawal resistance are the 10- of pile body side friction 20 times, in turn, institute's geared surface generation withdrawal resistance is significant, and the sum of the bottom bearing that institute's geared surface generates on pile body makes the tamper tooth form The ultimate bearing capacity of single pile of stake improves significant.
(3) pile follower depth of the invention is unable to reach up to 12 ~ 15m, other any pile-type.Based on pile follower depth, this hair It is bright can: a. strive for engineering on-stream time and greatly shorten the duration.B. usual manner is to have dug foundation pit piling again, is needed out Working face is dug out, needs more a large amount of earthworks of excavation, the present invention is not necessarily to the above process, and then it is a large amount of to save foundation pit periphery Earth and stone digging amount.
(4) tooth and tamper of pile-type of the invention have been transferred carries jointly along all soil layers of pile body, rather than leans on stake bottom The bottom bearing of certain supporting course, therefore, the tamper dentiform pile for constructing of the invention, no efficiency of pile groups are also held without the concern for being pressed onto certain Power layer, the also unnecessary influence for considering subjacent bed.
(5) when constructing, tamper is automatically with entering underground, many and diverse technique of immersed tube pore-forming without friction, not by immersed tube depth of pore forming, The limitation of diameter, light equipment can be depressed, and not hurt strength of the mixing pile, and speed of application is fast, at low cost, reliable in quality, controllable.Together When, construction tamper dentiform pile can optimize cap design of pile, save arrangement of reinforcement and concrete.
(6) based on structure of the invention, when construction, the super pore pressure water of generation dissipates rapidly along tamper, effect without squeezing soil It answers.
(7) safety coefficient of the present invention can ensure that characteristic value is 2, be conducive to antidetonation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the first embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the second embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the third embodiment of the present invention;
Fig. 4 is A-A cross-sectional view in Fig. 1;
Fig. 5 is B-B cross-sectional view in Fig. 2;
Fig. 6 is C-C cross-sectional view in Fig. 3.
Specific embodiment
Below in conjunction with the embodiment of the present invention, the technical solution in the present embodiment is clearly and completely described, is shown So, described embodiment is only rather than whole example to a part of example of the present invention.Based on the implementation in the present invention Example, those of ordinary skill in the art's every other embodiment obtained under that premise of not paying creative labor, belongs to The scope of protection of the invention.
Embodiment 1
As shown in Figure 1, the tamper dentiform pile haveing excellent performance of the present embodiment, including pile body 1, through-hole, pile body are equipped in the middle part of pile body 1 Several stepped tooths are equipped at intervals on 1, stepped tooth includes trapezoidal wide tooth 2 and trapezoidal narrow tooth 3, and alternation method is two trapezoidal wide teeth 2 It is alternately distributed with a trapezoidal narrow tooth 3.
Tooth top width L1=100 ~ 250mm of trapezoidal wide tooth, tooth top width L2=50 ~ 80mm of narrow tooth.Between each stepped tooth Center is away from being 300 ~ 800mm.In angle of 45 degrees, the high L3 of the tooth of stepped tooth is 50 ~ 60mm to two bevel edges and pile body of stepped tooth.Sand Lining dentiform pile further includes the vertical rib 4 set on pile body upper and lower surface, tooth Gao Xiangtong, the A-A cross-sectional view of vertical rib height and stepped tooth As shown in Figure 4.1 both ends of pile body to both ends stepped tooth distance L4=500mm.Tamper dentiform pile total length L=12 ~ 13m.
It is R10 at the obtuse angle that trapezoidal hypotenuse and pile body are formed, two vertex of stepped tooth are R8.It is not set on tamper dentiform pile Set drainage hole.
The tamper dentiform pile of the present embodiment is mixed by centimetre stone with sand 6:4 in mass ratio, and the partial size of centimetre stone is 15 ~ 50mm, the partial size of sand are 5mm or less.
The construction method for the above-mentioned tamper dentiform pile that the present embodiment is related to, first passes through long screw auger and draws with diameter overall length Hole, then by embracing press piling, pile follower depth is 12 ~ 15m.
Embodiment 2
As shown in Fig. 2, the tamper dentiform pile of the present embodiment, including pile body 1, several stepped tooths, stepped tooth are equipped at intervals on pile body 1 For trapezoidal narrow tooth 3, center between each stepped tooth is away from being 300 ~ 800mm.
Tamper dentiform pile further includes the vertical rib 4 set on pile body upper and lower surface, the tooth Gao Xiangtong of vertical rib height and stepped tooth, The high L3 of the tooth of stepped tooth is 50 ~ 60mm, and B-B cross-sectional view is as shown in Figure 5.Tooth top width L2=50 ~ 80mm of narrow tooth.The two of stepped tooth Bevel edge and pile body are in angle of 45 degrees.1 both ends of pile body to both ends stepped tooth distance be 500mm.Tamper dentiform pile total length L= 12~13m。
It is R10 at the obtuse angle that trapezoidal hypotenuse and pile body are formed, two vertex of stepped tooth are R8.It is not set on tamper dentiform pile Set drainage hole.
The tamper dentiform pile of the present embodiment is mixed by centimetre stone with sand 6:4 in mass ratio, and the partial size of centimetre stone is 15 ~ 50mm, the partial size of sand are 5mm or less.The concrete block or discarded masonry that building waste can also be used, are crushed into a set pattern The similar material of lattice.
The construction method for the above-mentioned tamper dentiform pile that the present embodiment is related to, first passes through long screw auger and draws with diameter overall length Hole, then by high pressure apparatus piling, pile follower depth is 12 ~ 15m.
Embodiment 3
As shown in figure 3, the tamper dentiform pile of the present embodiment, pile body upper and lower surface is not provided with vertical rib 4, remaining and 2 phase of embodiment Together, C-C cross-sectional view is as shown in Figure 5.
The construction method for the above-mentioned tamper dentiform pile that the present embodiment is related to, first passes through long screw auger and draws with diameter overall length Hole, then by vibration press piling, pile follower depth is 12 ~ 15m.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of tamper dentiform pile haveing excellent performance, it is characterised in that: including pile body, several stepped tooths are equipped at intervals on pile body, Stepped tooth is that trapezoidal narrow tooth or trapezoidal wide tooth are alternately distributed with trapezoidal narrow tooth.
2. tamper dentiform pile according to claim 1, it is characterised in that: tamper dentiform pile further includes being set to following table on pile body The vertical rib in face, the tooth Gao Xiangtong of vertical rib height and stepped tooth.
3. tamper dentiform pile according to claim 1, it is characterised in that: described to be alternately distributed specifically two trapezoidal wide teeth It is alternately distributed with a trapezoidal narrow tooth.
4. tamper dentiform pile described according to claim 1 ~ one of 3, it is characterised in that: the tooth top width of trapezoidal wide tooth be 100 ~ 250mm, the tooth top width of narrow tooth are 50 ~ 80mm.
5. tamper dentiform pile described according to claim 1 ~ one of 3, it is characterised in that: center between stepped tooth is away from being 300~800mm。
6. tamper dentiform pile described according to claim 1 ~ one of 3, it is characterised in that: two bevel edges and pile body of stepped tooth are at 45 Spend angle, the tooth of stepped tooth a height of 50 ~ 60.
7. tamper dentiform pile described according to claim 1 ~ one of 3, it is characterised in that: the obtuse angle that trapezoidal hypotenuse and pile body are formed Place is R10, and two vertex of stepped tooth are R8.
8. tamper dentiform pile described according to claim 1 ~ one of 3, it is characterised in that: be not provided with draining on tamper dentiform pile Hole.
9. tamper dentiform pile described according to claim 1 ~ one of 3, it is characterised in that: tamper dentiform pile is pressed by centimetre stone with sand Mass ratio 6:4 or so mixing, the partial size of centimetre stone are 15 ~ 50mm, and the partial size of sand is 5mm or less.
10. the construction method of the tamper dentiform pile of one of claim 1 ~ 9, it is characterised in that: first pass through the same diameter of long screw auger Overall length pilot hole, then by embracing press, high pressure apparatus or vibration press piling, pile follower depth is 12 ~ 15m.
CN201811595209.1A 2018-12-25 2018-12-25 The tamper dentiform pile and its construction method haveing excellent performance Pending CN109440802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811595209.1A CN109440802A (en) 2018-12-25 2018-12-25 The tamper dentiform pile and its construction method haveing excellent performance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811595209.1A CN109440802A (en) 2018-12-25 2018-12-25 The tamper dentiform pile and its construction method haveing excellent performance

Publications (1)

Publication Number Publication Date
CN109440802A true CN109440802A (en) 2019-03-08

Family

ID=65535565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811595209.1A Pending CN109440802A (en) 2018-12-25 2018-12-25 The tamper dentiform pile and its construction method haveing excellent performance

Country Status (1)

Country Link
CN (1) CN109440802A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242207A (en) * 2001-02-22 2002-08-28 Taisei Corp Support structure of structure foundation
CN1793525A (en) * 2006-01-05 2006-06-28 江苏南水土建工程公司 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN102720206A (en) * 2012-07-16 2012-10-10 南京工业大学 Novel connection structure of prestressed concrete pile and cushion cap
CN202910984U (en) * 2012-10-30 2013-05-01 郭兆泉 Improved tooth-shaped pile mold
JP2013108279A (en) * 2011-11-21 2013-06-06 Inoue Shoji Kk Foundation structure for ground installed object and installation method of foundation pile
CN203701136U (en) * 2014-01-23 2014-07-09 中国化学工程第十一建设有限公司 Embedded steel plate leveling device
CN104775446A (en) * 2014-01-15 2015-07-15 广东强光海洋工程有限公司 Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier
CN209703541U (en) * 2018-12-25 2019-11-29 郭兆泉 The tamper dentiform pile of superior performance

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242207A (en) * 2001-02-22 2002-08-28 Taisei Corp Support structure of structure foundation
CN1793525A (en) * 2006-01-05 2006-06-28 江苏南水土建工程公司 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
JP2013108279A (en) * 2011-11-21 2013-06-06 Inoue Shoji Kk Foundation structure for ground installed object and installation method of foundation pile
CN102720206A (en) * 2012-07-16 2012-10-10 南京工业大学 Novel connection structure of prestressed concrete pile and cushion cap
CN202910984U (en) * 2012-10-30 2013-05-01 郭兆泉 Improved tooth-shaped pile mold
CN104775446A (en) * 2014-01-15 2015-07-15 广东强光海洋工程有限公司 Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier
CN203701136U (en) * 2014-01-23 2014-07-09 中国化学工程第十一建设有限公司 Embedded steel plate leveling device
CN209703541U (en) * 2018-12-25 2019-11-29 郭兆泉 The tamper dentiform pile of superior performance

Similar Documents

Publication Publication Date Title
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
CN204059332U (en) A kind of concrete precast pipe pile and piling prepressing Soft Ground device
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN104164868A (en) Concave-convex support-engaged water-stopping pile
CN110056000B (en) Construction method and structure of counter weight type retaining wall
CN108035362A (en) Mixing pile inner sleeve beats the foundation pit enclosure structure and construction method of quincunx bored concrete pile
CN103835203A (en) Deep soft foundation back-jacking light road embankment structure and construction method thereof
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN104060601A (en) Construction method utilizing pile foundations of precast construction piles for ground treatment
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN209703541U (en) The tamper dentiform pile of superior performance
CN113818402A (en) Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof
CN106049413B (en) A kind of composite power drain consolidation system and construction method applied to deep layer foundation in saturated soft soil
CN210066810U (en) Assembled cutting barricade
CN217974332U (en) Concrete precast pile structure
CN218116337U (en) Be used for permeating earth and rockfill dam and widen seepage prevention structure
CN106958176A (en) Quick prefabricated pin-connected panel soft base processing method
CN204282295U (en) Pile formula case cylinder breakwater structure
CN109440802A (en) The tamper dentiform pile and its construction method haveing excellent performance
CN215441846U (en) Foundation anti-settling structure
CN205369281U (en) Radial precipitation structure
CN108487226A (en) Multisection type composite bushing punching press sandy pile construction engineering method
CN104153350A (en) Octagonal meshed water-stopping rectangular pile of support
CN204530685U (en) Cement soil stiffness composite pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination