CN109440774A - A kind of foundation pit structure and its construction method - Google Patents

A kind of foundation pit structure and its construction method Download PDF

Info

Publication number
CN109440774A
CN109440774A CN201811607660.0A CN201811607660A CN109440774A CN 109440774 A CN109440774 A CN 109440774A CN 201811607660 A CN201811607660 A CN 201811607660A CN 109440774 A CN109440774 A CN 109440774A
Authority
CN
China
Prior art keywords
shallow
foundation
hole
foundation pit
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811607660.0A
Other languages
Chinese (zh)
Inventor
董鸽
逯相科
罗永�
唐华罡
陈军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201811607660.0A priority Critical patent/CN109440774A/en
Publication of CN109440774A publication Critical patent/CN109440774A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

In order to solve the problem on deformation of complicated foundation pit, the present invention provides a kind of foundation pit structure and its construction method.A kind of foundation pit structure is cheated including shallow foundation and excavates in the deep basal pit of shallow bottom of foundation ditch, and the bottom in the shallow foundation hole is laid with reinforcement cushion, is laid with bottom plate on the reinforcement cushion, the reinforcement cushion of the deep basal pit two sides is connected by power transmission stiffening plate.Foundation pit structure of the invention, reinforcement cushion is laid under bottom plate, and the reinforcement cushion of deep basal pit two sides is linked together by power transmission stiffening plate, complete structural system is formed with the building enclosure in the outside in shallow foundation hole, to reduce the deformation of foundation pit, the deformation that intensity after dell concrete support does not construct or constructs is not up to foundation pit in the desired period is especially reduced.

Description

A kind of foundation pit structure and its construction method
Technical field
The invention belongs to foundation pit construction technical field, in particular to a kind of foundation pit structure and its construction method.
Background technique
Along with the continuous construction of base pit engineering, construction experience and blending for theoretical knowledge have further pushed foundation pit to enclose The development of shield technology and construction technology.At the same time, the structure of foundation pit also becomes increasingly complex.
When the structure of foundation pit is the form cheated in hole, need first to carry out shallow hole construction.Bottom slab concreting is being carried out to shallow hole When, due to needing reserved dell excavation face to lead to shallow hole bottom plate not it is thus impossible to pour shallow hole bottom plate in dell excavation face Complete structural system can be formed with the building enclosure in outside, so as to cause the deformation of foundation pit.Although can be by being opened in dell Dell is arranged in digging face to support to improve the structural system of shallow hole, but pouring of supporting of shallow hole bottom plate and dell require it is longer Time not can guarantee in this period, and foundation pit does not deform.
Summary of the invention
In order to solve the problem on deformation of complicated foundation pit, the present invention provides a kind of foundation pit structure and its construction method.
The technical solution of foundation pit structure of the invention is as follows:
A kind of foundation pit structure is cheated and is excavated including shallow foundation in the deep basal pit of shallow bottom of foundation ditch, the bottom in the shallow foundation hole It is laid with reinforcement cushion, is laid with bottom plate on the reinforcement cushion, the reinforcement cushion of the deep basal pit two sides is connected by power transmission stiffening plate It connects.
Foundation pit structure of the invention is laid with reinforcement cushion under bottom plate, and passes through power transmission stiffening plate for deep basal pit two sides Reinforcement cushion links together, and complete structural system is formed with the building enclosure in the outside in shallow foundation hole, to reduce foundation pit Deformation, especially reduce intensity after dell concrete support does not construct or constructs and be not up to foundation pit in the desired period Deformation.
Further, in the foundation pit structure, specifically, shallow hole building enclosure is set around shallow foundation hole, it is described Dell building enclosure is set around deep basal pit, shallow hole concrete support, the depth base are set between the two sides in the shallow foundation hole It cheats and dell concrete support is set between the bottom plate of two sides.
Further, it in the foundation pit structure, is supportted between the end and reinforcement cushion of the power transmission stiffening plate by eight words Connection.Reinforcement cushion and power transmission stiffening plate are connected by the support of eight words can play better power transmission effect, be further formed complete Foundation pit structure system, to reduce the deformation of foundation pit.
Further, in the foundation pit structure, the dell concrete support is respectively arranged at the top of power transmission stiffening plate. In this way, power transmission stiffening plate can be with when carrying out the construction of dell concrete support after reinforcement cushion and the construction of power transmission stiffening plate As the work surface of dell concrete support, to reduce the difficulty of construction of dell concrete support.
It further, further include anchor bar to reinforce foundation pit structure in the foundation pit structure, the anchor bar Perpendicular to bottom plate, it is vertical with the reinforcing bar of bottom plate side exposing in the middle part of the anchor bar to connect, and pour in dell concrete In support, the upper end of the anchor bar passes through bottom plate, and the lower end of the anchor bar passes through the gap of eight words support.In addition, anchor Gu the reserved of the top and bottom of reinforcing bar also provides condition for the construction of subsequent deep basal pit side wall.
It further, further include side wall reserved steel bar for the ease of the construction of deep basal pit side wall in the foundation pit structure, The side wall reserved steel bar perpendicular to bottom plate, and pour in dell concrete support, the upper end of the side wall reserved steel bar Across bottom plate, the lower end of the side wall reserved steel bar passes through the gap of eight words support.
Of the invention also provides a kind of construction method of above-mentioned foundation pit structure.
The technical solution of the construction method of foundation pit structure of the invention is as follows, includes the following steps:
The first step carries out the construction of shallow hole building enclosure and dell building enclosure;
Shallow hole concrete support is arranged in second step between the two sides of shallow hole building enclosure;
Third step excavates shallow foundation hole;
4th step, after shallow bottom of foundation ditch reserves deep pit digging position, in shallow foundation hole, bottom pours reinforcement cushion;
5th step is connected the reinforcement cushion of the two sides of deep basal pit reserved location by power transmission stiffening plate, power transmission stiffening plate End and reinforcement cushion between by eight words support connect;
6th step, pours bottom plate on reinforcement cushion;
7th step is connect vertical with the bottom plate side reinforcing bar exposed in the middle part of anchor bar, and the lower end of anchor bar passes through The gap of eight words support;
Side wall reserved steel bar is set to anchor bar side by the 8th step, and the lower end of side wall reserved steel bar is supportted across eight words Gap;
Dell concrete support, anchor bar and side is arranged in 9th step between the bottom plate of deep basal pit reserved location two sides Wall reserved steel bar pours in dell concrete support, and the upper end of anchor bar and side wall reserved steel bar passes through bottom plate;
Tenth step, deep pit excavation.
The construction method of foundation pit structure of the invention is laid with reinforcement cushion under bottom plate, and will be deep by power transmission stiffening plate The reinforcement cushion of foundation pit two sides links together, and forms complete structural system with the building enclosure in the outside in shallow foundation hole, thus The deformation of foundation pit is reduced, intensity after dell concrete support does not construct or constructs especially is reduced and is not up to the desired time The deformation of foundation pit in section.
It is provided in addition, the setting of power transmission stiffening plate also anchors into dell concrete support with side wall reserved steel bar for anchor bar Time and space, so that the construction of the deep basal pit side wall for after provides condition, and when making structure construction, dell is mixed Solidifying soil support does not have to be removed, and can continue the deformation for playing the role of keeping out foundation pit.
Further, in the construction method of the foundation pit structure, specifically, further include the 11st step, by anchor bar with The both ends of side wall reserved steel bar are connect with the reinforcing bar of deep basal pit side wall respectively, and carry out pouring for deep basal pit side wall.
Further, in the construction method of the foundation pit structure, in order to reinforce the ability for the resistance to deformation that shallow foundation is cheated, third step In, while excavating shallow foundation hole, shallow hole is set below shallow hole concrete support and reinforces support.
Further, in the construction method of the foundation pit structure, for the ease of constructing, in the tenth step, in deep pit excavation Before, remove the support of eight words and power transmission stiffening plate.
Detailed description of the invention
Fig. 1 is the schematic diagram of foundation pit structure of the invention;
Fig. 2 is the A-A sectional view of Fig. 1 of foundation pit structure of the invention;
Fig. 3 is the B-B sectional view of Fig. 1 of foundation pit structure of the invention;
Fig. 4 is the construction schematic diagram of foundation pit structure construction method of the invention;
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation, the present invention The advantages of and feature will become apparent from.It should be noted that attached drawing is all made of very simplified form and uses non-accurate ratio, Only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.
Embodiment 1:
Referring to figs. 1 to Fig. 4, a kind of foundation pit structure provided in this embodiment, including shallow foundation hole 8 and excavation cheat 8 in shallow foundation The deep basal pit 9 of bottom, the bottom in the shallow foundation hole 8 are laid with reinforcement cushion 3, are laid with bottom plate 6, the depth on the reinforcement cushion 3 The reinforcement cushion 3 of 9 two sides of foundation pit is connected by power transmission stiffening plate 4.
The foundation pit structure of the present embodiment is laid with reinforcement cushion 3 under bottom plate 6, and passes through power transmission stiffening plate 4 for deep basal pit 9 The reinforcement cushion 3 of two sides links together, and complete structural system is formed with the building enclosure in the outside in shallow foundation hole 8, to subtract The small deformation of foundation pit especially reduces intensity after dell concrete support 7 does not construct or constructs and is not up to the desired time The deformation of foundation pit in section.
As preferable embodiment, in the foundation pit structure, specifically, setting shallow hole encloses around shallow foundation hole 8 Dell building enclosure 2 is arranged around the deep basal pit 9, shallow hole coagulation is arranged between the two sides in the shallow foundation hole 8 for protection structure 1 Soil supports 10, and dell concrete support 7 is arranged between the bottom plate 6 of 9 two sides of deep basal pit.
As preferable embodiment, in the foundation pit structure, the end of the power transmission stiffening plate 4 and reinforcement cushion 3 it Between by eight words support 5 connection.Reinforcement cushion 3, which is connect with power transmission stiffening plate 4 by eight words support 5, can play better power transmission effect, It is further formed complete foundation pit structure system, to reduce the deformation of foundation pit.
As preferable embodiment, in the foundation pit structure, the dell concrete support 7 is respectively arranged at power transmission and adds The top of strong plate 4.In this way, when carrying out the construction of dell concrete support 7 after reinforcement cushion 3 and power transmission stiffening plate 4 are constructed, Power transmission stiffening plate 4 can be used as the work surface of dell concrete support 7, to reduce the difficulty of construction of dell concrete support 7.
It further include anchor bar 12 to reinforce foundation pit structure in the foundation pit structure as preferable embodiment, The anchor bar 12 perpendicular to bottom plate 6,12 middle part of the anchor bar is vertical with the reinforcing bar of 6 side of bottom plate exposing to be connect, And pour in dell concrete support 7, the upper end of the anchor bar 12 passes through bottom plate 6, the lower end of the anchor bar 12 Across the gap of eight words support 5.In addition, the reserved of the top and bottom of anchor bar 12 is also constructed for subsequent deep basal pit side wall 13 Provide condition.
It further include side for the ease of the construction of deep basal pit side wall 13 in the foundation pit structure as preferable embodiment Wall reserved steel bar 11, the side wall reserved steel bar 11 perpendicular to bottom plate 6, and pour in dell concrete support 7, the side The upper end of wall reserved steel bar 11 passes through bottom plate 6, and the lower end of the side wall reserved steel bar 11 passes through the gap of eight words support 5.
Embodiment 2:
Referring to figs. 1 to Fig. 4, the present embodiment provides a kind of construction methods of foundation pit structure of embodiment 1, including walk as follows It is rapid:
The first step carries out the construction of shallow hole building enclosure 1 and dell building enclosure 2;
Shallow hole concrete support 10 is arranged in second step between the two sides of shallow hole building enclosure 1;
Third step excavates shallow foundation hole 8;
4th step cheats 8 bottoms in shallow foundation and pours reinforcement cushion 3 after shallow foundation cheats the 8 bottoms reserved excavation of deep basal pit 9 position;
5th step connects the reinforcement cushion 3 of the two sides of 9 reserved location of deep basal pit by power transmission stiffening plate 4, and power transmission is reinforced Pass through eight words support, 5 connection between the end and reinforcement cushion 3 of plate 4;
6th step pours bottom plate 6 on reinforcement cushion 3;
7th step is connect vertical with 6 side of the bottom plate reinforcing bar exposed in the middle part of anchor bar 12, the lower end of anchor bar 12 Across the gap of eight words support 5;
Side wall reserved steel bar 11 is set to 12 side of anchor bar by the 8th step, and the lower end of side wall reserved steel bar 11 passes through The gap of eight words support 5;
Dell concrete support 7, anchor bar 12 is arranged in 9th step between the bottom plate 6 of 9 reserved location two sides of deep basal pit It is poured in dell concrete support 7 with side wall reserved steel bar 11, anchor bar 12 and the upper end of side wall reserved steel bar 11 pass through Bottom plate 6;
Tenth step, deep pit excavation 9.
The construction method of the foundation pit structure of the present embodiment is laid with reinforcement cushion 3 under bottom plate 6, and passes through power transmission stiffening plate 4 The reinforcement cushion 3 of 9 two sides of deep basal pit is linked together, forms complete structural body with the building enclosure in the outside in shallow foundation hole 8 System especially reduces intensity after dell concrete support 7 does not construct or constructs and not up to wants to reduce the deformation of foundation pit The deformation of foundation pit in the period asked.
In addition, the setting of power transmission stiffening plate 4 is also that anchor bar 12 and side wall reserved steel bar 11 anchor into dell concrete branch Support 7 provides time and space, so that the construction of the deep basal pit side wall 13 for after provides condition, and makes structure construction When, dell concrete support 7 does not have to be removed, and can continue the deformation for playing the role of keeping out foundation pit.
As preferable embodiment, in the construction method of the foundation pit structure, specifically, further include the 11st step, it will Anchor bar 12 is connect with the reinforcing bar of deep basal pit side wall 13 respectively with the both ends of side wall reserved steel bar 11, and carries out deep basal pit side wall 13 pour.
As preferable embodiment, in the construction method of the foundation pit structure, in order to reinforce the resistance to deformation in shallow foundation hole 8 Ability in third step, while excavating shallow foundation hole 8, is arranged shallow hole below shallow hole concrete support 10 and reinforces support.
As preferable embodiment, in the construction method of the foundation pit structure, for the ease of constructing, in the tenth step, Before deep pit excavation 9, eight words support 5 and power transmission stiffening plate 4 are removed.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (10)

1. a kind of foundation pit structure, which is characterized in that including shallow foundation hole (8) and excavate in the deep basal pit of shallow foundation hole (8) bottom (9), the bottom of the shallow foundation hole (8) is laid with reinforcement cushion (3), is laid with bottom plate (6) on the reinforcement cushion (3), the depth base The reinforcement cushion (3) for cheating (9) two sides is connected by power transmission stiffening plate (4).
2. foundation pit structure as described in claim 1, which is characterized in that setting shallow hole goes along with sb. to guard him knot around the shallow foundation hole (8) Dell building enclosure (2) are arranged around the deep basal pit (9) in structure (1), and shallow hole is arranged between the two sides of the shallow foundation hole (8) Dell concrete support (7) are arranged between the bottom plate (6) of deep basal pit (9) two sides in concrete support (10).
3. foundation pit structure as claimed in claim 2, which is characterized in that the end of the power transmission stiffening plate (4) and reinforcement cushion (3) pass through eight words support (5) connection between.
4. foundation pit structure as claimed in claim 3, which is characterized in that the dell concrete support (7) is respectively arranged at biography The top of power stiffening plate (4).
5. foundation pit structure as claimed in claim 4, which is characterized in that further include anchor bar (12), the anchor bar (12) perpendicular to bottom plate (6), it is vertical with the reinforcing bar of bottom plate (6) side exposing in the middle part of the anchor bar (12) to connect, and pour It builds in dell concrete support (7), the upper end of the anchor bar (12) passes through bottom plate (6), the anchor bar (12) Lower end passes through the gap of eight words support (5).
6. foundation pit structure as claimed in claim 5, which is characterized in that further include side wall reserved steel bar (11), the side wall is pre- Stay reinforcing bar (11) perpendicular to bottom plate (6), and pour in dell concrete support (7), the side wall reserved steel bar (11) Upper end passes through bottom plate (6), and the lower end of the side wall reserved steel bar (11) passes through the gap of eight words support (5).
7. a kind of construction method of foundation pit structure as claimed in claim 6, which comprises the steps of:
The first step carries out the construction of shallow hole building enclosure (1) and dell building enclosure (2);
Shallow hole concrete support (10) are arranged between the two sides of shallow hole building enclosure (1) in second step;
Third step excavates shallow foundation hole (8);
4th step, after deep basal pit (9) excavation position is reserved in shallow foundation hole (8) bottom, in shallow foundation hole, (8) bottom pours reinforcement cushion (3);
5th step connects the reinforcement cushion (3) of the two sides of deep basal pit (9) reserved location by power transmission stiffening plate (4), and power transmission adds It is connect between the end and reinforcement cushion (3) of strong plate (4) by eight words support (5);
6th step pours bottom plate (6) on reinforcement cushion (3);
7th step is connect, under anchor bar (12) by vertical with bottom plate (6) the side reinforcing bar exposed in the middle part of anchor bar (12) It holds across the gap of eight words support (5);
Side wall reserved steel bar (11) is set to anchor bar (12) side by the 8th step, and the lower end of side wall reserved steel bar (11) is worn Cross the gap of eight words support (5);
Dell concrete support (7) are arranged between the bottom plate (6) of deep basal pit (9) reserved location two sides, anchor bar in 9th step (12) it is poured in dell concrete support (7) with side wall reserved steel bar (11), anchor bar (12) and side wall reserved steel bar (11) upper end passes through bottom plate (6);
Tenth step, deep pit excavation (9).
8. the construction method of foundation pit structure as claimed in claim 7, which is characterized in that further include the 11st step, steel will be anchored Muscle (12) is connect with the reinforcing bar of deep basal pit side wall (13) respectively with the both ends of side wall reserved steel bar (11), and carries out deep basal pit side wall (13) pour.
9. the construction method of foundation pit structure as claimed in claim 7, which is characterized in that in third step, excavate shallow foundation hole (8) Meanwhile setting shallow hole reinforces support below shallow hole concrete support (10).
10. the construction method of foundation pit structure as claimed in claim 7, which is characterized in that in the tenth step, in deep pit excavation (9) before, eight words support (5) and power transmission stiffening plate (4) are removed.
CN201811607660.0A 2018-12-27 2018-12-27 A kind of foundation pit structure and its construction method Pending CN109440774A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811607660.0A CN109440774A (en) 2018-12-27 2018-12-27 A kind of foundation pit structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811607660.0A CN109440774A (en) 2018-12-27 2018-12-27 A kind of foundation pit structure and its construction method

Publications (1)

Publication Number Publication Date
CN109440774A true CN109440774A (en) 2019-03-08

Family

ID=65537617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811607660.0A Pending CN109440774A (en) 2018-12-27 2018-12-27 A kind of foundation pit structure and its construction method

Country Status (1)

Country Link
CN (1) CN109440774A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813983A (en) * 2020-12-31 2021-05-18 长江勘测规划设计研究有限责任公司 Cantilever beam-column system implemented synchronously with pit depth in pit and construction method
CN113737857A (en) * 2021-10-09 2021-12-03 中国建筑第二工程局有限公司 Be used for deep pipe gallery structure and major structure to build connection structure again and worker's method thereof
CN115478544A (en) * 2022-11-02 2022-12-16 北京市政建设集团有限责任公司 Interim biography power additional strengthening of foundation ditch
CN117090224A (en) * 2023-10-18 2023-11-21 上海建工集团股份有限公司 Edge-pasting pit-in-pit unsupported enclosure system and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416287A1 (en) * 1984-05-03 1985-11-07 Ernst 7270 Nagold Wackenhut Method of producing a foundation
JPH0464618A (en) * 1990-07-02 1992-02-28 Kajima Corp Pit excavation work method
EP0803613A1 (en) * 1996-04-23 1997-10-29 Jan Forster Method for placing a wall in the soil
JPH11200362A (en) * 1998-01-13 1999-07-27 Kajima Corp Earth retaining work
KR20060110130A (en) * 2005-04-19 2006-10-24 주식회사 효광엔지니어링 Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system
KR20090064711A (en) * 2007-12-17 2009-06-22 이창남 Construction method of basement exterior wall applying the floor slab as the strut against the earth pressure from the temporary earth wall = tsw(thrusting slabbed wall) method
CN102704493A (en) * 2012-06-20 2012-10-03 上海建工二建集团有限公司 Force-transferring device for shallow pit base plate and deep pit strut and construction method
CN103603357A (en) * 2013-10-12 2014-02-26 姚攀峰 Multi-platform inner-support-free self-waterproof foundation pit retaining structure and construction method thereof
CN204590038U (en) * 2015-04-15 2015-08-26 广东省基础工程集团有限公司 A kind of permanent foundation pit supporting construction
KR101713674B1 (en) * 2015-11-05 2017-03-23 주식회사 한빛구조엔지니어링 Underground slab structure and underground construction method using the same
CN107313431A (en) * 2017-08-02 2017-11-03 中铁隧道集团二处有限公司 Close on not contour foundation ditch method for synchronously constructing
CN209620029U (en) * 2018-12-27 2019-11-12 上海建工七建集团有限公司 A kind of foundation pit structure

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416287A1 (en) * 1984-05-03 1985-11-07 Ernst 7270 Nagold Wackenhut Method of producing a foundation
JPH0464618A (en) * 1990-07-02 1992-02-28 Kajima Corp Pit excavation work method
EP0803613A1 (en) * 1996-04-23 1997-10-29 Jan Forster Method for placing a wall in the soil
JPH11200362A (en) * 1998-01-13 1999-07-27 Kajima Corp Earth retaining work
KR20060110130A (en) * 2005-04-19 2006-10-24 주식회사 효광엔지니어링 Auto-syncronized supporting system controlling to recover and offset displacement and repulsive force occurred according to working load, and constructing method of the supporting system
KR20090064711A (en) * 2007-12-17 2009-06-22 이창남 Construction method of basement exterior wall applying the floor slab as the strut against the earth pressure from the temporary earth wall = tsw(thrusting slabbed wall) method
CN102704493A (en) * 2012-06-20 2012-10-03 上海建工二建集团有限公司 Force-transferring device for shallow pit base plate and deep pit strut and construction method
CN103603357A (en) * 2013-10-12 2014-02-26 姚攀峰 Multi-platform inner-support-free self-waterproof foundation pit retaining structure and construction method thereof
CN204590038U (en) * 2015-04-15 2015-08-26 广东省基础工程集团有限公司 A kind of permanent foundation pit supporting construction
KR101713674B1 (en) * 2015-11-05 2017-03-23 주식회사 한빛구조엔지니어링 Underground slab structure and underground construction method using the same
CN107313431A (en) * 2017-08-02 2017-11-03 中铁隧道集团二处有限公司 Close on not contour foundation ditch method for synchronously constructing
CN209620029U (en) * 2018-12-27 2019-11-12 上海建工七建集团有限公司 A kind of foundation pit structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙志国: "软土地区深基坑"垫层换撑"体系的建立与施工技术研究", 建筑施工, pages 847 - 849 *
金立坚等: ""坑中坑"—高低跨深浅坑异形区间隧道的基坑施工技术—上海地铁一号线南站站改建工程(三)", 建筑施工, pages 5 - 7 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813983A (en) * 2020-12-31 2021-05-18 长江勘测规划设计研究有限责任公司 Cantilever beam-column system implemented synchronously with pit depth in pit and construction method
CN112813983B (en) * 2020-12-31 2022-07-22 长江勘测规划设计研究有限责任公司 Cantilever beam-column system implemented synchronously with pit depth in pit and construction method
CN113737857A (en) * 2021-10-09 2021-12-03 中国建筑第二工程局有限公司 Be used for deep pipe gallery structure and major structure to build connection structure again and worker's method thereof
CN115478544A (en) * 2022-11-02 2022-12-16 北京市政建设集团有限责任公司 Interim biography power additional strengthening of foundation ditch
CN115478544B (en) * 2022-11-02 2023-08-29 北京市政建设集团有限责任公司 Temporary force transmission reinforcing structure for foundation pit
CN117090224A (en) * 2023-10-18 2023-11-21 上海建工集团股份有限公司 Edge-pasting pit-in-pit unsupported enclosure system and construction method thereof

Similar Documents

Publication Publication Date Title
CN109440774A (en) A kind of foundation pit structure and its construction method
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN109372517A (en) One kind is suitable for wearing water supplying pipe construction method under upper soft lower hard compound stratum tunnel
CN105545323B (en) The construction method of cut-and-cover tunnel lining cutting
CN110106919A (en) A kind of lid digs the building enclosure and its construction method at station
CN108930275A (en) It is a kind of to face forever in conjunction with the ultra-deep shaft rapid constructing method along inverse combination
CN106958254A (en) Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN105649094B (en) A kind of deep water foundation bearing platform construction three wall steel cofferdams and its construction method
CN209620029U (en) A kind of foundation pit structure
CN108951647A (en) Construction method for supporting is excavated in hole in the hole of open trench tunnel
CN108071118A (en) A kind of supporting construction and its construction method and the overlapping piling wall for also serving as supporting construction
CN108035360A (en) A kind of method for pattern foundation pit supporting structure
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN106948350A (en) The rapid constructing method of deep basal pit accessory structure
CN106917358A (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN107165170B (en) A kind of foundation ditch construction method
CN106120853B (en) A kind of inverted construction method of frame bridge
ES8701273A1 (en) Foundation arrangement.
CN211690389U (en) Inter-pile retaining plate structure for adjacent anti-slide piles
CN211735421U (en) Force transmission structure for sensitive deep foundation pit
CN108149707A (en) A kind of basement building structure and its construction method
CN210141142U (en) Underground structure is built in same direction as digging in hole stake secret

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination