CN109424201A - Center pillar hoisting is built in single industrial premises - Google Patents

Center pillar hoisting is built in single industrial premises Download PDF

Info

Publication number
CN109424201A
CN109424201A CN201710745073.7A CN201710745073A CN109424201A CN 109424201 A CN109424201 A CN 109424201A CN 201710745073 A CN201710745073 A CN 201710745073A CN 109424201 A CN109424201 A CN 109424201A
Authority
CN
China
Prior art keywords
column
poured
lifting
cup
rim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710745073.7A
Other languages
Chinese (zh)
Inventor
吴洋忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Original Assignee
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Meiji Real Estate Marketing Planning Co Ltd filed Critical Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority to CN201710745073.7A priority Critical patent/CN109424201A/en
Publication of CN109424201A publication Critical patent/CN109424201A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses center pillar hoisting is built in single industrial premises, these steps are finally fixed including basic preparation, the binding of column, the hanging liter of column, the correction of column, column, finally fixation can carry out after calibration, method is that the pea gravel concreten than one strength grade of pillar height is poured in the gap of suspension column and rim of a cup, completion is poured with secondary, it is poured into voussoir bottom surface for the first time, when the concrete poured for the first time reaches 25% strength grade, voussoir is extracted, then pea gravel concreten is poured to rim of a cup top surface.Hoisting of the present invention can quickly guarantee the stability of lifting, improve the service life of building.

Description

Center pillar hoisting is built in single industrial premises
Technical field
The present invention relates to a kind of architectural construction technologies, and in particular to one kind builds center pillar slinger in single industrial premises Skill.
Background technique
Building is based on timber buildings, and the traditional architecture in west is based on masonry structure.Modern building is then with steel Based on reinforced concrete.
Chinese ancient architecture has simple simple and elegant style, is knot with yoke structure mainly using cogongrass, timber as construction material Structure mode (components such as column, beam, a tree, used in making timber for boats, purlin, rafter) is combined according to actual size, shape and the spacing that structure needs.It is this Building structure mode reflects the clear, orderly of ancient times patriarchal society structure and stablizes.Due to wooden material production beam column not Huge inner space is easily formed, ancient architecture just dexterously using outport place, forms garden.Garden is the base of building Our unit, it is both closed and open;Be both it is artificial and naturally, can bow and plant flowers, plants and trees, face upward and serve as a lookout Cloud life becomes the another performance of ancients " harmony between man and nature " idea, also embodies Chinese's not only implicit introversion, but also pioneer and keep forging ahead National character.The groups of building that ancient times somewhat larger building is all made of several gardens, single building and garden are along one Move towards to arrange calmly, it is A distinction should be made between what is primary and what is secondary, there is climax to have transition, become the space for the depth that has levels, has, shows a kind of Chinese and chased after The integrated beauty and deep beauty asked.Wherein palace, the building that temple one kind is more solemn, often one by one along central axes It is longitudinally arranged key construction, monosymmetric arrangement secondary structure, arrangement balancing is unfolded, fascinating.
Ancients can achieve the effect that beauty with the design techniques such as balance, harmonious, symmetrical, light and shade axis very early.Ancient times Weight artistic decoration is built, but uncomplicated, only makees emphasis decoration, such as window hood, lintel, ridge in main portions, layout is mostly to weigh Square to development, skyscraper is not weighed, until there is building pagoda, high building is just able to prevailing after Buddhism is incoming.The one of building Cutting art processing is also all processing to structural system and component, if color, decoration are in conjunction with component, constitute enrich it is gorgeous Art achievements, carved beams and painted rafter, body are graceful and colorful;Couplet written on scrolls and hung on the pillars of a hall horizontal inscribed board, excites interest and charm and reverie is infinite, ancient architecture category It is flouring, including palace, cemetery park, monastery, palace sight, gardens, bridge, tower brake etc..
Low efficiency is lifted for construction center pillar at present, and risk is big, causes the service life of building to reduce, sternly Safety accident is even caused when weight.
Summary of the invention
The technical problem to be solved by the present invention is to lift low efficiency, and risk for construction center pillar at present Greatly, and it is an object of the present invention to provide one kind builds center pillar hoisting in single industrial premises, solution at present hangs construction center pillar Fill low efficiency, and the problem that risk is big.
The present invention is achieved through the following technical solutions:
Center pillar hoisting is built in single industrial premises, comprising the following steps:
(1) basic to prepare: it is basic to prepare to refer to that column lifting is preceding to bottom of a cup levelling and progress rim of a cup basis top surface snap the line, it is same with this When, prefabricated post also should lift directrix in three face bullet of shaft, in capital, the installation center of the pop-up of bracket top surface roof truss and crane girder Line;
(2) binding of column: after determining lashing location, the binding method that uses tiltedly to hang strapping and directly hanging strapping, Tiltedly hanging strapping is the method used when the wide face bending stiffness of column is able to satisfy lifting requirements, and crampon is lower than capital, column Hang oblique in the sky after rising, and directly hanging binding rule needs column to turn over, and crampon is higher than capital, is in the sky after column lifting Vertical;
(3) column hangs liter: the lifting method that hangs of column has rotary process and coastdown, rotary process refers to when using bulk-breaking lift-on/lift-off system When, prefabricated using diagonally disposed, working efficiency relatively high method when hanging liter of column;
(4) correction of column: correction is mainly verticality correction, and the inspection method of column vertical missing is with two theodolites The verticality of column lifting directrix is checked from the adjacent both sides (sight should be substantially vertical with cylinder) of column;
(5) the last fixation of column: finally fixation can carry out after calibration, and method is poured in the gap of suspension column and rim of a cup The pea gravel concreten than one strength grade of pillar height is built, completion is poured with secondary, is poured into voussoir bottom surface for the first time, when for the first time When the concrete poured reaches 25% strength grade, voussoir is extracted, then pea gravel concreten is poured to rim of a cup top surface.
Compared with prior art, the present invention having the following advantages and benefits: hoisting of the present invention can be quick The stability for guaranteeing lifting, improves the service life of building.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment, the present invention is made Further to be described in detail, exemplary embodiment of the invention and its explanation for explaining only the invention, are not intended as to this The restriction of invention.
Embodiment:
Center pillar hoisting is built in single industrial premises, comprising the following steps:
(1) basic to prepare: it is basic to prepare to refer to that column lifting is preceding to bottom of a cup levelling and progress rim of a cup basis top surface snap the line, it is same with this When, prefabricated post also should lift directrix in three face bullet of shaft, in capital, the installation center of the pop-up of bracket top surface roof truss and crane girder Line;
(2) binding of column: after determining lashing location, the binding method that uses tiltedly to hang strapping and directly hanging strapping, Tiltedly hanging strapping is the method used when the wide face bending stiffness of column is able to satisfy lifting requirements, and crampon is lower than capital, column Hang oblique in the sky after rising, and directly hanging binding rule needs column to turn over, and crampon is higher than capital, is in the sky after column lifting Vertical;
(3) column hangs liter: the lifting method that hangs of column has rotary process and coastdown, rotary process refers to when using bulk-breaking lift-on/lift-off system When, prefabricated using diagonally disposed, working efficiency relatively high method when hanging liter of column;
(4) correction of column: correction is mainly verticality correction, and the inspection method of column vertical missing is with two theodolites The verticality of column lifting directrix is checked from the adjacent both sides (sight should be substantially vertical with cylinder) of column;
(5) the last fixation of column: finally fixation can carry out after calibration, and method is poured in the gap of suspension column and rim of a cup The pea gravel concreten than one strength grade of pillar height is built, completion is poured with secondary, is poured into voussoir bottom surface for the first time, when for the first time When the concrete poured reaches 25% strength grade, voussoir is extracted, then pea gravel concreten is poured to rim of a cup top surface.
Hoisting of the present invention can quickly guarantee the stability of lifting, improve the service life of building.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (1)

1. building center pillar hoisting in single industrial premises, which comprises the following steps:
(1) basic to prepare: it is basic to prepare to refer to that column lifting is preceding to bottom of a cup levelling and progress rim of a cup basis top surface snap the line, at the same time, Prefabricated post also should lift directrix in three face bullet of shaft, in capital, the installation center line of the pop-up of bracket top surface roof truss and crane girder;
(2) binding of column: after determining lashing location, the binding method used tiltedly hangs tiltedly to hang strapping and directly hanging strapping Strapping is the method used when the wide face bending stiffness of column is able to satisfy lifting requirements, and crampon is lower than capital, and column hangs liter It is oblique in the sky afterwards, and directly hanging binding rule needs column to turn over, crampon is higher than capital, in the sky in upright after column lifting Shape;
(3) column hangs liter: the lifting method that hangs of column has rotary process and coastdown, rotary process refers to when using bulk-breaking lift-on/lift-off system, column Prefabricated using diagonally disposed, working efficiency relatively high method when hanging liter;
(4) correction of column: correction is mainly verticality correction, and the inspection method of column vertical missing is with two theodolites from column Adjacent both sides (sight should be substantially vertical with cylinder) check column lifting directrix verticality;
(5) the last fixation of column: finally fixation can carry out after calibration, and method is that ratio is poured in the gap of suspension column and rim of a cup The pea gravel concreten of one strength grade of pillar height pours completion with secondary, voussoir bottom surface is poured into for the first time, when what is poured for the first time When concrete reaches 25% strength grade, voussoir is extracted, then pea gravel concreten is poured to rim of a cup top surface.
CN201710745073.7A 2017-08-25 2017-08-25 Center pillar hoisting is built in single industrial premises Withdrawn CN109424201A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710745073.7A CN109424201A (en) 2017-08-25 2017-08-25 Center pillar hoisting is built in single industrial premises

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710745073.7A CN109424201A (en) 2017-08-25 2017-08-25 Center pillar hoisting is built in single industrial premises

Publications (1)

Publication Number Publication Date
CN109424201A true CN109424201A (en) 2019-03-05

Family

ID=65501303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710745073.7A Withdrawn CN109424201A (en) 2017-08-25 2017-08-25 Center pillar hoisting is built in single industrial premises

Country Status (1)

Country Link
CN (1) CN109424201A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647590A (en) * 2020-12-01 2021-04-13 河北建工集团有限责任公司 Construction method for prefabricated assembled reinforced concrete beam column steel node prefabricated combination column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647590A (en) * 2020-12-01 2021-04-13 河北建工集团有限责任公司 Construction method for prefabricated assembled reinforced concrete beam column steel node prefabricated combination column

Similar Documents

Publication Publication Date Title
CN105604334B (en) A kind of rapid constructing method for large span steel truss integral installation
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN109424201A (en) Center pillar hoisting is built in single industrial premises
CN105298124A (en) Large-span double-curved-surface tree-shadow-shaped ceiling structure and construction method thereof
CN104674997B (en) A kind of supporting construction and its construction method on timber buildings roof modelled after an antique
CN206143616U (en) Assembled precast concrete anticollision wall component
CN106522364A (en) Garland steel structure system for periphery of stadium and installation technique of garland steel structure system
CN109424189A (en) The technique constructed in construction to rolled roofing material waterproof
CN109424185A (en) Form construction technology in construction
CN109424788A (en) Pipe layer skill when based on to underground pipeline construction
CN106522222A (en) Operation process based on realization of embedded pile foundation in forming of furniture plant
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN109424090A (en) The technique that shear wall concrete is poured and vibrated in construction
CN101446110B (en) High-altitude overhanging steel structure and rotary construction method thereof
CN109424196A (en) Based on the technique for improving concrete pouring quality in construction
CN109424121A (en) Based on the technique for carrying out concreting to column class formation under construction
CN109424069A (en) The method of Lift-slab machine lifting plate in construction
CN109424198A (en) Concrete pre-stress construction technology in construction
CN109425464A (en) Closed-water test method is carried out to pipeline after building underground piping is embedded
CN109424187A (en) The method that concreting is carried out to beam, hardened structure in construction
CN109424149A (en) Based on the method to brick wall tiling in building
CN109424070A (en) The technique constructed in construction to lift slab
CN109424192A (en) The technique of concrete pouring quality is improved in construction
CN109424053A (en) In construction to the embedded technique of underground piping
CN109423994A (en) The method of in situ pile in building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190305

WW01 Invention patent application withdrawn after publication