CN109403344A - A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method - Google Patents

A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method Download PDF

Info

Publication number
CN109403344A
CN109403344A CN201811418013.5A CN201811418013A CN109403344A CN 109403344 A CN109403344 A CN 109403344A CN 201811418013 A CN201811418013 A CN 201811418013A CN 109403344 A CN109403344 A CN 109403344A
Authority
CN
China
Prior art keywords
pile
truss
double
connecting plate
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811418013.5A
Other languages
Chinese (zh)
Inventor
秦会来
周予启
刘卫未
李冬晓
郭恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201811418013.5A priority Critical patent/CN109403344A/en
Publication of CN109403344A publication Critical patent/CN109403344A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/16Foundations formed of separate piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure, including the double pile element of one group of truss-like and soil cement water-stop curtain;The soil cement water-stop curtain is arranged around foundation pit and there are spacing between margin of foundation pit;One group of double pile element of truss-like is arranged along margin of foundation pit, parallel interval;The double pile element of every truss-like is truss structure, including heel row single armed steel-pipe pile, front-seat single armed steel-pipe pile, horizontal connecting plate and oblique connecting plate;Heel row single armed steel-pipe pile is plugged in soil cement water-stop curtain, front-seat single armed steel-pipe pile is plugged in the soil body, is detachably connected respectively with the steel-pipe pile of corresponding side close to the both ends of stiffening plate described at marginal position, and the bottom edge of stiffening plate whittles to form cutting edge, so that the double pile element of truss-like is sunk in the soil body.It is not environmentally small and the technical issues of not can be effectively controlled Support Deformation with waste of material and fashioned iron, steel sheet pile enclosure structure bending stiffness that the present invention solves traditional concrete building enclosure construction.

Description

A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method
Technical field
The present invention relates to foundation field, especially a kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its Construction method.
Background technique
The building enclosure of deep basal pit is divided from material can be divided into concrete building enclosure and steel building enclosure, existing mixed Although the advantages of solidifying fortifield village's protection structure has rigidity big, is conducive to Deformation control, there are construction slurry pollution environment and foundation pits The drawbacks of interim building enclosure is recyclable, waste of material.Although the steel sheet pile in steel building enclosure can recycle, also it is not present Mud contamination problem, but the rigidity of supporting construction is small, is unfavorable for deformation control of foundation pit, and construction is limited by formation condition;And SMW The fashioned iron cement soil wall that engineering method, TRD engineering method and CSM engineering method are formed, although having earth-retaining water stopping function, in these engineering methods Fashioned iron will be fully embedded among cement-soil pile, and section is limited, and bearing capacity and stiffness is limited.It can be seen that existing fashioned iron cement soil wall, steel The rigidity of sheet pile etc., building enclosure is smaller, and bearing capacity is also low, is unfavorable for the carrying and Deformation control of support system.
Summary of the invention
The object of the present invention is to provide a kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction methods, It is not environmentally small with waste of material and fashioned iron, steel sheet pile enclosure structure bending stiffness to solve traditional concrete building enclosure construction Not the technical issues of not can be effectively controlled Support Deformation.
To achieve the above object, the present invention adopts the following technical scheme that.
A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure, is arranged in the soil body around foundation pit;It include one The double pile element of group truss-like and soil cement water-stop curtain;The soil cement water-stop curtain is arranged around foundation pit and and foundation pit There are spacing between edge;The soil cement water-stop curtain is made of one group of cement mixing method, adjacent cement mixing method occlusion Setting;One group of double pile element of truss-like is arranged along margin of foundation pit, parallel interval;Wherein, the double pile element of every truss-like It include heel row single armed steel-pipe pile, front-seat single armed steel-pipe pile, horizontal connecting plate and oblique connecting plate for truss structure;After described Row's single armed steel-pipe pile is plugged in soil cement water-stop curtain, and the front row single armed steel-pipe pile is plugged in the soil body, close to margin location Set place;The horizontal connecting plate has one group, vertically parallel interval is connected to front-seat single armed steel-pipe pile and heel row single armed steel-pipe pile Between;The oblique connecting plate has one group, oblique is respectively connected between neighbouring horizontal connecting plate;In the water of lowest part Horizontal stiffening plate is also connected with below flushconnection plate;The both ends of the stiffening plate are removable with the steel-pipe pile of corresponding side respectively Connection is unloaded, and the bottom edge of stiffening plate whittles to form cutting edge, so that the double pile element of truss-like is sunk in the soil body.
Preferably, the spacing between the soil cement water-stop curtain and margin of foundation pit be 2~3 times of front-seat diameter of steel tube or 2~3 times of person's heel row diameter of steel tube;Spacing between the double pile element of adjacent truss formula is the 1.5~2.5 of front-seat diameter of steel tube Times or 1.5~2.5 times of heel row diameter of steel tube.
Preferably, the front-seat single armed steel-pipe pile and the line of heel row single armed steel-pipe pile and the edge-perpendicular of the soil body;Wherein, Front-seat single armed steel-pipe pile is made of front-seat steel pipe and the first connecting plate, and the first connecting plate is vertically connected on the outer of front-seat steel pipe On wall, towards heel row single armed steel-pipe pile side;Heel row single armed steel-pipe pile is made of heel row steel pipe and the second connecting plate, and second Connecting plate is vertically connected on the outer wall of heel row steel pipe, towards front-seat single armed steel-pipe pile side.
Preferably, the outer diameter of the front-seat steel pipe and heel row steel pipe is not less than 600mm, front-seat steel pipe and heel row steel pipe Wall thickness is not less than 8mm;The diameter of the cement mixing method is greater than the diameter of heel row steel pipe.
Preferably, first connecting plate is vertically elongated is arranged on front-seat outer wall of steel pipe, on the first connecting plate, edge Vertical be spaced apart is equipped with the first connecting hole;Second connecting plate is vertically elongated to be arranged on heel row outer wall of steel pipe, second On connecting plate, vertically be spaced apart be equipped with the second connecting hole;Described horizontal connecting plate one end is by being threaded through in the first connecting hole Bolt be detachably connected with the first connecting plate, the horizontal connecting plate other end passes through the bolt being threaded through in the second connecting hole and Two connecting plates are detachably connected.
Preferably, the width of first connecting plate is 150mm~200mm, with a thickness of 10mm~15mm, the first connecting plate Bottom, close to front-seat steel pipe side be equipped with wedge angle;The width of second connecting plate be 150mm~200mm, with a thickness of 10mm~ 15mm, the bottom of the second connecting plate are equipped with wedge angle close to heel row steel pipe side.
Preferably, the width of the horizontal connecting plate is 200~300mm, with a thickness of 10mm~15mm;The stiffening plate Width is 1.5 times of horizontal connection board width, with a thickness of 15~22mm;The width of the oblique connecting plate is 200~300mm, With a thickness of 10mm~15mm.
A kind of construction method of truss-like double-row pile cement soil wall foundation pit enclosure structure, including steps are as follows.
Step 1, according to the hydrogeologic condition of construction site, the cutting depth of foundation pit, surrounding enviroment and site condition, The size for determining various components in the double pile element of truss-like is calculated by design, and carries out factory of component processing, is then transported To construction site.
Step 2 identifies the position of building enclosure along foundation pit periphery surveying setting-out.
Step 3 assembles the various components of the double pile element of truss-like at the construction field (site), is assembled into one group of truss The double pile element of formula.
Step 4, soil cement water-stop curtain of constructing: one group of cement mixing method of successively constructing by design requirement, one group of cement Native mixing pile is arranged along the edge of foundation pit, and the spacing between margin of foundation pit be 2~3 times of front-seat diameter of steel tube or after 2~3 times for arranging steel-pipe pile diameter, make mutually to be engaged between adjacent cement mixing method.
Step 5, at the cement mixing method position constructed, successively pile foundation in place, lifting, positioning truss-like are double Pile element is located at heel row single armed steel-pipe pile at cement mixing method overlap joint occlusal position, and front-seat single armed steel-pipe pile is located at base At pit edge positions.
Step 6, before the soil cement final set for the cement mixing method constructed, by exempting from synchronous vibration hammer for truss-like Double pile element vibration is sunk in stratum;During vibration is heavy, horizontal connecting plate keeps horizontal.
Preferably, when the double pile element of truss-like is spliced by multiple truss-like double-row pile elementary sections, in step 6, When previous section truss-like double-row pile elementary section vibration sinks to upper end away from the earth's surface position 1.0~1.5m, stops vibrating and remove vibration Hammer;Then later section truss-like double-row pile elementary section is welded, after the completion of welding, then the fixture of vibration hammer is clamped in respectively latter On the front-seat single armed steel-pipe pile and heel row single armed steel-pipe pile for saving truss-like double-row pile elementary section, it is heavy to continue vibration;Until by truss-like All segments vibration of double pile element sinks to position.
It preferably, can when the settling velocity degree that shakes in the soil body around foundation pit when the double pile element of truss-like is less than 5mm/ minutes Before truss-like double-row pile shakes heavy construction, on the soil body, pre- at the position of horizontal connecting plate on the corresponding double pile element of truss-like If circular hole, so that the vibration of the double pile element of truss-like is heavy;Wherein, the diameter of circular hole is 8mm~12mm.
Compared with prior art the invention has the characteristics that and beneficial effect.
1, in order to overcome in current deep-foundation pit engineering, the concrete building enclosure such as campshed, diaphram wall construct not environmentally, The low bearing capacities such as waste of material and fashioned iron, steel sheet pile, building enclosure bending stiffness is small, not can be effectively controlled Support Deformation etc. Defect, the present invention propose a kind of truss-like double-row pile cement soil wall foundation pit enclosure structure, and Water And Earth Pressures are by truss-like double-row pile list Member undertakes;The building enclosure is formed by the heel row single armed steel-pipe pile occlusion cement mixing method of the double pile element of truss-like, truss The single armed steel-pipe pile that the double pile element of formula is relatively large in diameter by forward and backward two rows, which is connected by horizontal connecting plate with oblique connecting plate, to be formed Truss structure, significantly improves stress of the building enclosure under Water And Earth Pressures effect, and bearing capacity is greatly improved, can keep off Soil again can sealing, and truss structure anti-side rigidity significantly improves, and is conducive to the Deformation control of foundation pit supporting system.
2, the truss-like double-row pile cement soil wall foundation pit enclosure structure in the present invention, double-row pile is truss structure, carrying Power is high, and anti-side rigidity is big, under equivalent variations control condition, advantageously reduces inner support and anchor cable setting quantity, also helps Reduce construction process, remarkable in economical benefits.
3, the double pile element of truss-like in the present invention is sunk in stratum by exempting from synchronous vibration hammer vibration, is not necessarily to preparatory grooving, No slurry coat method pollutes environment, construction site civilization environmental protection.
4, the double pile element of cement mixing method and truss-like in the present invention, which overlaps, to be engaged, and when stratum deformation, rigidity is very The double pile element of big truss-like forms fulcrum to soil cement water-stop curtain, efficiently reduces the internal force of soil cement water-stop curtain And deformation, significantly reduce the cracking of soil cement water-stop curtain and the risk of lose effectiveness in sealing.
5, the truss-like double-row pile cement soil wall foundation pit enclosure structure in the present invention can pass through after the completion of foundation pit use The double pile element of truss-like is extracted in vibration, recycles all components of the double pile element of truss-like, and is repeatedly recycled, energy-saving Material, low-carbon environment-friendly.
6, the stiffening plate of the double pile element of truss-like is the biggish reinforcement steel plate of width, and the bottom edge of stiffening plate in the present invention It whittles to form cutting edge, facilitates the injection stratum in the case where vibration hammer acts on.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing.
Fig. 1 is the planar structure schematic diagram of truss-like double-row pile cement soil wall foundation pit enclosure structure of the invention.
Fig. 2 is the structural schematic diagram of the double pile element of truss-like in the present invention.
Fig. 3 is the structural schematic diagram of the double pile element of truss-like in the present invention being arranged in soil cement water-stop curtain.
Fig. 4 is the structural schematic diagram of front-seat single armed steel-pipe pile in the present invention.
Fig. 5 is the structural schematic diagram of heel row single armed steel-pipe pile in the present invention.
Fig. 6 is the structural schematic diagram of stiffening plate in the present invention.
Appended drawing reference: the 1- soil body, the double pile element of 2- truss-like, the front row 2.1- single armed steel-pipe pile, 2.1.1- are front-seat Steel pipe, the first connecting plate of 2.1.2-, 2.2- heel row single armed steel-pipe pile, 2.2.1- heel row steel pipe, the second connecting plate of 2.2.2-, The oblique connecting plate of 2.3- horizontal connecting plate, 2.4-, 2.5- stiffening plate, 3- soil cement water-stop curtain, 3.1- Soil-cement Stake, the first connecting hole of 4-, the second connecting hole of 5-, 6- circular hole.
Specific embodiment
As shown in figures 1 to 6, this truss-like double-row pile cement soil wall foundation pit enclosure structure, is arranged in the soil body around foundation pit In 1;The truss-like double-row pile cement soil wall foundation pit enclosure structure includes the double pile element 2 of one group of truss-like and soil cement sealing Curtain 3;The soil cement water-stop curtain 3 is arranged around foundation pit and there are spacing between margin of foundation pit;The soil cement sealing Curtain 3 is made of one group of cement mixing method 3.1, the adjacent occlusion of cement mixing method 3.1 setting;One group of truss-like double-row pile list Member 2 is arranged along margin of foundation pit, parallel interval;Wherein, the double pile element 2 of every truss-like is truss structure, includes heel row Single armed steel-pipe pile 2.2, front-seat single armed steel-pipe pile 2.1, horizontal connecting plate 2.3 and oblique connecting plate 2.4;The heel row single armed steel pipe Stake 2.2 is plugged in soil cement water-stop curtain 3, and the front row single armed steel-pipe pile 2.1 is plugged in the soil body 1, close to marginal position Place;The horizontal connecting plate 2.3 has one group, vertically parallel interval is connected to front-seat single armed steel-pipe pile 2.1 and heel row single armed steel Between tubular pole 2.2;The oblique connecting plate 2.4 have one group, respectively it is oblique be connected to neighbouring horizontal connecting plate 2.3 it Between;Horizontal stiffening plate 2.5 is also connected in the lower section of the horizontal connecting plate 2.3 of lowest part;The both ends of the stiffening plate 2.5 point It is not detachably connected with the steel-pipe pile of corresponding side, and the bottom edge of stiffening plate 2.5 whittles to form cutting edge, so that truss-like is double Campshed unit 2 is sunk in the soil body 1.
In the present embodiment, the double pile element 2 of one group of truss-like and soil cement water-stop curtain 3 overlap joint be engaged formation collect earth-retaining and The closed foundation pit enclosure structure that sealing is integrated, can earth-retaining again can sealing, wherein it is each in the double pile element 2 of truss-like A component is made of fashioned iron.
In the present embodiment, the spacing between the soil cement water-stop curtain 3 and margin of foundation pit is front-seat steel pipe 2.1.1 diameter 2~3 times or 2~3 times of heel row steel pipe 2.2.1 diameter;Spacing between the double pile element 2 of adjacent truss formula is front-seat steel 1.5~2.5 times of 1.5~2.5 times of pipe 2.1.1 diameter or heel row steel pipe 2.2.1 diameter.
In the present embodiment, the front row single armed steel-pipe pile 2.1 and the line of heel row single armed steel-pipe pile 2.2 and the side of the soil body 1 Marginal lappet is straight;Wherein, front-seat single armed steel-pipe pile 2.1 is made of front-seat steel pipe 2.1.1 and the first connecting plate 2.1.2, and first connects Fishplate bar 2.1.2 is vertically connected on the outer wall of front-seat steel pipe 2.1.1, towards 2.2 side of heel row single armed steel-pipe pile;Heel row single armed steel Tubular pole 2.2 is made of heel row steel pipe 2.2.1 and the second connecting plate 2.2.2, and the second connecting plate 2.2.2 is vertically connected on heel row On the outer wall of steel pipe 2.2.1, towards front-seat 2.1 side of single armed steel-pipe pile.
In the present embodiment, the outer diameter of the front row steel pipe 2.1.1 and heel row steel pipe 2.2.1 is not less than 600mm, front-seat steel The wall thickness of pipe 2.1.1 and heel row steel pipe 2.2.1 are not less than 8mm;The diameter of the cement mixing method 3.1 is greater than heel row steel pipe 2.2.1 diameter.
In the present embodiment, the first connecting plate 2.1.2 is vertically elongated to be arranged on front-seat steel pipe 2.1.1 outer wall, On first connecting plate 2.1.2, vertically be spaced apart be equipped with the first connecting hole 4;The second connecting plate 2.2.2 is vertically elongated to be set Set on heel row steel pipe 2.2.1 outer wall, on the second connecting plate 2.2.2, vertically be spaced apart be equipped with the second connecting hole 5;It is described 2.3 one end of horizontal connecting plate is detachably connected by the bolt being threaded through in the first connecting hole 4 with the first connecting plate 2.1.2, water 2.3 other end of flushconnection plate is detachably connected by the bolt being threaded through in the second connecting hole 5 with the second connecting plate 2.2.2.
In the present embodiment, the width of the first connecting plate 2.1.2 is 150mm~200mm, with a thickness of 10mm~15mm, The bottom of first connecting plate 2.1.2 is equipped with wedge angle close to the front-seat side steel pipe 2.1.1;The width of second connecting plate 2.2.2 is 150mm~200mm, with a thickness of 10mm~15mm, the bottom of the second connecting plate 2.2.2 is equipped with close to the side heel row steel pipe 2.2.1 Wedge angle.
In the present embodiment, the setting of 4 consistency from top to bottom of the first connecting hole on the first connecting plate 2.1.2, aperture be 23mm~ 25mm;5 consistency from top to bottom of the second connecting hole setting on second connecting plate 2.2.2, aperture are 23mm~25mm.
In the present embodiment, the width of the horizontal connecting plate 2.3 is 200~300mm, with a thickness of 10mm~15mm;It is described The width of stiffening plate 2.5 is 1.5 times of 2.3 width of horizontal connecting plate, with a thickness of 15~22mm;The oblique connecting plate 2.4 Width is 200~300mm, with a thickness of 10mm~15mm.
In the present embodiment, the stiffening plate 2.5 is provided with one, the length of the length and stiffening plate 2.5 of each horizontal connecting plate 2.3 It is equal.
The construction method of this truss-like double-row pile cement soil wall foundation pit enclosure structure, including steps are as follows.
Step 1, according to the hydrogeologic condition in proposed place, excavation of foundation pit depth, surrounding enviroment, site condition etc. are led to It crosses design and calculates and determine that front row steel pipe 2.1.1 and the diameter of heel row steel pipe 2.2.1, stake are long in the double pile element 2 of truss-like, level Connecting plate 2.3, oblique connecting plate 2.4, the width of stiffening plate 2.5 and length, and factory of component processing is carried out as needed, transport To construction site.
Step 2 identifies the position of building enclosure along foundation pit periphery surveying setting-out.
The various components of the double pile element 2 of truss-like are assembled at the construction field (site), are assembled into one group of truss by step 3 The double pile element 2 of formula.
Step 4, soil cement water-stop curtain 3 of constructing: one group of cement mixing method 3.1 of successively constructing by design requirement, one group Cement mixing method 3.1 is arranged along the edge of foundation pit, and the spacing between margin of foundation pit is front-seat steel pipe 2.1.1 diameter 2~3 times of 2~3 times or 2.2.1 diameters of heel row steel pipe, make mutually to be engaged between adjacent cement mixing method 3.1.
Step 5, at 3.1 position of cement mixing method constructed, successively pile foundation in place, lifting, positioning truss-like are double Campshed unit 2 is located at heel row single armed steel-pipe pile 2.2 and overlaps at occlusal position with cement mixing method 3.1, front-seat single armed steel pipe Stake 2.1 is located at margin of foundation pit position.
Step 6, before the soil cement final set for the cement mixing method 3.1 constructed, by exempting from synchronous vibration hammer for truss The double vibration of pile element 2 of formula is sunk in stratum;During vibration is heavy, horizontal connecting plate 2.3 keeps horizontal.
In the present embodiment, when the double pile element 2 of truss-like is spliced by multiple truss-like double-row pile elementary sections, step In six, when previous section truss-like double-row pile elementary section vibration sinks to upper end away from the earth's surface position 1.0~1.5m, stop vibrating and removing Vibration hammer;Then later section truss-like double-row pile elementary section is welded, after the completion of welding, then the fixture of vibration hammer is clamped in respectively On the front-seat single armed steel-pipe pile 2.1 and heel row single armed steel-pipe pile 2.2 of later section truss-like double-row pile elementary section, it is heavy to continue vibration;Directly Position is sunk to by all segments vibration of the double pile element 2 of truss-like.
In the present embodiment, when meeting firm hard formation, the double pile element 2 of truss-like shakes settling velocity degree in the soil body 1 around foundation pit When less than 5mm/ minutes, on the soil body 1, water on the double pile element 2 of truss-like can be corresponded to before truss-like double-row pile shakes heavy construction Circular hole 6 is preset at the position of flushconnection plate 2.3, so that the vibration of the double pile element 2 of truss-like is heavy;Wherein, the diameter of circular hole 6 is 8mm~12mm.
Above-described embodiment is not the exhaustion of specific embodiment, can also there is other embodiments, and above-described embodiment purpose exists In illustrating the present invention, the protection scope being not intended to limit the present invention, all applications from simple change of the present invention all fall within this In the protection scope of invention.

Claims (10)

1. a kind of truss-like double-row pile cement soil wall foundation pit enclosure structure, is arranged in the soil body around foundation pit (1);Its feature exists In: it include one group of double pile element of truss-like (2) and soil cement water-stop curtain (3);The soil cement water-stop curtain (3) surrounds Foundation pit setting and there are spacing between margin of foundation pit;The soil cement water-stop curtain (3) is by one group of cement mixing method (3.1) it constitutes, adjacent cement mixing method (3.1) occlusion setting;One group of double pile element of truss-like (2) along margin of foundation pit, Parallel interval arrangement;Wherein, the double pile element of every truss-like (2) is truss structure, includes heel row single armed steel-pipe pile (2.2), front-seat single armed steel-pipe pile (2.1), horizontal connecting plate (2.3) and oblique connecting plate (2.4);The heel row single armed steel-pipe pile (2.2) it is plugged in soil cement water-stop curtain (3), the front row single armed steel-pipe pile (2.1) is plugged in the soil body (1), by near side (ns) At edge position;The horizontal connecting plate (2.3) have one group, vertically parallel interval be connected to front-seat single armed steel-pipe pile (2.1) with Between heel row single armed steel-pipe pile (2.2);The oblique connecting plate (2.4) has one group, oblique is respectively connected to neighbouring water Between flushconnection plate (2.3);Horizontal stiffening plate (2.5) are also connected with below the horizontal connecting plate (2.3) of lowest part;Institute The both ends for stating stiffening plate (2.5) are detachably connected with the steel-pipe pile of corresponding side respectively, and the bottom edge of stiffening plate (2.5) is gradually cut Thin formation cutting edge, so that the double pile element of truss-like (2) is sunk in the soil body (1).
2. truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 1, it is characterised in that: the cement Spacing between native water-stop curtain (3) and margin of foundation pit is 2~3 times or heel row steel pipe of front-seat steel pipe (2.1.1) diameter 2~3 times of (2.2.1) diameter;Spacing between the double pile element of adjacent truss formula (2) is front-seat steel pipe (2.1.1) diameter 1.5~2.5 times of 1.5~2.5 times or heel row steel pipe (2.2.1) diameter.
3. truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 1, it is characterised in that: the front row The edge-perpendicular of the line and the soil body (1) of single armed steel-pipe pile (2.1) and heel row single armed steel-pipe pile (2.2);Wherein, front-seat single armed steel Tubular pole (2.1) is made of front-seat steel pipe (2.1.1) and the first connecting plate (2.1.2), and the first connecting plate (2.1.2) vertically connects It connects on the outer wall of front-seat steel pipe (2.1.1), towards heel row single armed steel-pipe pile (2.2) side;Heel row single armed steel-pipe pile (2.2) by Heel row steel pipe (2.2.1) and the second connecting plate (2.2.2) are constituted, and the second connecting plate (2.2.2) is vertically connected on heel row steel It manages on the outer wall of (2.2.1), towards front-seat single armed steel-pipe pile (2.1) side.
4. truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 3, it is characterised in that: the front row The outer diameter of steel pipe (2.1.1) and heel row steel pipe (2.2.1) is not less than 600mm, front-seat steel pipe (2.1.1) and heel row steel pipe The wall thickness of (2.2.1) is not less than 8mm;The diameter of the cement mixing method (3.1) is straight greater than heel row steel pipe (2.2.1's) Diameter.
5. truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 3, it is characterised in that: described first Connecting plate (2.1.2) is vertically elongated to be arranged on front-seat steel pipe (2.1.1) outer wall, on the first connecting plate (2.1.2), along perpendicular The first connecting hole (4) are equipped with to being spaced apart;Second connecting plate (2.2.2) is vertically elongated to be arranged in heel row steel pipe On (2.2.1) outer wall, on the second connecting plate (2.2.2), vertically be spaced apart be equipped with the second connecting hole (5);The level is even Fishplate bar (2.3) one end is detachably connected by the bolt being threaded through in the first connecting hole (4) with the first connecting plate (2.1.2), water Flushconnection plate (2.3) other end is detachably connected by the bolt being threaded through in the second connecting hole (5) with the second connecting plate (2.2.2) It connects.
6. truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 5, it is characterised in that: described first The width of connecting plate (2.1.2) is 150mm~200mm, and with a thickness of 10mm~15mm, the bottom of the first connecting plate (2.1.2) is leaned on Nearby the row steel pipe side (2.1.1) is equipped with wedge angle;The width of second connecting plate (2.2.2) is 150mm~200mm, with a thickness of 10mm~15mm, the bottom of the second connecting plate (2.2.2) are equipped with wedge angle close to the heel row steel pipe side (2.2.1).
7. truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 1, it is characterised in that: the level The width of connecting plate (2.3) is 200mm~300mm, with a thickness of 10mm~15mm;The width of the stiffening plate (2.5) is level 1.5 times of connecting plate (2.3) width, with a thickness of 15mm~22mm;The width of the oblique connecting plate (2.4) be 200mm~ 300mm, with a thickness of 10mm~15mm.
8. the construction party of truss-like double-row pile cement soil wall foundation pit enclosure structure described in a kind of any one of claim 1-7 Method, which is characterized in that comprise the following steps that
Step 1 passes through according to the hydrogeologic condition of construction site, the cutting depth of foundation pit, surrounding enviroment and site condition Design calculates the size for determining various components in the double pile element of truss-like (2), and carries out factory of component processing, then transports Construction site;
Step 2 identifies the position of building enclosure along foundation pit periphery surveying setting-out;
Step 3 assembles the various components of the double pile element of truss-like (2) at the construction field (site), is assembled into one group of truss-like Double pile element (2);
Step 4 is constructed soil cement water-stop curtain (3): one group of cement mixing method (3.1) of successively constructing by design requirement, and one group Cement mixing method (3.1) is arranged along the edge of foundation pit, and the spacing between margin of foundation pit is that front-seat steel pipe (2.1.1) is straight 2~3 times of 2~3 times of diameter or heel row steel pipe (2.2.1) stake diameter, make mutually to sting between adjacent cement mixing method (3.1) It closes;
Step 5, at cement mixing method (3.1) position constructed, successively pile foundation in place, lifting, positioning truss-like are double Pile element (2) is located at heel row single armed steel-pipe pile (2.2) and overlaps at occlusal position with cement mixing method (3.1), front-seat single armed Steel-pipe pile (2.1) is located at margin of foundation pit position;
Step 6, before the soil cement final set for the cement mixing method (3.1) constructed, by exempting from synchronous vibration hammer for truss-like Double pile element (2) vibration is sunk in stratum;During vibration is heavy, horizontal connecting plate (2.3) keeps horizontal.
9. the construction method of truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 8, feature It is: when the double pile element of truss-like (2) is spliced by multiple truss-like double-row pile elementary sections, in step 6, previous section When the vibration of truss-like double-row pile elementary section sinks to upper end away from the earth's surface position 1.0~1.5m, stops vibrating and remove vibration hammer;Then Later section truss-like double-row pile elementary section is welded, after the completion of welding, then the fixture of vibration hammer is clamped in later section truss respectively On the front-seat single armed steel-pipe pile (2.1) of formula double-row pile elementary section and heel row single armed steel-pipe pile (2.2), it is heavy to continue vibration;Until by purlin All segments vibration of the double pile element of posture (2) sinks to position.
10. the construction method of truss-like double-row pile cement soil wall foundation pit enclosure structure according to claim 8, feature exist In: it, can be in truss when the middle vibration settling velocity degree of the soil body (1) of the double pile element of truss-like (2) around foundation pit is less than 5mm/ minutes Before the heavy construction of formula double-row pile vibration, on the soil body (1), on corresponding the double pile element of truss-like (2) horizontal connecting plate (2.3) position Locate default circular hole (6), so that the vibration of the double pile element of truss-like (2) is heavy;Wherein, the diameter of circular hole (6) is 8mm~12mm.
CN201811418013.5A 2018-11-26 2018-11-26 A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method Pending CN109403344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811418013.5A CN109403344A (en) 2018-11-26 2018-11-26 A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811418013.5A CN109403344A (en) 2018-11-26 2018-11-26 A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method

Publications (1)

Publication Number Publication Date
CN109403344A true CN109403344A (en) 2019-03-01

Family

ID=65455683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811418013.5A Pending CN109403344A (en) 2018-11-26 2018-11-26 A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method

Country Status (1)

Country Link
CN (1) CN109403344A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158608A (en) * 2019-05-22 2019-08-23 安徽省城建设计研究总院股份有限公司 A kind of double piling wall
CN112861208A (en) * 2021-01-07 2021-05-28 青岛理工大学 Analysis method for converting row pile supporting system into underground continuous wall supporting structure
CN113914323A (en) * 2021-09-28 2022-01-11 中亿丰建设集团股份有限公司 Steel pipe grouting type tree root pile construction method for advanced support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110142550A1 (en) * 2008-08-14 2011-06-16 Jae Ho Lee Method for constructing a chair-type, self-supported earth retaining wall
CN102286980A (en) * 2011-07-11 2011-12-21 福建工大建筑设计院 Steel truss foundation pit supporting structure
CN104532851A (en) * 2014-12-17 2015-04-22 北京工业大学 Recycling assembling type double-row pile and supporting method thereof
CN106522242A (en) * 2016-12-21 2017-03-22 大连交通大学 Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system
CN207987930U (en) * 2018-03-20 2018-10-19 吉林东煤建筑基础工程公司 One kind exempting from precipitation foundation pit supporting construction
CN209323528U (en) * 2018-11-26 2019-08-30 中建一局集团建设发展有限公司 A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110142550A1 (en) * 2008-08-14 2011-06-16 Jae Ho Lee Method for constructing a chair-type, self-supported earth retaining wall
CN102286980A (en) * 2011-07-11 2011-12-21 福建工大建筑设计院 Steel truss foundation pit supporting structure
CN104532851A (en) * 2014-12-17 2015-04-22 北京工业大学 Recycling assembling type double-row pile and supporting method thereof
CN106522242A (en) * 2016-12-21 2017-03-22 大连交通大学 Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system
CN207987930U (en) * 2018-03-20 2018-10-19 吉林东煤建筑基础工程公司 One kind exempting from precipitation foundation pit supporting construction
CN209323528U (en) * 2018-11-26 2019-08-30 中建一局集团建设发展有限公司 A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158608A (en) * 2019-05-22 2019-08-23 安徽省城建设计研究总院股份有限公司 A kind of double piling wall
CN112861208A (en) * 2021-01-07 2021-05-28 青岛理工大学 Analysis method for converting row pile supporting system into underground continuous wall supporting structure
CN112861208B (en) * 2021-01-07 2022-08-16 青岛理工大学 Analysis method for converting row pile supporting system into underground continuous wall supporting structure
CN113914323A (en) * 2021-09-28 2022-01-11 中亿丰建设集团股份有限公司 Steel pipe grouting type tree root pile construction method for advanced support

Similar Documents

Publication Publication Date Title
CN109403347A (en) A kind of frame-type double-row pile cement soil wall foundation pit enclosure structure and its construction method
CN109403344A (en) A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method
CN104947681B (en) Super large super deep basement ground pit construction method
CN103215946A (en) Electroosmosis electrode and electroosmosis draining system thereof
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN207959264U (en) Soft clay foundation adjoins High-filled emkankment pipe gallery
CN104762967B (en) The envelope stake device of the anchor jacked pile of a kind of improvement and construction method
CN209323526U (en) A kind of truss-like double-row pile foundation pit enclosure structure
CN209323528U (en) A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure
CN108331015A (en) Soft clay foundation adjoins High-filled emkankment pipe gallery and its construction technology
CN205742214U (en) The structural protective system of churning between a kind of T-shaped stake associating stake
CN204825923U (en) Relay formula underground structure
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN205742290U (en) A kind of bottom plate rear pouring tape force transferring structure
CN209323529U (en) A kind of frame-type double-row pile cement soil wall foundation pit enclosure structure
CN209323527U (en) A kind of frame-type double-row pile foundation pit enclosure structure
CN111877365A (en) H-shaped steel combined steel sheet pile continuous wall combined supporting system and construction method thereof
CN104074195A (en) Method for controlling sedimentation of ground outside foundation pit through horizontal grouting
CN204676533U (en) A kind of soil-nail wall support system based on the recyclable technique of assembling
CN204551470U (en) A kind of envelope stake device of anchor jacked pile of improvement
CN109403345A (en) A kind of truss-like double-row pile foundation pit enclosure structure and its construction method
CN109403346A (en) A kind of frame-type double-row pile foundation pit enclosure structure and its construction method
CN107165155B (en) Disturbance device and its construction method for structural soft soil
CN206570828U (en) Assembled steel sheet pile waling support system
CN110565692A (en) construction method for steel bar and formwork of reverse construction method construction joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination