CN109386939A - Air conditioner control method and device, storage medium and air conditioner - Google Patents

Air conditioner control method and device, storage medium and air conditioner Download PDF

Info

Publication number
CN109386939A
CN109386939A CN201811141060.XA CN201811141060A CN109386939A CN 109386939 A CN109386939 A CN 109386939A CN 201811141060 A CN201811141060 A CN 201811141060A CN 109386939 A CN109386939 A CN 109386939A
Authority
CN
China
Prior art keywords
air
conditioning
preset mode
condition
communicating circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811141060.XA
Other languages
Chinese (zh)
Inventor
李忠正
刘桂鹏
玉维友
唐杰
刘泉洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201811141060.XA priority Critical patent/CN109386939A/en
Publication of CN109386939A publication Critical patent/CN109386939A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention provides an air conditioner control method, an air conditioner control device, a storage medium and an air conditioner, wherein the method comprises the following steps: judging whether the air conditioner meets the condition of entering a preset mode at present; and if the preset condition is met, controlling a communication circuit power supply of an outer unit main control board of the air conditioner to enable the air conditioner to enter the preset mode. The scheme provided by the invention can reduce partial power consumption of the communication circuit of the air conditioning unit.

Description

A kind of air conditioning control method, device, storage medium and air-conditioning
Technical field
The present invention relates to control field more particularly to a kind of air conditioning control method, device, storage medium and air-conditionings.
Background technique
Currently, the commercial air conditioning systems such as multi-connected machine are mainly used for the office spaces such as office building, festivals or holidays, day off substantially to Machine does not use, and practical stand-by time is longer.Normal multi-joint outer machine controller plate includes master control borad, driving plate, and filter band leads to Interrogate module etc..Modules still remain loss, generally in 20W or more when standby.Since unit stand-by time is long, to Machine loss can not be ignored.
Summary of the invention
It is a primary object of the present invention to overcome the defect of the above-mentioned prior art, a kind of method, apparatus of air-conditioning is provided, is deposited Storage media and air-conditioning, with solve air-conditioner set is standby in the prior art when outside machine controller modules still have asking for loss Topic.
One aspect of the present invention provides a kind of air conditioning control method, comprising: judges whether the air-conditioning currently meets entrance The condition of preset mode;If meeting the preset condition, the communicating circuit electricity of the outer machine master control borad by controlling the air-conditioning Source makes the air-conditioning enter the preset mode.
Optionally, judge whether the air-conditioning currently meets the condition into preset mode, comprising: judge that the air-conditioning is The no instruction received into preset mode, if so, the air-conditioning currently meets the condition into preset mode;And/or sentence Whether break standby time of interior machine of the air-conditioning was greater than for the first predetermined time, if so, the air-conditioning currently meets into pre- If the condition of mode;And/or judge whether the air-conditioning enters standby mode, if so, the air-conditioning currently meets into pre- If the condition of mode;And/or detect whether the air-conditioning has refrigeration or heating needs every the second predetermined time, if it is not, then The air-conditioning currently meets the condition into preset mode.
Optionally, judge whether the air-conditioning receives into preset mode by listening to the communication bus of the air-conditioning Instruction, the air-conditioning interior machine standby time whether be greater than for the first predetermined time, whether the air-conditioning enters standby mode and/ Or whether the detection air-conditioning has refrigeration or heating needs.
Optionally, by controlling the communicating circuit power supply of the outer machine master control borad of the air-conditioning, make described in the air-conditioning entrance Preset mode, comprising: cut off the communicating circuit power supply of the outer machine master control borad of the air-conditioning;And/or cut off the outer machine of the air-conditioning The communicating circuit power supply of master control borad, and so that the communicating circuit power supply was connected for the 4th predetermined time every the third predetermined time.
Optionally, further includes: within the 4th predetermined time for every time connecting the communicating circuit power supply, detected whether The wake-up signal of interior machine from the air-conditioning;If so, connecting the communicating circuit power supply of the outer machine master control borad of the air-conditioning, make The air-conditioning exits the preset mode.
Optionally, the wake-up signal, comprising: exit the instruction of preset mode;The instruction for exiting preset mode, packet It includes: to the control signal of the air-conditioning.
Another aspect of the present invention provides a kind of air conditioning control device, comprising: judging unit, for judging that the air-conditioning is worked as The preceding condition whether met into preset mode;Control unit, if meeting the preset condition for judging unit judgement, Then by controlling the communicating circuit power supply of the outer machine master control borad of the air-conditioning, the air-conditioning is made to enter the preset mode.
Optionally, the judging unit, judges whether the air-conditioning currently meets the condition into preset mode, comprising: Judge whether the air-conditioning receives the instruction into preset mode, if so, the air-conditioning, which currently meets, enters preset mode Condition;And/or judge whether the standby time of the interior machine of the air-conditioning was greater than for the first predetermined time, if so, the air-conditioning It is current to meet the condition for entering preset mode;And/or judge whether the air-conditioning enters standby mode, if so, the air-conditioning It is current to meet the condition for entering preset mode;And/or detect whether the air-conditioning has refrigeration or system every the second predetermined time Heat demand, if it is not, then the air-conditioning currently meets the condition into preset mode.
Optionally, the judging unit, is further used for: the communication bus by listening to the air-conditioning judges the air-conditioning Whether instruction into preset mode is received, whether standby time of interior machine of the air-conditioning is greater than the first predetermined time, institute It states air-conditioning and whether enters whether standby mode and/or the detection air-conditioning have refrigeration or heating needs.
Optionally, described control unit, the communicating circuit power supply of the outer machine master control borad by controlling the air-conditioning make described Air-conditioning enters the preset mode, comprising: cuts off the communicating circuit power supply of the outer machine master control borad of the air-conditioning;And/or cutting institute The communicating circuit power supply of the outer machine master control borad of air-conditioning is stated, and so that the communicating circuit power supply is connected the 4th every the third predetermined time Predetermined time.
Optionally, further includes: detection unit, within the 4th predetermined time for every time connecting the communicating circuit power supply, Detect whether the wake-up signal of the interior machine from the air-conditioning;Described control unit is further used for: if the detection unit It detects the wake-up signal, then connects the communicating circuit power supply of the outer machine master control borad of the air-conditioning, the air-conditioning is made to exit institute State preset mode.
Optionally, the wake-up signal, comprising: exit the instruction of preset mode;The instruction for exiting preset mode, packet It includes: to the control signal of the air-conditioning.
Another aspect of the invention provides a kind of storage medium, is stored thereon with computer program, and described program is processed The step of device realizes aforementioned any the method when executing.
Further aspect of the present invention provides a kind of air-conditioning, including processor, memory and storage on a memory can be The step of computer program run on processor, the processor realizes aforementioned any the method when executing described program.
Further aspect of the present invention provides a kind of air-conditioning, including aforementioned any air conditioning control device.
According to the technique and scheme of the present invention, when judging that the air-conditioning meets the condition for entering preset mode, pass through control The communicating circuit power supply of the outer machine master control borad of the air-conditioning makes the air-conditioning enter the preset mode, by timing wake-up and Communicating circuit power supply is cut off, to achieve the purpose that reduce air-conditioner set communicating circuit part power consumption, and can reduce air-conditioner set Stand-by power consumption, it is energy saving, reduce the expenditure of user.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes a part of the invention, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the method schematic diagram of an embodiment of air conditioning control method provided by the invention;
Fig. 2 is the method schematic diagram of a specific embodiment of air conditioning control method provided by the invention;
Fig. 3 is the structural schematic diagram of an embodiment of air conditioning control device provided by the invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with the specific embodiment of the invention and Technical solution of the present invention is clearly and completely described in corresponding attached drawing.Obviously, described embodiment is only the present invention one Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
Fig. 1 is the method schematic diagram of an embodiment of air conditioning control method provided by the invention.The air conditioning control method It specifically can be used for multi-gang air-conditioner unit.
As shown in Figure 1, according to one embodiment of present invention, the air conditioning control method includes at least step S110 and step Rapid S120.
Step S110, judges whether the air-conditioning currently meets the condition into preset mode.
The preset mode is specially the low-power consumption mode of communicating circuit.Specifically, judge whether the air-conditioning is currently full The concrete mode that foot enters the condition of preset mode includes at least one of:
(1) judge whether the air-conditioning receives the instruction into preset mode, if so, the air-conditioning currently meet into Enter the condition of preset mode.
Specifically, by listening to the communication bus of the air-conditioning, judge whether to receive the instruction into preset mode.More Specifically, when the air-conditioning operates normally, while outer machine master control borad is interacted with interior machine normal data, communication bus is listened to On whether have signal into preset mode, that is, receive the instruction into preset mode.The instruction into preset mode It such as can be the instruction that user is triggered by programmable button.The programmable button, such as can be set in the air conditioner On control panel or remote controler.If the air-conditioning receives the instruction into preset mode, it is determined that the air-conditioning is worked as It is preceding to meet the condition for entering preset mode.
(2) judge whether the standby time of the interior machine of the air-conditioning was greater than for the first predetermined time, if so, the air-conditioning is worked as It is preceding to meet the condition for entering preset mode.
Specifically, by listening to the communication bus of the air-conditioning, judge whether the standby time of the interior machine of the air-conditioning is big In the first predetermined time.Wherein, if air-conditioner set is for a long time without control signal input, can determine that for interior machine it is idle, therefore, can be with Whether the communication bus by listening to the air-conditioning has control signal input, to judge whether the interior machine of the air-conditioning leaves unused, with And whether the time that the interior machine leaves unused was greater than for the first predetermined time.If the standby time of machine is greater than the first pre- timing in judging Between, it is determined that air-conditioning currently meets the condition into preset mode.
(3) judge whether the air-conditioning enters standby mode, if so, the air-conditioning currently meets into preset mode Condition.
When the air-conditioning enters standby mode, i.e., outer machine master control borad also enters standby mode, meets and enters the default mould The condition of formula.
(4) detect whether the air-conditioning has refrigeration or heating needs every the second predetermined time, if it is not, the then air-conditioning It is current to meet the condition for entering preset mode.
Specifically, judging whether the air-conditioning has refrigeration or heating to need by the communication bus for listening to the air-conditioning It asks.More specifically, while outer machine master control borad is interacted with interior machine normal data, being listened to logical when the air-conditioning is operated normally Whether refrigeration or heating signal are had in letter bus.Wherein it is possible to the second predetermined time was the interval time for listening to communication bus, That is, listening on communication bus whether have refrigeration or heating signal every the second predetermined time.
Step S120, if meeting the preset condition, the communicating circuit of the outer machine master control borad by controlling the air-conditioning Power supply makes the air-conditioning enter the preset mode.
Specifically, the air-conditioning can be made to enter described preset by cutting off the communicating circuit power supply of the outer machine master control borad Mode, to reduce the loss of the outer machine master control borad.
In a preferred embodiment, the communicating circuit power supply of the outer machine master control borad of the air-conditioning is cut off, and every Three predetermined times made the communicating circuit power supply connect for the 4th predetermined time.That is, the cutting outer machine master control borad is logical The circuit power third predetermined time is interrogated, then connects the communicating circuit power supply of the outer machine master control borad the 4th predetermined time, the 4th Predetermined time and then the cutting communicating circuit power supply third predetermined time, and so on.The third predetermined time is less than The time limit value of the air-conditioner set report communication failure, that is to say, that when communication turn-off time reaching the time limit value, institute Communication failure will be reported by stating air-conditioner set, therefore, make the communication electricity again after cutting off the communicating circuit power supply third predetermined time Road power supply is connected.
Further, it within the 4th predetermined time for every time connecting the communicating circuit power supply, has detected whether to come from The wake-up signal of the interior machine of the air-conditioning;If so, connecting the communicating circuit power supply of the outer machine master control borad of the air-conditioning, make described Air-conditioning exits the preset mode.
Specifically, by listening to the communication bus of the air-conditioning, the wake-up of the interior machine from the air-conditioning is detected whether Signal.The wake-up signal is for example including the instruction for exiting preset mode.The instruction for exiting preset mode for example can be The instruction that user is triggered by programmable button.The programmable button, for example, can be set the air conditioner control panel or It on person's remote controler, such as can be same key with the programmable button for entering the preset mode.Or described exit default mould The instruction of formula can be the control signal to the air-conditioning, for example, cooling signals.Preferably, the 4th predetermined time is greater than Equal to the time needed for listening to a communication bus data.For example, the time needed for listening to a communication bus is 5S, then it is described 4th predetermined time was set as being more than or equal to 5S.
Technical solution of the present invention to clearly illustrate, below again with a specific embodiment to airconditioning control provided by the invention The execution process of method is described.
Fig. 2 is the method schematic diagram of a specific embodiment of air conditioning control method provided by the invention.Implement as shown in Figure 2 It include step S200~step S206 in example.
Step S200, air-conditioner set operate normally.
Step S201 judges whether to receive interior machine Low-Power Instruction (into preset mode by listening to communication bus Instruction), if so, S203 is thened follow the steps, if it is not, thening follow the steps S202.
Step S202 judges whether interior machine standby time is greater than Kmin (first if not receiving interior machine Low-Power Instruction Predetermined time), if so, S203 is thened follow the steps, if it is not, then return step S200.
Next step S203 executes step S204 into low-power consumption mode.
Step S204 behind communicating circuit power supply M seconds of the outer machine master control borad of cutting, then connects N into after low-power consumption mode Second, and step S205 is executed within the N of the connection second.
Step S205 detects whether to receive wake-up signal by bus mode, if so, S206 is thened follow the steps, if it is not, Low-power consumption mode is then kept, and executes step S204 and step S205 again.
Step S206 exits low-power consumption mode, that is, restores the communicating circuit of outer machine master control borad if receiving wake-up signal Power supply.
Fig. 3 is the structural schematic diagram of an embodiment of air conditioning control device provided by the invention.As shown in figure 3, the sky Adjusting control device 100 includes: judging unit 110 and control unit 120.
Judging unit 110 is for judging whether the air-conditioning currently meets the condition into preset mode;Control unit 120 If meeting the preset condition for the judging unit 110 judgement, pass through the logical of the outer machine master control borad for controlling the air-conditioning Circuit power is interrogated, the air-conditioning is made to enter the preset mode.
Judging unit 110 judges whether the air-conditioning currently meets the condition into preset mode.
Specifically, judging unit 110 judges whether the air-conditioning currently meets the specific side into the condition of preset mode Formula includes at least one of:
(1) judge whether the air-conditioning receives the instruction into preset mode, if so, the air-conditioning currently meet into Enter the condition of preset mode.
Specifically, judging unit 110 judges whether to receive into default mould by listening to the communication bus of the air-conditioning The instruction of formula.More specifically, when the air-conditioning operates normally, while outer machine master control borad is interacted with interior machine normal data, The signal whether having on communication bus into preset mode is listened to, that is, receives the instruction into preset mode.It is described to enter in advance If the instruction of mode for example can be the instruction that user is triggered by programmable button.The programmable button, such as can be set On the control panel or remote controler of the air conditioner.If the air-conditioning receives the instruction into preset mode, really The fixed air-conditioning currently meets the condition into preset mode.
(2) judge whether the standby time of the interior machine of the air-conditioning was greater than for the first predetermined time, if so, the air-conditioning is worked as It is preceding to meet the condition for entering preset mode.
Specifically, judging unit 110 judges the idle of the interior machine of the air-conditioning by listening to the communication bus of the air-conditioning Whether the time was greater than for the first predetermined time.Wherein, it if air-conditioner set is for a long time without control signal input, can determine that as the interior machine spare time It sets, therefore, whether can have control signal input by listening to the communication bus of the air-conditioning, to judge the interior machine of the air-conditioning Whether leave unused and whether time that the interior machine is idle was greater than for the first predetermined time.If the standby time of machine is greater than in judging First predetermined time, it is determined that air-conditioning currently meets the condition into preset mode.
(3) judge whether the air-conditioning enters standby mode, if so, the air-conditioning currently meets into preset mode Condition.
When the air-conditioning enters standby mode, i.e., outer machine master control borad also enters standby mode, meets and enters the default mould The condition of formula.
(4) detect whether the air-conditioning has refrigeration or heating needs every the second predetermined time, if it is not, the then air-conditioning It is current to meet the condition for entering preset mode.
Specifically, judging unit 110 judges whether the air-conditioning has refrigeration by listening to the communication bus of the air-conditioning Or heating needs.More specifically, being interacted in outer machine master control borad with interior machine normal data same when the air-conditioning is operated normally When, whether listen on communication bus has refrigeration or heating signal.Wherein it is possible to which the second predetermined time was to listen to communication bus Interval time, that is, whether listen on communication bus every the second predetermined time has refrigeration or heating signal.
If the judgement of judging unit 110 meets the preset condition, control unit 120 is by controlling the air-conditioning The communicating circuit power supply of outer machine master control borad makes the air-conditioning enter the preset mode.
Specifically, judging unit 110 can make the air-conditioning by cutting off the communicating circuit power supply of the outer machine master control borad Into the preset mode, to reduce the loss of the outer machine master control borad.
In a preferred embodiment, judging unit 110 cuts off the communicating circuit electricity of the outer machine master control borad of the air-conditioning Source, and so that the communicating circuit power supply was connected for the 4th predetermined time every the third predetermined time.That is, the cutting outer machine The communicating circuit power supply third predetermined time of master control borad, then so that the communicating circuit power supply of the outer machine master control borad is connected the 4th and make a reservation for Time, the 4th predetermined time and then the cutting communicating circuit power supply third predetermined time, and so on.The third is pre- It fixes time less than the time limit value of the air-conditioner set report communication failure, that is to say, that when communication turn-off time reaching described Between limit value when, the air-conditioner set will report communication failure, therefore, make again after cutting off the communicating circuit power supply third predetermined time The communicating circuit power supply is connected.
Further, described device can also include detection unit (not shown), for making the communicating circuit every time In the 4th predetermined time that power supply is connected, the wake-up signal of the interior machine from the air-conditioning is detected whether;If the detection is single Member detects the wake-up signal, then control unit 120 connects the communicating circuit power supply of the outer machine master control borad of the air-conditioning, makes institute It states air-conditioning and exits the preset mode.
Specifically, the detection unit can have been detected whether by listening to the communication bus of the air-conditioning from described The wake-up signal of the interior machine of air-conditioning.The wake-up signal is for example including the instruction for exiting preset mode.It is described to exit preset mode The instruction that can be for example triggered by programmable button for user of instruction.The programmable button, such as can be set in the sky It on the control panel or remote controler for adjusting device, such as can be same key with the programmable button for entering the preset mode.Or The instruction that preset mode is exited described in person can be the control signal to the air-conditioning, for example, cooling signals.Preferably, described 4th predetermined time is more than or equal to the time needed for listening to a communication bus data.For example, listening to needed for a communication bus Time be 5S, then the 4th predetermined time be set as be more than or equal to 5S.
The present invention also provides a kind of storage mediums for corresponding to the air conditioning control method, are stored thereon with computer journey Sequence, the step of aforementioned any the method is realized when described program is executed by processor.
The present invention also provides a kind of air-conditionings for corresponding to the air conditioning control method, including processor, memory and deposit The computer program that can be run on a processor on a memory is stored up, the processor is realized aforementioned any when executing described program The step of the method.
The present invention also provides a kind of air-conditionings for corresponding to the air conditioning control device, including aforementioned any air-conditioning control Device processed.
Accordingly, scheme provided by the invention passes through control when judging that the air-conditioning meets the condition for entering preset mode The communicating circuit power supply of the outer machine master control borad of the air-conditioning makes the air-conditioning enter the preset mode, by timing wake-up and Communicating circuit power supply is cut off, to achieve the purpose that reduce air-conditioner set communicating circuit part power consumption, and can reduce air-conditioner set Stand-by power consumption, it is energy saving, reduce the expenditure of user.
Function described herein can be implemented in hardware, the software executed by processor, firmware or any combination thereof. If implemented in the software executed by processor, computer can be stored in using function as one or more instructions or codes It is transmitted on readable media or via computer-readable media.Other examples and embodiment are wanted in the present invention and appended right It asks in the scope and spirit of book.For example, due to the property of software, function described above can be used by processor, Hardware, firmware, hardwired or the software implementation for appointing the combination of whichever to execute in these.In addition, each functional unit can integrate In one processing unit, it is also possible to each unit to physically exist alone, can also be integrated in two or more units In one unit.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, and fill as control The component set may or may not be physical unit, it can and it is in one place, or may be distributed over multiple On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above description is only an embodiment of the present invention, is not intended to restrict the invention, for those skilled in the art For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification, Equivalent replacement, improvement etc., should be included within scope of the presently claimed invention.

Claims (15)

1. a kind of air conditioning control method characterized by comprising
Judge whether the air-conditioning currently meets the condition into preset mode;
If meeting the preset condition, the communicating circuit power supply of the outer machine master control borad by controlling the air-conditioning makes the sky It transfers in into the preset mode.
2. the method according to claim 1, wherein judging whether the air-conditioning currently meets into preset mode Condition, comprising:
Judge whether the air-conditioning receives the instruction into preset mode, if so, the air-conditioning currently meets into default The condition of mode;
And/or
Judge whether the standby time of the interior machine of the air-conditioning was greater than for the first predetermined time, if so, the air-conditioning currently meets Into the condition of preset mode;
And/or
Judge whether the air-conditioning enters standby mode, if so, the air-conditioning currently meets the condition into preset mode;
And/or
Detect whether the air-conditioning has refrigeration or heating needs every the second predetermined time, if it is not, then the air-conditioning is currently full Foot enters the condition of preset mode.
3. according to the method described in claim 2, it is characterized in that,
Communication bus by listening to the air-conditioning judges whether the air-conditioning receives the instruction into preset mode, the sky Whether the standby time for the interior machine adjusted is greater than whether the first predetermined time and/or the detection air-conditioning have refrigeration or heating to need It asks.
4. method according to claim 1-3, which is characterized in that by the outer machine master control borad for controlling the air-conditioning Communicating circuit power supply, make the air-conditioning enter the preset mode, comprising:
Cut off the communicating circuit power supply of the outer machine master control borad of the air-conditioning;
And/or
The communicating circuit power supply of the outer machine master control borad of the air-conditioning is cut off, and makes the communicating circuit electricity every the third predetermined time The 4th predetermined time was connected in source.
5. according to the method described in claim 4, it is characterized by further comprising:
Within the 4th predetermined time for every time connecting the communicating circuit power supply, the interior machine from the air-conditioning is detected whether Wake-up signal;
If so, connecting the communicating circuit power supply of the outer machine master control borad of the air-conditioning, the air-conditioning is made to exit the preset mode.
6. according to the method described in claim 5, it is characterized in that,
The wake-up signal, comprising: exit the instruction of preset mode;
The instruction for exiting preset mode, comprising: to the control signal of the air-conditioning.
7. a kind of air conditioning control device characterized by comprising
Judging unit, for judging whether the air-conditioning currently meets the condition into preset mode;
Control unit, if meeting the preset condition for judging unit judgement, by the outer machine for controlling the air-conditioning The communicating circuit power supply of master control borad makes the air-conditioning enter the preset mode.
8. device according to claim 7, which is characterized in that the judging unit judges whether the air-conditioning is currently full Foot enters the condition of preset mode, comprising:
Judge whether the air-conditioning receives the instruction into preset mode, if so, the air-conditioning currently meets into default The condition of mode;
And/or
Judge whether the standby time of the interior machine of the air-conditioning was greater than for the first predetermined time, if so, the air-conditioning currently meets Into the condition of preset mode;
And/or
Judge whether the air-conditioning enters standby mode, if so, the air-conditioning currently meets the condition into preset mode;
And/or
Detect whether the air-conditioning has refrigeration or heating needs every the second predetermined time, if it is not, then the air-conditioning is currently full Foot enters the condition of preset mode.
9. device according to claim 8, which is characterized in that the judging unit is further used for:
Communication bus by listening to the air-conditioning judges whether the air-conditioning receives the instruction into preset mode, the sky Whether the standby time for the interior machine adjusted is greater than whether the first predetermined time and/or the detection air-conditioning have refrigeration or heating to need It asks.
10. according to the described in any item devices of claim 7-9, which is characterized in that described control unit, by controlling the sky The communicating circuit power supply for the outer machine master control borad adjusted makes the air-conditioning enter the preset mode, comprising:
Cut off the communicating circuit power supply of the outer machine master control borad of the air-conditioning;
And/or
The communicating circuit power supply of the outer machine master control borad of the air-conditioning is cut off, and makes the communicating circuit electricity every the third predetermined time The 4th predetermined time was connected in source.
11. device according to claim 10, which is characterized in that further include:
Detection unit has detected whether within the 4th predetermined time for every time connecting the communicating circuit power supply from described The wake-up signal of the interior machine of air-conditioning;
Described control unit is further used for: if the detection unit detects the wake-up signal, connecting the air-conditioning The communicating circuit power supply of outer machine master control borad, makes the air-conditioning exit the preset mode.
12. device according to claim 11, which is characterized in that
The wake-up signal, comprising: exit the instruction of preset mode;
The instruction for exiting preset mode, comprising: to the control signal of the air-conditioning.
13. a kind of storage medium, which is characterized in that it is stored thereon with computer program, it is real when described program is executed by processor The step of existing claim 1-6 any the method.
14. a kind of air-conditioning, which is characterized in that can be transported on a processor on a memory including processor, memory and storage The step of capable computer program, the processor realizes claim 1-6 any the method when executing described program.
15. a kind of air-conditioning, which is characterized in that including the air conditioning control device as described in claim 7-12 is any.
CN201811141060.XA 2018-09-28 2018-09-28 Air conditioner control method and device, storage medium and air conditioner Pending CN109386939A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811141060.XA CN109386939A (en) 2018-09-28 2018-09-28 Air conditioner control method and device, storage medium and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811141060.XA CN109386939A (en) 2018-09-28 2018-09-28 Air conditioner control method and device, storage medium and air conditioner

Publications (1)

Publication Number Publication Date
CN109386939A true CN109386939A (en) 2019-02-26

Family

ID=65418212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811141060.XA Pending CN109386939A (en) 2018-09-28 2018-09-28 Air conditioner control method and device, storage medium and air conditioner

Country Status (1)

Country Link
CN (1) CN109386939A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111853928A (en) * 2020-07-20 2020-10-30 珠海格力电器股份有限公司 Control method and device for awakening outdoor unit by indoor unit, indoor unit and storage medium
CN113390172A (en) * 2020-03-11 2021-09-14 上海海立(集团)股份有限公司 Air conditioner control method and system, air conditioner and readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014231913A (en) * 2013-05-28 2014-12-11 株式会社富士通ゼネラル Air conditioner
CN104315672A (en) * 2014-11-25 2015-01-28 珠海格力电器股份有限公司 Air conditioning unit and power consumption control system thereof
JP5830719B2 (en) * 2011-05-16 2015-12-09 パナソニックIpマネジメント株式会社 Control device for multi-room air conditioner
CN105135632A (en) * 2015-10-16 2015-12-09 珠海格力电器股份有限公司 Sleep display control method and device of air conditioner
CN105757881A (en) * 2016-02-29 2016-07-13 广东志高空调有限公司 Air conditioner and standby control method thereof
CN107270475A (en) * 2017-06-14 2017-10-20 青岛海尔空调电子有限公司 The autonomous dormancy control method of air-conditioner outdoor unit and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5830719B2 (en) * 2011-05-16 2015-12-09 パナソニックIpマネジメント株式会社 Control device for multi-room air conditioner
JP2014231913A (en) * 2013-05-28 2014-12-11 株式会社富士通ゼネラル Air conditioner
CN104315672A (en) * 2014-11-25 2015-01-28 珠海格力电器股份有限公司 Air conditioning unit and power consumption control system thereof
CN105135632A (en) * 2015-10-16 2015-12-09 珠海格力电器股份有限公司 Sleep display control method and device of air conditioner
CN105757881A (en) * 2016-02-29 2016-07-13 广东志高空调有限公司 Air conditioner and standby control method thereof
CN107270475A (en) * 2017-06-14 2017-10-20 青岛海尔空调电子有限公司 The autonomous dormancy control method of air-conditioner outdoor unit and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113390172A (en) * 2020-03-11 2021-09-14 上海海立(集团)股份有限公司 Air conditioner control method and system, air conditioner and readable storage medium
CN111853928A (en) * 2020-07-20 2020-10-30 珠海格力电器股份有限公司 Control method and device for awakening outdoor unit by indoor unit, indoor unit and storage medium

Similar Documents

Publication Publication Date Title
CN107388487B (en) method and device for controlling air conditioner
CN106016587B (en) multi-connected air conditioning unit and communication method and device thereof
CN109386939A (en) Air conditioner control method and device, storage medium and air conditioner
CN102901186A (en) control device, method and system of air conditioner
CN104121661A (en) Method and system for controlling air conditioner purification device
CN106773959B (en) A kind of light current wake-up system and method based on the communication of two core wires
CN107612774B (en) Multi-channel synchronous sleeping method and system
CN110962664B (en) Power distribution system and method of group control charging system
CN107632526A (en) Control device, method, storage medium and equipment
CN104536338A (en) Aircraft cabin management interface subsystem
CN106130742A (en) Equipment method of supplying power to based on POE system and device
CN101977429B (en) Micropower wireless communication network system and implementing method thereof
CN106352477A (en) Communication method and device of air conditioner and air conditioner
CN110360721A (en) Power consumption control method and device of air conditioner, storage medium and air conditioner
CN207457886U (en) A kind of wake-up circuit of electric power system
CN110274362B (en) Multi-system synchronization method, display panel, electric control system and air conditioner
CN108507118B (en) Power supply method and device of multi-split air conditioning system, external unit and internal unit
CN102416916A (en) Common screen display control method for vehicle-mounted automatic air conditioner and audio systems
CN107181654A (en) CAN communication method and system for controlling local area network and air conditioning system
CN105959596A (en) Backup method and device of video source
CN110274360A (en) Air conditioner control method and device, storage medium and air conditioner
CN103516570B (en) multi-object competition method and system
CN108826605A (en) Air conditioner control method and device, storage medium and air conditioner
CN208238141U (en) Air conditioner controller and air conditioner
CN107449107B (en) Multi-module air conditioning unit water pump scheduling control method, water pump system and air conditioning unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190226

RJ01 Rejection of invention patent application after publication