CN109385992A - The construction method of pore-forming in artificial Backfilled Stone Layer - Google Patents

The construction method of pore-forming in artificial Backfilled Stone Layer Download PDF

Info

Publication number
CN109385992A
CN109385992A CN201710661075.8A CN201710661075A CN109385992A CN 109385992 A CN109385992 A CN 109385992A CN 201710661075 A CN201710661075 A CN 201710661075A CN 109385992 A CN109385992 A CN 109385992A
Authority
CN
China
Prior art keywords
drilling
pore
casing
construction
forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710661075.8A
Other languages
Chinese (zh)
Other versions
CN109385992B (en
Inventor
姚喜民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710661075.8A priority Critical patent/CN109385992B/en
Publication of CN109385992A publication Critical patent/CN109385992A/en
Application granted granted Critical
Publication of CN109385992B publication Critical patent/CN109385992B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of construction method of pore-forming in artificial Backfilled Stone Layer, this method removes shallow-layer block stone using digging machine screening in stake position position first and is laid with steel plate after backfilling cohesive soil and compacting;Embedded casing, casing center is overlapped with stake position center;According to block stone diameter and Backfilled Stone Layer thickness, rotary drilling rig is respectively adopted and punching drilling machine is located in the steel plate progress drilling construction of laying, while preparing the mud slip casting pore-forming of certain relative density;It after pore-forming, is measured using lining rope and checks hole depth, after confirmation, carry out borehole cleaning.Present method solves be irrigated drilling construction in Backfilled Stone Layer, it is ensured that construction operation is normally carried out, and reduces construction operation cost, improves construction operation efficiency.

Description

The construction method of pore-forming in artificial Backfilled Stone Layer
Technical field
The present invention relates to a kind of construction methods of pore-forming in artificial Backfilled Stone Layer.
Background technique
With the high speed development of urban construction, coastal cities constantly carry out large-scale marine reclamation land, the original of marine reclamation land Place belongs to coastal tidal landforms mostly, and artificial landfill material is mainly granite block stone composition, and block stone diameter is generally 20~ 80cm, maximum gauge can exceed that 1m, cooperation rubble, dust and cohesive soil filling, and thickness is uneven.When in reclaimation area domain It when carrying out building deep foundation pit support pile driving construction, frequently encounters the Backfilled Stone Layer and is difficult to pass through, the problems such as pore-forming is difficult gives support pile Construction brings puzzlement, affects being normally carried out for construction operation, increases construction operation cost, reduces construction operation efficiency.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of construction method of pore-forming in artificial Backfilled Stone Layer, this method It solves the problems, such as to be irrigated a drilling construction in Backfilled Stone Layer, it is ensured that construction operation is normally carried out, and reduction is applied Work operating cost improves construction operation efficiency.
In order to solve the above technical problems, present invention construction method of pore-forming in artificial Backfilled Stone Layer includes the following steps:
Step 1: shallow-layer block stone is removed, according to block stone layer distribution situation in construction site, stake is determined to stake position unwrapping wire to be onstructed It is screened within removing 6m using digging machine, block stone of the partial size greater than 20cm, after block stone is removed in stake bit positions position position Steel plate is laid with after cohesive soil of the backfill without block stone and compacting;
Step 2: casing made of burying and rolled as steel plate in stake position position, shield-tube embedment depth are not preferably less than 1.5m, casing top Face 300mm above ground level, and casing center is overlapped with stake position center;
Step 3: thickness is less than the Backfilled Stone Layer of 4m for block stone diameter between 20~100cm, it is located in using rotary drilling rig The steel plate of laying carries out drilling construction, and rotary drilling rig is pulled block stone out using short augers and the cooperation of pick coring drilling pipe, used Rotary drilling digger fishes for rubble and mud;The Backfilled Stone Layer of 100cm, thickness greater than 4m is greater than for block stone diameter, using punching drilling machine The steel plate for being located in laying carries out drilling construction, will take drilling out of after block stone impact grinding using jump bit;
Step 4: preparing relative density is respectively 1.3~1.4 and 1.4 during rotary drilling rig and punching drilling machine drilling construction ~1.5 mud slip casting pore-forming, wherein in rotary drilling rig work progress, mud liquid level must not be lower than casing bottom always, guarantee The stability of hole wall, during punching drilling machine construction, mud liquid level, which remains, exceeds casing base opening 0.5m or more, simultaneously greater than Level of ground water 1m or more;
Step 5: being measured using lining rope after pore-forming and checking hole depth, after confirmation, borehole cleaning is carried out, uses relative density for 1.05 ~1.1 mud carries out the cleaning of the mud and sediment of bottom hole, controls the mud density of bottom hole between 1.1~1.15.
Further, it in the rotary drilling rig pore forming process, adjusts drilling rod verticality and is directed at casing center, for part Biggish block of stone in hole is invaded, is expressed on the outside of hole wall range using short augers;Model in hole is fallen into for most of The block stone enclosed pulls drilling out after being loosened using pick coring drilling pipe;Rubble lesser for partial size, is fished out using rotary drilling digger It takes;Enter mud or viscous soil horizon after passing through artificial Backfilled Stone Layer, crept into using rotary drilling digger, when rotary digging drill bit declines To after predetermined depth, rotary drilling digger applies pressure, and soil is squeezed into drilling bucket, and when display barrel is full, rotary drilling digger bottom is closed, and mentions Rotary drilling digger is risen to unload soil in stacking place.
Further, in the punching drilling machine pore forming process, cross jump bit be aligned casing center and deviation no more than ± 20mm starts to hit so that the low hammer of 0.4~0.6m stroke is close, until increasing stroke to 1.0~1.5m after hole is as deep as 3~4m under casing It is transferred to normal bump, and residue in hole is discharged in time, in case there is burying phenomenon too much in residue in hole.
Further, the steel plate thickness of the casing is 6~8mm, internal diameter is than 200 mm big, and casing top of designing stake diameter Open up 1~2 overflow hole.
Further, the casing backfills cohesive soil and compaction in layers using embedded method of digging pit, casing bottom and surrounding, and Casing plane allowable error is 50mm, vertical line inclination is not more than 1%.
Further, the punching drilling machine is in drilling process, and every 1~2m checks the verticality of pore-forming, and discovery deflection is immediately Stop creeping into and simultaneously take measures to rectify a deviation, for the position at change layer and easily glanced off, cross jump bit tapped using low hammer, Disconnected impact is across good with retaining hole shape.
Further, the viscosity for preparing mud is 30~40s.
Since the construction method of present invention pore-forming in artificial Backfilled Stone Layer uses above-mentioned technical proposal, i.e., this method is first in stake Position position is using digging machine screening removing shallow-layer block stone and backfills cohesive soil and is laid with steel plate after being compacted;Embedded casing, casing center It is overlapped with stake position center;According to block stone diameter and Backfilled Stone Layer thickness, rotary drilling rig is respectively adopted and punching drilling machine is located in laying Steel plate carry out drilling construction, while preparing the mud slip casting pore-forming of certain relative density;After pore-forming, is measured and examined using lining rope Hole depth is looked into, after confirmation, carries out borehole cleaning.Present method solves drilling construction is irrigated in Backfilled Stone Layer, really Being normally carried out for construction operation has been protected, construction operation cost is reduced, has improved construction operation efficiency.
Specific embodiment
Present invention construction method of pore-forming in artificial Backfilled Stone Layer includes the following steps:
Step 1: shallow-layer block stone is removed, according to block stone layer distribution situation in construction site, stake is determined to stake position unwrapping wire to be onstructed It is screened within removing 6m using digging machine, block stone of the partial size greater than 20cm, after block stone is removed in stake bit positions position position Steel plate is laid with after cohesive soil of the backfill without block stone and compacting;
Step 2: casing made of burying and rolled as steel plate in stake position position, shield-tube embedment depth are not preferably less than 1.5m, casing top Face 300mm above ground level, and casing center is overlapped with stake position center;
Step 3: thickness is less than the Backfilled Stone Layer of 4m for block stone diameter between 20~100cm, it is located in using rotary drilling rig The steel plate of laying carries out drilling construction, and rotary drilling rig is pulled block stone out using short augers and the cooperation of pick coring drilling pipe, used Rotary drilling digger fishes for rubble and mud;The Backfilled Stone Layer of 100cm, thickness greater than 4m is greater than for block stone diameter, using punching drilling machine The steel plate for being located in laying carries out drilling construction, will take drilling out of after block stone impact grinding using jump bit;
Step 4: preparing relative density is respectively 1.3~1.4 and 1.4 during rotary drilling rig and punching drilling machine drilling construction ~1.5 mud slip casting pore-forming, wherein in rotary drilling rig work progress, mud liquid level must not be lower than casing bottom always, guarantee The stability of hole wall, during punching drilling machine construction, mud liquid level, which remains, exceeds casing base opening 0.5m or more, simultaneously greater than Level of ground water 1m or more;
Step 5: being measured using lining rope after pore-forming and checking hole depth, after confirmation, borehole cleaning is carried out, uses relative density for 1.05 ~1.1 mud carries out the cleaning of the mud and sediment of bottom hole, controls the mud density of bottom hole between 1.1~1.15.
Preferably, it in the rotary drilling rig pore forming process, adjusts drilling rod verticality and is directed at casing center, for part Biggish block of stone in hole is invaded, is expressed on the outside of hole wall range using short augers;Model in hole is fallen into for most of The block stone enclosed pulls drilling out after being loosened using pick coring drilling pipe;Rubble lesser for partial size, is fished out using rotary drilling digger It takes;Enter mud or viscous soil horizon after passing through artificial Backfilled Stone Layer, crept into using rotary drilling digger, when rotary digging drill bit declines To after predetermined depth, rotary drilling digger applies pressure, and soil is squeezed into drilling bucket, and when display barrel is full, rotary drilling digger bottom is closed, and mentions Rotary drilling digger is risen to unload soil in stacking place.
Preferably, in the punching drilling machine pore forming process, cross jump bit be aligned casing center and deviation no more than ± 20mm starts to hit so that the low hammer of 0.4~0.6m stroke is close, until increasing stroke to 1.0~1.5m after hole is as deep as 3~4m under casing It is transferred to normal bump, and residue in hole is discharged in time, in case there is burying phenomenon too much in residue in hole.
Preferably, the steel plate thickness of the casing is 6~8mm, internal diameter is than 200 mm big, and casing top of designing stake diameter Open up 1~2 overflow hole.
Preferably, the casing backfills cohesive soil and compaction in layers using embedded method of digging pit, casing bottom and surrounding, and Casing plane allowable error is 50mm, vertical line inclination is not more than 1%.
Preferably, the punching drilling machine is in drilling process, and every 1~2m checks the verticality of pore-forming, and discovery deflection is immediately Stop creeping into and simultaneously take measures to rectify a deviation, for the position at change layer and easily glanced off, cross jump bit tapped using low hammer, Disconnected impact is across good with retaining hole shape.
Preferably, the viscosity for preparing mud is 30~40s.To increase retaining wall effect, while increasing deslagging ability.
When rotary drilling rig is in place in this method, it is necessary to which held stationary, not run-off the straight, displacement are deep to accurately control drilling Degree, should make the scale of control, to be observed, to record in construction on the rack or on machine pipe.When punching drilling machine is in place, Cross jump bit align piles position, and punching drilling machine is adjusted to horizontal, stabilization.
For Backfilled Stone Layer thickness greater than 4m in this method, using rotary drilling rig it will cause uneconomical, while causing to fill out Rock layers are collapsed hole, and be easy to cause the super side of filling concrete, and pile body is irregular, and the later period causes water-stop curtain constructional difficulties, thus adopts Drilling construction is carried out with punching drilling machine, using jump bit by block stone impact grinding, and is recycled by mud and takes rubble out of drilling.
This method pointedly selects rotary drilling rig and punching drilling machine coordinative construction according to Backfilled Stone Layer thickness, block stone size, It selects suitable drilling bit of rotary-digging drilling rig to cut, squeezed and skim block stone in stratum, cooperates digging machine desurfacing Backfilled Stone Layer Block stone is constructed.Pouring pile hole is cooperated using kinds of processes, reaches technically feasible, and the purpose of economical rationality.We It is mixed that method can be applied to pattern foundation pit supporting structure and architectural engineering stake in the building construction in artificial extensive sea reclamation region etc. Solidifying soil pouring pile hole construction, especially there are be irrigated asking for a drilling construction in the artificial Backfilled Stone Layer of larger thickness for solution Topic.

Claims (7)

1. a kind of construction method of the pore-forming in artificial Backfilled Stone Layer, it is characterised in that this method includes the following steps:
Step 1: shallow-layer block stone is removed, according to block stone layer distribution situation in construction site, stake is determined to stake position unwrapping wire to be onstructed It is screened within removing 6m using digging machine, block stone of the partial size greater than 20cm, after block stone is removed in stake bit positions position position Steel plate is laid with after cohesive soil of the backfill without block stone and compacting;
Step 2: casing made of burying and rolled as steel plate in stake position position, shield-tube embedment depth are not preferably less than 1.5m, casing top Face 300mm above ground level, and casing center is overlapped with stake position center;
Step 3: thickness is less than the Backfilled Stone Layer of 4m for block stone diameter between 20~100cm, it is located in using rotary drilling rig The steel plate of laying carries out drilling construction, and rotary drilling rig is pulled block stone out using short augers and the cooperation of pick coring drilling pipe, used Rotary drilling digger fishes for rubble and mud;The Backfilled Stone Layer of 100cm, thickness greater than 4m is greater than for block stone diameter, using punching drilling machine The steel plate for being located in laying carries out drilling construction, will take drilling out of after block stone impact grinding using jump bit;
Step 4: preparing relative density is respectively 1.3~1.4 and 1.4 during rotary drilling rig and punching drilling machine drilling construction ~1.5 mud slip casting pore-forming, wherein in rotary drilling rig work progress, mud liquid level must not be lower than casing bottom always, guarantee The stability of hole wall, during punching drilling machine construction, mud liquid level, which remains, exceeds casing base opening 0.5m or more, simultaneously greater than Level of ground water 1m or more;
Step 5: being measured using lining rope after pore-forming and checking hole depth, after confirmation, borehole cleaning is carried out, uses relative density for 1.05 ~1.1 mud carries out the cleaning of the mud and sediment of bottom hole, controls the mud density of bottom hole between 1.1~1.15.
2. the construction method of the pore-forming according to claim 1 in artificial Backfilled Stone Layer, it is characterised in that: the rotary drilling rig It in pore forming process, adjusts drilling rod verticality and is directed at casing center, for biggish block of stone in the intrusion hole of part, using short spiral shell Rotary drill is expressed on the outside of hole wall range;It, will using pick coring drilling pipe for most of block stone for falling into range in hole It pulls drilling out after loosening;Rubble lesser for partial size, is fished for using rotary drilling digger;Enter after passing through artificial Backfilled Stone Layer and becomes silted up Mud layer or viscous soil horizon, are crept into using rotary drilling digger, and after rotary digging drill bit drops to predetermined depth, rotary drilling digger applies pressure Power squeezes into soil in drilling bucket, and when display barrel is full, rotary drilling digger bottom is closed, and promotes rotary drilling digger and unloads soil in stacking place.
3. the construction method of the pore-forming according to claim 1 in artificial Backfilled Stone Layer, it is characterised in that: the punching drilling machine In pore forming process, cross jump bit is directed at casing center and deviation is not more than ± 20mm, starts with the low hammer of 0.4~0.6m stroke It is close to hit, until increasing stroke to 1.0~1.5m is transferred to normal bump, and in time will be in hole after hole is as deep as 3~4m under casing Residue discharge, in case there is burying phenomenon too much in residue in hole.
4. the construction method of the pore-forming according to claim 1,2 or 3 in artificial Backfilled Stone Layer, it is characterised in that: the shield The steel plate thickness of cylinder is 6~8mm, internal diameter is 200 mm bigger than design stake diameter, and casing top opens up 1~2 overflow hole.
5. the construction method of the pore-forming according to claim 4 in artificial Backfilled Stone Layer, it is characterised in that: the casing uses Dig pit embedded method, casing bottom and surrounding backfill cohesive soil and compaction in layers, and casing plane allowable error be 50mm, it is vertical Line inclination is not more than 1%.
6. the construction method of the pore-forming according to claim 3 in artificial Backfilled Stone Layer, it is characterised in that: the punching drilling machine In drilling process, every 1~2m checks that the verticality of pore-forming, discovery deflection stop creeping into immediately and take measures to rectify a deviation, for The position glanced off at change layer and easily, cross jump bit is using low hammer tap, interruption impact across good with retaining hole shape.
7. the construction method of the pore-forming according to claim 1 in artificial Backfilled Stone Layer, it is characterised in that: the preparation mud Viscosity be 30~40s.
CN201710661075.8A 2017-08-04 2017-08-04 Construction method for forming hole in artificial stone-filling layer Active CN109385992B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710661075.8A CN109385992B (en) 2017-08-04 2017-08-04 Construction method for forming hole in artificial stone-filling layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710661075.8A CN109385992B (en) 2017-08-04 2017-08-04 Construction method for forming hole in artificial stone-filling layer

Publications (2)

Publication Number Publication Date
CN109385992A true CN109385992A (en) 2019-02-26
CN109385992B CN109385992B (en) 2021-06-01

Family

ID=65413728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710661075.8A Active CN109385992B (en) 2017-08-04 2017-08-04 Construction method for forming hole in artificial stone-filling layer

Country Status (1)

Country Link
CN (1) CN109385992B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080209A (en) * 2019-04-20 2019-08-02 中国二十冶集团有限公司 Cast-in-place pile construction method in deep backfill
CN110863492A (en) * 2019-11-25 2020-03-06 上海市基础工程集团有限公司 Method for treating large-particle-size rock blocks in hydraulic full-casing rotary pile digging construction
CN112983265A (en) * 2021-02-26 2021-06-18 中交一公局第二工程有限公司 Drilling construction process
CN113338314A (en) * 2021-05-21 2021-09-03 南京市水利建筑工程有限公司 Larsen steel sheet pile cofferdam construction method for underwater deep riprap layer area
CN113669003A (en) * 2021-08-05 2021-11-19 深圳宏业基岩土科技股份有限公司 Deep rockfill and sludge area breast wall hole forming construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2351711C1 (en) * 2007-08-20 2009-04-10 Анатолий Никифорович Саурин Method for manufacture of bored pile from slags in rolled wells
CN106013092A (en) * 2016-06-08 2016-10-12 深圳市宏业基基础工程有限公司 Cast-in-situ bored pile construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2351711C1 (en) * 2007-08-20 2009-04-10 Анатолий Никифорович Саурин Method for manufacture of bored pile from slags in rolled wells
CN106013092A (en) * 2016-06-08 2016-10-12 深圳市宏业基基础工程有限公司 Cast-in-situ bored pile construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
文丽: ""深厚石碴回填地层灌注桩施工机具选择"", 《红水河》 *
赵伟等: ""旋挖灌注桩在(深圳)沿海地区复杂地层中应用实例"", 《岩土工程学报》 *
高加林等: ""大型工程中旋挖机与冲孔桩机组合施工技术"", 《施工技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080209A (en) * 2019-04-20 2019-08-02 中国二十冶集团有限公司 Cast-in-place pile construction method in deep backfill
CN110863492A (en) * 2019-11-25 2020-03-06 上海市基础工程集团有限公司 Method for treating large-particle-size rock blocks in hydraulic full-casing rotary pile digging construction
CN112983265A (en) * 2021-02-26 2021-06-18 中交一公局第二工程有限公司 Drilling construction process
CN113338314A (en) * 2021-05-21 2021-09-03 南京市水利建筑工程有限公司 Larsen steel sheet pile cofferdam construction method for underwater deep riprap layer area
CN113669003A (en) * 2021-08-05 2021-11-19 深圳宏业基岩土科技股份有限公司 Deep rockfill and sludge area breast wall hole forming construction method
CN113669003B (en) * 2021-08-05 2023-12-15 深圳宏业基岩土科技股份有限公司 Construction method for wall protection pore-forming in deep filled stone and silt region

Also Published As

Publication number Publication date
CN109385992B (en) 2021-06-01

Similar Documents

Publication Publication Date Title
CN107938676B (en) Pile foundation construction method for penetrating through full-filling karst cave
CN109385992A (en) The construction method of pore-forming in artificial Backfilled Stone Layer
CN108560541B (en) Rotary drilling full-casing follow-up rock face drilling construction method
WO2022096024A1 (en) Construction method for super-long small-diameter hole bored pile
CN104747088B (en) A kind of leafy hosqe bit of cast-in-situ bored pile list waist and drilling construction method
CN108035335A (en) A kind of construction freezing method well shaft type underground parking garage method
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN109056706A (en) A kind of Karst Geological Landscape poured pile base construction method
CN109537574B (en) Construction process of underground continuous wall in extremely hard rock
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN1265062C (en) Construction for making piles and tools
CN112030956A (en) Karst stratum bored pile construction method
CN110735432A (en) Method for clearing pile foundation and controlling parameters in shield tunneling machine over-invasion limit tunnel range
CN110952528A (en) Construction method of cement-soil underground continuous wall under complex geological conditions
CN111705786A (en) Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN111894450A (en) Combined construction method for percussion drill and rotary drill in thick sand gravel layer
CN114108654A (en) Construction method for removing obstacles in foundation pit area invaded by pressure-bearing water dock
CN103015408A (en) Cast-in-place pile synchronous casing hole-forming constructing method
CN104314092A (en) Open caisson construction method based on substitution method
CN114059527A (en) Large-diameter mixing pile construction method suitable for high-groundwater-level hard soil layer
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant