CN109376974A - A kind of Water Resources Irrigation total management system - Google Patents

A kind of Water Resources Irrigation total management system Download PDF

Info

Publication number
CN109376974A
CN109376974A CN201810897505.0A CN201810897505A CN109376974A CN 109376974 A CN109376974 A CN 109376974A CN 201810897505 A CN201810897505 A CN 201810897505A CN 109376974 A CN109376974 A CN 109376974A
Authority
CN
China
Prior art keywords
water
data
module
inspection
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810897505.0A
Other languages
Chinese (zh)
Inventor
陈亮
韩君
姜跃昆
罗强
肖廷亭
贺新
罗朝传
曹雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Wan Jiang Gang Li Technology Co Ltd
Original Assignee
Chengdu Wan Jiang Gang Li Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Wan Jiang Gang Li Technology Co Ltd filed Critical Chengdu Wan Jiang Gang Li Technology Co Ltd
Priority to CN201810897505.0A priority Critical patent/CN109376974A/en
Publication of CN109376974A publication Critical patent/CN109376974A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B13/00Irrigation ditches, i.e. gravity flow, open channel water distribution systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B13/00Irrigation ditches, i.e. gravity flow, open channel water distribution systems
    • E02B13/02Closures for irrigation conduits
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of Water Resources Irrigation total management system, the management system includes warning module, data disaply moudle, water transfer management module, lock group scheduler module, regimen statistical module, engineering polling module and anti-flood module of taking precautions against drought;The data of gate operation monitoring data, pumping station operation monitoring data, warning message, video monitoring displaying, dam safety monitor are integrated based on GIS platform, are passed through the same displaying of GIS platform by the data disaply moudle;The data disaply moudle includes GIS map module, the river valley GIS map that water conservancy bureau of territory of use provides, and carry out on this basis main hydraulic structure, river, channel, measuring point, irrigated area mark;The map layer of Overlapping display at different levels in the data disaply moudle.The present invention realize to Water Resources Irrigation scheduling, decision commanding, management of the use of water, video monitoring, engineering management, dam safety, flood-control and drought relief integrated management.

Description

A kind of Water Resources Irrigation total management system
Technical field
The invention belongs to the technical fields of water-resource information managing, and in particular to a kind of Water Resources Irrigation integrated management system System.
Background technique
China is the relatively deficient country of freshwater resources, and water resource spatial and temporal distributions are uneven.Currently, as population increases Long, industrial development and urbanization process are accelerated, in China, generally produced shortage of fresh water, deteriorating water quality and The problems such as aquatic ecosystem destroys, shortage of water resources, water environment degradation have become the conditionality factor of socio-economic development.This Outside, burst fire-disaster event such as important water pollution event, Important Project accident, major natural disasters (such as sleet and snow ice, earthquake, sea Howl, typhoon etc.) and great man-made disaster event etc., seriously threaten this water safety.Management especially for irrigated area is outstanding To be important, irrigated area generally refers to reliable water source and draws, is defeated, the irrigated area of canal for water distribution system and corresponding drainage channel, is The product of economical activities of mankind, with the development of social economy.For guarantee regional water resources sustainable use, reduce and The influence of shortage of water resources and water pollution to economic development is eliminated, needs to reinforce water resource comprehensive monitoring management, especially for The synthesis of Water Resources Irrigation scheduling, decision commanding, management of the use of water, video monitoring, engineering management, dam safety, flood-control and drought relief etc. Management system.
Summary of the invention
It is to be directed to Water Resources Irrigation tune the purpose of the present invention is to provide a kind of Water Resources Irrigation total management system Degree, decision commanding, management of the use of water, video monitoring, engineering management, dam safety, flood-control and drought relief total management system.
The present invention provides the executive condition tracking of annual water plan for each water conservancy bureau;The formulation of daily water transfer plan is examined It criticizes, executive condition analysis;The gate remote control operation of lock station administration;Channel, the early warning monitoring of river reservoir level, early warning letter Breath notice and tracking response;The statistical analysis of each channel water of website;The early warning monitoring of water quality safety, warning information notice and with Track response;The tracking of the problem of reservoir, the engineerings inspection such as channel, sluice gate station, river and response processing;Each water conservancy bureau is helped to work Personnel can notify target in place with early warning decision, timely information in discovery flood-control and drought relief dangerous situation in time, timely make accurate judgment Crowd avoids the generation of major accident, loses caused by reduction accident.
The present invention is achieved through the following technical solutions: a kind of Water Resources Irrigation total management system, including data prison Survey end, GIS GIS-Geographic Information System, central data server, client, the central data server respectively with data monitoring End, client, GIS GIS-Geographic Information System, management system connection, the client includes the end PC and mobile terminal;The management system System includes warning module, data disaply moudle, water transfer management module, lock group scheduler module, regimen statistical module, engineering inspection mould Block and anti-flood module of taking precautions against drought;Flood-control and drought relief prediction scheme of the anti-flood module of taking precautions against drought to local built engineering, address list, goods and materials Situation carries out online management, and according to water trend, gives a forecast to flood-control and drought relief trend;The warning module includes that water level is pre- Police, water quality early-warning, storage capacity early warning, flood-control and drought relief early warning and flow early warning;The water level early warning includes river water level early warning, channel Water level early warning and reservoir level early warning;The flood-control and drought relief early warning includes big flood early warning and drought early warning;The data show mould Block based on GIS platform, by gate run monitoring data, pumping station operation monitoring data, warning message, video monitoring show, The data of dam safety monitor are integrated, and the same displaying of GIS platform is passed through;The data disaply moudle includes GIS map mould Block, the river valley GIS map that water conservancy bureau of territory of use provides, and main hydraulic structure, river, canal are carried out on this basis Road, measuring point, irrigated area mark;The map layer of Overlapping display at different levels in the data disaply moudle.
The technical information of the flood-control and drought relief module is 2012101271976 by number of patent application, the applying date is 2012.04.27 Chinese invention patent disclose, so it will not be repeated.Each early warning project needs in setting in the warning module The related threshold value of warning of intracardiac configuration.Different threshold value and color mark is arranged in 1 ~ n grades of early warning of configuration point, every grade of early warning.In described Centre data server is the prior art and is not improvement of the invention, and so it will not be repeated.The end PC refers to computer end, described Mobile terminal refers to mobile phone terminal.
In order to preferably realize the present invention, further, the monitoring side includes video surveillance instrument, gate PLC, water level biography Sensor, water quality testing meter, channel, river water level rate of discharge detector;The water quality testing meter is separately positioned on earth's surface and underground.
In order to preferably realize the present invention, further, the water transfer management system is to be formulated according to manager or be Water transfer plan based on the water transfer period that system automatically generates;Summarize each small water user with water unit in the water transfer management system Water plan, then submit it is next with the water period with water application to dispatcher;The next rank of dispatcher's typing Section water plan, determines the water transfer date and submits examination & approval;For manager after line is examined successfully, information notifies Field Force's water transfer day Phase and water transfer auditing result, Field Force reach scene before the water transfer of water transfer date, carry out water transfer with combined floodgate control personnel;Or it is straight Connect information notice lock control personnel's water transfer;Lock control personnel carry out long-range lock control according to water transfer plan, and water transfer is completed, in recording process Dynamic lock is simultaneously put in storage, and information notifies water user;If manager does not examine, information notifies that regulation personnel examine failure and remarks are former Cause.
In order to preferably realize the present invention, further, the lock group scheduler module is unified to carry out local gate Control inputs target flow, if target flow and another intake gate flow summation are lower than the total inflow-rate of water turbine in lock station, according to target stream Amount operation judgement, using free flow, company judges, if the current water level before gates maximum lock flow of gate, and if target water level before gates No more than safety level, then check gate adjustment aperture is calculated, according to increase and decrease flow rate zone, determines that flow averagely splits, is full respectively The quantity of the check gate of sufficient flow adjustment;Judgement selects free flow or undercurrent to calculate intake gate aperture, finally exports result To interface.
In order to preferably realize the present invention, further, if intake gate is 2, intake gate aperture is calculated, formula is passed through Judgement carries out selection free flow or undercurrent to calculate intake gate aperture;Otherwise directly by formula judgement carry out select free flow or Undercurrent calculates intake gate aperture, and when if desired moving 1 or more check gate, then keeps the aperture one of dynamic each check gate It causes.
In order to preferably realize the present invention, further, water level or storage capacity, each lock of the regimen statistical module to reservoir Door or the hydrologic regime data of lock control are for statistical analysis, while analyzing regimen, channel;The regimen statistical module includes water Position transfinite number, water level natural rate of interest, flow compliance rate, lack lower than the plan number of days of flow, water supply quota utilization rate, of that month data Report rate, historical data lack the statistics of report rate;The water level natural rate of interest is acquired by water level alarm number of days, and the flow compliance rate is same Plan the number of days that flow error is no more than 3%, the water supply quota utilization rate is actual used water amount or annual plan water consumption, institute Stating the scarce report rate of of that month data is when obtaining in this month to run total less than the of that month system of data less than the duration of data or of that month acquisition Long, it is the system operation total duration for obtaining the total duration less than data or obtaining less than data that the historical data, which lacks report rate,.
In order to preferably realize the present invention, further, in the engineering polling module, if entering without patrol task Engineering inspection column checks that whether there is or not patrol task prompts, if there is patrol task, loads the station according to the affiliated inspection website of role The inspection template of point shows the same day patrol task page into engineering inspection column, carries out project inspection according to page prompts, If the problem of finding the problem, carrying out problem escalation, report meeting simultaneous display is on map;If not finding the problem, this is completed Secondary inspection;It records this inspection and shows this inspection in inspection list;In the engineering polling module, manager's configuration is patrolled Inspection task, if finding the problem, after leader's examination & approval, patrol officer's Coordination Treatment, after the completion of processing, patrol officer submits processing feelings Condition, then issue handling is completed after leader's confirmation.
The purpose of the present invention is the tracking of the executive condition of annual water plan is provided for each water conservancy bureau;Daily water transfer plan It formulates, examination & approval, executive condition analysis;The gate remote control operation of lock station administration;The pre- police commissioner of channel, river reservoir level Control, warning information notice and tracking response;The statistical analysis of each channel water of website;Early warning monitoring, the early warning letter of water quality safety Breath notice and tracking response;Built engineering operation condition managing, engineering data Drawings and documents;The concentrate tube of video monitoring system Reason, is uniformly controlled;The tracking of the problem of reservoir, the engineerings inspection such as channel, sluice gate station, river and response processing;, help each water conservancy Office staff can arrive in discovery flood-control and drought relief dangerous situation in time, timely make accurate judgment with early warning decision, timely information notice Position target group, avoids the generation of major accident, loses caused by reduction accident.
The invention mainly comprises following functions:
GIS map multilayer level display river, channel, measuring point, hydraulic structure, irrigated area etc.;Regimen real-time monitoring and early warning, water quality Real-time monitoring and early warning;Gate remotely controls and video interlink;Engineering inspection website, personnel, task, record management, inspection meter The task of drawing;Short message service, APP Push Service, wechat Push Service (only key modules do not include all functional modules);Data It acquires, report and shares.
Mobile terminal uses the form of task stream, i.e. management station leader issues patrol task, selection task execution, inspection Personnel are that executor carries out task publication.Patrol officer receives task, and (information notice form includes but is not limited to that short message is informed, micro- Believe client information notice) the inspection operation that carries out related patrol task afterwards, it is made a report on online after the completion of inspection and feeds back to management station leader Completion task closed loop.Plan target: inspection task automatically forms work calendar and work is reminded, and periodically patrols convenient for carrying out Examine work.
The automation equipment data that the present invention acquires need to carry out in-stockroom operation.It can be required according to higher level supervision department, it will Data pass through the interface defined and are reported.And can in a manner of webservice by data sharing to third-party platform
The water transfer management system needs to file history water transfer plan and the current water transfer plan data on flows of reference to each channel flow The amount display page is compared with actual flow, while supporting difference percentage threshold that (flow early warning) is arranged
The lock group scheduler module is centralized and unified to control local gate, can individually divide to management station lock control personnel With local gate control authority (the case where more people are responsible for different websites).
Gate numerical value, which is shown, includes but is not limited to (according to the data of PLC acquisition): gate status, gate operating condition, water before lock , water level after lock, gatage.Gate flow is calculated in real time by building measurement Law.
SEA LEVEL VARIATION situation is compared with data before 1 minute after lock front brake.
Gate rise and fall need corresponding down arrows icon and show.
The malfunctions such as bottom failure or phase shortage are usually hidden, and the upper limit or lower limit state are shown as.When a failure occurs it, may be used Current or voltage situation is checked to click to enter.
The effect of the scram button at top be in gate operational process, occur emergency when, emergency braking.
It is serviced by calculating, calculates the gatage of target lock flow needs.It can choose whether automatically according to defeated The target flow interval some cycles entered are according to the aperture of the water level conditions adjust automatically gate when the front brake front brake after.
If it is the lock control of reservoir type, there is no need to consider the switch conditions of check gate for that, it is only necessary to according to working as front brake Preceding water level carries out tune lock, while will be in view of combining with water level forecast, in the case of judging storage outflow after the adjustment, library water The variation tendency of position.
The page logic of management of the invention is main include the following:
1. problem, after patrol officer is submitted a question in patrol task implementation procedure by APP, system can be shown on map Problem.
2. can according to the solution state of problem carry out problem screening, problem state include: it is unresolved, solved.
3. selection region looks like to select the task type below the inspection website, is respectively: river, channel, lock station work Journey, reservoir dam, pump station engineering etc..
4. inspection people name is the inspection responsible person that drop-down selects current inspection website.
5. selecting the time to screen from certain year the in such a month, and on such a day inspection problem by certain year in such a month, and on such a day.
6. input inquiry property frame is to search for patrol task title generally.
7. " inspection map " and the switching push button of " inspection list " is GIS map to switch the form of expression of patrol task Displaying or textual list display form.
8. the definition of dangerous section dangerous section is to be chosen in patrol task as the patrol task of dangerous section dangerous section.Patrol officer's turns out for work Rate is that this patrol officer has carried out the task (containing not completing completely for task) of inspection and accounts for all inspections for distributing to him The ratio of task.
Irrigated area metering method: hydraulic structure measurement Law;(current meter need to periodically import stage-discharge to stage discharge relation Relationship);Instrumental method (flowmeter);Weir slot measurement Law;Standard section amount water
Different channel rivers can configure different amount water modes according to the difference of selection access device or reported data.
Beneficial effects of the present invention:
(1) management system includes warning module, data disaply moudle, water transfer management module, lock group scheduler module, regimen system Count module, engineering polling module and anti-flood module of taking precautions against drought.The present invention provides the executive condition of annual water plan for each water conservancy bureau Tracking;Formulation, examination & approval, the executive condition analysis of daily water transfer plan;The gate remote control operation of lock station administration;Channel, river Early warning monitoring, warning information notice and the tracking response of road reservoir level;The statistical analysis of each channel water of website;Water quality safety Early warning monitoring, warning information notice and tracking response;The problem of reservoir, the engineerings inspection such as channel, sluice gate station, river, tracks And response processing;Help each water conservancy bureau staff can be in discovery flood-control and drought relief dangerous situation in time, in time make accurate judgment and in advance Alert decision, timely information notify target group in place, avoid the generation of major accident, lose caused by reduction accident.
(2) warning module includes water level early warning, water quality early-warning, storage capacity early warning, flood-control and drought relief early warning and flow early warning; The water level early warning includes river water level early warning, the early warning of channel water level and reservoir level early warning;The flood-control and drought relief early warning includes Big flood early warning and drought early warning.The present invention is notified the early warning monitoring of channel, river reservoir level, warning information and tracking is rung It answers, early warning monitoring, warning information notice and the tracking response of water quality safety help each water conservancy bureau staff that can find in time Flood-control and drought relief dangerous situation, make accurate judgment notifies target group in place with early warning decision, timely information in time, avoids major accident Generation, lose caused by reduction accident.
(3) gate is run monitoring data, pumping station operation monitors number based on GIS platform by the data disaply moudle According to, warning message, video monitoring are shown, the data of dam safety monitor are integrated, pass through the same displaying of GIS platform;It is described Data disaply moudle includes GIS map module, the river valley GIS map that water conservancy bureau of territory of use provides, and on this basis into The main hydraulic structure of row, river, channel, measuring point, irrigated area mark;Superposition at different levels is aobvious in the data disaply moudle The map layer shown.The present invention by GIS map normal data show there is preferable intuitive, while conveniently The executive condition of each water conservancy bureau's year water plan tracks, and has preferable practicability.
(4) the water transfer management system was formulated according to manager or based on the water transfer period of system automatically generated Water transfer plan;Then the water plan for summarizing each small water user in the water transfer management system with water unit is submitted and next uses water Period with water application to dispatcher;The next stage water plan of dispatcher's typing, determines the water transfer date and mentions Hand over examination & approval;For manager after line is examined successfully, information notifies Field Force's water transfer date and water transfer auditing result, Field Force in Scene is reached before the water transfer of water transfer date, carries out water transfer with combined floodgate control personnel;Or direct information notifies lock control personnel's water transfer;Lock control Personnel carry out long-range lock control according to water transfer plan, and water transfer is completed, and the dynamic lock in recording process is simultaneously put in storage, and information notifies water user; If manager does not examine, information notifies regulation personnel to examine failure and remarks reason.The present invention provides daily water transfer meters Formulation, examination & approval, the executive condition analysis drawn, facilitate each water conservancy bureau staff information can notify target group in place in time, keep away Exempt from the generation of major accident, is lost caused by reduction accident.
(5) the lock group scheduler module is unified controls local gate, target flow is inputted, if target flow It is lower than the total inflow-rate of water turbine in lock station with another intake gate flow summation, then is run and judged according to target flow, company is sentenced using free flow It is disconnected, if the current water level before gates maximum lock flow of gate, and if target water level before gates be no more than safety level, calculate check gate Aperture is adjusted, according to increase and decrease flow rate zone, determines that flow averagely splits, meets the quantity of the check gate of flow adjustment respectively; Judgement selects free flow or undercurrent to calculate intake gate aperture, finally outputs results to interface.The present invention can be to lock station administration Gate remote control operation;Facilitate each water conservancy bureau staff information can notify target group in place in time, avoids great thing Therefore generation, lose caused by reduction accident.
(6) the regimen statistical module counts the hydrologic regime data of the water level or storage capacity of reservoir, each gate or lock control Analysis, while regimen, channel are analyzed;The regimen statistical module includes that water level transfinites number, water level natural rate of interest, flow Compliance rate, the number of days lower than plan flow, water supply quota utilization rate, of that month data lack report rate, historical data lacks the statistics of report rate; The water level natural rate of interest is acquired by water level alarm number of days, and the flow compliance rate is no more than 3% day with plan flow error Number, the water supply quota utilization rate are actual used water amount or annual plan water consumption, and this month data lack report rate and obtained for this month It takes less than the duration of data or the of that month of that month system operation total duration obtained less than data, it is to obtain that the historical data, which lacks report rate, It takes the total duration less than data or obtains the system operation total duration less than data.The present invention can to each channel water of website into Row statistical analysis helps each water conservancy bureau staff can be in discovery flood-control and drought relief dangerous situation in time, in time make accurate judgment and in advance Alert decision, timely information notify target group in place, avoid the generation of major accident, lose caused by reduction accident.
(7) in the engineering polling module, if entering engineering inspection column without patrol task and checking that whether there is or not patrol tasks Prompt, if there is patrol task, the inspection template of the website is loaded according to the affiliated inspection website of role, into engineering inspection column Mesh shows the same day patrol task page, carries out project inspection according to page prompts and carries out problem escalation if finding the problem, on The problem of report meeting simultaneous display is on map;If not finding the problem, this inspection is completed;It records this inspection and is arranged in inspection This inspection is shown in table;In the engineering polling module, manager's inspection configuration task, if finding the problem, leader's examination & approval Afterwards, patrol officer's Coordination Treatment, after the completion of processing, patrol officer submits disposition, and then issue handling is completed after leader's confirmation. The present invention can be to reservoir, tracking and response processing the problem of the engineerings inspection such as channel, sluice gate station, river;Help each water conservancy Office staff can arrive in discovery flood-control and drought relief dangerous situation in time, timely make accurate judgment with early warning decision, timely information notice Position target group, avoids the generation of major accident, loses caused by reduction accident.
Detailed description of the invention
Fig. 1 is the schematic diagram of the GIS map of data disaply moudle;
Fig. 2 is the functional block diagram of lock group scheduler module;
Fig. 3 is the functional block diagram of water transfer management module;
Fig. 4 is the functional block diagram of engineering polling module.
Specific embodiment
Embodiment 1:
A kind of Water Resources Irrigation total management system, including data monitoring end, GIS GIS-Geographic Information System, central data service Device, client, the central data server respectively with data monitoring end, client, GIS GIS-Geographic Information System, management system Connection, the client includes the end PC and mobile terminal;The management system includes warning module, data disaply moudle, water transfer pipe Manage module, lock group scheduler module, regimen statistical module, engineering polling module and anti-flood module of taking precautions against drought;The anti-flood module of taking precautions against drought Online management is carried out to the flood-control and drought relief prediction scheme of local built engineering, address list, goods and materials situation, and according to water trend, It gives a forecast to flood-control and drought relief trend;The warning module includes water level early warning, water quality early-warning, storage capacity early warning, flood-control and drought relief early warning With flow early warning;The water level early warning includes river water level early warning, the early warning of channel water level and reservoir level early warning;The flood control is anti- Non-irrigated early warning includes big flood early warning and drought early warning;As shown in Figure 1, the data disaply moudle is based on GIS platform, by gate Operation monitoring data, pumping station operation monitoring data, warning message, video monitoring are shown, the progress of the data of dam safety monitor is whole It closes, passes through the same displaying of GIS platform;The data disaply moudle includes GIS map module, the river that water conservancy bureau of territory of use provides Valley GIS map, and carry out on this basis main hydraulic structure, river, channel, measuring point, irrigated area mark;The data The map layer of Overlapping display at different levels in display module.
The present invention provides the executive condition tracking of annual water plan for each water conservancy bureau;The formulation of daily water transfer plan is examined It criticizes, executive condition analysis;The gate remote control operation of lock station administration;Channel, the early warning monitoring of river reservoir level, early warning letter Breath notice and tracking response;The statistical analysis of each channel water of website;The early warning monitoring of water quality safety, warning information notice and with Track response;The tracking of the problem of reservoir, the engineerings inspection such as channel, sluice gate station, river and response processing;Each water conservancy bureau is helped to work Personnel can notify target in place with early warning decision, timely information in discovery flood-control and drought relief dangerous situation in time, timely make accurate judgment Crowd avoids the generation of major accident, loses caused by reduction accident.
Embodiment 2:
The present embodiment is to advanced optimize on the basis of embodiment 1, and the monitoring side includes video surveillance instrument, gate PLC, water Level sensor, water quality testing meter, channel, river water level rate of discharge detector;The water quality testing meter be separately positioned on earth's surface and Underground.
As shown in figure 3, the water transfer management system is the water transfer period according to manager's formulation or system automatically generated Based on water transfer plan;The water plan for summarizing each small water user in the water transfer management system with water unit, is then submitted It is next with the water period with water application to dispatcher;The next stage water plan of dispatcher's typing, determines water transfer Date simultaneously submits examination & approval;For manager after line is examined successfully, information notifies Field Force's water transfer date and water transfer auditing result, existing Field personnel reach scene before the water transfer of water transfer date, carry out water transfer with combined floodgate control personnel;Or direct information notifies lock control personnel Water transfer;Lock control personnel carry out long-range lock control according to water transfer plan, and water transfer is completed, and the dynamic lock in recording process is simultaneously put in storage, and information is logical Know water user;If manager does not examine, information notifies regulation personnel to examine failure and remarks reason.
The present invention provides the formulation of daily water transfer plan, examination & approval, executive condition analyses, facilitate each water conservancy bureau staff It information can notify target group in place in time, avoid the generation of major accident, lost caused by reduction accident.
The other parts of the present embodiment are same as Example 1, and so it will not be repeated.
Embodiment 3:
The present embodiment is advanced optimized on the basis of embodiment 2, as shown in Fig. 2, the lock group scheduler module is unified to linchpin Gate in area is controlled, and target flow is inputted, if target flow and another intake gate flow summation are lower than the total overcurrent in lock station Amount then runs according to target flow and judges, using free flow, company judges, if the current water level before gates maximum lock flow of gate, And if target water level before gates is no more than safety level, calculates check gate adjustment aperture and is determined respectively according to increase and decrease flow rate zone Flow averagely splits, meets the quantity of the check gate of flow adjustment;Judgement selection free flow or undercurrent are opened to calculate intake gate Degree, finally outputs results to interface.If intake gate is 2, intake gate aperture is calculated, selection is carried out freely by formula judgement Stream or undercurrent calculate intake gate aperture;Otherwise selection free flow or undercurrent are directly carried out by formula judgement to calculate intake gate Aperture, and if desired move 1 or more check gate when, then keep the aperture of dynamic each check gate consistent.
The present invention can gate remote control operation to lock station administration;Facilitate each water conservancy bureau staff can timely information It notifies target group in place, avoids the generation of major accident, lost caused by reduction accident.
The other parts of the present embodiment are identical as above-described embodiment 2, and so it will not be repeated.
Embodiment 4:
The present embodiment is optimized on the basis of embodiment 2 or 3, water level or library of the regimen statistical module to reservoir Appearance, each gate or the hydrologic regime data of lock control are for statistical analysis, while analyzing regimen, channel;The regimen counts mould Block include water level transfinite number, water level natural rate of interest, flow compliance rate, lower than the plan number of days of flow, water supply quota utilization rate, when Month data lack report rate, historical data lacks the statistics of report rate;The water level natural rate of interest is acquired by water level alarm number of days, the flow Compliance rate is no more than 3% number of days with plan flow error, and the water supply quota utilization rate is that actual used water amount or annual plan are used Water, this month data lack report rate and obtain to be of that month less than the duration of data or the of that month of that month system fortune obtained less than data Row total duration, it is when obtaining less than the total duration of data or obtaining total less than the operation of the system of data that the historical data, which lacks report rate, It is long.
The present invention can be for statistical analysis to each channel water of website, helps each water conservancy bureau staff that can send out in time Existing flood-control and drought relief dangerous situation, make accurate judgment notifies target group in place with early warning decision, timely information in time, avoids great thing Therefore generation, lose caused by reduction accident.
The other parts of the present embodiment are identical as above-described embodiment 2 or 3, and so it will not be repeated.
Embodiment 5:
The present embodiment is optimized on the basis of embodiment 4, as shown in figure 4, in the engineering polling module, if without inspection Task then enters engineering inspection column and checks that whether there is or not patrol task prompts, if there is patrol task, according to the affiliated inspection station of role Point loads the inspection template of the website, into engineering inspection column, shows the same day patrol task page, carries out according to page prompts Project inspection, if the problem of finding the problem, carrying out problem escalation, report meeting simultaneous display is on map;If not finding the problem, Then complete this inspection;It records this inspection and shows this inspection in inspection list;In the engineering polling module, management Person's inspection configuration task, if finding the problem, after leader's examination & approval, patrol officer's Coordination Treatment, after the completion of processing, patrol officer is mentioned Disposition is handed over, then issue handling is completed after leader's confirmation.
The present invention can be to reservoir, tracking and response processing the problem of the engineerings inspection such as channel, sluice gate station, river;Side Zhu Ge water conservancy bureau staff can in time discovery flood-control and drought relief dangerous situation, in time make accurate judgment and early warning decision, in time letter Breath notifies target group in place, avoids the generation of major accident, loses caused by reduction accident.
The other parts of the present embodiment are identical as above-described embodiment 4, and so it will not be repeated.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is all according to According to technical spirit any simple modification to the above embodiments of the invention, equivalent variations, protection of the invention is each fallen within Within the scope of.

Claims (7)

1. a kind of Water Resources Irrigation total management system, including data monitoring end, GIS GIS-Geographic Information System, central data service Device, client, the central data server respectively with data monitoring end, client, GIS GIS-Geographic Information System, management system Connection, the client includes the end PC and mobile terminal;It is characterized in that, the management system includes that warning module, data are shown Module, water transfer management module, lock group scheduler module, regimen statistical module, engineering polling module and anti-flood module of taking precautions against drought;It is described anti- The anti-flood module of drought carries out online management to the flood-control and drought relief prediction scheme of local built engineering, address list, goods and materials situation, and according to Water trend gives a forecast to flood-control and drought relief trend;The warning module includes water level early warning, water quality early-warning, storage capacity early warning, flood control Drought resisting early warning and flow early warning;The water level early warning includes river water level early warning, the early warning of channel water level and reservoir level early warning;Institute Stating flood-control and drought relief early warning includes big flood early warning and drought early warning;The data disaply moudle is transported gate based on GIS platform Row monitoring data, pumping station operation monitoring data, warning message, video monitoring are shown, the data of dam safety monitor are integrated, Pass through the same displaying of GIS platform;The data disaply moudle includes GIS map module, the river that water conservancy bureau of territory of use provides Domain GIS map, and carry out on this basis main hydraulic structure, river, channel, measuring point, irrigated area mark;The data are aobvious Show the map layer of Overlapping display at different levels in module.
2. a kind of Water Resources Irrigation total management system according to claim 1, which is characterized in that the monitoring side includes Video surveillance instrument, gate PLC, water level sensor, water quality testing meter, channel, river water level rate of discharge detector;The water quality inspection It surveys instrument and is separately positioned on earth's surface and underground.
3. a kind of Water Resources Irrigation total management system according to claim 2, which is characterized in that water transfer management system System is according to the water transfer plan based on the water transfer period of manager's formulation or system automatically generated;The water transfer management system Middle water unit summarizes the water plan of each small water user, then submit it is next with the water period with water application to dispatcher; The next stage water plan of dispatcher's typing, determines the water transfer date and submits examination & approval;Manager examines success online Afterwards, information notifies Field Force's water transfer date and water transfer auditing result, and Field Force reaches scene before the water transfer of water transfer date, matches Combined floodgate control personnel carry out water transfer;Or direct information notifies lock control personnel's water transfer;Lock control personnel carry out long-range according to water transfer plan Lock control, water transfer are completed, and the dynamic lock in recording process is simultaneously put in storage, and information notifies water user;If manager does not examine, information is logical Know that regulation personnel examine failure and remarks reason.
4. a kind of Water Resources Irrigation total management system according to claim 1 or 3, which is characterized in that the lock group tune Degree module is unified to control local gate, inputs target flow, if target flow and another intake gate flow summation Lower than the total inflow-rate of water turbine in lock station, is then run and judged according to target flow, company judges using free flow, if the current water level before gates of gate Maximum lock flow, and if target water level before gates be no more than safety level, calculate check gate adjustment aperture, according to increase and decrease flow Section determines that flow averagely splits, meets the quantity of the check gate of flow adjustment respectively;Judgement selection free flow or undercurrent come Intake gate aperture is calculated, interface is finally outputted results to.
5. a kind of Water Resources Irrigation total management system according to claim 4, which is characterized in that if intake gate is 2, Intake gate aperture is then calculated, selection free flow or undercurrent are carried out by formula judgement to calculate intake gate aperture;Otherwise directly logical When crossing formula judgement and carry out selection free flow or undercurrent to calculate intake gate aperture, and if desired moving 1 or more check gate, then protect The aperture for each check gate held is consistent.
6. a kind of Water Resources Irrigation total management system according to claim 2, which is characterized in that the regimen counts mould Block is for statistical analysis to the hydrologic regime data of the water level or storage capacity of reservoir, each gate or lock control, while dividing regimen, channel Analysis;The regimen statistical module include water level transfinite number, water level natural rate of interest, flow compliance rate, lower than plan flow number of days, Water supply quota utilization rate, of that month data lack report rate, historical data lacks the statistics of report rate;The water level natural rate of interest passes through water level alarm Number of days acquires, and the flow compliance rate is no more than 3% number of days with plan flow error, and the water supply quota utilization rate is practical Water consumption or annual plan water consumption, it is that of that month obtain obtains not less than the duration of data or this month that the of that month data, which lack report rate, To data of that month system run total duration, the historical data lack report rate be obtain less than data total duration or acquisition less than The system of data runs total duration.
7. a kind of Water Resources Irrigation total management system according to claim 2, which is characterized in that the engineering inspection mould In block, if entering engineering inspection column without patrol task and checking that whether there is or not patrol task prompts, if there is patrol task, basis The affiliated inspection website of role loads the inspection template of the website, into engineering inspection column, shows the same day patrol task page, presses Project inspection is carried out according to page prompts, if the problem of finding the problem, carrying out problem escalation, report meeting simultaneous display is in map On;If not finding the problem, this inspection is completed;It records this inspection and shows this inspection in inspection list;The work In journey polling module, manager's inspection configuration task, if finding the problem, after leader's examination & approval, patrol officer's Coordination Treatment, processing After the completion, patrol officer submits disposition, and then issue handling is completed after leader's confirmation.
CN201810897505.0A 2018-08-08 2018-08-08 A kind of Water Resources Irrigation total management system Pending CN109376974A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810897505.0A CN109376974A (en) 2018-08-08 2018-08-08 A kind of Water Resources Irrigation total management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810897505.0A CN109376974A (en) 2018-08-08 2018-08-08 A kind of Water Resources Irrigation total management system

Publications (1)

Publication Number Publication Date
CN109376974A true CN109376974A (en) 2019-02-22

Family

ID=65404423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810897505.0A Pending CN109376974A (en) 2018-08-08 2018-08-08 A kind of Water Resources Irrigation total management system

Country Status (1)

Country Link
CN (1) CN109376974A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110413668A (en) * 2019-06-19 2019-11-05 成都万江港利科技股份有限公司 A kind of Water Conservancy Information data intelligence processing system
CN110442071A (en) * 2019-01-02 2019-11-12 哈尔滨鸿德亦泰数码科技有限责任公司 Wisdom irrigated area e platform based on dual architecture technology
CN111626892A (en) * 2020-04-02 2020-09-04 珠海智信佰达科技有限公司 Irrigation area water demand metering monitoring method and system
CN111830225A (en) * 2020-07-28 2020-10-27 安徽沃特水务科技有限公司 Ecological flow monitoring and early warning method based on intelligent scheduling
CN111965317A (en) * 2020-08-05 2020-11-20 宁夏无线互通信息技术有限公司 Movable river water quality monitoring system
CN112070393A (en) * 2020-09-07 2020-12-11 宜昌湖蓝科技开发有限公司 Wastewater quality detection system that industry and agriculture production discharged
CN112116251A (en) * 2020-09-18 2020-12-22 河北省水利工程局 Water conservancy information automatic statistical system for water transfer
CN112445166A (en) * 2020-11-18 2021-03-05 尚禹科技有限公司 Construction method of hydraulic engineering gate pump remote measurement and control system
CN112557611A (en) * 2020-11-06 2021-03-26 佛山市禅城区环境监测站 River surge water regulating system and method thereof
CN112862628A (en) * 2021-01-15 2021-05-28 哈尔滨鸿德亦泰数码科技有限责任公司 Visual comprehensive display application platform for irrigation area
CN113873114A (en) * 2021-09-14 2021-12-31 中国石油化工股份有限公司 Oil and gas pipeline integrity management monitoring early warning system and method
CN114657951A (en) * 2022-03-10 2022-06-24 宁夏回族自治区水利科学研究院 Intelligent lock of central control gate and using method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101714235A (en) * 2009-11-25 2010-05-26 浙江省电力公司 Province and district cooperative dispatching method in hydropower dispatching system
CN202177926U (en) * 2011-07-07 2012-03-28 上海市水务规划设计研究院 Comprehensive scheduling management system for water resource
CN106223257A (en) * 2016-07-25 2016-12-14 中国水利水电科学研究院 A kind of long distance open channel accident section upstream emergency response gate group control method
CN107065743A (en) * 2017-03-23 2017-08-18 珠江水利委员会珠江水利科学研究院 A kind of Irrigation District Information System and its management method
CN107657329A (en) * 2017-07-04 2018-02-02 江苏鸿利智能科技有限公司 The intelligent scheduling decision-making technique taked precautions against drought based on flood control under extreme weather conditions
CN108181940A (en) * 2017-12-27 2018-06-19 中国水利水电科学研究院 It meets an urgent need the regulation and control method of the gate in the case of cutting off the water supply suitable for series connection channel downstream

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101714235A (en) * 2009-11-25 2010-05-26 浙江省电力公司 Province and district cooperative dispatching method in hydropower dispatching system
CN202177926U (en) * 2011-07-07 2012-03-28 上海市水务规划设计研究院 Comprehensive scheduling management system for water resource
CN106223257A (en) * 2016-07-25 2016-12-14 中国水利水电科学研究院 A kind of long distance open channel accident section upstream emergency response gate group control method
CN107065743A (en) * 2017-03-23 2017-08-18 珠江水利委员会珠江水利科学研究院 A kind of Irrigation District Information System and its management method
CN107657329A (en) * 2017-07-04 2018-02-02 江苏鸿利智能科技有限公司 The intelligent scheduling decision-making technique taked precautions against drought based on flood control under extreme weather conditions
CN108181940A (en) * 2017-12-27 2018-06-19 中国水利水电科学研究院 It meets an urgent need the regulation and control method of the gate in the case of cutting off the water supply suitable for series connection channel downstream

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
辽宁省通信学会主编: "通信网络与信息技术2016", vol. 1, 辽宁科学技术出版社, pages: 131 - 132 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110442071B (en) * 2019-01-02 2021-09-24 哈尔滨鸿德亦泰数码科技有限责任公司 Intelligent irrigation area e platform based on dual-architecture technology
CN110442071A (en) * 2019-01-02 2019-11-12 哈尔滨鸿德亦泰数码科技有限责任公司 Wisdom irrigated area e platform based on dual architecture technology
CN110413668A (en) * 2019-06-19 2019-11-05 成都万江港利科技股份有限公司 A kind of Water Conservancy Information data intelligence processing system
CN110413668B (en) * 2019-06-19 2023-08-11 成都万江港利科技股份有限公司 Intelligent processing system for water conservancy informationized data
CN111626892A (en) * 2020-04-02 2020-09-04 珠海智信佰达科技有限公司 Irrigation area water demand metering monitoring method and system
CN111830225A (en) * 2020-07-28 2020-10-27 安徽沃特水务科技有限公司 Ecological flow monitoring and early warning method based on intelligent scheduling
CN111830225B (en) * 2020-07-28 2023-09-29 安徽沃特水务科技有限公司 Ecological flow monitoring and early warning method based on intelligent scheduling
CN111965317A (en) * 2020-08-05 2020-11-20 宁夏无线互通信息技术有限公司 Movable river water quality monitoring system
CN112070393A (en) * 2020-09-07 2020-12-11 宜昌湖蓝科技开发有限公司 Wastewater quality detection system that industry and agriculture production discharged
CN112070393B (en) * 2020-09-07 2021-06-01 宜昌湖蓝科技开发有限公司 Wastewater quality detection system that industry and agriculture production discharged
CN112116251A (en) * 2020-09-18 2020-12-22 河北省水利工程局 Water conservancy information automatic statistical system for water transfer
CN112557611A (en) * 2020-11-06 2021-03-26 佛山市禅城区环境监测站 River surge water regulating system and method thereof
CN112445166A (en) * 2020-11-18 2021-03-05 尚禹科技有限公司 Construction method of hydraulic engineering gate pump remote measurement and control system
CN112862628A (en) * 2021-01-15 2021-05-28 哈尔滨鸿德亦泰数码科技有限责任公司 Visual comprehensive display application platform for irrigation area
CN113873114A (en) * 2021-09-14 2021-12-31 中国石油化工股份有限公司 Oil and gas pipeline integrity management monitoring early warning system and method
CN114657951A (en) * 2022-03-10 2022-06-24 宁夏回族自治区水利科学研究院 Intelligent lock of central control gate and using method thereof
CN114657951B (en) * 2022-03-10 2024-05-10 宁夏回族自治区水利科学研究院 Intelligent lock for central control gate and use method thereof

Similar Documents

Publication Publication Date Title
CN109376974A (en) A kind of Water Resources Irrigation total management system
CN102184490A (en) System and system for real-time monitoring and managing urban water resources
CN107195164B (en) Mountain flood on-line monitoring identification method for early warning and its early warning system
CN103175513B (en) System and method for monitoring hydrology and water quality of river basin under influence of water projects based on Internet of Things
US7233843B2 (en) Real-time performance monitoring and management system
CN104200322A (en) Integrated watershed management system
CN103489053A (en) Intelligent water resource control platform based on cloud computing and expert system
CN109857047A (en) Wisdom irrigated area e platform based on dual architecture technology
CN105608842A (en) Nuclear reactor fuel failure online monitoring alarm device
CN105976264A (en) Display method and system for comprehensive drainage information monitoring
WO2024012552A1 (en) Graded early-warning method for safety production risks in tailings pond
Shen et al. Risk dynamics modeling of reservoir dam break for safety control in the emergency response process
Penkova et al. Emergency situations monitoring using OLAP tehnology
Liu et al. Application and study of internet of things used in rural water conservancy project
CN106871963A (en) A kind of reservoir water-supply real time monitoring management system
CN115067194B (en) Full-pipeline irrigation area measurement and control intelligent irrigation system and method
CN109409597A (en) A kind of medium-term and long-term great flood forecasting procedure based on genetic analysis
Liu et al. Water resources monitoring system construction in shanxi province, China
Penkova et al. On-line control of the state of technosphere and environment objects in Krasnoyarsk region based on monitoring data
Ren et al. Model and application of inversion data cleaning for flow monitoring stations in the middle route of the South-to-North Water Diversion Project
Moldovan et al. MONITORISATION OF MEDIAS HYDROTECNICAL SYSTEM IN ORDER TO OPTIMISE REQUIREMENTS FOR WATER USE
Xue et al. Design of Intelligent Environmental Management and Decision-Making Platform for Small-and Medium-Sized Hydropower-Intensive Watersheds
Chunzhong et al. Design of Intelligent Monitoring System of Integrated Water Supply and Drainage based on Big Data and Cloud Computing
CN115053795B (en) Method and terminal for data measurement and control of irrigation system
Yu et al. Evaluation of reservoir management modernization under the concept of coordinated development

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222

RJ01 Rejection of invention patent application after publication