CN109361080A CN201811167762.5A CN201811167762A CN109361080A CN 109361080 A CN109361080 A CN 109361080A CN 201811167762 A CN201811167762 A CN 201811167762A CN 109361080 A CN109361080 A CN 109361080A
Authority
CN
China
Prior art keywords
substation
soil
metal
charcoal bed
resistivity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811167762.5A
Other languages
Chinese (zh)
Inventor
胡轶峰
胡红武
刘成刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jiedian Electric Co Ltd
Original Assignee
Hubei Jiedian Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jiedian Electric Co Ltd filed Critical Hubei Jiedian Electric Co Ltd
Priority to CN201811167762.5A priority Critical patent/CN109361080A/en
Publication of CN109361080A publication Critical patent/CN109361080A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/58Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
    • H01R4/66Connections with the terrestrial mass, e.g. earth plate, earth pin
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Manufacturing Of Electrical Connectors (AREA)

Abstract

The invention discloses a kind of substations efficiently to drop resistance method, the following steps are included: the first step, survey soil, establish soil model, survey crew survey soil resistivity, frost penetration and the soil layering situation in substation location region using Soil K+adsorption instrument, and soil model is established according to the transversely layered data of the soil of exploration and longitudinal layered data, the earthing or grounding means in design station in substation location region carries out security verification to the earthing or grounding means of design.Resistance method efficiently drops in the substation; by being embedded to charcoal bed in substation location region; and use high-silicon chromium iron stick as the leading body of charcoal bed electrode; the friction reducer in metal bucket or metal trough is poured into cooperation, can effectively reduce the resistivity between grounding body and soil, and improve and keep the electric conductivity of substation location regional soil; to keep ground resistance up to standard; improve resistance reducing effect, improves Transformer Substation Lightning Protection performance, effective protection substation, transformer station personnel and equipment.

Description

Resistance method efficiently drops in a kind of substation
Technical field
The present invention relates to electric power project engineering field, resistance method efficiently drops in specially a kind of substation.
Background technique
Substation, which refers in electric system, converts voltage and current, receives electric energy and distributes the place of electric energy, Substation in power plant is primary substation, and effect is to be fed to high-voltage fence after the electric energy that generator issues boosts In, there have been substation since being established first electric system truly, substation can not as electric system Or scarce part, and electric system joint development more than 100 years, in this more than 100 years development course, substation was building field Huge variation all has occurred in ground, voltage class and equipment situation etc., on the build the side of substation, by original complete Gradually there is indoor substation and some underground substations, the occupied area and original of substation in portion's open type outdoor substation The open type outdoor substation come is many compared to reducing.
Substation grounding device is the indispensable measure of electrical safety, and conventional ground connection is to connect round steel or band steel manufacturing artificial Ground, for reducing ground resistance, but artificial earthing is influenced by place and geological conditions, and ground resistance has not up to standard often Situation, unstable for the drop resistance of substation, resistance reducing effect is poor, causes Transformer Substation Lightning Protection poor, for substation, substation people There are larger harm for member and equipment.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of substations efficiently to drop resistance method, solves ground resistance Often there is situation not up to standard, unstable for the drop resistance of substation, resistance reducing effect is poor, and cause Transformer Substation Lightning Protection poor, for There is larger endanger in substation, transformer station personnel and equipment.
To achieve the above object, the invention provides the following technical scheme: resistance method efficiently drops in a kind of substation, including it is following Step:
Step 1: exploration soil, establishes soil model
Survey crew are using Soil K+adsorption instrument to soil resistivity, frost penetration and the soil layering in substation location region Situation is surveyed, and establishes soil model according to the transversely layered data of the soil of exploration and longitudinal layered data, in substation Earthing or grounding means in design station in the region of site carries out security verification to the earthing or grounding means of design, obtains check results, save school It is qualified as a result, simultaneously the best check results in constituency draw construction drawing to test, and construction personnel carries out site operation according to construction drawing;
Step 2: digging pit and burying the arrangement in hole
One is dug on the soil layer in substation location region according to vertical-type or the requirement of horizontal type construction method according to construction drawing After a truncated cone-shaped or rectangle dell, a zinc-plated truncated cone-shaped metal bucket or hot galvanizing rectangle metal trough are put into the bottom in hole, iron Bucket is put into truncated cone-shaped heatable adobe sleeping platform, and metal trough is put into rectangle trench;
Step 3: embedded charcoal bed
It is put into charcoal bed ground connection in the bottom of metal bucket or metal trough, the leading body using high-silicon chromium iron stick as charcoal bed electrode, using YJV High-silicon chromium iron stick is led on grounded screen steel by insulating sheath cable, by the new process of exothermic weld to grounded screen steel and height The junction of silicochromium iron staff is welded, and is sealed anti-corrosion to Exothermic welded connections using epoxy resin, uses friction reducer The bottom that connecting line on metal bucket or metal trough is welded on high-silicon chromium iron stick is drawn on galvanized sheet, high-silicon chromium iron stick top lead-out wire Weld together with major network zinc-coated flat steel sheet, then pours into the friction reducer being stirred in advance in metal bucket or metal trough, friction reducer is put into Number should be lower than 30 millimeters of metal bucket or metal trough upper end;
Step 4: pit slot backfills
Into the metal bucket or metal trough for buried charcoal bed, the fine clay for setting and being stirred in advance is filled out in layering, and every layer of backfill thickness is about 300 Millimeter or so, until the upper end of metal bucket or metal trough is completely covered in fine clay, then in fine clay surface uniform sprinkling;
Step 5: charcoal bed buries the compacting in hole
Weathering is paved at the gap of truncated cone-shaped metal bucket or hot galvanizing rectangle metal trough and dell and at the top of metal bucket or metal trough Rock ballast bed course, smooth location completely ram one time, levelling, spread geotextiles again, are rolled eight times with vibrating roller.
Preferably, the charcoal bed is layered with 95% or more carbon containing petroleum calcined coke and is laid with, and charcoal bed surface uses waveform Design, charcoal bed are located at -0.8 meter~-1.2 meters, and the length of high-silicon chromium iron stick is 2.4 meters~2.5m meters, and grounded screen steel use 60* 8 zinc-coated flat steel sheets, the area of section of band steel are greater than 300 square millimeters, and thickness is greater than 6 millimeters of band steel.
Preferably, the new process by exothermic weld to the lead junction of grounded screen steel and high-silicon chromium iron stick into Before row welding, grounded screen steel need to be cleaned out, and when welding first solder joint, welding powder dosage should be slightly less than grounded screen The lead connector of steel and high-silicon chromium iron stick makes grounded screen steel and mold coincide good, avoids welding fluid stream using C-type clamp tool Out.
Preferably, the survey crew are selected using Soil K+adsorption instrument to the soil resistivity in substation location region The central point in substation location region is arranged apart from the symmetrical two groups of measuring electrodes of survey child's central point, utilizes described at least two Group measuring electrode measures the substation location regional soil resistivity, and two groups of measuring electrodes exchange electrode is corrected Measurement obtains correction substation location regional soil resistivity, when the substation location regional soil resistivity and correction power transformation When the error of site regional soil resistivity is less than preset value, then by the substation location regional soil repeatedly measured electricity Resistance rate average value is determined as substation location regional soil resistivity.
Preferably, when prepared by the high-silicon chromium iron stick, implement casting according to the following ratio.
Component list
Serial number Title Required value
1 Silicon 14.25~15.25%
2 Manganese ≤0.5%
3 Carbon <1.4%
4 Phosphorus (P) <0.25%
5 Sulphur (S) <0.1%
6 Chromium 4%~5%
7 Molybdenum ≤0.2%
8 Copper ≤0.5%
9 Iron Surplus
Technical indicator meets following require
Physical characteristic
Serial number Title Index
1 Resistivity (Ω-cm) at 20 DEG C < 0.5
2 Compression strength (MPa) > 690
3 Tensile strength (MPa) > 103
4 Specific gravity (g/cm3) 6.85—7
5 Fusing point (DEG C) > 1150
6 Expansion rate (1/ DEG C) < 1.3 × 10-5
It has the beneficial effect that:
(1) resistance method efficiently drops in the substation, by substation location region be embedded to charcoal bed, and use high-silicon chromium iron stick as The leading body of charcoal bed electrode, cooperation are poured into the friction reducer in metal bucket or metal trough, can effectively be reduced between grounding body and soil Resistivity, and improve and keep the electric conductivity of substation location regional soil, to keep ground resistance up to standard, improve drop resistance Effect improves Transformer Substation Lightning Protection performance, effective protection substation, transformer station personnel and equipment.
(2) resistance method efficiently drops in the substation, by the undulated design on charcoal bed surface, and with carbon containing with 95% or more Petroleum calcined coke layering is laid with, and can effectively improve the compression strength and electric conductivity of charcoal bed, prevents charcoal bed when backfill from rupturing, The difficulty for reducing substation's drop resistance construction effectively reduces the adverse effect in place and ground confrontation worker construction, solves artificial earthing It is influenced by place and geological conditions, ground resistance has situation not up to standard often, hinders unstable, lightning protection for the drop of substation Property is poor, for power station, transformer station personnel and equipment there are problems that it is larger endanger, by the new process of exothermic weld to ground connection Net steel and the junction of high-silicon chromium iron stick are welded, and are sealed anti-corrosion to Exothermic welded connections using epoxy resin, So that charcoal bed, high-silicon chromium iron stick and grounded screen steel is preferably adapted to the soil environment of strong acid and strong base, is not easy to be corroded, it is effective to protect Permanently effective good conductive ability has been demonstrate,proved, the bond stress of high-silicon chromium iron stick Yu charcoal bed has been increased, reduces contact resistance, into one Step improves the substation and efficiently drops resistance method to the stability of substation's drop resistance.
(3) resistance method efficiently drops in the substation, by digging a truncated cone-shaped or length on the soil layer in substation location region After rectangular dell, a zinc-plated truncated cone-shaped metal bucket or hot galvanizing rectangle metal trough are put into the bottom in hole, prevent substation location The soil layer in region is directly contacted with charcoal bed, corrosion charcoal bed, high-silicon chromium iron stick and grounded screen steel, by the top of metal bucket or metal trough Portion is paved with weathering rock ballast bed course, smooth location, completely rams one time, levelling, spreads geotextiles again, rolls eight times with vibrating roller, effectively It prevents drop resistance equipment from collapsing or damaging, can be further improved the stability that the drop resistance of resistance method efficiently drops in the substation, avoid dropping Equipment damage is hindered, Transformer Substation Lightning Protection effect is caused to be deteriorated.
Specific embodiment
Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution: resistance method efficiently drops in a kind of substation, comprising the following steps: step 1: surveying Soil is surveyed, soil model is established
Survey crew are using Soil K+adsorption instrument to soil resistivity, frost penetration and the soil layering in substation location region Situation is surveyed, and establishes soil model according to the transversely layered data of the soil of exploration and longitudinal layered data, in substation Earthing or grounding means in design station in the region of site carries out security verification to the earthing or grounding means of design, obtains check results, save school It is qualified as a result, simultaneously the best check results in constituency draw construction drawing to test, and construction personnel carries out site operation according to construction drawing, Survey crew, to the soil resistivity in substation location region, select the center in substation location region using Soil K+adsorption instrument Point, setting measure substation location apart from the symmetrical two groups of measuring electrodes of survey child's central point, using at least two groups measuring electrode Two groups of measuring electrode exchange electrodes are corrected measurement and obtain correction substation location regional soil electricity by regional soil resistivity Resistance rate, when the error of substation location regional soil resistivity and correction substation location regional soil resistivity is less than preset value When, then the substation location regional soil resistivity average value repeatedly measured is determined as substation location regional soil resistance Rate;
Step 2: digging pit and burying the arrangement in hole
One is dug on the soil layer in substation location region according to vertical-type or the requirement of horizontal type construction method according to construction drawing After a truncated cone-shaped or rectangle dell, a zinc-plated truncated cone-shaped metal bucket or hot galvanizing rectangle metal trough are put into the bottom in hole, iron Bucket is put into truncated cone-shaped heatable adobe sleeping platform, and metal trough is put into rectangle trench;
Step 3: embedded charcoal bed
It is put into charcoal bed ground connection in the bottom of metal bucket or metal trough, the leading body using high-silicon chromium iron stick as charcoal bed electrode, using YJV High-silicon chromium iron stick is led on grounded screen steel by insulating sheath cable, by the new process of exothermic weld to grounded screen steel and height The junction of silicochromium iron staff is welded, and is sealed anti-corrosion to Exothermic welded connections using epoxy resin, uses friction reducer The bottom that connecting line on metal bucket or metal trough is welded on high-silicon chromium iron stick is drawn on galvanized sheet, high-silicon chromium iron stick top lead-out wire Weld together with major network zinc-coated flat steel sheet, then pours into the friction reducer being stirred in advance in metal bucket or metal trough, friction reducer is put into Number should be lower than 30 millimeters of metal bucket or metal trough upper end, charcoal bed is layered with 95% or more carbon containing petroleum calcined coke and is laid with, charcoal bed Surface uses undulated design, and charcoal bed is located at -0.8 meter~-1.2 meters, and the length of high-silicon chromium iron stick is 2.4 meters~2.5m meters, is connect Earth mat steel use 60*8 zinc-coated flat steel sheet, and the area of section of band steel is not less than 300 square millimeters, and thickness is flat not less than 6 millimeters Steel need to will connect before being welded by the new process of exothermic weld to the lead junction of grounded screen steel and high-silicon chromium iron stick Earth mat steel are cleaned out, and when welding first solder joint, welding powder dosage should be slightly less than grounded screen steel and high-silicon chromium iron The lead connector of stick makes grounded screen steel and mold coincide good, welding fluid is avoided to flow out using C-type clamp tool;
Step 4: pit slot backfills
Into the metal bucket or metal trough for buried charcoal bed, the fine clay for setting and being stirred in advance is filled out in layering, and every layer of backfill thickness is about 300 Millimeter or so, until the upper end of metal bucket or metal trough is completely covered in fine clay, then in fine clay surface uniform sprinkling;
Step 5: charcoal bed buries the compacting in hole
Weathering is paved at the gap of truncated cone-shaped metal bucket or hot galvanizing rectangle metal trough and dell and at the top of metal bucket or metal trough Rock ballast bed course, smooth location completely ram one time, levelling, spread geotextiles again, are rolled eight times with vibrating roller.
When prepared by high-silicon chromium iron stick, implement casting according to the following ratio.
Component list
Serial number Title Required value
1 Silicon 14.25~15.25%
2 Manganese ≤0.5%
3 Carbon <1.4%
4 Phosphorus (P) <0.25%
5 Sulphur (S) <0.1%
6 Chromium 4%~5%
7 Molybdenum ≤0.2%
8 Copper ≤0.5%
9 Iron Surplus
Technical indicator meets following require
Physical characteristic
Serial number Title Index
1 Resistivity (Ω-cm) at 20 DEG C < 0.5
2 Compression strength (MPa) > 690
3 Tensile strength (MPa) > 103
4 Specific gravity (g/cm3) 6.85—7
5 Fusing point (DEG C) > 1150
6 Expansion rate (1/ DEG C) < 1.3 × 10-5
Operating method: resistance method efficiently drops in the substation, by the soil in exploration substation location region, establishes soil mould Type facilitates construction personnel to construct, and selects suitable friction reducer and charcoal bed size according to the resistivity of exploration and frost penetration, leads to The arrangement for digging pit and burying hole is crossed, is put into after metal bucket or metal trough and is burying charcoal bed ground connection in the bottom of metal bucket or metal trough again, using height High-silicon chromium iron stick is led on grounded screen steel by leading body of the silicochromium iron staff as charcoal bed electrode using YJV insulating sheath cable, Then into the metal bucket or metal trough for buried charcoal bed, the fine clay for setting and being stirred in advance is filled out in layering, is finally buried hole to charcoal bed and is rammed Real, effective solution ground resistance has situation not up to standard often, and unstable for the drop resistance of substation, resistance reducing effect is poor, Cause Transformer Substation Lightning Protection poor, there are problems that larger endanger for substation, transformer station personnel and equipment.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. resistance method efficiently drops in a kind of substation, it is characterised in that: the following steps are included:
Step 1: exploration soil, establishes soil model
Survey crew are using Soil K+adsorption instrument to soil resistivity, frost penetration and the soil layering in substation location region Situation is surveyed, and establishes soil model according to the transversely layered data of the soil of exploration and longitudinal layered data, in substation Earthing or grounding means in design station in the region of site carries out security verification to the earthing or grounding means of design, obtains check results, save school It is qualified as a result, simultaneously the best check results in constituency draw construction drawing to test, and construction personnel carries out site operation according to construction drawing;
Step 2: digging pit and burying the arrangement in hole
One is dug on the soil layer in substation location region according to vertical-type or the requirement of horizontal type construction method according to construction drawing After a truncated cone-shaped or rectangle dell, a zinc-plated truncated cone-shaped metal bucket or hot galvanizing rectangle metal trough are put into the bottom in hole, iron Bucket is put into truncated cone-shaped heatable adobe sleeping platform, and metal trough is put into rectangle trench;
Step 3: embedded charcoal bed
It is put into charcoal bed ground connection in the bottom of metal bucket or metal trough, the leading body using high-silicon chromium iron stick as charcoal bed electrode, using YJV High-silicon chromium iron stick is led on grounded screen steel by insulating sheath cable, by the new process of exothermic weld to grounded screen steel and height The junction of silicochromium iron staff is welded, and is sealed anti-corrosion to Exothermic welded connections using epoxy resin, uses friction reducer The bottom that connecting line on metal bucket or metal trough is welded on high-silicon chromium iron stick is drawn on galvanized sheet, high-silicon chromium iron stick top lead-out wire Weld together with major network zinc-coated flat steel sheet, then pours into the friction reducer being stirred in advance in metal bucket or metal trough, friction reducer is put into Number should be lower than 30 millimeters of metal bucket or metal trough upper end;
Step 4: pit slot backfills
Into the metal bucket or metal trough for buried charcoal bed, the fine clay for setting and being stirred in advance is filled out in layering, and every layer of backfill thickness is about 300 Millimeter or so, until the upper end of metal bucket or metal trough is completely covered in fine clay, then in fine clay surface uniform sprinkling;
Step 5: charcoal bed buries the compacting in hole
Weathering is paved at the gap of truncated cone-shaped metal bucket or hot galvanizing rectangle metal trough and dell and at the top of metal bucket or metal trough Rock ballast bed course, smooth location completely ram one time, levelling, spread geotextiles again, are rolled eight times with vibrating roller.
2. resistance method efficiently drops in a kind of substation according to claim 1, it is characterised in that: the charcoal bed is with 95% or more Carbon containing petroleum calcined coke, which is layered, to be laid with, and charcoal bed surface uses undulated design, and charcoal bed is located at -0.8 meter~-1.2 meters, high silicon The length of ferrochrome stick is 2.4 meters~2.5m meters, and grounded screen steel use 60*8 zinc-coated flat steel sheet, and the area of section of band steel is greater than 300 Square millimeter, thickness are greater than 6 millimeters of band steel.
3. resistance method efficiently drops in a kind of substation according to claim 1, it is characterised in that: described by exothermic weld Before new process welds the lead junction of grounded screen steel and high-silicon chromium iron stick, grounded screen steel need to be cleaned out, And when welding first solder joint, welding powder dosage should be slightly less than the lead connector of grounded screen steel Yu high-silicon chromium iron stick, adopt So that grounded screen steel and mold is coincide with C-type clamp tool good, welding fluid is avoided to flow out.
4. resistance method efficiently drops in a kind of substation according to claim 1, it is characterised in that: the survey crew use soil Earth detector selectes the central point in substation location region, setting distance should to the soil resistivity in substation location region The symmetrical two groups of measuring electrodes of virgin central point are surveyed, measure the substation location region soil using at least two groups measuring electrode Two groups of measuring electrodes exchange electrode is corrected measurement and obtains correction substation location regional soil resistance by earth resistivity Rate is preset when the error of the substation location regional soil resistivity and correction substation location regional soil resistivity is less than When value, then the substation location regional soil resistivity average value repeatedly measured is determined as substation location regional soil Resistivity.
5. resistance method efficiently drops in a kind of substation according to claim 1, it is characterised in that: the high-silicon chromium iron stick preparation When, implement casting according to the following ratio.
6. component list
Technical indicator meets following require
Physical characteristic
CN201811167762.5A 2018-10-08 2018-10-08 Resistance method efficiently drops in a kind of substation Pending CN109361080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811167762.5A CN109361080A (en) 2018-10-08 2018-10-08 Resistance method efficiently drops in a kind of substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811167762.5A CN109361080A (en) 2018-10-08 2018-10-08 Resistance method efficiently drops in a kind of substation

Publications (1)

Publication Number Publication Date
CN109361080A true CN109361080A (en) 2019-02-19

Family

ID=65348504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811167762.5A Pending CN109361080A (en) 2018-10-08 2018-10-08 Resistance method efficiently drops in a kind of substation

Country Status (1)

Country Link
CN (1) CN109361080A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112147463A (en) * 2020-09-25 2020-12-29 云南电网有限责任公司红河供电局 Method and device for reducing grounding impedance of transformer substation grounding grid by additionally arranging capacitor module

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101067184A (en) * 2007-06-06 2007-11-07 任国登 High-silicon-chrome-molybdenum-copper cast iron
CN102394389A (en) * 2011-06-17 2012-03-28 国网电力科学研究院武汉南瑞有限责任公司 High ferrochrome silicon electrode for direct-current grounding electrode
CN102856671A (en) * 2012-04-25 2013-01-02 辽宁省电力有限公司丹东供电公司 Environment-friendly leak-proof moisturizing grounding device and construction method
CN104319498A (en) * 2014-11-18 2015-01-28 句容华源电器设备有限公司 Lightning preventing and resistance reducing method for substation grounding resistance
CN104901030A (en) * 2015-06-09 2015-09-09 河北省电力勘测设计研究院 Construction method of resistance reduction and grounding device of transformer station
CN204720575U (en) * 2015-07-02 2015-10-21 云南宇恬防雷材料有限公司 DC earthing electrode
CN108051647A (en) * 2017-12-01 2018-05-18 湖北省电力勘测设计院有限公司 A kind of method of wind power plant soil resistivity correction measurement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101067184A (en) * 2007-06-06 2007-11-07 任国登 High-silicon-chrome-molybdenum-copper cast iron
CN102394389A (en) * 2011-06-17 2012-03-28 国网电力科学研究院武汉南瑞有限责任公司 High ferrochrome silicon electrode for direct-current grounding electrode
CN102856671A (en) * 2012-04-25 2013-01-02 辽宁省电力有限公司丹东供电公司 Environment-friendly leak-proof moisturizing grounding device and construction method
CN104319498A (en) * 2014-11-18 2015-01-28 句容华源电器设备有限公司 Lightning preventing and resistance reducing method for substation grounding resistance
CN104901030A (en) * 2015-06-09 2015-09-09 河北省电力勘测设计研究院 Construction method of resistance reduction and grounding device of transformer station
CN204720575U (en) * 2015-07-02 2015-10-21 云南宇恬防雷材料有限公司 DC earthing electrode
CN108051647A (en) * 2017-12-01 2018-05-18 湖北省电力勘测设计院有限公司 A kind of method of wind power plant soil resistivity correction measurement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112147463A (en) * 2020-09-25 2020-12-29 云南电网有限责任公司红河供电局 Method and device for reducing grounding impedance of transformer substation grounding grid by additionally arranging capacitor module
CN112147463B (en) * 2020-09-25 2022-11-04 云南电网有限责任公司红河供电局 Method and device for reducing grounding impedance of transformer substation grounding grid by additionally arranging capacitor module

Similar Documents

Publication Publication Date Title
CN103457044B (en) The earthing device of 10kV distribution network overhead line tower pole and laying method thereof
CN106096225A (en) The power station of a kind of karst area geomorphic feature or the preparation method of grounding net of transformer substation resistance value
CN104901030B (en) A kind of transformer station&#39;s electric resistance reducing grounding device construction method
CN106495607A (en) A kind of conducting concrete and preparation method thereof and application
CN102437437B (en) Grounding resistance reduction process method for sand/gravel area
CN211182560U (en) Novel tower lightning grounding device
CN109361080A (en) Resistance method efficiently drops in a kind of substation
CN106159475B (en) Arid geology grounded screen and its water conservation drop resistance construction method
CN104953434A (en) Design method of novel multi-pin vertical earthing system
CN103928771A (en) Grounding method of reducing local impact grounding resistance of power plant and substation
CN106877019A (en) A kind of arid geology grounded screen and its construction and application method
CN202550081U (en) Environment-friendly leakage-proof moisturizing grounding device
CN106785511A (en) Horizontal grounding composite resistance reduction groove of power transmission line tower and construction method
CN205790429U (en) Lightning protection grounding component
CN109217061B (en) Resistance reducing method of grounding grid
CN204516912U (en) Arid geology ground network
CN205875130U (en) Reduce underground substation ground resistance&#39;s building pile foundation
CN109066112A (en) Reduce the earthing or grounding means and method of ground resistance and anti-artificial destruction high voltage iron tower
CN206401540U (en) Electric power line pole tower earthing or grounding means
CN104184015A (en) Installation construction process for grounding device
CN207069081U (en) A kind of arid geology grounded screen
CN209200165U (en) A kind of communications equipment room low resistance Combined Protection ground-wire earthing body
CN209056625U (en) Earthing or grounding means for tower bar equipment
CN111641096B (en) Construction process of conductive polymer material grounding grid
Fawssett et al. Practical aspects of earthing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219