CN109356527A - A kind of login method of the submarine pipeline in Offshore Engineering work progress - Google Patents

A kind of login method of the submarine pipeline in Offshore Engineering work progress Download PDF

Info

Publication number
CN109356527A
CN109356527A CN201811525233.8A CN201811525233A CN109356527A CN 109356527 A CN109356527 A CN 109356527A CN 201811525233 A CN201811525233 A CN 201811525233A CN 109356527 A CN109356527 A CN 109356527A
Authority
CN
China
Prior art keywords
reaming
submarine pipeline
drill bit
pipeline
land
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811525233.8A
Other languages
Chinese (zh)
Other versions
CN109356527B (en
Inventor
王文龙
林贻海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201811525233.8A priority Critical patent/CN109356527B/en
Publication of CN109356527A publication Critical patent/CN109356527A/en
Application granted granted Critical
Publication of CN109356527B publication Critical patent/CN109356527B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/043Directional drilling for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes
    • E21B7/061Deflecting the direction of boreholes the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of login method of the submarine pipeline in Offshore Engineering work progress is returned using directional drilling crossing and technology is dragged to realize logging in for submarine pipeline;→ drill bit a little pulls out back from burying → just to be pushed away reaming → drill bit step by step and from seabed be unearthed → draws back drill bit → coating (argillic horizon and mud) and just pushing away reaming → pipe laying barge on reaming bit → and unloading drill bit its construction process are as follows: Directional Drilling rigging up and debugging → from land to marine brill pilot hole → drill through rock layer, connecting pipe → pipeline is prefabricated in pipe laying barge, start back to drag → return to drag completion, carries out coherent detection.Being returned using directional drilling crossing of the invention drags technology to carry out logging in for submarine pipeline; the difficulty of construction of conventional submarine pipeline landing approach can effectively be solved, effective protection can be carried out to existing facility and environment; greatly reduce construction operation amount; it is obviously shortened construction period, reduces the construction cost of entire engineering project.

Description

A kind of login method of the submarine pipeline in Offshore Engineering work progress
Technical field
The present invention relates to Offshore Engineering fields, especially one kind submarine pipeline in Offshore Engineering work progress Login method.
Background technique
Submarine pipeline refers between Offshore Units and plays between Offshore Units and land terminal medium translocation Pipeline.Submarine pipeline routine landing approach are as follows: excavated, drawn and backfilled protection, technology in advance to section submarine pipeline is logged in Background technique situation and there are the following problems:
1, the offshore end landforms for logging in section are complicated and sea situation is more severe (wind scale height and later the wave is high), it will to logging in section The pre- ditching operation of submarine pipeline brings very big difficulty.
2, closer from facilities such as existing submarine pipeline and cables, and need to have protection after the facilities such as submarine pipeline and cable to this and carry out removal work Industry, to the safety for having the facilities such as submarine pipeline and cable, there are certain construction risks.
3, protection removes operation and backfill protection operation after the facilities such as the pre- ditching operation of submarine pipeline, existing submarine pipeline and cable Big etc. total engineering workload, investment working sources are big, it will greatly increase the implementation cost of entire engineering project;And construction period It is long, it will plan is completed in the construction for influencing subsequent entire project.
4, protection removes operation and backfill protection operation after the facilities such as the pre- ditching operation of submarine pipeline, existing submarine pipeline and cable Etc. will destroy existing related facility and original environment etc., and it is destructive larger.
Immediate search result is as follows:
State Intellectual Property Office discloses the patent document of Publication No. CN108412424A, and a kind of Directional Drilling, which returns, drags construction In prevent drilling rod from springing back tooling, it is characterised in that: including anchoring mechanism and lattice retaining device, the anchoring mechanism includes that steel cylinder is mixed Solidifying soil stake, the steel cylinder concrete stake outer wall are installed with the first lifting lug, and the lattice retaining device includes sleeve and block, the sleeve It is set in on operation drilling rod, the sleeve outer wall is installed with the second lifting lug, and the block is located at the sleeve and bores with to operation It is described to operation drilling rod to limit between bar, it is connected between first lifting lug and the second lifting lug by wirerope.
For another example State Intellectual Property Office discloses the patent document of Publication No. CN101786496B, a kind of deep water Directional Drilling Hole and steel-cable back-dragging device, it is characterised in that: include: shell, at least one pedestal, several columns, frame lid, Screw Anchor, storage Mechanism and drilling machine mechanism, hydraulic mechanism, are blown down at measurement control mechanism in mud mechanism, and the drilling machine mechanism includes: to coil drilling rod, twist Vehicle, electric slip ring, brill push and pull machine, drill bit and detector to brill angle adjuster, drilling rod, wherein coil drilling rod and coil setting in winch On, winch is fixed on the base, and electric slip ring is arranged on winch, and hydraulic mechanism is connected with electric slip ring, coils drilling rod and dense mud Pump is connected, and bores to brill angle adjuster and is connected with measurement control mechanism, bores and be set on the base to brill angle adjuster, drilling rod pushes and pulls machine Be connected respectively to boring angle adjuster with coiling drilling rod and bore, drill bit is arranged outside shell, drill bit equipped with detector, detector with Control mechanism is measured to be connected;Chu Ni mechanism is connected with pedestal, and column is fixed at the end of pedestal, and column is arranged in frame lid Top, shell are coated between pedestal and frame lid, and Screw Anchor is attached on column, hydraulic mechanism, drilling machine mechanism, measurement control machine Structure and blowing mechanism are all disposed on pedestal, and measurement control mechanism is connected respectively to transmit letter with drilling machine mechanism and hydraulic mechanism Number, hydraulic mechanism is connected with Chu Ni mechanism, blowing mechanism and drilling machine mechanism respectively, and drilling machine mechanism is connected with Chu Ni mechanism.
By patent retrieval, the technology returned in terms of dragging about submarine pipeline Directional Drilling similar with the present invention is not retrieved Content.
Summary of the invention
To be faced using conventional submarine pipeline landing approach: difficulty of construction is larger, to existing facility and environmental disruption Greatly, construction operation amount is big and long construction period, will greatly increase the construction cost of entire engineering project.
In order to effectively solve the above problems, the present invention provides one kind in Offshore Engineering work progress submarine pipeline Login method.
The purpose of the present invention is achieved through the following technical solutions:
A kind of login method of the submarine pipeline in Offshore Engineering work progress, it is characterised in that: use Directional Drilling From land to marine, after passing through marine rock layer and coating, pipeline returning is carried out in the borehole, realizes submarine pipeline by sea To logging in for land;Its construction process are as follows: installation and debugging orient drilling equipment → from land to marine brill pilot hole → drill through rock Layer → drill bit buries a little to pull out back → use from land and is just pushing away mode reaming step by step → drill bit be unearthed → draws back drill bit from seabed → and cover Cap rock (argillic horizon with mud) unloads drill bit using just pushing away mode reaming → reaming bit connects pipe laying barge →, and connecting pipe → Pipeline is prefabricated in pipe laying barge, starts back to drag → return to drag to be detected after the completion.
Further, it from land to marine brill pilot hole, is oriented to hole precision and uses magnetic target positioning combination GPS Dual positioning Technology is controlled.
Further, drill through rock layer → drill bit a little pulls out back from burying, and is segmented using lithosphere and seabed coating Construction technology carries out reaming in two stages, first is that rock section reaming, second is that coating reaming.
Further, reaming step by step is just being pushed away, is just pushing away counter-boring techniques using major diameter power reamer.
Further, pipeline is prefabricated in pipe laying barge, starts back to be dragged to back the process for dragging completion to be by Directional Drilling and marine paving Pipe ship cooperates dilatory pipeline to complete together.
The beneficial effects of the present invention are: the difficulty of construction of submarine pipeline landing approach is reduced, to existing facility and environment Effective protection is carried out.Greatly reduce construction operation amount, hence it is evident that shorten construction period, reduce the construction of entire engineering project Cost.
Detailed description of the invention
Fig. 1 is to return that technology is dragged to carry out the construction process that submarine pipeline logs in using directional drilling crossing;
Fig. 2 arranges terrestrial beacon systems;
Fig. 3 GPS drill bit tracking measurement instrument;
Fig. 4 rock section is just pushing away reaming schematic diagram;
Fig. 5 clay section is just pushing away reaming schematic diagram;
Fig. 6 Directional Drilling and marine pipe-laying ship cooperate dilatory pipeline landing schematic diagram;
Fig. 7 returns drilling tool part connected mode schematic diagram when dragging.
In figure: 1, GPS signal;2, GPS drill bit tracking measurement instrument;3, drill bit;4, seawater;5, land;6, land rig; 7, drilling rod;8, Hai Guan;9, pipe laying barge.
Specific embodiment
Referring to Fig.1, it after passing through marine rock layer and coating, is carried out in the borehole using Directional Drilling from land to marine Pipeline returning realizes submarine pipeline by marine logging in land;Its construction process are as follows: installation and debugging orient drilling equipment → from land Ground uses to marine brill pilot hole → drill through rock layer → drill bit buries from land and a little pulls out back → and just pushes away mode reaming → brill step by step Head, which from seabed be unearthed → draws back drill bit → coating (argillic horizon with mud) use and just pushes away mode reaming → reaming bit, to be connected Upper pipe laying barge → unload drill bit, connecting pipe → pipeline is prefabricated in pipe laying barge, starts back to drag → return to drag to be detected after the completion.
1, pilot hole precision controlling --- magnetic target positioning combination GPS Dual Positioning Technology
In order to ensure Directional Drilling construction carries out meeting technical requirements with precision according to design routing curve.It is oriented to hole precision control Main technical requirements processed are as follows:
1) precise measurement unwrapping wire;
2) the magnetic azimuth measurement for passing through center line is carried out;
3) arrangement terrestrial beacon systems measure (such as Fig. 2) in ground configuration artificial magnetic field auxiliary;
4) drill bit positioning auxiliary, using GPS drill bit tracking measurement instrument subsidiary (such as Fig. 3);
5) guarantee steering accuracy of instrument;
6) well construction, pilot hole strictly press design curve drilling;
7) it constructs in strict accordance with the requirement of job specfication, it is ensured that the operation of every drilling rod meets the curvature half of design defined Diameter range;
8) when connection is without magnetic drill collar, deflecting pipe nipple, drill bit, it is ensured that in tool-face and the bit jet drilling of deflecting pipe nipple Heart line is consistent, makes the tool face amount of measurement closer to actual tool face amount, facilitates steering engineer and control drilling direction;
9) direction controlling system uses high-precision mathematical model;
10) in pilot hole drilling process, when discovery pilot hole shifts, when carrying out secondary correction, using level side Upward " c-type deflecting " bores pilot hole to unearthed point, avoids " S type deflecting " as far as possible.
2, simulated mud technology
In order to avoid drilling cuttings carries unclean, drilling rod increases drilling rod torque by viscous card, and thrust or pulling force increase, and returns and drags The problems such as Shi Zeng great is to submarine pipeline anti-corrosion damage layer;Ensure the safe and smooth progress of crossing project.According to penetrating ground geology item Part in mud test room trial and should determine different mud prescriptions, in the construction process, should be according to geological condition and drilling work Skill, i.e., pilot hole stage, reaming stage and hole flushing, return drag the stage, selection adjustment mud formula and mud property, recommend mud Slurry performance is shown in Tables 1 and 2.
1 mud ratio of dynamic shear force/yield value to plastic viscosity of table, filter loss return slurry silt carrying capacity table
2 mud viscosity table of table
3, major diameter power reamer just pushes away counter-boring techniques
Power reamer working principle is to drive cutting disc high speed rotation using the power of mud motor output, to reach The purpose of rock cutting, and improve reaming efficiency.Due to power reamer high-speed smooth operate so that hole inner wall very It is smooth, effectively reduce back the breakage risk of pipeline anticorrosion coating when dragging.Such as submarine pipeline outer diameter is Φ 610mm, by reaming Diameter is greater than 1.5 times of considerations of submarine pipeline outer diameter, this reaming is reaming step by step, referring to table 3.
It is 3 pipeline reaming series of table, differential
4, lithosphere and seabed coating section construction technology
Crossing project soil layer is generally divided into lithosphere and coating (argillic horizon and mud);When due to rock section reaming Between it is long, the collapse hole or shrinkage cavity of the side coating that is unearthed in order to prevent carry out reaming in two stages, first is that rock section reaming, two It is coating reaming.So it is as follows to carry out section construction process according to lithosphere and coating:
1) the side lithosphere that buries is crept into from land to sea first.After drilling lithosphere, drill bit is pulled out back, then carries out rock Section reaming.Rock section reaming uses and just pushes away chambering process;Drilling tool installation power reamer is constructed, and is such as schemed, 4.
2) the pilot hole drilling of remaining unearthed side coating carries out again after waiting the reaming of rock section to complete.Guide digging is complete After being unearthed at, drill bit in seabed, after combining confirmation bit location by marine magnetic target positioning system and diver, by drill bit from burying Point is drawn back, and is changed to clay section and is just being pushed away reamer, start clay section just pushes away reaming.Clay section reamer is recommended board-like using cylinder Reamer, such as Fig. 5.
5, Directional Drilling and marine pipe-laying ship cooperate dilatory pipeline landing technology
Submarine pipeline return drag take pipe laying barge it is prefabricated, draw back the mode dragged by land rig, pipeline precast with time drag Intersect and carry out, i.e., prefabricated section, a time drag one section;Such as Fig. 6;Moment pay close attention to submarine pipeline return drag during directional drilling machine pull-back force With pipe laying barge stretcher tension values, if in design requirement content, and whether numerical value change is steady, it is ensured that return and operation is dragged to connect It is continuous, reduce the pipeline time totally stationary in hole to the greatest extent;Return drilling tool connection type when dragging: drilling machine → drilling rod → heavy weight drill pipe → Borehole enlargement by drawing back device → rotary joint → U-loop → working line (pipe laying barge), such as Fig. 7.
After the completion of submarine pipeline time drags, the influence that hauling pipe line is constructed by submarine pipeline pipe laying barge is returned in order to prevent, is used On the basis of holding card embraces back the tube body delayed, while holding card is connected to drilling machine by use wirerope, prevent submarine pipeline construction from making Industry is dilatory to have installed go back to hauling pipe road in place.To undersea pipe-laying a distance, the test of drilling machine pull-back force shows go back to hauling pipe road It is no longer influenced by the influence of submarine pipeline construction, i.e., dismountable holding card, drilling machine basis carry out the construction of land linkage section.
The above is a preferred embodiment of the present invention, cannot limit the right model of the present invention with this certainly It encloses, it is noted that for those skilled in the art, modify or wait to technical solution of the present invention With replacement, without departure from the protection scope of technical solution of the present invention.

Claims (5)

1. a kind of login method of the submarine pipeline in Offshore Engineering work progress, it is characterised in that: using Directional Drilling by Land is to marine, after passing through marine rock layer and coating, carries out pipeline returning in the borehole, realize submarine pipeline by sea to Land logs in;Its construction process are as follows: installation and debugging orient drilling equipment → from land to marine brill pilot hole → drill through rock layer → drill bit buries from land and a little pulls out back →, which uses, just to push away mode reaming → drill bit from seabed be unearthed → draws back drill bit → covering step by step Layer (argillic horizon with mud) unloads drill bit, connecting pipe → pipe using just pushing away mode reaming → reaming bit connects pipe laying barge → Road is prefabricated in pipe laying barge, starts back to drag → return to drag to be detected after the completion.
2. the login method of Offshore Engineering submarine pipeline according to claim 1, it is characterised in that: from land to sea Middle brill pilot hole, guiding hole precision are controlled using magnetic target positioning combination GPS Dual positioning.
3. the login method of Offshore Engineering submarine pipeline according to claim 1, it is characterised in that: drill through rock layer → drill bit a little pulls out back from burying, and using lithosphere and the section construction of seabed coating, i.e., carries out reaming in two stages, First is that rock section reaming, second is that coating reaming.
4. the login method of Offshore Engineering submarine pipeline according to claim 1, it is characterised in that: just push away and expand step by step Hole just pushes away reaming using major diameter power reamer.
5. the login method of Offshore Engineering submarine pipeline according to claim 1, it is characterised in that: pipeline is in pipe laying Ship is prefabricated, start back to be dragged to back the process for dragging completion be from Directional Drilling together with marine pipe-laying ship with draw pipeline and complete.
CN201811525233.8A 2018-12-13 2018-12-13 Method for landing submarine pipeline in marine petroleum engineering construction process Active CN109356527B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811525233.8A CN109356527B (en) 2018-12-13 2018-12-13 Method for landing submarine pipeline in marine petroleum engineering construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811525233.8A CN109356527B (en) 2018-12-13 2018-12-13 Method for landing submarine pipeline in marine petroleum engineering construction process

Publications (2)

Publication Number Publication Date
CN109356527A true CN109356527A (en) 2019-02-19
CN109356527B CN109356527B (en) 2021-06-25

Family

ID=65329742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811525233.8A Active CN109356527B (en) 2018-12-13 2018-12-13 Method for landing submarine pipeline in marine petroleum engineering construction process

Country Status (1)

Country Link
CN (1) CN109356527B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734308A (en) * 2020-07-28 2020-10-02 中国石油天然气集团有限公司 Forward reaming method for directional drilling penetration
CN112814650A (en) * 2021-01-05 2021-05-18 四川石油天然气建设工程有限责任公司 Hole measuring process for directional drilling of wireless probe and pipe back-dragging risk assessment method
CN112923129A (en) * 2021-01-21 2021-06-08 四川石油天然气建设工程有限责任公司 Butt-joint type dragging pipe construction process and system for oil and gas pipelines
CN113131405A (en) * 2021-04-20 2021-07-16 伟卓石油科技(北京)有限公司 Cable laying system in submarine underground rock
CN114233191A (en) * 2021-12-23 2022-03-25 浙江华东工程咨询有限公司 Offshore wind farm submarine cable embankment penetrating construction method based on trenchless directional drilling technology
CN114754196A (en) * 2021-01-08 2022-07-15 中国石油天然气集团有限公司 Special dragging head for submarine pipeline landing directional drill and submarine pipeline landing directional drill system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409998A (en) * 2011-10-28 2012-04-11 中国海洋石油总公司 Downhole safety valve
US20120273218A1 (en) * 2006-11-07 2012-11-01 Halliburton Energy Services, Inc. Offshore universal riser system
CN102953683A (en) * 2012-11-27 2013-03-06 福建省泷澄建设集团有限公司 Pipe pulling construction method through horizontal directional drilling
CN103398217A (en) * 2013-08-09 2013-11-20 柳州固瑞机械有限公司 Horizontal directional driller pulling tube clamp

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120273218A1 (en) * 2006-11-07 2012-11-01 Halliburton Energy Services, Inc. Offshore universal riser system
US20120292106A1 (en) * 2006-11-07 2012-11-22 Halliburton Energy Services, Inc. Offshore universal riser system
CN102409998A (en) * 2011-10-28 2012-04-11 中国海洋石油总公司 Downhole safety valve
CN102953683A (en) * 2012-11-27 2013-03-06 福建省泷澄建设集团有限公司 Pipe pulling construction method through horizontal directional drilling
CN103398217A (en) * 2013-08-09 2013-11-20 柳州固瑞机械有限公司 Horizontal directional driller pulling tube clamp

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734308A (en) * 2020-07-28 2020-10-02 中国石油天然气集团有限公司 Forward reaming method for directional drilling penetration
CN111734308B (en) * 2020-07-28 2022-07-12 中国石油天然气集团有限公司 Forward hole expanding method for directional drilling penetration
CN112814650A (en) * 2021-01-05 2021-05-18 四川石油天然气建设工程有限责任公司 Hole measuring process for directional drilling of wireless probe and pipe back-dragging risk assessment method
CN112814650B (en) * 2021-01-05 2022-07-26 四川石油天然气建设工程有限责任公司 Hole measuring process for directional drilling of wireless probe and pipe back-dragging risk assessment method
CN114754196A (en) * 2021-01-08 2022-07-15 中国石油天然气集团有限公司 Special dragging head for submarine pipeline landing directional drill and submarine pipeline landing directional drill system
CN114754196B (en) * 2021-01-08 2024-04-30 中国石油天然气集团有限公司 Special drag head for sea pipe landing directional drill and sea pipe landing directional drill system
CN112923129A (en) * 2021-01-21 2021-06-08 四川石油天然气建设工程有限责任公司 Butt-joint type dragging pipe construction process and system for oil and gas pipelines
CN113131405A (en) * 2021-04-20 2021-07-16 伟卓石油科技(北京)有限公司 Cable laying system in submarine underground rock
CN113131405B (en) * 2021-04-20 2021-10-15 伟卓石油科技(北京)有限公司 Cable laying system in submarine underground rock
CN114233191A (en) * 2021-12-23 2022-03-25 浙江华东工程咨询有限公司 Offshore wind farm submarine cable embankment penetrating construction method based on trenchless directional drilling technology

Also Published As

Publication number Publication date
CN109356527B (en) 2021-06-25

Similar Documents

Publication Publication Date Title
CN109356527A (en) A kind of login method of the submarine pipeline in Offshore Engineering work progress
US7963722B2 (en) Method for the trenchless laying of pipes
JP2005517105A (en) Well system
NL2005099C2 (en) Method and device for introducing an electrical cable at a depth in a seabed.
US2966221A (en) Well drilling process and apparatus
CN110924864A (en) Directional drilling traction construction method for offshore water delivery pipeline
CN105370208A (en) Underwater drill-burst ship and drilling construction method thereof
CN113187438A (en) Installation device and installation method of deep water surface layer conduit
EP2909126A2 (en) Improvements in or relating to marine operations
CN101581216B (en) Driving depth calculation and control methods of large-size pipe shared by three bunchy wells
CN101218459B (en) Riser installation from offshore floating production unit
CN209600759U (en) Bottom supporting steel beam threading equipment for salvaging sunken ship
CN113131404B (en) Method for laying cables in submarine underground rock
CN109989710A (en) High-precision heavy-caliber horizontal resistance force method
CN109649601B (en) Bottom-supporting steel girder penetrating equipment and method for salvaging sunken ship
Foss The Ocean Drilling Program II: JOIDES Resolution-Scientific drillship of the 80's
RU2731010C1 (en) Processing system for sea cluster drilling
JP4392307B2 (en) Underground pipeline installation method
CN218862567U (en) Integrated rope coring system and special rope coring drilling machine
RU2409734C2 (en) Device for well hole making with working face
Den Boer et al. An Integrated Towed Flowline Bundle Production System for Subsea Developments
Mok et al. A perspective of pipejacking works by tunnel boring machines in Hong Kong: part II–applications, problems encountered, cost and prospects
Weiner Microtunnelling: progress by experience and innovation
Schmaeh Installation of Shore Approaches and Sea-Lines Using Trenchless Methods: Technologies and Case Studies
Sumner Under water crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant