CN109344592A - Project kanban system method and apparatus based on bio-identification - Google Patents

Project kanban system method and apparatus based on bio-identification Download PDF

Info

Publication number
CN109344592A
CN109344592A CN201811127992.9A CN201811127992A CN109344592A CN 109344592 A CN109344592 A CN 109344592A CN 201811127992 A CN201811127992 A CN 201811127992A CN 109344592 A CN109344592 A CN 109344592A
Authority
CN
China
Prior art keywords
project
user
task
management
destination item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811127992.9A
Other languages
Chinese (zh)
Inventor
苏生宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OneConnect Smart Technology Co Ltd
Original Assignee
OneConnect Smart Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OneConnect Smart Technology Co Ltd filed Critical OneConnect Smart Technology Co Ltd
Priority to CN201811127992.9A priority Critical patent/CN109344592A/en
Publication of CN109344592A publication Critical patent/CN109344592A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • G06F21/32User authentication using biometric data, e.g. fingerprints, iris scans or voiceprints
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Computer Security & Cryptography (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Software Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • Computer Hardware Design (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides the project kanban system method and apparatus based on bio-identification, wherein, method includes: to obtain the project management instruction initiated for the project billboard by project billboard, the project management instruction includes the identity data of the first user, the project billboard shows each task of destination item and the progress of each task, and the project management instruction is for managing the destination item;Determine first user to the operating right of the destination item according to the identity data of first user;If it is determined that first user has the operating right to the destination item, it is then instructed according to the project management and project management is carried out to the destination item, and pass through each task of the destination item after the project billboard display management and the progress of each task.The technical solution makes user directly directly can carry out project management to the project in project billboard by project billboard, simple to operate.

Description

Project kanban system method and apparatus based on bio-identification
Technical field
The present invention relates to project management fields, more particularly to the project kanban system method and apparatus based on bio-identification.
Background technique
One word of billboard is the tool for transmitting signal control production, it can be certain " plate ", for example, blocks originating from Japan Piece, notice board, entity blank, electronical display etc. are also possible to that other forms of certain information, for example, signal lamp can be identified Deng.Kanban system refers in carrying out a certain business process, the affairs is divided into several subtransactions in advance, pass through billboard The progress for showing these subtransactions changes the progress of subtransaction when there is the progress of subtransaction to change in time on billboard.
Billboard can be applied in IT project development, by being multiple tasks by IT item dividing and assigning the task to not Same project personnel, show progress and the corresponding project personnel of the task of the task, so that in the IT project on billboard Project personnel can see the progress of each task.Currently, IT project management is usually with blackboard or blank or electronics The form of screen shows project process, when the progress of a certain task in project changes, for the black of entity Plate or blank need artificially or the Self-stick note on modification blackboard or blank are to modify to development of projects;For electrical screen Curtain, needs artificially to modify into the project management system on line;Operation is not convenient enough.
Summary of the invention
The embodiment of the present invention provides the project kanban system method and apparatus based on bio-identification, solves the modification of project billboard Inconvenient problem.
In a first aspect, providing a kind of project kanban system method based on bio-identification, comprising:
The project management instruction initiated for the project billboard, the project management instruction packet are obtained by project billboard Include the identity data of the first user, the project billboard show destination item each task and each task into Degree, the project management instruction is for managing the destination item;
Determine first user to the operating right of the destination item according to the identity data of first user;
If it is determined that first user has the operating right to the destination item, then referred to according to the project management It enables and project management is carried out to the destination item, and pass through each task of the destination item after the project billboard display management And the progress of each task.
In the embodiment of the present invention, project management instruction is directly obtained by project billboard, and refer to according to the project management In the case that identity data in order determines that first user has the operating right to the project shown in the project billboard, root The project in the project billboard is managed according to project management instruction, then passes through the target after project billboard display management The progress of each task of project is the equal of that user directly passes through project billboard to the destination item progress item in project billboard Mesh management, it is simple to operate.
With reference to first aspect, in one possible implementation, it is instructed according to the project management to the target item Mesh carries out before project management, further includes: determines that the project management instructs corresponding goal task and the goal task Corresponding management user, the goal task are the task of the destination item, and the goal task is that the project management refers to The project management object of order, the management user is the user for having the operating right to the goal task;If according to institute The identity data for stating the first user determines that first user is the management user, then executes described according to the project management The step of instruction is managed the destination item.In the case where determining that user has the operating right to destination item, Also the permission of goal task is determined to whether the user has, it is ensured that the only owner of the goal task or management Person could be managed the task of oneself, realize the isolation of task right.
With reference to first aspect, in one possible implementation, described to be instructed according to the project management to the mesh Mark project carries out after project management, further includes: determines that the project management instructs corresponding goal task and the target The corresponding operation user of task, the goal task are the task of the destination item, and the goal task is the project pipe The project management object of instruction is managed, the operation user is the user for executing the goal task;It is pushed to the operation user Task change prompt, the task change prompt include the progress of the goal task and the goal task, the task Change prompt is for informing the alteration of goal task described in the operation user.By being pushed away to the user of performance objective task Task change prompt is sent, the user can be allow to understand the variable condition of the task of oneself in time.
With reference to first aspect, in one possible implementation, described to be instructed according to the project management to the mesh Mark project carries out after project management, further includes: determines that the project management instructs corresponding goal task and the target The corresponding each project user of project;To each project user push task change prompt, the task change prompt packet The progress of the goal task and the goal task is included, the task change prompt is for informing described in the project user The alteration of goal task.Task change prompt is pushed by each user into the project, can be made in the project team Member can be with the progress of the entire project of timely learning.
With reference to first aspect, in one possible implementation, described to be instructed according to the project management to the mesh Mark project carries out after project management, further includes: determines that the project management instructs corresponding goal task;It is described by described Project billboard shows that each task of the destination item after project management and the progress of each task include: to pass through The each task of destination item after the project billboard display management and the progress of each task, wherein described The goal task is highlighted in project billboard in a manner of being different from other tasks, other described tasks are the target item Task in purpose each task in addition to the goal task.By highlighting the target by change in project billboard Task can be used family and know clearly last updated task in project.
With reference to first aspect, in one possible implementation, the identity data of first user includes described The voice print database of one user;The identity data according to first user determines first user to the destination item Operating right include: the voice print database for obtaining the corresponding each project user of the destination item;By first user's Voice print database is matched with the voice print database of each project user respectively;If the voice print database of first user with The similarity of any one voice print database in the voice print database of each project user is greater than or equal to sound similarity threshold Value, it is determined that first user has the operating right to the destination item.Since the identity data of user is vocal print number According to then user directly can carry out operational administrative to the task in project billboard by sound, simple and convenient.
With reference to first aspect, in one possible implementation, the identity data of first user includes described The voice print database of one user;The identity data according to first user determines first user to the destination item Operating right include: the voice print database for obtaining the corresponding each project user of the destination item;By first user's Voice print database is matched with the voice print database of each project user respectively;If the voice print database of first user with The similarity of any one voice print database in the voice print database of each project user is greater than or equal to sound similarity threshold Value, it is determined that first user has the operating right to the destination item.Since the identity data of user is fingerprint number According to then user can carry out operational administrative to the task in project billboard by finger, simple and convenient.
Second aspect provides the project kanban system device based on bio-identification, comprising:
Instruction acquisition module, for obtaining the project management instruction initiated for the project billboard by project billboard, Project management instruction includes the identity data of the first user, the project billboard show each task of destination item with And the progress of each task, the project management instruction is for managing the destination item;
Operating right determining module, for determining first user to described according to the identity data of first user The operating right of destination item;
Project management module, if determining that first user has to the target item for operating right determining module Purpose operating right then instructs according to the project management and carries out project management to the destination item, and passes through the project The progress of each task of destination item after billboard display management and each task.
The third aspect provides the project kanban system device based on bio-identification, including processor, memory, Yi Jixiang Mesh billboard, the processor, memory and project billboard are connected with each other, wherein the project billboard is used for displaying target project Each task and each task progress, the memory is for storing the project kanban system based on bio-identification Device executes the application code of the above method, and the processor is configured for the method for executing above-mentioned first aspect.
Fourth aspect provides a kind of computer storage medium, and the computer storage medium is stored with computer program, institute Stating computer program includes program instruction, and described program instruction makes the processor execute above-mentioned first when being executed by a processor The method of aspect.
In the embodiment of the present invention, the project management instruction of user is obtained by project billboard and is instructed according to the project management The each of the destination item after project management is managed and shown by project billboard to the project in the project billboard The progress of item task is the equal of that user directly passes through project billboard to the project progress project management in project billboard, operation It is simple and convenient.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to needed in the embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 schematically illustrates user and directly passes through what project billboard was managed the project shown in project billboard A kind of schematic diagram of a scenario;
Fig. 2, which schematically illustrates user and directly passes through project billboard, is managed the project shown in project billboard Another schematic diagram of a scenario;
Fig. 3 is a kind of flow diagram for project kanban system method based on bio-identification that inventive embodiments provide;
Fig. 4 is the process signal of another project kanban system method based on bio-identification provided in an embodiment of the present invention Figure;
Fig. 5 is the schematic diagram for highlighting goal task of project billboard provided in an embodiment of the present invention;
Fig. 6 is that a kind of composed structure of project kanban system device based on bio-identification provided in an embodiment of the present invention is shown It is intended to;
Fig. 7 is the composed structure of another project kanban system device based on bio-identification provided in an embodiment of the present invention Schematic diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that the described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on this Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts Example is applied, shall fall within the protection scope of the present invention.
The scheme of the embodiment of the present invention be suitable for exploration project, test item etc. need group/division of responsibilites of teams cooperation with It realizes some purpose or is made into the project management scene of the project of something, user can be directly by for showing that this is opened The project billboard of hair project or test item is managed the project shown in the project billboard, so that showing in project billboard Project progress can with user for project billboard issue management instruct or management operate and change.
The embodiment of the present invention for ease of understanding introduces some scene embodiments of the embodiment of the present invention, referring to Fig. 1-first Fig. 2.
Fig. 1 schematically illustrates user and directly passes through what project billboard was managed the project shown in project billboard A kind of schematic diagram of a scenario.Firstly, the case where project of entitled " marketing system exploration project " is shown in project billboard 10, it should Project includes 4 program members, and respectively 1~program member of program member 4, each program member corresponds to multiple tasks, often There are three types of situations for the state of the corresponding task of a program member, the first is untreated task, are handling for second Task, the third is having completed for task.Program member 1 in the project wish by the state of the task 11 in the project by Untreated to become handling, program member 1 issues phonetic order against project billboard and " is updated to the state of task 11 Processing ".After project billboard 10 receives the phonetic order, the phonetic order is responded, the content shown in renewal item billboard 10, Task 11 from untreated one column of task by switching in one column of task handled.
Fig. 2 schematically illustrates what user was directly managed the project shown in project billboard by project billboard Another schematic diagram of a scenario.Firstly, the case where project of entitled " marketing system exploitation " is shown in project billboard 10, this Mesh includes 4 program members, and respectively 1~program member of program member 4, each program member corresponds to multiple tasks, Mei Gexiang There are three types of situations for the state of the corresponding task of mesh member, the first is untreated task, and second is handling for task, The third is having completed for task.Program member 2 in the project wishes for task 2b+1 to be updated to by handling It completes, program member 2 chooses with finger on project billboard and drag task 2b+1, and task 2b+1 is appointed from what is handled A column of being engaged in drags to one column of task completed, and the task 2b+1 in project billboard follows the finger movement of user, from One column of task of processing switches to one column of task completed.
It can be seen that the project for showing in project billboard from Fig. 1 and Fig. 2, user only needs logical for project billboard The project in project billboard can directly be managed by crossing finger or voice, simple to operate, improve user experience.
The technical solution introduced below for realizing above-mentioned scene.
It is a kind of process for project kanban system method based on bio-identification that inventive embodiments provide referring to Fig. 3, Fig. 3 Schematic diagram, as shown, this method comprises:
S301 obtains the project management initiated for the project billboard by project billboard and instructs, the project management Instruction includes the identity data of the first user, and the project billboard shows each task of destination item and the items are appointed The progress of business, the project management instruction is for managing the destination item.
In the embodiment of the present invention, project billboard is the electronic curtain for having display function, is used for displaying target project Project process, the project process include each task of destination item and the progress of each task.Destination item can be open Hair project, test item etc. need division of responsibilites of teams cooperation to realize some purpose or be made into the project of something.For example, target Project can be the project of a APP of exploitation, and destination item may be that the web station system developed to one is surveyed Project of examination, etc..Destination item is made of the multiple tasks for distributing to disparity items member.The progress of task indicates task Performance is specifically as follows and does not start, completes, be completed, etc.;Optionally, the progress of task can also be carried out Further division, such as can be not start, complete not completing half also, completing and complete to be more than half, it is complete At, etc., it is not limited to description here.Illustratively, each task and items of the destination item shown in project billboard The progress of task can be for shown in the A in Fig. 1.
First user is the user being managed by certain mode to the destination item in project billboard, first user The destination item in project billboard can be managed in the following manner:
First way, user are managed the destination item in project billboard by voice control.
The second way, user are managed the destination item in project billboard by touch project billboard.
Under the first technique, can use project billboard voice collecting function acquisition user voice data with and it is right The collected voice data of project billboard is identified, to obtain the project management instruction initiated for project billboard.At this point, the The identity data of one user is the voice print database of the first user.For example, the voice collecting function by project billboard is collected The content of the voice data of user is " task 1 is completed ", then can determine that " task 1 is completed " is to get for item The particular content for the project management instruction that mesh billboard is initiated, and the volume of the sound in " task 1 is completed " this section of voice data, The sound characteristic that sound quality, tone color, waveform etc. are used to show the first user is the voice print database of the first user.
In the specific implementation, statistical model method, the method based on channel model and phonic knowledge, template matching can be passed through Methods or in the way of method of artificial neural network etc. to passing through the voice data of the collected user of project billboard Speech recognition is carried out, determines the particular content of the voice data, which is determined as the specific interior of project management instruction Hold.
Speech recognition is carried out to by the voice data of the collected user of project billboard with statistical model method below, really Determine to be introduced for the particular content of voice data, specifically:
It is possible, firstly, to framing is carried out to the collected voice data of project billboard using mobile window function, i.e., it is user is defeated The phonetic segmentation entered is at multiple voice segments.Then acoustic feature extraction is carried out to each voice data that framing obtains, it will Each voice segment, which is converted into, contains the multi-C vector of the content information of the voice segment, specifically, can be using Meier frequency The mode of rate scramble coefficient (mel-frequency cepstral coefficient, MFCC) feature extraction extracts framing The voice data arrived carries out acoustic feature extraction.After each voice segment that framing is obtained is converted into multi-C vector, collect Voice data be converted into the observation sequences of M row * N column, wherein M is the characteristic dimension of the multi-C vector, and N is voice segment Quantity.Then by observation sequence be sent into advance it is trained based on hidden Markov model (hidden markov model, It HMM, will in state network lookup and the most matched path of the observation sequence, the i.e. path of maximum probability in state network) Content of text corresponding to the most matched path is determined as the content of the voice data, and then the content is determined as project pipe Manage the particular content of instruction.
Under a second technique, the touch detection function of can use project billboard acquires the finger of the first user in project Action data on billboard, identifies action data, to obtain the project management instruction initiated for project billboard, this When, the identity data of the first user is the finger print data of the first user.For example, the touch detection function by project billboard acquires To the action data of user be that task 1 dragged into completed one column of task from one column of task handled, it is determined that The particular content of the item instruction of the initiation of the first user got is that task 1 is completed, and collected user drags task 1 The fingerprint of used finger is the finger print data of the first user.
In the specific implementation, can determine the corresponding billboard coordinate of the action data, touching intensity, touch duration and touching Touch the data such as interval;Then according to data and preset projects such as billboard coordinate, touching intensity, touch duration and touch intervals Management instruction triggers condition determines the corresponding content of the action data, which is determined as to the project initiated for project billboard Manage the particular content of instruction.Wherein, billboard coordinate refers to that the contact point when finger of user is contacted with project billboard is seen in project Coordinate in plate, touching intensity refer to the dynamics that finger generates project billboard when the finger of user touches project billboard, touch duration Refer to that the finger of user touches the lasting duration of project billboard, touches interval and refer to that the finger of user is touched twice between project billboard Time interval.Preset project management instruction triggers condition is billboard coordinate, touching when triggering certain type of project management instruction Dynamics is touched, duration is touched and touches the condition that the needs such as interval meet.
For example, addition task or the trigger condition for the project management instruction for deleting this type of task can be set as touching It touches interval and is less than first time interval, also, touching intensity is greater than the first dynamics, i.e., the corresponding touching of the action data that ought be got It touches interval and is less than first time interval, also, the corresponding touching intensity of action data is greater than the first dynamics, it is determined that the movement number According to the project management instruction for addition task or deletion this type of task, and then can be sat according to the corresponding billboard of the action data Mark or the data of user's input determine the title of the task of addition or the task of deletion.It for another example, can be by the progress for the task that changes The trigger condition of the project management instruction of this type is set as touching intensity greater than the second dynamics, also, touches duration and be greater than First duration, i.e., when the corresponding touching intensity of the action data got is greater than the second dynamics and touches duration greater than first When long, it is determined that the action data is the project management instruction of this type of the progress of change task, and then can be according to the movement The corresponding billboard coordinate of data determine the task of carry out task change title and specifically by the schedule variance of the task to what Kind progress.
S302 determines first user to the operating rights of the destination item according to the identity data of first user Limit.
Here, the first user includes two kinds of situations to the operating right of destination item: one is the first users to have to mesh The operating right of mark project, the first user have corresponding for the destination item to operating right the first user of expression of destination item Project team in program member;Another kind is that second user does not have operating right to destination item, and second user does not have The standby operating right to destination item indicates that second user is not the program member in the corresponding project team of the destination item.
Corresponding to the mode that the first user is managed the destination item in project billboard, according to the identity of the first user Data determine operating right of first user to destination item, and also there are two types of judgment modes:
First way: determine the first user to the operating right of destination item according to the voice print database of the first user.
The second way: determine the first user to the operating right of destination item according to the finger print data of the first user.
Under the first technique, the voice print database of the corresponding each project user of destination item can be acquired in advance and will be each The voice print database of a project user is stored into authentication database.Determining the first user to the operating right of destination item When, the voice print database of the corresponding each project user of the destination item can be obtained from authentication database, and first is used The voice print database at family is matched with the voice print database in each project user respectively, if the voice print database of the first user and each Any one voice print database matches in the voice print database of a project user, then illustrates that first user is the corresponding item of destination item Program member in mesh group, it is determined that the first user has the operating right to destination item;Otherwise, it is determined that the first user is not Has the operating right to destination item.Wherein, appoint in the voice print database of the voice print database of the first user and each project user Voice print database matching of anticipating can be any one in the voice print database of the first user and the voice print database of each project user The similarity of voice print database is greater than or equal to sound similarity threshold.Sound similarity threshold be one close to 1 score or Percentage, such as can be 90%, 95%, etc..
Citing is to be illustrated, it is assumed that the corresponding project team of destination item includes 4 program members, respectively program member 1~program member 4, acquire the voice print database of this 4 program members respectively, and collected voice print database is 1~sound of voice print database 1~voice print database of voice print database 4 is saved in authentication database by line data 4, and sound similarity threshold is 95%, the The voice print database of one user is that voice print database 0 can be from identity then when determining operating right of first user to destination item In validation database obtain 1~voice print database of voice print database 4, by voice print database 0 respectively with 1~voice print database of voice print database 4 Match, if one of vocal print number in voice print database 0 and voice print database 1, voice print database 2, voice print database 3 or voice print database 4 According to similarity be greater than 95%, it is determined that the first user has the operating right to destination item.
Under second of implementation, it can acquire the finger print data of the corresponding each project user of destination item in advance And by the storage of the voice print database of each project user into authentication database.Determining the first user to the behaviour of destination item When making permission, the finger print data of the corresponding each project user of the destination item can be obtained from authentication database, it will The finger print data of each project user of the finger print data of first user with storage in the database matches, if first uses The finger print data at family is matched with the finger print data of any one member in project team, then illustrates that first user is destination item Program member in corresponding project team, it is determined that the first user has the operating right to destination item;Otherwise, it is determined that the One user does not have the operating right to destination item.Wherein, the fingerprint of the finger print data of the first user and each project user The matching of any one finger print data can be in the finger print data of the first user and the finger print data of each project user in data The similarity of any one finger print data is greater than or equal to fingerprint similarity threshold.Fingerprint similarity threshold is one close to 1 Score or percentage, such as can be 90%, 95%, etc..Fingerprint similarity threshold can be with above sound similarity threshold Be worth it is identical, can also be different from above sound similarity threshold.
Citing is to be illustrated, it is assumed that the corresponding project team of destination item includes 4 program members, respectively program member 1~program member 4, acquire the finger print data of this 4 program members respectively, and collected voice print database is finger print data 1~refer to 1~finger print data of finger print data 4 is saved in authentication database by line data 4, and sound similarity threshold is 98%, the The finger print data of one user is that finger print data 0 can be from identity then when determining operating right of first user to destination item In validation database obtain 1~finger print data of finger print data 4, by finger print data 0 respectively with 1~finger print data of finger print data 4 Match, if one of fingerprint number in finger print data 0 and finger print data 1, finger print data 2, finger print data 3 or finger print data 4 According to similarity be greater than 98%, it is determined that the first user has the operating right to destination item.
It should be noted that in the voice print database and/or finger print data of the corresponding each project user of acquisition destination item When, the voice print database and/or finger print data of each project user are not limited to one, can have it is multiple, i.e., in certificate data In library, the voice print database and/or finger print data of each project user can have multiple.For example, can be adopted for project user 1 Collect the finger print data of the finger print data of the left index finger of the project user 1, the finger print data of right hand index finger, right hand middle finger, totally three A finger print data is saved in authentication database.In addition, may be used also in authentication database in some possible scenes The corresponding voice print database of each project user and the corresponding finger print data of each project user are saved simultaneously.
S303, if it is determined that first user has the operating right to the destination item, then according to the project Management instruction carries out project management to the destination item, and passes through each of the destination item after the project billboard display management The progress of item task and each task.
Here, it is instructed according to project management and destination item progress project management is referred to according to project management instruction completion Setting to one or several tasks in destination item, wherein the project management instruction may include project management object and Project management content, project management object are the goal task in destination item, and project management content is the setting of Task Progress.
The setting of Task Progress specifically may include addition task, change the schedule variance of task or delete task, according to item Mesh management instruction carries out project management to destination item specifically: the project management is instructed corresponding target in destination item The progress of task is set as the specified Task Progress of project management instruction.
For example, project management instruction for " for user 1 add task 1 ", then according to project management instruct to destination item into Row management is that user 1 adds task 1, and sets untreated for the progress of task 1;For another example, project management instruction is " task 1 It is completed ", then destination item is managed according to project management instruction as the progress of task 1 to be set as being completed.
Here, each task and the items that the destination item after project management is shown by project billboard are appointed The progress of business can be found in the C in Fig. 1 or Fig. 2.
In the embodiment of the present invention, instructed by the project management that project billboard obtains user, and according to the project management In the case that identity data in instruction determines that first user has the operating right to the project shown in the project billboard, The project in the project billboard is managed according to project management instruction, and is shown by project billboard by project management The progress of each task of destination item afterwards is the equal of that user directly passes through project billboard to the target item in project billboard Mesh carries out project management, simple to operate.
In some possible embodiments, determining that the first user has the case where operating right to destination item Under, the operating right of project management object can also be judged to whether the first user has.Referring to fig. 4, Fig. 4 is this hair The flow diagram for another project kanban system method based on bio-identification that bright embodiment provides, as shown, the party Method includes:
S401 obtains the project management initiated for the project billboard by project billboard and instructs, the project management Instruction includes the identity data of the first user, and the project billboard shows each task of destination item and the items are appointed The progress of business, the project management instruction is for managing the destination item.
Here, the specific implementation of step S401 can refer to the description of above mentioned step S3 01, and details are not described herein again.
S402 determines that the project management instructs corresponding goal task and the corresponding management of the goal task to use Family, the goal task are the task of the destination item, and the goal task is the project management of project management instruction Object, the management user is the user for having the operating right to the goal task.
In one possible implementation, the corresponding management user of goal task can be the item of the execution goal task Mesh user.For example, goal task is the task 11 of Fig. 1, then the corresponding management user of goal task is the program member 1 in Fig. 1.
In alternatively possible implementation, the corresponding management user of goal task can be to execute the goal task The management user of project user and the destination item, wherein management user has the behaviour to all tasks in the destination item Make permission.The management user of destination item for example can be project manager, project leader of the destination item, etc..
In the embodiment of the present invention, management of identifying project instructs corresponding goal task and executes the project of the goal task User has the possible mode of following two:
The first possible mode, if project management instruction is that user is instructed by the project management that voice is initiated, It then can be after the voice data to user carries out speech recognition and determines the particular content of voice data, by the particular content It is compared with instruction type keyword, to determine the type of project management instruction.Wherein, instruction type keyword be for The keyword of the type of directory entry management instruction, for example, the instruction type of the project management instruction of addition this type of task Keyword is the keyword for increasing newly, increase, add, add, increasing or adding etc. for indicating addition, deletes this type of task Project management instruction instruction type keyword be delete, reduce, deleting, removing, removing etc. be used for indicate deletion key Word, change the keyword of the progress of task this type for change, change, change, substitute, modification, replacement, transformation etc. is for table Show the keyword of change.If it is determined that the type of project management instruction is this type of addition task, then by the particular content It is compared after removal instruction type keyword with member Name's keyword, to determine the project user for executing the goal task. Wherein, member Name's keyword is the mark for indicating the identity of each project user, can be to be shown in project billboard On each member title.In after particular content removal instruction type keyword and member Name's keyword Hold, determines that the destination item management instructs corresponding goal task.If it is determined that the type of project management instruction is not increase Task type will be then compared, with pipe of identifying project with task key word after particular content removal instruction type keyword Reason instructs corresponding goal task.Wherein, task key word is the title or mark of already existing each task in destination item Know.The project user for executing the goal task is determined further according to goal task.
For example, the particular content of voice data is " increasing task 1 for project user 1 "." it will increase for project user 1 and appoint Business 1 " and instruction type Key comparison, instruction type keyword include increasing newly, increase, add, add, increase or adding etc. to use In the keyword for indicating addition, and, the keyword for indicating deletion such as delete, reduce, deleting, removing, removing, and, Change, change, change, replacement etc. are for indicating the keyword of change.Due to including to refer in " increasing task 1 for project user 1 " Enable type keyword " increase ", it is determined that the type of project management instruction is this type of increase task.It will be " for project user 1, which increases task 1 ", removes content " for 1 task 1 of project user " and member Name's keyword after instruction type keyword " increase " It is compared, member Name's keyword includes project user 1, project user 2, project user 3 and project user 4.Due to " for Include in 1 task 1 " of project user " project user 1 ", it is determined that the project user for executing the goal task is project user 1.It goes After instruction type keyword and member Name's keyword, content becomes " for task 1 ", it is determined that the task 1 of goal task.
For another example, voice data is " being changed to be completed by the processing status of task 1 "." processing status of task 1 will be become More be completed " with instruction type Key comparison, instruction type keyword include increase newly, increase, adding, adding, increasing or The keyword for indicating addition such as add, and, the key for being used to indicate deletion such as delete, reduce, deleting, removing, removing Word, and, change, change, change, replacement etc. are for indicating the keyword of change.Due to " processing status of task 1 being changed To be completed " in include instruction type keyword " change ", it is determined that the project management instruct type be not increase task this One type." being changed to be completed by the processing status of task 1 ", which is removed the content after instruction type keyword " change ", " will appoint Business 1 processing status be completed " be compared with task key word, task key word include task 1, task 2, task 3 with And task 4.Due to including " task 1 " in " being to be completed by the processing status of task 1 ", it is determined that goal task is task 1.Into And the corresponding user of task 1 can be determined as to execute the project user of the goal task.
The second way, if project management instruction is the project management that user passes through that touch detection project billboard is initiated Instruction, then can determine the project according to the action data and preset project management instruction triggers condition of collected user Manage the type of instruction, if it is determined that the type of project management instruction is increase task, then determining according to the input of user should Project management instructs corresponding goal task and executes the project user of the goal task;If it is determined that project management instruction Type is not increase task, then determines that the project management instructs corresponding goal task and the execution target according to the action data The project user of task.
For example, determining this according to the action data of collected user and preset project management instruction triggers condition The type of mesh management instruction is increase task, then shows task input frame and project user selection to user by project billboard Frame determines goal task according to the content that user inputs in task input frame, if user's input is task 1, it is determined that appoint Business 1 is goal task;The item for executing the goal task is determined according to the project user that user selects in project user choice box Mesh user, for example, the project user that user selects is project user 1, it is determined that project user 1 is the item for executing the goal task Mesh user.
For another example, this is determined according to the action data of collected user and preset project management instruction triggers condition The type of mesh management instruction is not increase task, then can be sat according to the starting billboard in the corresponding billboard coordinate of the action data Mark is determined as goal task, for example, the corresponding task of starting billboard coordinate of the corresponding billboard coordinate of the action data is task 1, then task 1 is determined as goal task.And then the corresponding user of task 1 can be determined as to execute the project of the goal task User.
S403, if determining that first user is the management user, root according to the identity data of first user Project management is carried out to the destination item according to project management instruction, and passes through the mesh after the project billboard display management The progress of each task of mark project and each task.
Corresponding to the mode that the first user is managed the destination item in project billboard, according to the identity of the first user Data determine the first user whether be goal task management user mode also there are two types of mode:
First way: according to the voice print database of the first user determine the first user whether be goal task management use Family.
The second way: according to the finger print data of the first user determine the first user whether be goal task management use Family.
Under the first technique, the voice print database of the corresponding each project user of destination item can be acquired in advance and will be each The voice print database of a project user is stored into authentication database.Determine the first user whether be goal task management When user, the corresponding voice print database of management user can be obtained from authentication database, by the vocal print number of the first user It is matched according to voice print database corresponding with management user, if the vocal print of the voice print database of the first user and management user Data Matching, it is determined that first user is management user, wherein the sound of the voice print database of the first user and management user Line Data Matching can be greater than or equal to sound for the similarity of the voice print database of the voice print database and management user of the first user Sound similarity threshold.
Under a second technique, it can acquire the finger print data of the corresponding each project user of destination item and incite somebody to action in advance The finger print data of each project user is stored into authentication database.Determine the first user whether be goal task pipe When managing user, the corresponding finger print data of management user can be obtained from authentication database, by the fingerprint of the first user Data finger print data corresponding with management user matches, if the finger of the finger print data of the first user and management user Line Data Matching, it is determined that first user is management user, wherein the finger print data of the first user is with management user's Finger print data matching can be greater than or equal to for the similarity of the finger print data and the finger print data of management user of the first user Fingerprint similarity threshold.
Here, it is instructed according to project management and the specific implementation of project management is carried out to the destination item and passes through item Mesh billboard shows that each task of the destination item after project management and the progress of each task can refer to step S303 Description, details are not described herein again.
In the embodiment of the present invention, instructed by the project management that project billboard obtains user, and according to the project management When identity data in instruction determines that user is that project management instructs the management user of corresponding goal task, determine that the user has In the case where the standby operating right to goal task, goal task is managed according to project management instruction, and pass through item Mesh billboard shows the progress of each task of the destination item after project management, it is ensured that the only executor of the goal task Or manager could be managed the task of oneself, realize the division on the operating right of task.
In some possible scenes, after carrying out project management to destination item according to project management instruction, logical The project billboard of mistake show the destination item after project management each task and each task progress when, can be in item Mesh billboard highlights the project management in a manner of being different from other tasks and instructs corresponding goal task, wherein this other Task is the task in the corresponding each task of the destination item in addition to the goal task.
Specifically, can in a manner of highlighting text, highlight the project management in the way of the additional label of addition and refer to Enable corresponding goal task.
For example, what is shown in project billboard is interior after carrying out project management to destination item according to project management instruction Hold shown in C as shown in figure 1, goal task is task 11, then prominent aobvious in a manner of being different from other tasks in project billboard Show that the goal task can be as shown in Figure 5.
By highlighting the goal task by change in project billboard, project billboard can be passed through clearly with user Know current last updated task in project.
In some possible scenes, after carrying out project management to destination item according to project management instruction, may be used also Corresponding goal task and the corresponding each project user of destination item are instructed with the determination project management, then to the mesh The corresponding each project user of mark project pushes task change instruction, which includes that project management instruction corresponds to Goal task and the goal task progress, to inform the alteration of each project user task.Wherein it is determined that project Management instructs the mode of corresponding goal task to can be found in the description of abovementioned steps S402, and details are not described herein again.
In the specific implementation, the message push contact method of the corresponding each project user of destination item can be acquired in advance simultaneously The message push contact method of each project user is saved.In the change prompt of the task of push, according to each project user Message pushes contact method and pushes task change prompt to each project user.For example, can be according to each project user Email address pushes task change prompt by way of sending mail to each project user, according to each project user Telephone number pushes task change prompt, according to each project user by way of sending short message to each project user WeChat ID pushes task change prompt, etc. by way of sending wechat message, is not limited to description here.
Push task change prompt by each user into the project, can enable member in the project team and When know the progress of entire project.
In other possible scenes, after carrying out project management to destination item according to project management instruction, also It can determine that the project management instructs corresponding goal task and the corresponding operation user of goal task, then to the target The corresponding operation user of task pushes task change prompt, which includes that the project management instructs corresponding target The progress of task and the goal task, to inform the alteration of the operation ownership goal task.Here, goal task is corresponding Operation user be execute the goal task user, determine the goal task and goal task it is corresponding operation user side Formula can be found in foregoing description, and details are not described herein again.
In the specific implementation, the message push contact method of the corresponding each project user of destination item can be acquired in advance simultaneously The message push contact method of each project user is saved.In the change prompt of the task of push, in disappearing for each project user It determines that the message of operation user pushes contact method in breath push contact method, is pushed and contacted according to the message of operation user Mode pushes task change prompt to operation user.Contact method is pushed to operation user's push according to the message of operation user Several forms of task change prompt can be found in foregoing description, and details are not described herein again.
By pushing task change prompt to the user of performance objective task, the user can be allow to understand oneself in time Task variable condition, and then goal task can be handled in time.
The method of inventive embodiments is described above, the device of inventive embodiments is described below.
It is a kind of group of project kanban system device based on bio-identification provided in an embodiment of the present invention referring to Fig. 6, Fig. 6 At structural schematic diagram, which includes:
Instruction acquisition module 601 refers to for obtaining the project management initiated for the project billboard by project billboard It enables, the project management instruction includes the identity data of the first user, and the items that the project billboard shows destination item are appointed The progress of business and each task, the project management instruction is for managing the destination item;
Operating right determining module 602, for determining first user couple according to the identity data of first user The operating right of the destination item;
Project management module 603, if determining that first user has to the mesh for operating right determining module The operating right of mark project then instructs according to the project management and carries out project management to the destination item, and by described The each task of destination item after project billboard display management and the progress of each task.
In a kind of possible design, described device 60 further include:
Task right determining module 604, for determining that the project management instructs corresponding goal task and the mesh The corresponding management user of mark task, the goal task are the task of the destination item, and the goal task is the project The project management object of instruction is managed, the management user is the user for having the operating right to the goal task;
If task right determining module 604 determines first user for institute according to the identity data of first user Management user is stated, then project management module 603 executes described instruct according to the project management and carries out pipe to the destination item The step of reason.
In a kind of possible design, described device 60 further include:
User's determining module 605 is operated, for determining that the project management instructs corresponding goal task and the mesh The corresponding operation user of mark task, the goal task are the task of the destination item, and the goal task is the project The project management object of instruction is managed, the operation user is the user for executing the goal task;
Change prompt pushing module 606, for pushing task change prompt to the operation user, the task change is mentioned Show the progress including the goal task and the goal task, the task change prompt is for informing the operation user The alteration of the goal task.
In a kind of possible design, described device 60 further include:
Project user determining module 607, for determining that the project management instructs corresponding goal task and the mesh The corresponding each project user of mark project;
The change prompt pushing module 606 is also used to each project user push task change prompt, described Task change prompt includes the progress of the goal task and the goal task, and the task change prompt is for informing State the alteration of goal task described in project user.
In a kind of possible design, described device 60 further include:
Goal task determining module 608, for determining that the project management instructs corresponding goal task;
Project management module 603 is specifically used for: being appointed by the items of the destination item after the project billboard display management The progress of business and each task, wherein highlighted in a manner of being different from other tasks in the project billboard The goal task, other described tasks are the task in each task of the destination item in addition to the goal task.
In a kind of possible design, the identity data of first user includes the voice print database of first user;
The operating right determining module 602 is specifically used for:
Obtain the voice print database of the corresponding each project user of the destination item;
The voice print database of first user is matched with the voice print database of each project user respectively;
If any one sound in the voice print database of the voice print database of first user and each project user The similarity of line data is greater than or equal to sound similarity threshold, it is determined that first user has to the destination item Operating right.
In a kind of possible design, the identity data of first user includes the finger print data of first user;
The operating right determining module 602 is specifically used for:
Obtain the finger print data of the corresponding each project user of the destination item;
The finger print data of first user is matched with the finger print data of each project user respectively;
If the finger print data of first user refers to any one in the finger print data of each project user The similarity of line data is greater than or equal to fingerprint similarity threshold, it is determined that first user has to the destination item Operating right.
It should be noted that unmentioned content can be found in the description of embodiment of the method in the corresponding embodiment of Fig. 6, here It repeats no more.
In the embodiment of the present invention, the project kanban system device based on bio-identification directly passes through project billboard and obtains user Project management instruction, and determine that first user has to the project billboard in the identity data instructed according to the project management In the case where the operating right of the project of middle display, pipe is carried out to the project in the project billboard according to project management instruction Reason, and pass through the progress that project billboard shows each task of the destination item after project management, it is the equal of that user is straight It connected project billboard and project management is carried out to the destination item in project billboard, it is simple to operate.
It is another project kanban system device based on bio-identification provided in an embodiment of the present invention referring to Fig. 7, Fig. 7 Composed structure schematic diagram, the device 70 include processor 701, memory 702 and project billboard 703.Processor 701 is connected to Memory 702 and project billboard 703, such as processor 701 can be connected to memory 702 and project billboard 703 by bus.
Processor 701 is configured as that the project kanban system device based on bio-identification is supported to execute Fig. 3-Fig. 5 institute Corresponding function in the project kanban system method based on bio-identification stated.The processor 701 can be central processing unit (central processing unit, CPU), network processing unit (network processor, NP), hardware chip or its Any combination.Above-mentioned hardware chip can be specific integrated circuit (application specific integrated Circuit, ASIC), programmable logic device (programmable logic device, PLD) or combinations thereof.Above-mentioned PLD can To be Complex Programmable Logic Devices (complex programmable logic device, CPLD), field programmable logic Gate array (field-programmable gate array, FPGA), Universal Array Logic (generic array logic, GAL) or any combination thereof.
702 memory of memory is for storing program code etc..Memory 702 may include volatile memory (volatile memory, VM), such as random access memory (random access memory, RAM);Memory 702 It may include nonvolatile memory (non-volatile memory, NVM), such as read-only memory (read-only Memory, ROM), flash memory (flash memory), hard disk (hard disk drive, HDD) or solid state hard disk (solid-state drive, SSD);Memory 702 can also include the combination of the memory of mentioned kind.
The project billboard 703 is for each task of displaying target project and the progress of each task.Destination item It is specifically as follows exploration project, test item, etc..Project billboard 703 may include display panel, which for example may be used Think liquid crystal display, active matrix organic light emitting diode display, etc..The display panel may further be specifically touching Touch panel.Optionally, which can also include sound receiver, specifically, the sound receiver can be Mike Wind etc. is used to acquire the device of voice data.
Processor 701 can call said program code to execute following operation:
The project management instruction initiated for the project billboard is obtained by project billboard 703, the project management refers to The identity data including the first user is enabled, the project billboard shows each task and each task of destination item Progress, project management instruction is for managing the destination item;
Determine first user to the operating right of the destination item according to the identity data of first user;
If it is determined that first user has the operating right to the destination item, then referred to according to the project management It enables and project management is carried out to the destination item, and pass through the items of the destination item after 703 display management of project billboard The progress of task and each task.
It should be noted that realizing for each operation can also corresponding description to should refer to above method embodiment;Institute Other operations executed in above method embodiment can also be cooperated with project billboard 703 by stating processor 701.
The embodiment of the present invention also provides a kind of computer storage medium, and the computer storage medium is stored with computer journey Sequence, the computer program include program instruction, and described program instruction executes the computer such as Method described in previous embodiment, the computer can be the project kanban system device mentioned above based on bio-identification A part.For example, above-mentioned processor 701.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium In, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic Dish, CD, ROM or RAM etc..
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.

Claims (10)

1. a kind of project kanban system method based on bio-identification characterized by comprising
The project management instruction initiated for the project billboard is obtained by project billboard, and project management instruction includes the The identity data of one user, the project billboard show each task of destination item and the progress of each task, The project management instruction is for managing the destination item;
Determine first user to the operating right of the destination item according to the identity data of first user;
If it is determined that first user has the operating right to the destination item, then according to project management instruction pair The destination item carries out project management, and by each task of the destination item after the project billboard display management and The progress of each task.
2. the method according to claim 1, wherein described instruct according to the project management to the target item Mesh carries out before project management, further includes:
Determine that the project management instructs corresponding goal task and the corresponding management user of the goal task, the target Task is the task of the destination item, and the goal task is the project management object of project management instruction, the pipe Managing user is the user for having the operating right to the goal task;
If determining that first user is the management user according to the identity data of first user, described is executed The step of destination item is managed according to project management instruction.
3. the method according to claim 1, wherein described instruct according to the project management to the target item Mesh carries out after project management, further includes:
Determine that the project management instructs corresponding goal task and the corresponding operation user of the goal task, the target Task is the task of the destination item, and the goal task is the project management object of project management instruction, the behaviour Making user is the user for executing the goal task;
Task change prompt is pushed to the operation user, the task change prompt includes the goal task and the mesh The progress of mark task, the task change prompt is for informing the alteration of goal task described in the operation user.
4. the method according to claim 1, wherein described instruct according to the project management to the target item Mesh carries out after project management, further includes:
Determine that the project management instructs corresponding goal task and the corresponding each project user of the destination item;
To each project user push task change prompt, the task change prompt includes the goal task and institute The progress of goal task is stated, the task change prompts the alteration for informing goal task described in the project user.
5. the method according to claim 1, wherein described instruct according to the project management to the target item Mesh carries out after project management, further includes:
Determine that the project management instructs corresponding goal task;
It is described by each task of the destination item after the project billboard display management and the progress of each task Include:
By each task of the destination item after the project billboard display management and the progress of each task, In, the goal task is highlighted in a manner of being different from other tasks in the project billboard, other described tasks are Task in each task of the destination item in addition to the goal task.
6. method according to claim 1-5, which is characterized in that the identity data of first user includes institute State the voice print database of the first user;
The identity data according to first user determines first user to the operating right packet of the destination item It includes:
Obtain the voice print database of the corresponding each project user of the destination item;
The voice print database of first user is matched with the voice print database of each project user respectively;
If any one vocal print number in the voice print database of the voice print database of first user and each project user According to similarity be greater than or equal to sound similarity threshold, it is determined that first user has the operation to the destination item Permission.
7. method according to claim 1-5, which is characterized in that the identity data of first user includes institute State the finger print data of the first user;
The identity data according to first user determines first user to the operating right packet of the destination item It includes:
Obtain the finger print data of the corresponding each project user of the destination item;
The finger print data of first user is matched with the finger print data of each project user respectively;
If any one fingerprint number in the finger print data of the finger print data of first user and each project user According to similarity be greater than or equal to fingerprint similarity threshold, it is determined that first user has the operation to the destination item Permission.
8. a kind of project kanban system device based on bio-identification characterized by comprising
Instruction acquisition module, for obtaining the project management instruction for the project billboard, the project by project billboard Management instruction includes the identity data of the first user, and the project billboard shows each task of destination item and described each The progress of item task, the project management instruction is for managing the destination item;
Operating right determining module, for determining first user to the target according to the identity data of first user The operating right of project;
Project management module, if determining that first user has to the destination item for operating right determining module Operating right then instructs according to the project management and carries out project management to the destination item, and passes through the project billboard The progress of each task of destination item after display management and each task.
9. a kind of project kanban system device based on bio-identification, including processor, memory and project billboard, described Processor, memory and project billboard are connected with each other, wherein the project billboard for displaying target project each task with And the progress of each task, the memory is for storing program code, and the processor is for calling described program generation Code executes the method according to claim 1 to 7.
10. a kind of computer storage medium, which is characterized in that the computer storage medium is stored with computer program, described Computer program includes program instruction, and described program instruction makes the processor execute such as claim when being executed by a processor The described in any item methods of 1-7.
CN201811127992.9A 2018-09-26 2018-09-26 Project kanban system method and apparatus based on bio-identification Pending CN109344592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811127992.9A CN109344592A (en) 2018-09-26 2018-09-26 Project kanban system method and apparatus based on bio-identification

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811127992.9A CN109344592A (en) 2018-09-26 2018-09-26 Project kanban system method and apparatus based on bio-identification

Publications (1)

Publication Number Publication Date
CN109344592A true CN109344592A (en) 2019-02-15

Family

ID=65306638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811127992.9A Pending CN109344592A (en) 2018-09-26 2018-09-26 Project kanban system method and apparatus based on bio-identification

Country Status (1)

Country Link
CN (1) CN109344592A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110009521A (en) * 2019-03-05 2019-07-12 广州影子科技有限公司 Realize the method and electronic device of pig farm workload billboard
CN111125205A (en) * 2019-12-19 2020-05-08 广州唯品会信息科技有限公司 Signboard data display method, terminal and storage medium
CN112423050A (en) * 2020-10-28 2021-02-26 浙江中之杰智能***有限公司 Safe billboard device based on android box and control method
CN114418555A (en) * 2022-03-28 2022-04-29 四川高速公路建设开发集团有限公司 Project information management method and system applied to intelligent construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system
CN107392427A (en) * 2017-06-20 2017-11-24 广州供电局有限公司 A kind of enterprise-level monitoring operation system
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN107679832A (en) * 2017-10-09 2018-02-09 广州四三九九信息科技有限公司 Task management method, device and server
CN108460571A (en) * 2017-12-25 2018-08-28 北京中人网信息咨询股份有限公司 A kind of team's collaboration of big, medium-sized and small enterprises and project management tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104573991A (en) * 2015-01-28 2015-04-29 携程计算机技术(上海)有限公司 Project process management system
CN107392427A (en) * 2017-06-20 2017-11-24 广州供电局有限公司 A kind of enterprise-level monitoring operation system
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN107679832A (en) * 2017-10-09 2018-02-09 广州四三九九信息科技有限公司 Task management method, device and server
CN108460571A (en) * 2017-12-25 2018-08-28 北京中人网信息咨询股份有限公司 A kind of team's collaboration of big, medium-sized and small enterprises and project management tool

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110009521A (en) * 2019-03-05 2019-07-12 广州影子科技有限公司 Realize the method and electronic device of pig farm workload billboard
CN111125205A (en) * 2019-12-19 2020-05-08 广州唯品会信息科技有限公司 Signboard data display method, terminal and storage medium
CN111125205B (en) * 2019-12-19 2024-01-16 广州唯品会信息科技有限公司 Signboard data display method, terminal and storage medium
CN112423050A (en) * 2020-10-28 2021-02-26 浙江中之杰智能***有限公司 Safe billboard device based on android box and control method
CN114418555A (en) * 2022-03-28 2022-04-29 四川高速公路建设开发集团有限公司 Project information management method and system applied to intelligent construction
CN114418555B (en) * 2022-03-28 2022-06-07 四川高速公路建设开发集团有限公司 Project information management method and system applied to intelligent construction

Similar Documents

Publication Publication Date Title
US10997222B2 (en) Conversational agent dialog flow user interface
CN109344592A (en) Project kanban system method and apparatus based on bio-identification
US9686275B2 (en) Correlating cognitive biometrics for continuous identify verification
US20180316637A1 (en) Conversation lens for context
CN107787491A (en) Document for reusing the content in document stores
US8321803B2 (en) Aggregating service components
US20210241893A1 (en) Dashboard Usage Tracking and Generation of Dashboard Recommendations
US11526575B2 (en) Web browser with enhanced history classification
CN106789543A (en) The method and apparatus that facial expression image sends are realized in session
CN108139918A (en) Using every user as basic custom program feature
US11488585B2 (en) Real-time discussion relevance feedback interface
US11423185B2 (en) Sensor based intelligent system for assisting user with voice-based communication
US10019336B2 (en) Natural language based capturing of user interface interactions
Van der Vlist Counter-mapping surveillance: A critical cartography of mass surveillance technology after Snowden
US20190319911A1 (en) Confusion reduction in an online social network
CN109388468A (en) Multiprogram window management method and device
JP2018206361A (en) System and method for user-oriented topic selection and browsing, and method, program, and computing device for displaying multiple content items
US20160283846A1 (en) Assistive technology (at) responsive to cognitive states
WO2016138129A1 (en) Updating language databases using crowd-sourced input
CN107168610A (en) Pop-up processing method and processing device, storage medium and electronic equipment
US10169079B2 (en) Task status tracking and update system
TWI814394B (en) Electronic system, computer-implemented method, and computer program product
US10359836B2 (en) Assistive technology (AT) responsive to cognitive states
US9836530B2 (en) Determining preferred communication explanations using record-relevancy tiers
CN108369589A (en) Automatic theme label recommendations for classifying to communication are provided

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190215