CN109339480A - Temporarily use movable plank house radix saposhnikoviae reinforcement means - Google Patents

Temporarily use movable plank house radix saposhnikoviae reinforcement means Download PDF

Info

Publication number
CN109339480A
CN109339480A CN201811391144.9A CN201811391144A CN109339480A CN 109339480 A CN109339480 A CN 109339480A CN 201811391144 A CN201811391144 A CN 201811391144A CN 109339480 A CN109339480 A CN 109339480A
Authority
CN
China
Prior art keywords
cross bar
group
square tube
roofing tile
movable plank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811391144.9A
Other languages
Chinese (zh)
Inventor
汪小情
王连想
王博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Original Assignee
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd filed Critical FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority to CN201811391144.9A priority Critical patent/CN109339480A/en
Publication of CN109339480A publication Critical patent/CN109339480A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/04Propping of endangered or damaged buildings or building parts, e.g. with respect to air-raid action
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/14Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Greenhouses (AREA)

Abstract

Movable plank house radix saposhnikoviae reinforcement means is temporarily used the invention discloses a kind of, its arrangement and method for construction are as follows: two or more the cross bars that bear down on one 1. are spliced according to the lateral length of roofing tile, the cross bar group number that bears down on one of splicing is determined according to the longitudinal width of roofing tile, the cross bar that bears down on one is made of square tube, bear down on one and connected by lap joint between cross bar, lap joint is the square tube set that inside dimension matches cross bar external dimensions;2., more vertical bars that bear down on one of corresponding length are made according to the fore-and-aft distance between adjacent cross bar group of bearing down on one of square tube;3. successively carrying out the bear down on one connection of cross bar and roofing tile of each group to install, wind rope is worn in the bear down on one outer end of the initial and end cross bar of cross bar of each group, each wind rope drawing is corresponded in pre-buried earth anchor on the basis of board house;4. the installation for successively carrying out each vertical bar that bears down on one in adjacent cross bar group of bearing down on one is fixed;5. tightening each wind rope on earth anchor.The present invention has carried out the optimization design of ruggedized construction for the windproof weakness of interim board house, and reasonable Arrangement saves material.

Description

Temporarily use movable plank house radix saposhnikoviae reinforcement means
Technical field
The present invention relates to movable plank house site operation technologies, specially a kind of temporarily to use movable plank house radix saposhnikoviae reinforcement means.
Background technique
Temporarily with movable plank house in project construction standardization, with spy that is uniform, easy for construction, being dismounted easily Point.Therefore it in current project construction, is temporarily applied with movable plank house than wide.
But temporarily with movable plank house there are wind resistance is weak and the limited defect of wind resistance grade, especially in coastal area, often It is extremely difficult to resist the limit of typhoon.
Therefore, it is to embody the comprehensive ratio of the sexual valence of template activity board house to maximum, template activity plate can be played to greatest extent The effect in room reduces typhoon to the damage of template activity board house and repeats the expense of maintenance, to temporarily being added with movable plank house Strong consolidation process be quite it is necessary to.
Summary of the invention
In view of the deficiencies of the prior art, the technical problem to be solved by the present invention is to propose it is a kind of it is reasonable in design, Convenient, reusable, the both artistic and practical interim use movable plank house radix saposhnikoviae reinforcement means of materials.
It is able to solve the interim of above-mentioned technical problem and uses movable plank house radix saposhnikoviae reinforcement means, site operation scheme are as follows:
1, two or more the cross bars that bear down on one are spliced according to the lateral length of roofing tile, is determined and is spelled according to the longitudinal width of roofing tile The cross bar group number that bears down on one connect, the cross bar that bears down on one are made of square tube, are connected between the cross bar that bears down on one by lap joint, the overlap joint Head is the square tube set that inside dimension matches cross bar external dimensions of bearing down on one.
2, the more vertical bars that bear down on one of corresponding length are made of square tube according to the fore-and-aft distance between adjacent cross bar group of bearing down on one.
3, it successively carries out the bear down on one connection of cross bar and roofing tile of each group to install, and bears down on one the initial and end cross bar of cross bar in each group Outer end wear wind rope, and each wind rope drawing is corresponded in pre-buried earth anchor on the basis of board house.
4, the installation that each vertical bar that bears down on one successively is carried out in adjacent cross bar group of bearing down on one is fixed.
5, each wind rope is tightened in corresponding earth anchor.
Further, each wind rope is tightened by flower basket bolt.
To prevent from falling off, the rope end of each wind rope carries out locked and fixed with no less than 3 or more rope cards.
To improve service life, the square tube uses galvanized pipe, and the square tube set uses galvanized pipe socket.
Longitudinally it is being two pieces or more of splicing watt for roofing tile, then is needing to be correspondingly arranged one on the roofing tile two-by-two of splice ends Group is beared down on one cross bar.
Beneficial effects of the present invention:
1, the present invention temporarily uses movable plank house radix saposhnikoviae reinforcement means, has carried out reinforcing knot for the windproof weakness of interim board house The optimization design of structure, reasonable Arrangement save material.
2, the materials of reinforcement material used in the present invention are convenient, easy for assemble or unload the advantages of using material itself;Meet project Standardized requirement, it is both artistic and practical.
Detailed description of the invention
Fig. 1 is the three-dimensional structure diagram of one embodiment of the present invention.
Fig. 2 is partial enlarged view at the A in Fig. 1.
Fig. 3 (a) is the attachment structure schematic diagram of cross bar of bearing down on one in Fig. 1.
Fig. 3 (b) is the structural schematic diagram that Fig. 1 apoplexy rope pulls earth anchor.
Figure number mark: 1, board house basis;2, earth anchor;3, board house pillar;4, bear down on one cross bar;5, lap joint;6, roof structure; 7, roofing tile;8, bear down on one vertical bar;9, wind rope;10, flower basket bolt;11, tapping screw;12, rope card.
Specific embodiment
Illustrated embodiment is described further technical solution of the present invention with reference to the accompanying drawing.
The present invention temporarily uses movable plank house radix saposhnikoviae reinforcement means, is adopted for temporarily windproof reinforcing is carried out with movable plank house The measure taken.
Described includes temporarily triangle posture roof structure 6 with the conventional structure of movable plank house, before the roof structure 6, Tiltedly two panels roofing tile 7 is fixedly mounted with tapping screw 11 on frame in (longitudinal direction) respectively afterwards, roof structure 6 by forward and backward row transverse direction (left and right) three board house pillars 3 are supported on board house basis 1, as shown in Figure 1.
Site operation scheme of the invention are as follows:
1, two cross bars 4 that bear down on one are connected according to transverse direction (left and right) the length assembly of roofing tile 7, according to two panels roofing tile 7 Structure type determine the cross bar 4 that bears down on one that 4 assembly connect, the cross bar 4 that bears down on one is made of zinc-plated square tube, and every group is beared down on one It is connected between two cross bars of cross bar 4 by lap joint 5, the lap joint 5 (totally four) is that inside dimension matching is beared down on one outside cross bar 4 The zinc-plated square tube set of portion's size, left and right two cross bars 4 that bear down on one are connected after being socketed by lap joint 5 with more tapping screws 11 are fixed It connects, is staggeredly located position in the lap joint 5 on cross bar 4 of bearing down on one of longitudinal each group.
2,6 vertical bars 8 that bear down on one of corresponding length are made of zinc-plated square tube according to the forward and backward width of each roofing tile 7.
3, four groups of cross bars 4 that bear down on one are fitted in respectively on lateral watt of body edge of the front and back ends of two panels roofing tile 7, and with certainly It attacks screw 11 and is fixedly connected with roofing tile 7 and roof structure 6, and worn respectively in the bear down on one outer end of the left and right cross bar of cross bar 4 of each group Wind rope 9, and each wind rope 9 is hooked on downwards by flower basket bolt 10 and is corresponded on board house basis 1 in pre-buried earth anchor 2.
4, the vertical bar 8 that bears down on one of left, center, right three is overlapped on the corresponding forward and backward two groups cross bars 4 that bear down on one of each roofing tile 7 respectively On, respectively bear down on one vertical bar 8 and each group is beared down on one between 4 bond end of cross bar with the fixed position of tapping screw 11.
5, block the rope end of 12 locked and fixed wind ropes 9 by each tightening of wind rope 9 on earth anchor 2 and with 3 ropes.
In arrangement and method for construction of the invention, bear down on one cross bar 4 and the vertical bar 8 that bears down on one carry out grouped by itself and phase by tapping screw 11 Mutually combination forms unified good ruggedized construction, is easily installed and dismantles;Bear down on one and cross bar 4 and bears down on one vertical bar 8 according to board house roofing Watts 7 weak location carries out reasonable Arrangement, without full paving, saves material;The drawing of wind rope 9 is more efficient to ensure ruggedized construction Globality and validity.

Claims (5)

1. temporarily using movable plank house radix saposhnikoviae reinforcement means, site operation scheme are as follows:
1., two or more the cross bars that bear down on one (4) are spliced according to the lateral length of roofing tile (7), according to the longitudinal width of roofing tile (7) Determine that the cross bar that bears down on one (4) of splicing organizes number, the cross bar that bears down on one (4) is made of square tube, and the cross bar that bears down on one passes through overlap joint between (4) Head (5) connection, the lap joint (5) are the square tube set that inside dimension matches cross bar (4) external dimensions of bearing down on one;
2., more vertical bars that bear down on one of corresponding length are made according to the fore-and-aft distance between the adjacent cross bar that bears down on one (4) group of square tube (8);
3., successively carry out the bear down on one connection of cross bar (4) and roofing tile (7) of each group and install, and in each group bear down on one cross bar (4) head, The outer end of tail cross bar is worn wind rope (9), and each wind rope (9) drawing is corresponded to pre-buried earth anchor (2) on board house basic (1) In;
4., the installation that successively carries out in the adjacent cross bar that bears down on one (4) group each vertical bar that bears down on one (8) fixes;
5., the tightening of each wind rope (9) corresponded on pre-buried earth anchor (2) in board house basic (1).
2. interim movable plank house radix saposhnikoviae reinforcement means according to claim 1, it is characterised in that: each wind rope (9) passes through Flower basket bolt (10) is tightened.
3. interim movable plank house radix saposhnikoviae reinforcement means according to claim 2, it is characterised in that: the rope of each wind rope (9) Head at least carries out locked and fixed using 3 rope cards (12).
4. interim movable plank house radix saposhnikoviae reinforcement means according to any one of claims 1 to 3, it is characterised in that: The square tube is galvanized pipe, and the square tube set is galvanized pipe socket.
5. interim movable plank house radix saposhnikoviae reinforcement means according to any one of claims 1 to 3, it is characterised in that: The roofing tile (7) is being longitudinally two pieces or more splicings watt, then needs to be correspondingly arranged one group of pressure on the roofing tile two-by-two (7) of splice ends It pushes up cross bar (4).
CN201811391144.9A 2018-11-21 2018-11-21 Temporarily use movable plank house radix saposhnikoviae reinforcement means Pending CN109339480A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811391144.9A CN109339480A (en) 2018-11-21 2018-11-21 Temporarily use movable plank house radix saposhnikoviae reinforcement means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811391144.9A CN109339480A (en) 2018-11-21 2018-11-21 Temporarily use movable plank house radix saposhnikoviae reinforcement means

Publications (1)

Publication Number Publication Date
CN109339480A true CN109339480A (en) 2019-02-15

Family

ID=65316941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811391144.9A Pending CN109339480A (en) 2018-11-21 2018-11-21 Temporarily use movable plank house radix saposhnikoviae reinforcement means

Country Status (1)

Country Link
CN (1) CN109339480A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374360A (en) * 2019-06-05 2019-10-25 广东博智林机器人有限公司 The construction method of foundation structure and movable plank house
CN115387630A (en) * 2022-05-31 2022-11-25 广州理工学院 Windproof reinforcing method and device for color steel roof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5522184A (en) * 1995-01-12 1996-06-04 Oviedo-Reyes; Alfonso Apparatus for strengthening building structures
CN2434382Y (en) * 2000-07-11 2001-06-13 王成武 Combined movable dwellings composed of light steel skeleton standard assembly
US20090000211A1 (en) * 2007-05-18 2009-01-01 Hurricane Harness Corporation Apparatus and method for securing a roof assembly during a severe wind storm
CN202012208U (en) * 2011-03-22 2011-10-19 升逸豪环保工程科技(上海)有限公司 Light board integrated assembly type residential construction structure with steel frame
CN202530816U (en) * 2011-12-19 2012-11-14 中建三局第一建设工程有限责任公司 A hurricane-shielding reinforcing device of a prefabricated house
CN202645037U (en) * 2012-06-19 2013-01-02 中国十七冶集团有限公司 Anti-typhoon simple and easy protection device for movable board room
CN204186086U (en) * 2014-09-29 2015-03-04 中冶天工上海十三冶建设有限公司 Movable plank house bracing means
CN205743207U (en) * 2016-05-11 2016-11-30 中建六局建设发展有限公司 The typhoon protection ruggedized construction built is faced in a kind of construction
CN108625481A (en) * 2018-05-16 2018-10-09 中国水利水电第四工程局有限公司 A kind of movable plank house typhoon protection device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5522184A (en) * 1995-01-12 1996-06-04 Oviedo-Reyes; Alfonso Apparatus for strengthening building structures
CN2434382Y (en) * 2000-07-11 2001-06-13 王成武 Combined movable dwellings composed of light steel skeleton standard assembly
US20090000211A1 (en) * 2007-05-18 2009-01-01 Hurricane Harness Corporation Apparatus and method for securing a roof assembly during a severe wind storm
CN202012208U (en) * 2011-03-22 2011-10-19 升逸豪环保工程科技(上海)有限公司 Light board integrated assembly type residential construction structure with steel frame
CN202530816U (en) * 2011-12-19 2012-11-14 中建三局第一建设工程有限责任公司 A hurricane-shielding reinforcing device of a prefabricated house
CN202645037U (en) * 2012-06-19 2013-01-02 中国十七冶集团有限公司 Anti-typhoon simple and easy protection device for movable board room
CN204186086U (en) * 2014-09-29 2015-03-04 中冶天工上海十三冶建设有限公司 Movable plank house bracing means
CN205743207U (en) * 2016-05-11 2016-11-30 中建六局建设发展有限公司 The typhoon protection ruggedized construction built is faced in a kind of construction
CN108625481A (en) * 2018-05-16 2018-10-09 中国水利水电第四工程局有限公司 A kind of movable plank house typhoon protection device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374360A (en) * 2019-06-05 2019-10-25 广东博智林机器人有限公司 The construction method of foundation structure and movable plank house
CN110374360B (en) * 2019-06-05 2021-02-09 广东博智林机器人有限公司 Foundation structure and construction method of movable board house
CN115387630A (en) * 2022-05-31 2022-11-25 广州理工学院 Windproof reinforcing method and device for color steel roof

Similar Documents

Publication Publication Date Title
CN101463667A (en) Reinforcing means for power transmission iron tower
CN105442760A (en) Steel bar connection mode used for connection among prefabricated reinforced concrete members
CN109339480A (en) Temporarily use movable plank house radix saposhnikoviae reinforcement means
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN204728715U (en) The pre-buried mounting structure of channel-section steel for channel-section steel is nuzzled in concrete component in advance
CN202064536U (en) Solar photovoltaic assembly installing bracket used for roof with insufficient load
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN206245471U (en) A kind of dismountable assembled steel reinforced concrete column splices node with post
CN202530816U (en) A hurricane-shielding reinforcing device of a prefabricated house
CN207846666U (en) A kind of detachable reinforcing steel processing shed
CN105735353A (en) Prefabricated comprehensive pipe gallery
CN206418690U (en) Color steel tile roof photovoltaic bracket
CN103510521A (en) Connecting component
CN204139631U (en) The guard rail of building site fast demountable
CN203756190U (en) Trolley device for herringbone forked tunnel
CN203514323U (en) Connection component
CN207376530U (en) Highway bridge median strip Junk prevention web frame
CN102913007B (en) Steel reinforcement processing shed and construction method therefor
CN110030005A (en) The light-duty guarantor's circle support system of shield tunnel and its construction method
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN203403576U (en) Assembly-type parking lot floor plate of full steel structure
CN209891418U (en) Pre-buried connecting piece and concrete member
CN203430929U (en) Bridge frame connecting piece
CN205399827U (en) Concrete column, roof beam, board handing -over department are with prefabricated unit -installment reinforced frame
CN218540721U (en) Combined steel support truss structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190215