CN109339472B CN201811426356.6A CN201811426356A CN109339472B CN 109339472 B CN109339472 B CN 109339472B CN 201811426356 A CN201811426356 A CN 201811426356A CN 109339472 B CN109339472 B CN 109339472B
Authority
CN
China
Prior art keywords
safety rope
rope
roof
fixing
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811426356.6A
Other languages
Chinese (zh)
Other versions
CN109339472A (en
Inventor
邹隽
吴海华
唐德锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201811426356.6A priority Critical patent/CN109339472B/en
Publication of CN109339472A publication Critical patent/CN109339472A/en
Application granted granted Critical
Publication of CN109339472B publication Critical patent/CN109339472B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3276Arrangements on buildings for connecting safety-lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The invention provides a fixing device and a fixing method of a horizontal safety rope for roof maintenance. The safety rope is fixedly installed by installing the fixing device in the installation hole on the roof and winding the safety rope on the winding column of the fixing device. The device is high in connection strength with the roof, and operation safety is improved.

Description

Fixing device and fixing method of horizontal safety rope for roof maintenance
Technical Field
The invention relates to the field of maintenance safety devices, in particular to a fixing device and a fixing method of a horizontal safety rope for roof maintenance.
Background
In the installation and maintenance operation at the top of the factory building, a large amount of high-altitude operation and edge operation exist, and operating personnel need to walk and work high above the top of the factory building. The high-altitude operation constructor needs to carry out safety protection to prevent the high altitude from falling, and carries out the walking of horizontal direction at the eminence, needs to set up the platform passageway that has the guardrail usually. Under the condition that the structure is not perfect or a platform channel is not convenient to build, constructors need to wear safety belts. The use of safety belt needs the hook point of activity, and current method utilizes the steel cable of interim setting as the hook point, because the factory building top does not have the steel construction, can't will adopt modes such as welding to carry out effective hookup with support and factory building structure, leads to the support to have intensity not enough, has great potential safety hazard, and construction safety is difficult to effectively guarantee. Secondly, when the steel rope is fixed, the steel rope is generally simply wound, or after winding, clamping or bolts are adopted to be rigidly and fixedly connected with the bracket. The steel rope and the bracket are easy to slide during simple winding, so that the horizontal protection steel rope has weak bearing capacity. And adopt centre gripping connection or bolted connection, in order to improve the effect of connecting, need compress tightly steel cable and clamping part or bolt, have higher requirement to operating personnel's strength, operating personnel that the strength is weak is difficult for accomplishing the reliable fixed to the steel cable, has certain potential safety hazard.
Therefore, it is necessary to achieve an effective coupling of the fixing brackets at the top of the plant, so as to provide a basis for the safety of the horizontal safety lines. Meanwhile, the steel rope needs to be firmly and conveniently fixed on the bracket so as to eliminate potential safety hazards.
Disclosure of Invention
The invention aims to solve the technical problem of providing a fixing device and a fixing method of a horizontal safety rope for roof maintenance, which have high connection strength with a roof and improve the operation safety.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: the utility model provides a roofing overhauls fixing device with horizontal safety rope, includes the base, and the base upside is equipped with around the winding post of establishing the safety rope, and the base bottom is equipped with the pull rod, and the pull rod lower extreme is equipped with the clamp plate, and the pull rod passes through first nut fastening behind the through-hole on the clamp plate, and base and clamp plate set up the upper surface and the lower surface on the roof respectively.
In a preferable scheme, the winding column is provided with a ring groove for winding the safety rope.
In the preferred scheme, the winding column is provided with a threaded hole, a screw rod is arranged in the threaded hole, and two ends of the screw rod protrude out of the threaded hole.
In a further scheme, safety rope pressing plates are arranged at two ends of the screw, and the end part of the screw penetrates through the safety rope pressing plates and then is fastened through a second nut.
In a preferable scheme, the bottom of the base and/or the top of the pressure plate are/is provided with friction pads.
In a further scheme, the friction pad is a rubber pad.
In a preferable scheme, a reinforcing rib plate is arranged between the winding column and the base.
The invention also provides a method for fixing the horizontal safety rope for roof maintenance, which comprises the following steps: firstly, drilling mounting holes in the roof or reserving the mounting holes when the roof is constructed and mounted, wherein the number of the mounting holes is multiple, and the mounting holes are arranged along the route of the safety rope; step two: the fixing device is arranged on the mounting hole, and the lower end of a pull rod of the fixing device sequentially penetrates through the mounting hole and the pressing plate and then is screwed with a first nut for jacking; step three: and winding the safety rope on the winding column, and tensioning the safety rope between the fixing devices to a preset sag.
In a preferred embodiment, when the fixing device is installed in the second step, the screw installed on the winding column of the fixing device is perpendicular to the direction of the safety rope.
In the preferred scheme, in step three, the winding post sets gradually rope position A, rope position B and rope position C from last to down, and the safety rope begins the winding by the top of the first end of the screw rod of rope position B, draws to the screw rod second end backward to one half of a circle along winding post surface circumferencial direction winding, along winding post surface winding, twines to rope position C and walks around behind the screw rod first end below to draw to the slope and intersect with the safety rope of rope position B after, gets into rope position A, continues to wind along the winding post and establishes two half of a circle after, draws out the safety rope tail end, and the safety rope continues to wind and establishes on next fixing device.
According to the fixing device and the fixing method of the horizontal safety rope for roof maintenance, provided by the invention, under the action of the pretightening force of the first nut, the pull rod generates a certain axial tension, so that the base is firmly fixed on the surface of a roof, a safety support is provided for the installation of the horizontal safety rope, and the operation safety is improved. Preferably, the friction pad bonded at the bottom of the base is used for improving the friction coefficient between the base and the concrete surface and greatly reducing the peak stress, thereby protecting the surface of the concrete structure from being crushed; meanwhile, the friction pad is made of soft rubber, the friction coefficient (0.8-1.6) between the friction pad and the concrete surface is far larger than the friction coefficient (0.2-0.6) between the steel base and the concrete, and under the condition of the same axial tension of the pull rod, the bottom surface of the base has larger static friction force with the concrete roof, so that the horizontal bearing capacity of the fixing device is improved; the use of the friction pad also seals a channel for roof water vapor to enter the workshop through the mounting hole of the pull rod, and a good waterproof effect is achieved. When the safety steel rope is wound on the winding column, the minimum bending radius of the steel rope is controlled by the structural radius of the winding column, so that the reduction of the bearing capacity caused by the local severe bending of the steel rope is avoided, and meanwhile, the steel rope cannot slide relative to the fixing device after being loaded due to the friction between the safety rope and the surface of the winding column and the cross extrusion effect of the safety rope, so that the temporary or permanent fixation of the safety rope on the winding column is realized.
Drawings
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
fig. 1 is a perspective view of the present invention.
Fig. 2 is a schematic view of the overall structure of the present invention.
Fig. 3 is a schematic structural view of a wrapping post.
Fig. 4 is a diagram illustrating a safety rope winding structure according to the present invention.
In the figure: base 1, winding post 2, pull rod 3, clamp plate 4, first nut 5, annular 6, screw hole 7, screw rod 8, safety rope clamp plate 9, second nut 10, friction pad 11, deep floor 12, the first end 13 of screw rod, screw rod second end 14, rope position A, rope position B, rope position C.
Detailed Description
As in fig. 1 ~ 3, a fixing device of horizontal safety rope for roofing maintenance, including base 1, 1 upside of base is equipped with around establishing winding post 2 of safety rope, 1 bottom of base is equipped with pull rod 3, in this embodiment, 1 bottom of base is equipped with the screw hole, pull rod 3 passes through threaded connection with base 1, 3 lower extremes of pull rod are equipped with clamp plate 4, after pull rod 3 passes the through-hole on clamp plate 4, fasten through first nut 5, be equipped with the gasket between clamp plate 4 and the first nut 5, base 1 and clamp plate 4 set up the upper surface and the lower surface on roof respectively, fixing device's material is metal material.
Under the pretightening force effect of the first nut 5, the pull rod 3 generates a certain axial tension, so that the base 1 is firmly fixed on the surface of a roof, and a safety support is provided for the installation of the horizontal safety rope.
And the winding column 2 is provided with a ring groove 6 for winding the safety rope. The safety rope is arranged in the annular groove 6 in a winding mode, the winding position of the safety rope is limited, on one hand, the horizontal arrangement of the safety rope between the fixing devices is guaranteed to the greatest extent, and on the other hand, the vertical jumping of the safety rope can be limited to a certain extent.
And a threaded hole 7 is formed in the winding column 2, a screw rod 8 is arranged in the threaded hole 7, and two ends of the screw rod 8 protrude out of the threaded hole 7. Through twine the safety rope in the upper and lower side of screw rod 8, restriction safety rope reciprocates, improves reciprocating of safety rope, improves the joint strength between safety rope and the fixing device.
And safety rope pressing plates 9 are arranged at two ends of the screw rod 8, and the end part of the screw rod 8 penetrates through the safety rope pressing plates 9 and then is fastened through a second nut 10.
The safety rope arranged on the winding column 2 is extruded and compressed through the safety rope pressing plate 9, the safety rope is reinforced again, the safety rope is prevented from moving up and down or left and right, and the connection strength is improved.
The edge of the safety rope pressing plate 9 close to the safety rope is an arc-shaped round angle. The shearing force at the intersection of the safety rope is reduced, and the safety rope is prevented from being worn or cut by the safety rope pressing plate 9.
And friction pads 11 are arranged at the bottom of the base 1 and the top of the pressure plate 4. The friction pad 11 is bonded with the base 1 or the pressing plate 4 through an adhesive, and the friction pad 11 is a rubber pad which is used for improving the contact between the base 1 and the concrete on the upper surface of the roof and reducing the peak stress, so that the surface of the concrete structure is protected from being crushed. Meanwhile, as the friction coefficient between the friction pad 11 and the concrete surface is far larger than that between the steel base 1 and the concrete, the bottom surface of the base 1 and the concrete roof have larger friction force under the condition of the same axial tension of the pull rod 3, and the bearing capacity of the fixing device is improved. The use of the friction pad 11 also seals the channel for roof water vapor to enter the workshop through the mounting hole of the pull rod 3, thereby playing a good waterproof role.
And a reinforcing rib plate 12 is arranged between the winding column 2 and the base 1. The plane of the reinforcing rib plate 12 is parallel to the arrangement direction of the safety rope, so that the strength and the rigidity of the winding column 2 are improved.
A method for fixing a horizontal safety rope for roof maintenance comprises the following steps: firstly, drilling mounting holes in the roof or reserving the mounting holes when the roof is constructed and mounted, wherein the number of the mounting holes is multiple, and the mounting holes are arranged along the route of the safety rope;
step two: the fixing device is arranged on the mounting hole, the lower end of a pull rod 3 of the fixing device sequentially penetrates through the mounting hole, a friction pad 11 at the top of the pressing plate 4 and then is screwed with a first nut 5 for jacking, and a screw 8 arranged on a winding column 2 of the fixing device is vertical to the arrangement direction of the safety rope;
step three: the safety rope is wound on the winding column 2, preferably as shown in fig. 4, the winding column 2 is sequentially provided with a rope position A, a rope position B and a rope position C from top to bottom, the rope position A and the rope position B are arranged above the screw rod 8, the rope position C is arranged below the screw rod 8, the safety rope starts to be wound from the upper part of the first end 13 of the screw rod of the rope position B, the safety rope is wound by a half circle along the circumferential direction of the surface of the winding column 2 to the second end 14 of the screw rod and then obliquely pulled downwards and wound along the surface of the winding column 2, the safety rope is wound to the rope position C, the rope is wound to the lower part of the first end 13 of the screw rod and then obliquely pulled upwards to intersect with the safety rope of the rope position B, the safety rope enters the rope position A, the tail end of the safety rope is pulled out after the safety rope is continuously wound by a half circle along the winding column 2. When safety rope one end atress, because the friction on safety rope and winding post 2 surfaces, the criss-cross extrusion of safety rope and the limiting displacement of screw rod 8, the safety rope can not slide to the realization is fixed the temporary or permanent of safety rope on winding post 2, and further again, installation safety rope clamp plate 9 compresses tightly on the screw rod 8 and realizes the secondary fastening.
The connection of the safety rope and the fixing device is completed in sequence, the end parts of the safety rope on the fixing device positioned at the starting end and the tail end are reinforced by the rope clamps, and the arrangement of the horizontal safety rope is completed.
When the safety rope is required to be disassembled in maintenance, the second nut 10 is rotated, the safety rope pressing plate 9 is removed, the safety rope can be conveniently disassembled, or other parts are replaced, and the safety rope is used again after being fastened again.
The above-described embodiments are merely preferred embodiments of the present invention, and should not be construed as limiting the present invention, and the scope of the present invention is defined by the claims, and equivalents including technical features described in the claims. I.e., equivalent alterations and modifications within the scope hereof, are also intended to be within the scope of the invention.

Claims (5)

1. A fixing method of a horizontal safety rope for roof maintenance is characterized in that: comprises a fixing device, the fixing device comprises a base (1), a winding column (2) wound with a safety rope is arranged on the upper side of the base (1), a pull rod (3) is arranged at the bottom of the base (1), a pressing plate (4) is arranged at the lower end of the pull rod (3), the pull rod (3) passes through a through hole on the pressing plate (4) and then is fastened through a first nut (5), the base (1) and the pressing plate (4) are respectively arranged on the upper surface and the lower surface of a roof, a threaded hole (7) is arranged on the winding column (2), a screw rod (8) is arranged in the threaded hole (7), two ends of the screw rod (8) protrude out of the threaded hole (7), a friction pad (11) is arranged at the bottom of the base (1) and/or the top of the pressure plate (4), safety rope pressing plates (9) are arranged at two ends of the screw (8), and the end part of the screw (8) penetrates through the safety rope pressing plates (9) and is fastened through a second nut (10); the fixing method comprises the following steps of,
the method comprises the following steps: firstly, drilling mounting holes in the roof or reserving the mounting holes when the roof is constructed and mounted, wherein the number of the mounting holes is multiple, and the mounting holes are arranged along the route of the safety rope;
step two: the fixing device is arranged on the mounting hole, and the lower end of a pull rod (3) of the fixing device sequentially penetrates through the mounting hole and the pressing plate (4) and then is screwed with a first nut (5) for jacking;
step three: the safety rope is wound on a winding column (2), the safety rope between fixing devices is tensioned, the winding column (2) is sequentially provided with a rope position A, a rope position B and a rope position C from top to bottom, the safety rope is wound by the top of the first end (13) of the screw rod of the rope position B, the safety rope is obliquely pulled downwards after winding a half circle to the second end (14) of the screw rod along the surface circumferential direction of the winding column (2), the safety rope is obliquely pulled upwards after winding the rope position C to the position below the first end (13) of the screw rod and intersecting with the safety rope of the rope position B, the safety rope enters the rope position A, the safety rope is continuously wound by a half circle along the winding column (2), the tail end of the safety rope is pulled out, and the safety rope is continuously wound on the next fixing device.
2. The method for fixing the horizontal safety rope for roof overhaul according to claim 1, wherein the method comprises the following steps: and the winding column (2) is provided with a ring groove (6) wound with a safety rope.
3. The method for fixing the horizontal safety rope for roof overhaul according to claim 1, wherein the method comprises the following steps: the friction pad (11) is a rubber pad.
4. The method for fixing the horizontal safety rope for roof overhaul according to claim 1, wherein the method comprises the following steps: and a reinforcing rib plate (12) is arranged between the winding column (2) and the base (1).
5. The method for fixing the horizontal safety rope for roof overhaul according to claim 1, wherein the method comprises the following steps: and in the second step, when the fixing device is installed, the screw (8) installed on the winding column (2) of the fixing device is vertical to the direction of the safety rope.
CN201811426356.6A 2018-11-27 2018-11-27 Fixing device and fixing method of horizontal safety rope for roof maintenance Active CN109339472B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811426356.6A CN109339472B (en) 2018-11-27 2018-11-27 Fixing device and fixing method of horizontal safety rope for roof maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811426356.6A CN109339472B (en) 2018-11-27 2018-11-27 Fixing device and fixing method of horizontal safety rope for roof maintenance

Publications (2)

Publication Number Publication Date
CN109339472A CN109339472A (en) 2019-02-15
CN109339472B true CN109339472B (en) 2021-01-26

Family

ID=65318219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811426356.6A Active CN109339472B (en) 2018-11-27 2018-11-27 Fixing device and fixing method of horizontal safety rope for roof maintenance

Country Status (1)

Country Link
CN (1) CN109339472B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2757708A1 (en) * 2011-11-10 2012-04-06 Ez Roof Anchors, 7875819 Canada Inc. Safety anchoring device
CN205287307U (en) * 2015-12-30 2016-06-08 刘洋 Safety rope fixing device
CN205663232U (en) * 2016-06-02 2016-10-26 中国新兴建筑工程总公司 Steel structure level safety rope fixed bolster
CN206625598U (en) * 2017-04-10 2017-11-10 洛阳博创重科有限公司 A kind of safety rope fixing device of reusable edible

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE332127B (en) * 1965-02-09 1971-01-25 C Wallin
US20010032435A1 (en) * 2000-02-18 2001-10-25 Austin Barry J. Methods and apparatus for providing fall-arrest protection

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2757708A1 (en) * 2011-11-10 2012-04-06 Ez Roof Anchors, 7875819 Canada Inc. Safety anchoring device
CN205287307U (en) * 2015-12-30 2016-06-08 刘洋 Safety rope fixing device
CN205663232U (en) * 2016-06-02 2016-10-26 中国新兴建筑工程总公司 Steel structure level safety rope fixed bolster
CN206625598U (en) * 2017-04-10 2017-11-10 洛阳博创重科有限公司 A kind of safety rope fixing device of reusable edible

Also Published As

Publication number Publication date
CN109339472A (en) 2019-02-15

Similar Documents

Publication Publication Date Title
CN110259246B (en) Steel strand external stay rope structure system for wind tower and manufacturing and mounting method thereof
CN102900021A (en) Split mounting type bridge wet joint construction method
CN112963620A (en) Supporting and protecting structure for road construction embedded pipeline
CN109339472B (en) Fixing device and fixing method of horizontal safety rope for roof maintenance
CN111501517A (en) Novel external prestressed assembly of prestressed box girder
CN107905103A (en) A kind of prestress anchorage system and its construction method with compression spring
CN108643454A (en) A kind of the prestressed group anchorage system and its construction method of internal single beam sealing
US20040031216A1 (en) Anchor for securing safety device
CN215330985U (en) Roof windproof fixing device
CN213015720U (en) Rail guard for construction
CN207829327U (en) A kind of photovoltaic bracket mounting structure
CN212294349U (en) Assembled parallel steel strand extruding anchor inhaul cable
CN210482007U (en) Slab band device at bottom of bridge hollow slab
CA2847161C (en) Temporary fall protection
CN202788143U (en) Soft attachment for connecting holding rod and iron tower
CN111926704A (en) Assembled parallel steel strand extrusion anchor cable and construction method
CN105155552B (en) The retracting device of foundation ditch interim cable bolting steel strand wires and recovery method
CN215025466U (en) Anti-falling device guide rail fixing clamp
CN216305355U (en) All-steel climbing frame wall-attached support device
CN219431503U (en) Wind power tower cylinder body external prestress cable restraining device
CN221193306U (en) Concrete precast pile connecting device
CN219653521U (en) Main cable empty cable degree of losing of flat-pull cable bridge adjusts structure
CN214939847U (en) Slope protection net for hydraulic engineering
CN220645304U (en) Steel column lifeline hoop structure for overhead operation
CN206940223U (en) Tower material positioning apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant