CN109339230A - A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method - Google Patents

A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method Download PDF

Info

Publication number
CN109339230A
CN109339230A CN201811371722.2A CN201811371722A CN109339230A CN 109339230 A CN109339230 A CN 109339230A CN 201811371722 A CN201811371722 A CN 201811371722A CN 109339230 A CN109339230 A CN 109339230A
Authority
CN
China
Prior art keywords
column
vertical muscle
reinforced column
grouting
mentioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811371722.2A
Other languages
Chinese (zh)
Inventor
胡红松
郭子雄
方膨膨
王晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaqiao University
Original Assignee
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaqiao University filed Critical Huaqiao University
Priority to CN201811371722.2A priority Critical patent/CN109339230A/en
Publication of CN109339230A publication Critical patent/CN109339230A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction methods, reinforced column including reinforced column on one and once, region between the lower end of upper reinforced column and the upper end of lower reinforced column is join domain, above-mentioned join domain has poured ultra-high performance concrete, and upper reinforced column and lower reinforced column are connected.Ultra-high performance concrete is applied between prefabricated assembling type reinforced concrete column by the present invention, takes full advantage of the resistance to compression and tensile property of ultra-high performance concrete brilliance, to solve the problems, such as that node region connection is weak.

Description

A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method
Technical field
The invention belongs to building structure technology fields, and in particular to a kind of prefabricated assembling type reinforced concrete column splicing node Structure and its construction method.
Background technique
Precast reinforced concrete structure is one of the important directions of China's building structure development, prefabricated assembling type reinforced mixed Solidifying earth pillar has many advantages, such as that product quality is controllable, environmentally protective and easy for construction.Column column connection type is fabricated construction system In important connection type, it directly affects the speed of application and assembling degree of structure, therefore column column splicing node Construction method should be simple as far as possible, and its intensity is not lower than the intensity of prefabricated reinforced concrete column.Current assembled steel reinforced coagulation It mainly connects to form splicing node by grout sleeve between earth pillar.But be in the milk and connect for sleeve, reinforcing bar is in the milk by root to be connected Heavy workload is connect, and there is presently no a kind of effective detection methods to detect to the quality of grout sleeve, the safety of structure Risk hidden danger can not effectively eliminate.
Summary of the invention
It is an object of the invention to overcome prior art defect, a kind of prefabricated assembling type reinforced concrete column splicing section is provided Point structure.
Another object of the present invention is to provide the constructions of above-mentioned prefabricated assembling type reinforced concrete column splicing node structure Method.
Technical scheme is as follows:
A kind of prefabricated assembling type reinforced concrete column splicing node structure, comprising:
Reinforced column on one, cross section are square, and downward one cross section of projection in the middle part of bottom surface is positive Rectangular tenon, and its lower end has several overhanging vertical muscle set on the tenon periphery;
Reinforced column once, cross section are square, thereon the one of the above-mentioned tenon of the recessed correspondence in the middle part of top surface The groove that cross section is square, and the upper end has set on a pair of with above-mentioned several overhanging vertical muscle one of the periphery of the groove Answer and size it is identical it is several under overhanging vertical muscle;
Region between the lower end of upper reinforced column and the upper end of lower reinforced column is join domain, above-mentioned convex The lower end of tenon is inserted in above-mentioned groove, and the side length of the cross section of above-mentioned tenon is the cross section of above-mentioned upper reinforced column The 20~30% of side length, the big 1.8~2.5mm of side length of the cross section of the above-mentioned tenon of the side ratio of the cross section of above-mentioned groove, if Dry overhanging vertical muscle with it is several under overhanging vertical muscle mutually overlap and is tied up by iron wire and be connected, upper overhanging vertical muscle overhanging vertical muscle under Overlapping regions length be upper overhanging vertical muscle and under 10~15 times of diameter of overhanging vertical muscle, above-mentioned join domain has poured super Upper reinforced column and lower reinforced column are connected by high performance concrete, the peripheral wall of upper reinforced column At least four pulp channels for being connected to the join domain equidistantly are offered, to guarantee that it is closely knit that ultra-high performance concrete pours.
In a preferred embodiment of the present invention, the side length of the cross section of the tenon is the upper reinforced column Cross section side length 25%.
In a preferred embodiment of the present invention, the peripheral wall of the upper reinforced column equidistantly offers connection institute Four pulp channels of join domain are stated, to guarantee that it is closely knit that ultra-high performance concrete pours.
In a preferred embodiment of the present invention, the diameter in the pulp channel is less than the net of overhanging vertical muscle on adjacent two Away from.
The construction method of above-mentioned prefabricated assembling type reinforced concrete column splicing node structure, includes the following steps:
(1) be prefabricated in the factory upper reinforced column and lower reinforced column, reserves the good pulp channel, presets institute State tenon and groove, and ensure overhanging vertical muscle and under overhanging vertical muscle extension with meet the lap of splice requirement;
(2) by the lower end of the tenon be inserted in the groove to upper reinforced column and lower reinforced column into Row positioning, and corresponding overhanging vertical muscle overhanging vertical muscle under is subjected to binding using iron wire and is connected;
(3) several through-holes are opened in advance by the top of several steel forms and lower part are each, by high-strength screw by several steel forms It is fixed on the outside wall surface of reinforced column and lower reinforced column, wherein the middle part of die plate is equipped at least one grouting Mouthful, which is equipped with a grouting and is connected and fixed mechanism;
(4) grouting mechanism is connected and fixed mechanism with grouting to be connected, by being in the milk, mechanism is poured into the join domain Ultra-high performance concrete stops pouring when the uniform grout in above-mentioned pulp channel, and with pulp channel of sealing with wax, and removes and fills Pulp grinder structure, and block above-mentioned at least one grouting mouth;
(5) after pouring at least for 24 hours, several steel forms are removed,.
In a preferred embodiment of the invention, it includes being set to above grouting mouth that the grouting, which is connected and fixed mechanism, One upper hopper chute, the gliding groove below grouting mouth and the hush panel being slidably arranged in the upper hopper chute and gliding groove, should Grouting, which is connected and fixed mechanism, has a first state and one second state, when in the first state, hush panel closure grouting mouth, When in the second state, hush panel makes mouth opening of being in the milk far from grouting mouth.
It is further preferred that the grouting mechanism includes a grout pipe, one end of the grout pipe is funnel-shaped, the other end Edge extends outward to form end plate, and end plate sliding adapts in the upper hopper chute and gliding groove.
The beneficial effects of the present invention are:
1, ultra-high performance concrete is applied between prefabricated assembling type reinforced concrete column by the present invention, takes full advantage of super The resistance to compression and tensile property of high performance concrete brilliance, to solve the problems, such as that node region connection is weak.
2, the present invention in ultra-high performance concrete assembly node material utilization amount it is small, simple structure, only with longitudinal reinforcement without Stirrup need to be arranged again.
3, construction method of the invention technically has good feasibility, and construction method is simpler, ensure that existing Field construction quality, improves site operation efficiency and safety.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the present invention does not pour ultra-high performance concrete.
Fig. 2 is that the present invention pours the structural perspective after ultra-high performance concrete.
Fig. 3 is the structural schematic diagram in work progress of the present invention.
Fig. 4 is the structural schematic diagram that grouting of the invention is connected and fixed mechanism.
Fig. 5 is the structural schematic diagram of grouting mechanism of the invention.
Specific embodiment
Technical solution of the present invention is further explained and described below by way of specific embodiment.
As shown in Figure 1, a kind of prefabricated assembling type reinforced concrete column splices node structure, it is rectangular including cross section Reinforced column 1 and once reinforced column 2 on one, the lower end of upper reinforced column 1 and lower reinforced column 2 Region between upper end is join domain 3.
Upper reinforced column 1, cross section is square, and downward one cross section of projection in the middle part of bottom surface is pros The tenon 10 of shape, and its lower end has several overhanging vertical muscle 11 set on 10 periphery of tenon.
Lower reinforced column 2, cross section is square, thereon the one of the above-mentioned tenon 10 of the recessed correspondence in the middle part of top surface The groove 20 that cross section is square, and the upper end have set on the groove 20 periphery with above-mentioned several overhanging vertical muscle 11 Correspond and size it is identical it is several under overhanging vertical muscle 21;
As shown in Figure 1 to Figure 2, the region between the lower end of upper reinforced column 1 and the upper end of lower reinforced column 2 For join domain 3, the lower end of above-mentioned tenon 10 is inserted in above-mentioned groove 20, and the side length of the cross section of above-mentioned tenon 10 is above-mentioned The 25% of the side length of the cross section of upper reinforced column 1, the cross of the above-mentioned tenon 10 of the side ratio of the cross section of above-mentioned groove 20 The lower end of above-mentioned tenon 10 is inserted in above-mentioned groove 20 to guarantee to be accurately positioned by the big 1.8~2.5mm of the side length in section.If Dry overhanging vertical muscle 11 with it is several under overhanging vertical muscle 21 mutually overlap and tied up by iron wire and be connected, upper overhanging vertical muscle 11 and it is lower outside Stretch the overlapping regions of vertical muscle 21 length be the upper overhanging vertical muscle 11 and be described under 10 times of diameter of overhanging vertical muscle 21, it is above-mentioned Join domain 3 has poured ultra-high performance concrete 6, and upper reinforced column 1 and lower reinforced column 2 are connected, Its compression strength is more than 150MPa, and tensile strength is more than 15MPa, can significantly improve the bearing capacity and anti-seismic performance of join domain 3; The peripheral wall of upper reinforced column 1 equidistantly offers the four pulp channels 12 for being connected to the join domain 3, to guarantee superelevation Can concrete 6 pour closely knit, the diameter in pulp channel 12 is less than the clear distance of overhanging vertical muscle 11 on adjacent two, longitudinal to avoid influencing The arrangement of reinforcing bar.
As shown in figure 3, the construction method of above-mentioned prefabricated assembling type reinforced concrete column splicing node structure, including walk as follows It is rapid:
(1) be prefabricated in the factory upper reinforced column 1 and lower reinforced column 2, reserves the good pulp channel 12, Preset the tenon 10 and groove 20, and ensure overhanging vertical muscle 11 and under overhanging vertical muscle 21 extension with meet overlap joint length Degree requires;
(2) lower end of the tenon 10 is inserted in the groove 20 to upper reinforced column 1 and lower reinforced concrete Earth pillar 2 is positioned, and by corresponding overhanging vertical muscle 11, the overhanging vertical muscle 21 under carries out binding and connects using iron wire;
(3) several through-holes are opened in advance by the top of four steel forms 7 and lower part are each, by high-strength screw by several steel forms 7 Four outside wall surfaces of reinforced column 1 and lower reinforced column 2 are fixed on, wherein the middle part of die plate 7 is equipped with one and fills Mouth 70 is starched, which is equipped with a grouting and is connected and fixed mechanism 71;
As shown in Figure 4 and Figure 5, grouting is connected and fixed mechanism 71 and includes the upper hopper chute 711 for being set to 70 top of grouting mouth, sets Gliding groove 712 and the hush panel 713 that is slidably arranged in the upper hopper chute 711 and gliding groove 712 in the one of grouting mouth 70 lower section, The grouting is connected and fixed mechanism 71 with a first state and one second state, and when in the first state, hush panel 713 is closed Be in the milk mouth 70, and when in the second state, hush panel 713 makes the opening of mouth 70 of being in the milk far from grouting mouth 70;Mechanism 8 of being in the milk includes one One end of grout pipe 80, the grout pipe 80 is funnel-shaped, and the edge of the other end extends outward to form end plate 81, and the end plate 81 is sliding It is dynamic to adapt in the upper hopper chute 711 and gliding groove 712;
The internal diameter of grout pipe 80 is identical as the grouting diameter of mouth 70
(4) end plate 81 for mechanism 8 of being in the milk is inserted into upper hopper chute 711 and gliding groove 712, along upper hopper chute 711 and gliding groove 712 push hush panel 713 open, and the mechanism 8 that makes to be in the milk is connected and fixed mechanism 71 with grouting and is connected, by mechanism 8 of being in the milk to the connection Ultra-high performance concrete 6 is poured in region 3, when above-mentioned 12 uniform grout of pulp channel, stops pouring, and with sealing with wax out Channel 12 is starched, pushes hush panel 713 to eject the end plate 81 of grouting mechanism 8, makes 713 return of hush panel with plugging grouting mouth 70;
(5) after pouring at least for 24 hours, steel form 7 is removed, fills in screw hole cement slurry and with sealing with wax.
The foregoing is only a preferred embodiment of the present invention, the range that the present invention that therefore, it cannot be limited according to is implemented, i.e., Equivalent changes and modifications made in accordance with the scope of the invention and the contents of the specification should still be within the scope of the present invention.

Claims (7)

1. a kind of prefabricated assembling type reinforced concrete column splices node structure, it is characterised in that: include:
Reinforced column on one, cross section are square, and downward one cross section of projection in the middle part of bottom surface is square Tenon, and its lower end have set on the tenon periphery several overhanging vertical muscle;
Reinforced column once, cross section are square, and the one of the above-mentioned tenon of the recessed correspondence in the middle part of top surface is transversal thereon The groove that face is square, and the upper end have set on the periphery of the groove corresponded with above-mentioned several overhanging vertical muscle and Size it is identical it is several under overhanging vertical muscle;
Region between the lower end of upper reinforced column and the upper end of lower reinforced column is join domain, above-mentioned tenon Lower end is inserted in above-mentioned groove, and the side length of the cross section of above-mentioned tenon is the side length of the cross section of above-mentioned upper reinforced column 20~30%, the side length big 1.8~2.5mm, Ruo Ganshang of the cross section of the above-mentioned tenon of the side ratio of the cross section of above-mentioned groove Overhanging vertical muscle with it is several under overhanging vertical muscle mutually overlap and tied up by iron wire and be connected, upper overhanging vertical muscle and under overhanging vertical muscle take Connect region length be upper overhanging vertical muscle and under 10~15 times of diameter of overhanging vertical muscle, above-mentioned join domain has poured superelevation Energy concrete, upper reinforced column and lower reinforced column is connected, between peripheral wall of upper reinforced column etc. Away from at least four pulp channels for being connected to the join domain are offered, to guarantee that it is closely knit that ultra-high performance concrete pours.
2. a kind of prefabricated assembling type reinforced concrete column as described in claim 1 splices node structure, it is characterised in that: described The side length of the cross section of tenon is the 25% of the side length of the cross section of the upper reinforced column.
3. a kind of prefabricated assembling type reinforced concrete column as described in claim 1 splices node structure, it is characterised in that: described The peripheral wall of upper reinforced column equidistantly offers the four pulp channels for being connected to the join domain, to guarantee that very-high performance is mixed Solidifying soil pours closely knit.
4. a kind of prefabricated assembling type reinforced concrete column as described in claim 1 splices node structure, it is characterised in that: described The diameter in pulp channel is less than the clear distance of overhanging vertical muscle on adjacent two.
5. a kind of prefabricated assembling type reinforced concrete column splicing node structure described in any claim in Claims 1-4 Construction method, characterized by the following steps:
(1) be prefabricated in the factory upper reinforced column and lower reinforced column, reserves the good pulp channel, presets described convex Tenon and groove, and ensure overhanging vertical muscle and under overhanging vertical muscle extension with meet the lap of splice requirement;
(2) lower end of the tenon is inserted in the groove and upper reinforced column and lower reinforced column is determined Position, and corresponding overhanging vertical muscle overhanging vertical muscle under is subjected to binding using iron wire and is connected;
(3) several through-holes are opened in advance by the top of several steel forms and lower part are each, fixed several steel forms by high-strength screw In the outside wall surface of upper reinforced column and lower reinforced column, wherein the middle part of die plate is equipped at least one grouting mouth, The grouting mouth is equipped with a grouting and is connected and fixed mechanism;
(4) grouting mechanism is connected and fixed mechanism with grouting to be connected, by being in the milk, mechanism pours superelevation into the join domain Performance concrete stops pouring when the uniform grout in above-mentioned pulp channel, and with pulp channel of sealing with wax, and removes grouter Structure, and block above-mentioned at least one grouting mouth;
(5) after pouring at least for 24 hours, several steel forms are removed,.
6. construction method as claimed in claim 5, it is characterised in that: it includes being set to grouting mouth that the grouting, which is connected and fixed mechanism, One upper hopper chute of top, the gliding groove below grouting mouth and the sealing being slidably arranged in the upper hopper chute and gliding groove Plate, the grouting are connected and fixed mechanism with a first state and one second state, and when in the first state, hush panel closing fills Mouth is starched, when in the second state, hush panel makes mouth opening of being in the milk far from grouting mouth.
7. construction method as claimed in claim 6, it is characterised in that: the grouting mechanism includes a grout pipe, the grout pipe One end it is funnel-shaped, the edge of the other end extends outward to form end plate, the end plate sliding adapts to the upper hopper chute and under In sliding slot.
CN201811371722.2A 2018-11-16 2018-11-16 A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method Pending CN109339230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811371722.2A CN109339230A (en) 2018-11-16 2018-11-16 A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811371722.2A CN109339230A (en) 2018-11-16 2018-11-16 A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method

Publications (1)

Publication Number Publication Date
CN109339230A true CN109339230A (en) 2019-02-15

Family

ID=65315862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811371722.2A Pending CN109339230A (en) 2018-11-16 2018-11-16 A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method

Country Status (1)

Country Link
CN (1) CN109339230A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952658A (en) * 2019-12-23 2020-04-03 三一筑工科技有限公司 Cavity prefabricated column node connecting structure and construction method
CN110952660A (en) * 2019-12-23 2020-04-03 三一筑工科技有限公司 Cavity prefabricated column node connecting structure and construction method
CN110952659A (en) * 2019-12-23 2020-04-03 三一筑工科技有限公司 Prefabricated column node connecting structure and construction method
CN113216397A (en) * 2021-05-19 2021-08-06 西华大学 Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column
CN113700154A (en) * 2021-08-26 2021-11-26 上海宝冶集团有限公司 Prefabricated assembled post connected node with joining fixture
CN113763541A (en) * 2021-09-14 2021-12-07 广联达科技股份有限公司 Method and device for calculating longitudinal bar in column and readable storage medium
CN114108807A (en) * 2021-11-30 2022-03-01 江西理工大学 Beam column connecting node
CN114508096A (en) * 2022-03-03 2022-05-17 李硕 Cement precast pile connecting piece
CN114541611A (en) * 2022-03-17 2022-05-27 沈阳工业大学 Prefabricated light lattice type concrete wall assembly structure system and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762731A (en) * 1993-08-27 1995-03-07 Okumura Corp Joining method of pillar and beam
CN202745404U (en) * 2012-07-13 2013-02-20 中冶建筑研究总院有限公司 External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling
CN105277415A (en) * 2015-11-22 2016-01-27 合肥工业大学 High polymer grouting test mould simulating pavement rehabilitation and application thereof
CN105350641A (en) * 2015-11-20 2016-02-24 上海建工五建集团有限公司 Frame column connecting node suitable for prefabricating and assembling building, and construction process thereof
CN205857380U (en) * 2016-08-05 2017-01-04 上海宇辉住宅工业有限公司 A kind of tenon formula post attachment structure
CN106401069A (en) * 2016-11-02 2017-02-15 华侨大学 Damage repairing assembly type combined column with self-reset function
CN108035439A (en) * 2017-12-18 2018-05-15 湘潭大学 A kind of rapid coagulation soil assembling type node and its construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762731A (en) * 1993-08-27 1995-03-07 Okumura Corp Joining method of pillar and beam
CN202745404U (en) * 2012-07-13 2013-02-20 中冶建筑研究总院有限公司 External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling
CN105350641A (en) * 2015-11-20 2016-02-24 上海建工五建集团有限公司 Frame column connecting node suitable for prefabricating and assembling building, and construction process thereof
CN105277415A (en) * 2015-11-22 2016-01-27 合肥工业大学 High polymer grouting test mould simulating pavement rehabilitation and application thereof
CN205857380U (en) * 2016-08-05 2017-01-04 上海宇辉住宅工业有限公司 A kind of tenon formula post attachment structure
CN106401069A (en) * 2016-11-02 2017-02-15 华侨大学 Damage repairing assembly type combined column with self-reset function
CN108035439A (en) * 2017-12-18 2018-05-15 湘潭大学 A kind of rapid coagulation soil assembling type node and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘士润;司炳君;: "钢管混凝土柱-钢筋混凝土梁节点及受力特点", 建筑结构学报, no. 1 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952658A (en) * 2019-12-23 2020-04-03 三一筑工科技有限公司 Cavity prefabricated column node connecting structure and construction method
CN110952660A (en) * 2019-12-23 2020-04-03 三一筑工科技有限公司 Cavity prefabricated column node connecting structure and construction method
CN110952659A (en) * 2019-12-23 2020-04-03 三一筑工科技有限公司 Prefabricated column node connecting structure and construction method
CN110952659B (en) * 2019-12-23 2020-12-01 三一筑工科技有限公司 Prefabricated column node connecting structure and construction method
CN113216397A (en) * 2021-05-19 2021-08-06 西华大学 Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column
CN113700154A (en) * 2021-08-26 2021-11-26 上海宝冶集团有限公司 Prefabricated assembled post connected node with joining fixture
CN113763541A (en) * 2021-09-14 2021-12-07 广联达科技股份有限公司 Method and device for calculating longitudinal bar in column and readable storage medium
CN113763541B (en) * 2021-09-14 2024-05-28 广联达科技股份有限公司 Method and equipment for calculating longitudinal ribs in column and readable storage medium
CN114108807A (en) * 2021-11-30 2022-03-01 江西理工大学 Beam column connecting node
CN114508096A (en) * 2022-03-03 2022-05-17 李硕 Cement precast pile connecting piece
CN114541611A (en) * 2022-03-17 2022-05-27 沈阳工业大学 Prefabricated light lattice type concrete wall assembly structure system and construction method thereof

Similar Documents

Publication Publication Date Title
CN109339230A (en) A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method
CN109339238A (en) A kind of prefabricated assembled profile steel concrete column splicing node structure and its construction method
CN103938864B (en) Infilled wall Constructional Col-umn Construction engineering method
CN106869315B (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN109339281A (en) A kind of prefabricated assembling type reinforced concrete shear wall vertically splices node structure and its construction method
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN109024870A (en) The connection structure and its construction method of assembled underground structure vertical member
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN206512590U (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN106760054A (en) Precast reinforced concrete shear wall
CN209323688U (en) Prefabricated assembling type reinforced concrete column splices node structure
CN202611012U (en) Assembly type concrete shear wall edge member connection structure
CN208650333U (en) A kind of compound Coupled Shear Wall structure of assembled integral steel reinforced concrete frame support
CN208763204U (en) A kind of vertical connecting structure of low layer assembled architecture prefabricated panel
CN107060084A (en) Prefabricated constructional column attachment structure and attaching method thereof
CN109339283A (en) A kind of prefabricated assembled steel reinforced concrete shear walls vertically splice node structure and its construction method
CN106149878A (en) Attachment structure at concrete frame structure prefabricated post and beam slab node and method
CN209211630U (en) Prefabricated assembled profile steel concrete column splices node structure
CN109024973A (en) A kind of connection structure and its construction method for precast shear wall
CN208650313U (en) A kind of assembled integral reinforced concrete band shearing-resistant member Coupled Shear Wall structure
CN207032010U (en) A kind of assembled solid steel tube constrains armored concrete pillar height pier
CN209211693U (en) Prefabricated assembled steel reinforced concrete shear walls vertically splice node structure
CN206408599U (en) The U-shaped gool component of spigot-and-socket precast concrete
CN209323749U (en) Prefabricated assembling type reinforced concrete shear wall vertically splices node structure
CN205976235U (en) Grout sleeve and prefab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190215