CN109325665A - A kind of project cost appraisal procedure and system - Google Patents

A kind of project cost appraisal procedure and system Download PDF

Info

Publication number
CN109325665A
CN109325665A CN201811003687.9A CN201811003687A CN109325665A CN 109325665 A CN109325665 A CN 109325665A CN 201811003687 A CN201811003687 A CN 201811003687A CN 109325665 A CN109325665 A CN 109325665A
Authority
CN
China
Prior art keywords
cost
project
dimension
construction
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811003687.9A
Other languages
Chinese (zh)
Inventor
程爱珺
沈期彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG YUANHENG SOFTWARE TECHNOLOGY Co Ltd
Original Assignee
GUANGDONG YUANHENG SOFTWARE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG YUANHENG SOFTWARE TECHNOLOGY Co Ltd filed Critical GUANGDONG YUANHENG SOFTWARE TECHNOLOGY Co Ltd
Priority to CN201811003687.9A priority Critical patent/CN109325665A/en
Publication of CN109325665A publication Critical patent/CN109325665A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/10Tax strategies
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Development Economics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Educational Administration (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Technology Law (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of project cost appraisal procedure and systems, and this method comprises the following steps: establishing the construction engineering cost evaluation index table for having dimension, type and hierarchical relationship;Automation cost evaluation analysis is carried out to the exploration project for participating in assessment by construction engineering cost evaluation index table;The cost evaluation doubtful point table of corresponding exploration project is automatically generated according to analysis and assessment result.Construction engineering cost index table can flexibly be designed, the building installation engineering construction cost per square meter index under different factors is fully considered using multi objective dimension, project cost is allowed to assess no longer transparence, standardization, it is shown to tax bureau personnel in intuitive table, Engineering cost audit foundation is provided, the calculating time of tax bureau auditor is saved, the project cost being greatly saved for specific real estates projects assesses the time.

Description

A kind of project cost appraisal procedure and system
Technical field
The present invention relates to tax administration technical fields, more particularly to a kind of project cost appraisal procedure and system.
Background technique
The a big difficulty of land value-added tax settlement audit is that cost deducts the audit of item, and cost deducts construction and installation in item Engineering cost accounts for bigger specific gravity, and for the audit that building installation engineering is taken, maximum difficult point is to every project cost Assessment, it is small to arrive construction material with being divided according to engineering level, arrive basement, base, building construction cost per square meter greatly, area, location, Geology and surrounding enviroment are different, and the project cost of same type is different, is difficult intuitively to go the specific premises of appraisal and evaluation Produce the folk prescription project cost of each construction project of exploration project.
For the project cost assessment of real estates projects, there are following difficult points at present:
1, the project that building installation engineering is related to is more, small to arrive construction material, arrives the installing engineering of building main body greatly, granularity is from small To influencing layer by layer greatly, the numberical range according to granularity difference statistics is different, increases evaluation work amount.
2, construction engineering cost influence factor is more, time difference and each department price, location, geology (such as coastal area Underground foundation cost is higher than hinterland), the factors such as building type (such as ordinary residence, villa, retail shop) it is different directly Major project construction cost per square meter is influenced, is difficult uniformly to judge.
3, it after various dimensions factor is often analyzed in the assessment of construction engineering cost, for specific real estates projects, needs Manually to summarize one by one according to granule size correspondence, manual sorting goes out cost doubtful point, time-consuming and laborious.
Summary of the invention
In order to overcome the deficiencies of the above existing technologies, purpose of the present invention is to provide a kind of project cost appraisal procedures And system, allow project cost to assess no longer transparence, standardization can more save the calculating time of tax bureau auditor.Simultaneously It is shown to tax bureau personnel in intuitive table, Engineering cost audit foundation is provided.
In view of the above and other objects, the present invention proposes a kind of project cost appraisal procedure, specifically comprise the following steps:
Step 1 establishes the construction engineering cost evaluation index table for having dimension, type and hierarchical relationship;
Step 2 carries out automation cost to the exploration project for participating in assessment by construction engineering cost evaluation index table and comments Estimate analysis;
Step 3 automatically generates the cost evaluation doubtful point table of corresponding exploration project according to analysis and assessment result.
Further, in step 1, the dimension includes time and area, and marks construction cost per square meter model one by one with this It encloses;
The type includes building foundation engineering, basement engineering, ground engineering, indoor engineering and exterior components;
Described hierarchical relationship includes natural foundation, pile foundation, and pile foundation can be divided into down prefabricated tubular pile, rotary digging stake and drilling Stake.
Further, the construction cost per square meter range, which is provided with, fills in threshold values.
Further, it before step 2, selectes and has been registered for land value-added tax settlement and has needed to participate in project cost to comment The real estates projects estimated receive selected cost evaluation functional response entry instruction, read the area of selected item, build year The enterprise of part and each construction-engineering project reports cost certainly.
Further, further include following steps in step 2:
S1, traversal read project cost index table, are saved into memory, form project cost index list structure;
S2 traverses the report cost data certainly of selected real estates projects, is saved into memory, forms real estates projects From report cost list structure;
S3 extracts construction time, the area data of selected real estates projects, is saved into memory, forms real estate and open Hair project dimension list structure;
S4 traverses the project cost index chained list, according to the annual dimension in the area of chained list, retrieves the development of real estate Project dimension chained list positions corresponding dimension, according to the project major key of dimension chained list, navigates to the real estates projects from report The specific price construction and installation of cost chained list compares development of real estate according to the threshold value that project cost index chained list is set Project judges the exceeded data of cost from the corresponding value of report cost chained list;
S5 arranges the exceeded data of the cost of generation, is saved into memory, forms the exceeded data link table of cost.
Further, before step 3, the exceeded data link table of the cost of generation is traversed, according to the table of setting, Form preliminary judgment basis data;
For the table set as multi-dimensional table, the column of the multi-dimensional table include taxpayer's title, social credibility code, project Title, builds time, affiliated area, level threshold value, current value and difference at construction-engineering project;
The row of the multi-dimensional table is presented by dimension of selected real estates projects.
In order to achieve the above objectives, it the present invention also provides a kind of project cost assessment system, specifically includes:
Project cost evaluation index table generation unit has the architectural engineering of dimension, type and hierarchical relationship to make for establishing Valence evaluation index table;
Cost evaluation analytical unit is automated, by construction engineering cost evaluation index table to the exploration project for participating in assessment Carry out automation cost evaluation analysis;
Cost evaluation doubtful point table generation unit, the cost evaluation of corresponding exploration project is automatically generated according to analysis and assessment result Doubtful point table.
Further, the system also includes selected read module, for it is selected be registered for land value-added tax settlement and It needs to participate in the real estates projects of project cost assessment, receives selected cost evaluation functional response entry instruction, read institute The enterprise of time and each construction-engineering project is built from reporting cost in the area of option.
Further, the automation cost evaluation analytical unit includes:
Project cost index list structure module reads project cost index table for traversing, is saved into memory, forms work Journey Cost Index list structure;
It is saved into from report cost list structure module for traversing the report cost data certainly of selected real estates projects Memory forms real estates projects from report cost list structure;
Project dimension list structure module is protected for extracting construction time, the area data of selected real estates projects Memory is deposited into, real estates projects dimension list structure is formed;
Chained list module is traversed, for traversing the project cost index chained list of project cost index list structure module, according to The annual dimension in the area of chained list, retrieves the real estates projects dimension chained list of project dimension list structure module, and positioning corresponds to Dimension, according to the project major key of dimension chained list, the real estates projects navigated to from report cost list structure module are made from report The specific price construction and installation of valence chained list compares development of real estate item according to the threshold value that project cost index chained list is set Mesh judges the exceeded data of cost from the corresponding value of report cost chained list;
The exceeded data link table module of cost arranges the exceeded data of cost that the exceeded data module of cost generates, is saved into interior It deposits, forms the exceeded data link table of cost.
Further, the system also includes:
Preliminary judgment basis data module, for traversing the exceeded data link table of the cost generated, according to the table of setting Lattice form preliminary judgment basis data.
Compared with prior art, a kind of project cost appraisal procedure of the present invention and system, the present invention has the advantage that
1, construction engineering cost index table can be flexibly designed, is fully considered under different factors using multi objective dimension Building installation engineering construction cost per square meter index allows project cost to assess no longer transparence, standardization.
2, more fully automation is summarized layer by layer according to the granularity of building installation engineering project, saves tax bureau's audit The calculating time of personnel.
3, set is used in the real estates projects for participating in project cost assessment automatically, and automatic presentation different dimensions lower is right The enterprise for the specific real estates projects answered from report project cost it is exceeded whether, be greatly saved and opened for specific real estate The project cost of hair project assesses the time.
4, it is shown to tax bureau personnel in intuitive table, Engineering cost audit foundation is provided, it is accurate and efficient.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is a kind of step flow chart of project cost appraisal procedure of the present invention;
Fig. 2 is cost evaluation analytical procedure flow chart of the present invention;
Fig. 3 is a kind of system architecture diagram of project cost assessment system of the present invention;
Fig. 4 is specific embodiment of the invention basic procedure architecture diagram.
Specific embodiment
Below by way of specific specific example and embodiments of the present invention are described with reference to the drawings, those skilled in the art can Understand further advantage and effect of the invention easily by content disclosed in the present specification.The present invention can also pass through other differences Specific example implemented or applied, details in this specification can also be based on different perspectives and applications, without departing substantially from Various modifications and change are carried out under spirit of the invention.
Fig. 1 is a kind of step flow chart of project cost appraisal procedure of the present invention.As shown in Figure 1, a kind of engineering of the present invention Construction cost assessment method includes the following steps:
Step 101, the construction engineering cost evaluation index table for having dimension, type and hierarchical relationship is established;Specifically, it establishes It is dimension with time, area etc., using building installation engineering project as the construction engineering cost evaluation index of type and hierarchical relationship Table is divided with level (such as according to project in the specific embodiment of the invention according to the project granularity of building installation engineering by type It is divided into building foundation engineering, basement engineering, ground engineering, indoor engineering, exterior components etc.;For another example building basis can be by layer Be divided into natural foundation, pile foundation under grade, pile foundation can be divided into down prefabricated tubular pile, rotary digging stake, bore (punching) hole etc.), with the time, Area etc. is that dimension marks construction cost per square meter range one by one, forms the construction engineering cost evaluation index of various dimensions, polymorphic type, multi-layer Table;
That is, the graphics table interface instrument that example provides through the invention (can freely customize multi-dimensional spreadsheet Row/column information) formulate with area, year made for dimension, by the engineering of hierarchical structure tree pattern of building installation engineering project Valence table.
Preferably, construction cost per square meter range is provided with and fills in threshold values, each year, each department, each construction and installation item can be filled in Purpose folk prescription project cost threshold value, such as minimum and peak form project cost index table.
Step 102, automation cost is carried out to the exploration project for participating in assessment by construction engineering cost evaluation index table Analysis and assessment;That is, by choosing specific real estates projects, go out pair according to cost evaluation index table analysis automatically It answers every construction cost per square meter value in real estates projects whether exceeded, mainly crashes with enterprise from report from report cost.
Specifically, the development of real estate item for being registered for land value-added tax settlement and having needed to participate in project cost assessment is selected Mesh receives selected cost evaluation functional response entry instruction, reads the area of selected item, builds time and each architectural engineering The enterprise of project reports cost certainly.
Preferably, as shown in Fig. 2, further including following steps among step 102:
S1, traversal read project cost index table, are saved into memory, form project cost index list structure;
S2 traverses the report cost data certainly of selected real estates projects, is saved into memory, forms real estates projects From report cost list structure;
S3 extracts construction time, the area data of selected real estates projects, is saved into memory, forms real estate and open Hair project dimension list structure;
S4 traverses the project cost index chained list, according to the annual dimension in the area of chained list, retrieves the development of real estate Project dimension chained list positions corresponding dimension, according to the project major key of dimension chained list, navigates to the real estates projects from report The specific price construction and installation of cost chained list compares development of real estate according to the threshold value that project cost index chained list is set Project judges the exceeded data of cost from the corresponding value of report cost chained list;
S5 arranges the exceeded data of the cost of generation, is saved into memory, forms the exceeded data link table of cost.
Specifically, in a step 102, automatic traversal reads project cost index table, is saved into memory in real time, forms work Journey Cost Index list structure traverses the report cost data certainly of selected real estates projects at the same time, and is saved into real time In memory, real estates projects are formed from report cost list structure, when traversal, extract selected real estates projects The construction time, area data, be saved into memory, form real estate open project dimension list structure.
It is area according to chained list, annual dimension preferably, when traversal project cost index chained list, retrieval real estate is opened Hair project dimension chained list, and position corresponding dimension, that is to say, that according to the project major key of dimension chained list, navigate to real estate Exploration project is from the specific price construction and installation for reporting cost chained list, according to the threshold value that project cost index chained list is set, threshold Value point has minimum and peak, compares real estates projects from the corresponding value of report cost chained list, to judge that cost is super Mark data.
The exceeded data of cost that automatic arranging generates, are saved into memory in real time, form the exceeded data link table of cost.
Step 103, the cost evaluation doubtful point table of corresponding exploration project is automatically generated according to analysis and assessment result.Specifically, The exceeded project of automatic label cost, shows every project cost doubtful point with intuitive table, so that tax bureau auditor is to enterprise The construction and installation cost that industry reports carries out preliminary screening assessment.
Preferably, the exceeded data link table of the cost of generation is traversed, according to the table of setting, shape before step 103 At preliminary judgment basis data;
For the table set as multi-dimensional table, the column of the multi-dimensional table include taxpayer's title, social credibility code, project Title, builds time, affiliated area, level threshold value, current value and difference at construction-engineering project;
The row of the multi-dimensional table is presented by dimension of selected real estates projects.
The dimension includes building time, affiliated area, and the data according to the bivariate table of dimension difference generation are also different.
That is, system traverses the exceeded data link table of cost of generation automatically, depending on business, according to preset Table makes the preliminary judgment basis of Engineering cost audit for tax bureau auditor.
Fig. 3 is a kind of system architecture diagram of project cost assessment system of the present invention.As shown in figure 3, a kind of engineering of the present invention Cost evaluation system, including project cost evaluation index table generation unit 201, automation and are made cost evaluation analytical unit 202 Valence assesses doubtful point table generation unit 203;
Project cost evaluation index table generation unit 201, for establishing the architectural engineering for having dimension, type and hierarchical relationship Cost evaluation index table;To establish with time, area etc. be dimension, building by type and hierarchical relationship of building installation engineering project Build project cost evaluation index table, in the specific embodiment of the invention, according to building installation engineering project granularity by type and It (is such as building foundation engineering, basement engineering, ground engineering, indoor engineering, exterior components according to item dividing that level, which divides, Deng;For another example building basis can be by natural foundation, pile foundation be divided under level, and pile foundation can be divided into down prefabricated tubular pile, rotary digging stake, bore (punching) hole stake etc.), it is that dimension marks construction cost per square meter range one by one with time, area etc., forms various dimensions, polymorphic type, multi-layer Construction engineering cost evaluation index table;
Preferably, construction cost per square meter range is provided with and fills in threshold values, each year, each department, each construction and installation item can be filled in Purpose folk prescription project cost threshold value, such as minimum and peak form project cost index table
Cost evaluation analytical unit 202 is automated, the exploitation by construction engineering cost evaluation index table to assessment is participated in Project carries out automation cost evaluation analysis;By choosing specific real estates projects, automatically according to cost evaluation index Table analysis goes out to correspond to whether every construction cost per square meter value in real estates projects is exceeded, and mainly cost carries out from reporting from reporting with enterprise It crashes.
Specifically, the development of real estate item for being registered for land value-added tax settlement and having needed to participate in project cost assessment is selected Mesh receives selected cost evaluation functional response entry instruction, reads the area of selected item, builds time and each architectural engineering The enterprise of project reports cost certainly.
Cost evaluation doubtful point table generation unit 203, the cost of corresponding exploration project is automatically generated according to analysis and assessment result Assess doubtful point table.The exceeded project of automatic label cost, shows every project cost doubtful point with intuitive table, so that the tax bureau examines Core personnel carry out preliminary screening assessment to the construction and installation cost that enterprise reports.
The exceeded data link table of the cost that traversal generates forms preliminary judgment basis data according to the table of setting;
For the table set as multi-dimensional table, the column of the multi-dimensional table include taxpayer's title, social credibility code, project Title, builds time, affiliated area, level threshold value, current value and difference at construction-engineering project;
The row of the multi-dimensional table is presented by dimension of selected real estates projects.
System traverses the exceeded data link table of cost of generation automatically, depending on business, according to preset table, for tax Business office auditor makes the preliminary judgment basis of Engineering cost audit.
Preferably, system further includes selected read module, land value-added tax settlement has been registered for it for selected and needs to join With the real estates projects of project cost assessment, receives selected cost evaluation functional response entry instruction, read selected item Area, build the enterprise of time and each construction-engineering project from reporting cost.
Correspondingly, the automation cost evaluation analytical unit 202 includes:
Project cost index list structure module reads project cost index table for traversing, is saved into memory, forms work Journey Cost Index list structure;
It is saved into from report cost list structure module for traversing the report cost data certainly of selected real estates projects Memory forms real estates projects from report cost list structure;
Project dimension list structure module is protected for extracting construction time, the area data of selected real estates projects Memory is deposited into, real estates projects dimension list structure is formed;
Chained list module is traversed, for traversing the project cost index chained list of project cost index list structure module, according to The annual dimension in the area of chained list, retrieves the real estates projects dimension chained list of project dimension list structure module block, positioning pair Dimension is answered, according to the project major key of dimension chained list, navigates to and is reported certainly from the real estates projects of report cost list structure module The specific price construction and installation of cost chained list compares development of real estate according to the threshold value that project cost index chained list is set Project judges the exceeded data of cost from the corresponding value of report cost chained list;
The exceeded data link table module of cost arranges the exceeded data of cost that the exceeded data module of cost generates, is saved into interior It deposits, forms the exceeded data link table of cost.
System further include:
Preliminary judgment basis data module, for traversing the exceeded data link table of the cost generated, according to the table of setting Lattice form preliminary judgment basis data.
Fig. 4 is specific embodiment of the invention basic procedure architecture diagram.In the specific embodiment of the invention, according to dimension, wound It builds building and builds engineering or creation exterior components cost evaluation index table, combined by construction engineering cost evaluation index table and build peace Project cost overall target calculates project cost;
Specifically, traversal reads project cost index table, is saved into memory, forms project cost index list structure;Time The report cost data certainly for going through selected real estates projects, are saved into memory, form real estates projects from report cost chained list Structure;Construction time, the area data for extracting selected real estates projects, are saved into memory, form real estates projects Dimension list structure;The project cost index chained list is traversed, according to the annual dimension in the area of chained list, the real estate is retrieved and opens Hair project dimension chained list positions corresponding dimension, according to the project major key of dimension chained list, navigates to the real estates projects certainly The specific price construction and installation for reporting cost chained list compares real estate and opens according to the threshold value that project cost index chained list is set Hair project judges the exceeded data of cost from the corresponding value of report cost chained list;The exceeded data of the cost generated are arranged, are saved Into memory, the exceeded data link table of cost is formed.Referring to enterprise from report cost data, cost comparison is carried out, i.e., to participation assessment Exploration project carries out automation cost evaluation analysis;
The cost evaluation doubtful point table of corresponding exploration project is automatically generated according to analysis and assessment result, i.e. deviation is reminded, specifically Ground, the automatic project for marking cost exceeded show every project cost doubtful point with intuitive table, for tax bureau auditor couple The construction and installation cost that enterprise reports carries out preliminary screening assessment.
In conclusion present example by computer information handle, establish with project cost influence factor (time, Area etc.) it is dimension, the construction engineering cost assessment table that project is tree-shaped level is respectively built with building installation engineering, automatically to ginseng Mark and the early warning of the exceeded item of project cost are made with the project of assessment.
Figure multi-dimensional spreadsheet designer module through the invention, can flexibly design construction engineering cost index table, The building installation engineering construction cost per square meter index under different factors is fully considered using multi objective dimension, and project cost is allowed to assess no longer Transparence, standardization.
The tree-shaped hierarchical structure of building installation engineering project of project cost evaluation index table through the invention, more fully Automation is summarized layer by layer according to the granularity of building installation engineering project, saves the calculating time of tax bureau auditor.
Project cost evaluation index table module through the invention, automatic set use the real estate for participating in project cost assessment In exploration project, the automatic enterprise that specific real estates projects corresponding under different dimensions are presented is super from report project cost Whether mark, the project cost being greatly saved for specific real estates projects assesses the time.
The exceeded analytical table of the project cost provided through the invention shows in intuitive table to tax bureau personnel, provides Engineering cost audit foundation, it is accurate and efficient.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.Any Without departing from the spirit and scope of the present invention, modifications and changes are made to the above embodiments by field technical staff.Therefore, The scope of the present invention, should be as listed in the claims.

Claims (10)

1. a kind of project cost appraisal procedure, which is characterized in that described method includes following steps:
Step 1 establishes the construction engineering cost evaluation index table for having dimension, type and hierarchical relationship;
Step 2 carries out automation cost evaluation point to the exploration project for participating in assessment by construction engineering cost evaluation index table Analysis;
Step 3 automatically generates the cost evaluation doubtful point table of corresponding exploration project according to analysis and assessment result.
2. a kind of project cost appraisal procedure as described in claim 1, it is characterised in that: in step 1, the dimension packet Time and area are included, and construction cost per square meter range is marked one by one with this;
The type includes building foundation engineering, basement engineering, ground engineering, indoor engineering and exterior components;
Described hierarchical relationship includes natural foundation, pile foundation, and pile foundation can be divided into down prefabricated tubular pile, rotary digging stake and drilled pile.
3. a kind of project cost appraisal procedure as claimed in claim 2, it is characterised in that: the construction cost per square meter range is provided with Fill in threshold values.
4. a kind of project cost appraisal procedure as described in claim 1, it is characterised in that: before step 2, select Registration land value-added tax settlement and the real estates projects for needing to participate in project cost assessment receive selected cost evaluation function Entry instruction is responded, the area of selected item is read, builds the enterprise of time and each construction-engineering project from reporting cost.
5. a kind of project cost appraisal procedure as described in claim 1, it is characterised in that: further include walking in step 2 as follows It is rapid:
S1, traversal read project cost index table, are saved into memory, form project cost index list structure;
S2, the report cost data certainly of the selected real estates projects of traversal, is saved into memory, forms real estates projects and reports certainly Cost list structure;
S3 extracts construction time, the area data of selected real estates projects, is saved into memory, forms development of real estate item Mesh dimension list structure;
S4 traverses the project cost index chained list, according to the annual dimension in the area of chained list, retrieves the real estates projects Dimension chained list positions corresponding dimension, according to the project major key of dimension chained list, navigates to the real estates projects and reports cost certainly The specific price construction and installation of chained list compares real estates projects according to the threshold value that project cost index chained list is set From the corresponding value of report cost chained list, the exceeded data of cost are judged;
S5 arranges the exceeded data of the cost of generation, is saved into memory, forms the exceeded data link table of cost.
6. a kind of project cost appraisal procedure as claimed in claim 1 or 5, it is characterised in that: before step 3, traversal life At the exceeded data link table of the cost preliminary judgment basis data are formed according to the table of setting;
For the table set as multi-dimensional table, the column of the multi-dimensional table include taxpayer's title, social credibility code, entry name Title, builds time, affiliated area, level threshold value, current value and difference at construction-engineering project;
The row of the multi-dimensional table is presented by dimension of selected real estates projects.
7. a kind of project cost assessment system, which is characterized in that the system comprises project cost evaluation index table generation unit, For establishing the construction engineering cost evaluation index table for having dimension, type and hierarchical relationship;
Cost evaluation analytical unit is automated, the exploration project for participating in assessment is carried out by construction engineering cost evaluation index table Automate cost evaluation analysis;
Cost evaluation doubtful point table generation unit, the cost evaluation doubtful point of corresponding exploration project is automatically generated according to analysis and assessment result Table.
8. a kind of project cost assessment system as claimed in claim 7, it is characterised in that: the system also includes selected readings Module connects for the selected real estates projects for being registered for land value-added tax settlement and need to participate in project cost assessment By selected cost evaluation functional response entry instruction, reads the area of selected item, builds time and each construction-engineering project Enterprise from reporting cost.
9. a kind of project cost assessment system as claimed in claim 7, it is characterised in that: the automation cost evaluation analysis Unit includes:
Project cost index list structure module reads project cost index table for traversing, is saved into memory, forms engineering and makes Valence index list structure;
From report cost list structure module, for traverse selected real estates projects from report cost data, be saved into memory, Real estates projects are formed from report cost list structure;
Project dimension list structure module is saved into for extracting construction time, the area data of selected real estates projects Memory forms real estates projects dimension list structure;
Chained list module is traversed, for traversing the project cost index chained list of project cost index list structure module, according to chained list The annual dimension in area, retrieve the real estates projects dimension chained list of project dimension list structure module, position corresponding dimension, According to the project major key of dimension chained list, the real estates projects navigated to from report cost list structure module report cost chained list certainly Specific price construction and installation, according to project cost index chained list set threshold value, compare real estates projects from report The corresponding value of cost chained list judges the exceeded data of cost;
The exceeded data link table module of cost arranges the exceeded data of cost that the exceeded data module of cost generates, is saved into memory, shape At the exceeded data link table of cost.
10. a kind of project cost assessment system as claimed in claim 7, it is characterised in that: the system also includes:
Preliminary judgment basis data module, for traversing the exceeded data link table of the cost generated, according to the table of setting, shape At preliminary judgment basis data.
CN201811003687.9A 2018-08-30 2018-08-30 A kind of project cost appraisal procedure and system Pending CN109325665A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811003687.9A CN109325665A (en) 2018-08-30 2018-08-30 A kind of project cost appraisal procedure and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811003687.9A CN109325665A (en) 2018-08-30 2018-08-30 A kind of project cost appraisal procedure and system

Publications (1)

Publication Number Publication Date
CN109325665A true CN109325665A (en) 2019-02-12

Family

ID=65263391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811003687.9A Pending CN109325665A (en) 2018-08-30 2018-08-30 A kind of project cost appraisal procedure and system

Country Status (1)

Country Link
CN (1) CN109325665A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111415205A (en) * 2020-03-26 2020-07-14 倪慧珍 Building engineering cost evaluation system based on big data
CN111429100A (en) * 2020-03-25 2020-07-17 陕西合友网络科技有限公司 Construction project cost system and cost method
CN111950920A (en) * 2020-08-20 2020-11-17 武汉***工程造价咨询管理有限公司 Rapid building cost estimation method and system
CN116862545A (en) * 2023-04-25 2023-10-10 广东源恒软件科技有限公司 Dynamic analysis method and system for engineering cost

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005293527A (en) * 2004-03-31 2005-10-20 Kozo Keikaku Engineering Inc Construction cost management system
CN105225076A (en) * 2015-11-12 2016-01-06 国网宁夏电力公司经济技术研究院 Analysis of prices data Collection & Processing System
CN106021479A (en) * 2016-05-18 2016-10-12 广东源恒软件科技有限公司 Project key index automatic association method and system
CN106910011A (en) * 2017-02-06 2017-06-30 广东华联软件科技有限公司 A kind of Cost Index analysis method and system
US20170308966A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Post-evaluation and risk management and control method of power transmission engineering cost
CN107749027A (en) * 2017-09-18 2018-03-02 广东中标数据科技股份有限公司 A kind of accessory system and its implementation for land value-added tax settlement
CN108256821A (en) * 2017-12-14 2018-07-06 中国航空规划设计研究总院有限公司 A kind of management method of construction project overall process various dimensions cost management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005293527A (en) * 2004-03-31 2005-10-20 Kozo Keikaku Engineering Inc Construction cost management system
CN105225076A (en) * 2015-11-12 2016-01-06 国网宁夏电力公司经济技术研究院 Analysis of prices data Collection & Processing System
US20170308966A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Post-evaluation and risk management and control method of power transmission engineering cost
CN106021479A (en) * 2016-05-18 2016-10-12 广东源恒软件科技有限公司 Project key index automatic association method and system
CN106910011A (en) * 2017-02-06 2017-06-30 广东华联软件科技有限公司 A kind of Cost Index analysis method and system
CN107749027A (en) * 2017-09-18 2018-03-02 广东中标数据科技股份有限公司 A kind of accessory system and its implementation for land value-added tax settlement
CN108256821A (en) * 2017-12-14 2018-07-06 中国航空规划设计研究总院有限公司 A kind of management method of construction project overall process various dimensions cost management system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111429100A (en) * 2020-03-25 2020-07-17 陕西合友网络科技有限公司 Construction project cost system and cost method
CN111415205A (en) * 2020-03-26 2020-07-14 倪慧珍 Building engineering cost evaluation system based on big data
CN111950920A (en) * 2020-08-20 2020-11-17 武汉***工程造价咨询管理有限公司 Rapid building cost estimation method and system
CN116862545A (en) * 2023-04-25 2023-10-10 广东源恒软件科技有限公司 Dynamic analysis method and system for engineering cost

Similar Documents

Publication Publication Date Title
CN109325665A (en) A kind of project cost appraisal procedure and system
CA2643834C (en) Well planning system and method
DE112013007533T5 (en) Three-dimensional borehole visualization
Webb et al. Ecological site‐based assessments of wind and water erosion: Informing accelerated soil erosion management in rangelands
CN107450426A (en) Foundation pit construction deformable statistical analysis method and system
SA109300022B1 (en) Evaluation of Acid Fracturing Treatments in An Oil filed
CN104011564A (en) 4D saturation modeling
Strassberg A geographic data model for groundwater systems
Dang et al. AgasedViz: visualizing groundwater availability of Ogallala Aquifer, USA
Hamman et al. Data management and geotechnical models
US20220027616A1 (en) Systems and methods for reservoir history matching quality assessment and visualization
US20140040375A1 (en) Distributed subscription based notification service for integrated petro-technical application environment
Jani GIS as a tool for modelling groundwater flow
Johnson et al. Mapping the likelihood of flowing artesian conditions in the Okanagan Basin and Fraser Valley, British Columbia
Seipel et al. Role of multiple high-capacity irrigation wells on a surficial sand and gravel aquifer
Rane et al. Integrating Surface and Subsurface Models in an Automated Workflow Process for Asset Performance Analysis in Burgan Digital Oilfield–SEK
Jolk et al. Planning and decision support tools for integrated water resource management on river basin level in South Africa on the example of the middle Olifants sub-Basin
US11727191B2 (en) Process for highlighting text with varied orientation
CN115936640A (en) Non-ferrous metal smelting site environment management information system and method
Azenda et al. BIM for information management in structural safety control of embankment dams
Strassberg et al. Arc hydro groundwater data model and tools: overview and use cases
Akhurst et al. Steps to Achieve Storage Readiness for European Industrial CO2 Source Clusters, for Application to European Storage Sites, ALIGN-CCUS Project
Su et al. Rapid Model Update-Enabling Fast, Structured Dynamic Model Updates Leveraging Automation
DJERF et al. Evaluating the Impact of Uncertainties in Groundwater Modelling A case study of a glaciofluvial deposit investigating the effects of different boundary conditions using multiple numerical models
Alklih et al. Leveraging Data Analytics with Numerical Modeling for Optimizing Oil Field Development and Management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212