CN109322890A - A kind of Fast Installation type expansion bolt - Google Patents
A kind of Fast Installation type expansion bolt Download PDFInfo
- Publication number
- CN109322890A CN109322890A CN201811539906.5A CN201811539906A CN109322890A CN 109322890 A CN109322890 A CN 109322890A CN 201811539906 A CN201811539906 A CN 201811539906A CN 109322890 A CN109322890 A CN 109322890A
- Authority
- CN
- China
- Prior art keywords
- hole
- grooving
- head
- bolt
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 230000000630 rising effect Effects 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000009987 spinning Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B13/00—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
- F16B13/04—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front
- F16B13/06—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve
- F16B13/063—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander
- F16B13/066—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander fastened by extracting a separate expander-part, actuated by the screw, nail or the like
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B39/00—Locking of screws, bolts or nuts
- F16B39/22—Locking of screws, bolts or nuts in which the locking takes place during screwing down or tightening
- F16B39/28—Locking of screws, bolts or nuts in which the locking takes place during screwing down or tightening by special members on, or shape of, the nut or bolt
- F16B39/282—Locking by means of special shape of work-engaging surfaces, e.g. notched or toothed nuts
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Dowels (AREA)
Abstract
The invention discloses a kind of Fast Installation type expansion bolts, including casing and bolt, the bolt includes screw rod and the screw head positioned at screw rod both ends and the head that rises, the head that rises is reverse frustoconic, the outer surface of the head that rises is equipped with the first grooving of several annulars, the first platform is formed between first grooving, the casing includes bottom plate and the sleeve body positioned at bottom base plate, perforation is equipped with through-hole in the bottom plate and sleeve body, the through-hole includes the first rank hole and second-order hole, first rank hole is the threaded hole being adapted with screw rod and diameter is greater than second-order hole, the inner wall in the second-order hole is equipped with the second grooving of annular corresponding with the first grooving, the second platform is formed between second grooving, the lower end of described sleeve pipe ontology is equipped with several third groovings through tube wall for extending to bottom end, one-piece parts are few , install convenient.
Description
[technical field]
The present invention relates to the technical field of expansion bolt, especially a kind of technical field of Fast Installation type expansion bolt.
[background technique]
Expansion bolt is usually to be made of components such as screw rod cylinder, expansion-head, expansion sleeve, nut, washer and gaskets,
Nut external and the built-in expansion bolt of nut can be divided into according to the location of nut.Nut external expansion bolt refers to
Nut is exposed to the form of outside, and turning nut fastens expansion bolt;The built-in expansion bolt of nut refers to that nut (expands
Head) it is buried enter the connectors such as wall or concrete interior form of getting into the cave, the screw head for turning screw rod cylindrical end portions makes expansion bolt
Fastening.Common expansion bolt, part is more, is easily lost, and installation steps are more, more troublesome.
[summary of the invention]
The object of the invention is to solve the problems of the prior art, a kind of Fast Installation type expansion bolt is proposed, it can
It is provided with the bottom plate of spine by the cylindrical sleeve body of hexagonal and in sleeve body, avoids casing with the precession of bolt
It spins in hole, ensure that the tightness of expansion bolt, make casing along second-order hole spreading to make by the precession for the head that rises
The preset holes and internal bolt outside tube top jail are covered, the first platform of the first grooving and the second platform phase of the second grooving are utilized
It supports, prevents bolt from deviating from from the opposite direction in its precession direction, one-piece parts are few, install convenient.
To achieve the above object, described the invention proposes a kind of Fast Installation type expansion bolt, including casing and bolt
Bolt includes screw rod and the screw head positioned at screw rod both ends and the head that rises, and the head that rises is reverse frustoconic, on the outer surface of the head that rises
Equipped with several the first annular groovings, the first platform is formed between first grooving, the casing includes bottom plate and position
In the sleeve body of bottom base plate, perforation is equipped with through-hole in the bottom plate and sleeve body, the through-hole include the first rank hole and
Second-order hole, first rank hole is the threaded hole being adapted with screw rod and diameter is greater than second-order hole, the second-order hole
Inner wall is equipped with the second grooving of annular corresponding with the first grooving, forms the second platform between second grooving, described
The lower end of sleeve body is equipped with several third groovings through tube wall for extending to bottom end.
Preferably, described sleeve pipe ontology is hexagonal cylindricality.
Preferably, the bottom plate and sleeve body is structure as a whole, the outer diameter of the bottom plate is greater than described sleeve pipe
The bottom surface of the outer diameter of ontology, the bottom plate is equipped with several spines around sleeve body.
Preferably, the screw head, screw rod and the head that rises are structure as a whole, the outer diameter of the overhead that rises and screw rod it is straight
Diameter is identical, and the outer diameter of a bottom of rising is slightly larger than the diameter in second-order hole.
Preferably, the start position of the third grooving is lower than the junction in the first rank hole and second-order hole.
Preferably, the screw-in direction phase in the retaining direction of first grooving and the second grooving and bolt sleeve pipe
Instead.
Beneficial effects of the present invention: the present invention is by the cylindrical sleeve body of hexagonal and point is provided in sleeve body
The bottom plate of thorn avoids casing from spinning in hole with the precession of bolt, ensure that the tightness of expansion bolt, passes through the rotation for the head that rises
Into making casing, to make the bolt for covering tube top jail external preset holes and inside, utilize the first grooving along second-order hole spreading
Second platform of the first platform and the second grooving offsets, and prevents bolt from deviating from from the opposite direction in its precession direction, one-piece parts
It is few, install convenient.
Feature and advantage of the invention will be described in detail by embodiment combination attached drawing.
[Detailed description of the invention]
Fig. 1 is a kind of main view of Fast Installation type expansion bolt of the present invention;
Fig. 2 is a kind of main view of the casing of Fast Installation type expansion bolt of the present invention;
Fig. 3 is a kind of top view of the casing of Fast Installation type expansion bolt of the present invention;
Fig. 4 is a kind of main view of the bolt of Fast Installation type expansion bolt of the present invention;
Fig. 5 is the partial enlarged view at the A of Fig. 2;
Fig. 6 is the partial enlarged view at the B of Fig. 4.
In figure: 1- casing, 11- bottom plate, 111- spine, 12- sleeve body, 121- third grooving, 13- through-hole, 131-
Single order hole, 132- second-order hole, the second platform of 1321-, 2- bolt, 21- screw head, 22- screw rod, 23- rise head and 231- first it is flat
Platform.
[specific embodiment]
Refering to fig. 1 to Fig. 6, a kind of Fast Installation type expansion bolt of the present invention, including casing 1 and bolt 2, the bolt 2
Including screw rod 22 and positioned at 22 both ends of screw rod screw head 21 and rise first 23, it is described rise first 23 as reverse frustoconic, it is described to rise first 23
Outer surface is equipped with the first grooving of several annulars, forms the first platform 231, the casing 1 between first grooving
Perforation is equipped with through-hole in sleeve body 12 including bottom plate 11 and positioned at 11 bottom of bottom plate, the bottom plate 11 and sleeve body 12
13, the through-hole 13 includes the first rank hole 131 and second-order hole 132, and first rank hole 131 is the spiral shell being adapted with screw rod 22
Pit and diameter are greater than second-order hole 132, and the inner wall in the second-order hole 132 is equipped with annular corresponding with the first grooving
Second grooving, forms the second platform 1321 between second grooving, and the lower end of described sleeve pipe ontology 12 is equipped with several extensions
To the third grooving 121 through tube wall of bottom end, described sleeve pipe ontology 12 is hexagonal cylindricality, the bottom plate 11 and sleeve body
12 are structure as a whole, and the outer diameter of the bottom plate 11 is greater than the outer diameter of described sleeve pipe ontology 12, and the bottom surface of the bottom plate 11 is surround
Sleeve body 12 be equipped with several spines 111, the screw head 21, screw rod 22 and rising first 23 is structure as a whole, the head that rises
The outer diameter at 23 tops is identical as the diameter of screw rod 22, and the outer diameter of first 23 bottom of rising is slightly larger than the diameter in second-order hole 132, institute
The start position for stating third grooving 121 is lower than the junction in the first rank hole 131 and second-order hole 132, first grooving and the
The retaining direction of two groovings is opposite with the screw-in direction of 2 sleeve pipe 1 of bolt.
The course of work of the present invention:
A kind of Fast Installation type expansion bolt of the present invention during the work time, firstly, by casing 2 to have third grooving
It is then, the through-hole alignment of part to be fixed is preset in the preset holes of 121 one end direction insertion ground directed downwardly or metope
Hole, then be directly inserted into bolt 1 into the through-hole 13 of casing 2 to be equipped with the first 23 one end direction directed downwardly of rising.With bolt 1
Precession, rising first 23 gradually screws in the second-order hole 132 of casing 2 and makes casing 2 along the gradually spreading of third grooving 121.
The present invention passes through the cylindrical sleeve body of hexagonal and the bottom plate that spine is provided in sleeve body, avoids casing
As the precession of bolt is spinned in hole, the tightness of expansion bolt ensure that, make casing along second by the precession for the head that rises
Rank hole spreading is cut to make to cover preset holes and internal bolt outside tube top jail using the first platform and second of the first grooving
Second platform of slot offsets, and prevents bolt from deviating from from the opposite direction in its precession direction, one-piece parts are few, install convenient.
Above-described embodiment is the description of the invention, is not limitation of the invention, after any pair of simple transformation of the present invention
Scheme all belong to the scope of protection of the present invention.
Claims (6)
1. a kind of Fast Installation type expansion bolt, it is characterised in that: including casing (1) and bolt (2), the bolt (2) includes
Screw rod (22) and the screw head (21) and the head that rises (23) for being located at screw rod (22) both ends, the head that rises (23) is reverse frustoconic, described to rise
The outer surface of head (23) is equipped with the first grooving of several annulars, forms the first platform (231), institute between first grooving
The casing (1) stated includes bottom plate (11) and the sleeve body (12) for being located at bottom plate (11) bottom, the bottom plate (11) and casing sheet
Perforation is equipped with through-hole (13) in body (12), and the through-hole (13) includes the first rank hole (131) and second-order hole (132), and described the
Single order hole (131) is the threaded hole being adapted with screw rod (22) and diameter is greater than second-order hole (132), the second-order hole
(132) inner wall is equipped with the second grooving of annular corresponding with the first grooving, and it is flat to form second between second grooving
Platform (1321), the lower end of described sleeve pipe ontology (12) are equipped with several third groovings (121) through tube wall for extending to bottom end.
2. a kind of Fast Installation type expansion bolt as described in claim 1, it is characterised in that: described sleeve pipe ontology (12) is six
Corner post shape.
3. a kind of Fast Installation type expansion bolt as described in claim 1, it is characterised in that: the bottom plate (11) and casing
Ontology (12) is structure as a whole, and the outer diameter of the bottom plate (11) is greater than the outer diameter of described sleeve pipe ontology (12), the bottom plate
(11) bottom surface is equipped with several spines (111) around sleeve body (12).
4. a kind of Fast Installation type expansion bolt as described in claim 1, it is characterised in that: the screw head (21), screw rod
(22) it is structure as a whole with the head that rises (23), the outer diameter at the top of the head that rises (23) is identical as the diameter of screw rod (22), the head that rises
(23) outer diameter of bottom is slightly larger than the diameter of second-order hole (132).
5. a kind of Fast Installation type expansion bolt as described in claim 1, it is characterised in that: the third grooving (121)
Start position is lower than the junction in the first rank hole (131) and second-order hole (132).
6. a kind of Fast Installation type expansion bolt as described in claim 1, it is characterised in that: first grooving and second is cut
The retaining direction of slot is opposite with the screw-in direction of bolt (2) sleeve pipe (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811539906.5A CN109322890B (en) | 2018-12-17 | 2018-12-17 | Quick installation type expansion bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811539906.5A CN109322890B (en) | 2018-12-17 | 2018-12-17 | Quick installation type expansion bolt |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109322890A true CN109322890A (en) | 2019-02-12 |
CN109322890B CN109322890B (en) | 2023-08-25 |
Family
ID=65256968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811539906.5A Active CN109322890B (en) | 2018-12-17 | 2018-12-17 | Quick installation type expansion bolt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109322890B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2231729Y (en) * | 1995-12-13 | 1996-07-24 | 林仙富 | Internal thread expansive bolt |
CN2639603Y (en) * | 2003-07-08 | 2004-09-08 | 马志龙 | Large force expansion tube bolt |
JP2004332848A (en) * | 2003-05-08 | 2004-11-25 | Koyo Kizai Kk | Blind bolt |
CN101975211A (en) * | 2010-10-12 | 2011-02-16 | 魏民 | Pin shaft assembly |
JP2016223116A (en) * | 2015-05-28 | 2016-12-28 | Fsテクニカル株式会社 | Hole-in anchor, and installation method thereof |
CN207848139U (en) * | 2017-12-13 | 2018-09-11 | 苏州茂隆电梯配件有限公司 | A kind of hollow anchor bolt |
CN209398694U (en) * | 2018-12-17 | 2019-09-17 | 嘉兴钰丰汽车零部件有限公司 | A kind of Fast Installation type expansion bolt |
-
2018
- 2018-12-17 CN CN201811539906.5A patent/CN109322890B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2231729Y (en) * | 1995-12-13 | 1996-07-24 | 林仙富 | Internal thread expansive bolt |
JP2004332848A (en) * | 2003-05-08 | 2004-11-25 | Koyo Kizai Kk | Blind bolt |
CN2639603Y (en) * | 2003-07-08 | 2004-09-08 | 马志龙 | Large force expansion tube bolt |
CN101975211A (en) * | 2010-10-12 | 2011-02-16 | 魏民 | Pin shaft assembly |
JP2016223116A (en) * | 2015-05-28 | 2016-12-28 | Fsテクニカル株式会社 | Hole-in anchor, and installation method thereof |
CN207848139U (en) * | 2017-12-13 | 2018-09-11 | 苏州茂隆电梯配件有限公司 | A kind of hollow anchor bolt |
CN209398694U (en) * | 2018-12-17 | 2019-09-17 | 嘉兴钰丰汽车零部件有限公司 | A kind of Fast Installation type expansion bolt |
Also Published As
Publication number | Publication date |
---|---|
CN109322890B (en) | 2023-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3003149A (en) | Replacement antenna | |
CN106246675B (en) | Expansion bolt with stability | |
CN110965652B (en) | Assembled building primary and secondary roof beam steel connected node structure | |
CN209398694U (en) | A kind of Fast Installation type expansion bolt | |
CN209398692U (en) | A kind of dropproof expansion bolt of pattern pressing type | |
CN109322890A (en) | A kind of Fast Installation type expansion bolt | |
CN204635927U (en) | Fixed base of shower curtain rod | |
CN107654475A (en) | Stop nut and locking fastening assembly | |
CN105927642A (en) | Foundation expanding nut assembly | |
CN204756658U (en) | Coiling lamp | |
CN104060778B (en) | Downpipe mounting structure | |
CN105804381B (en) | The tool temporary support of prefabricated assembled air-conditioning plate | |
CN209398695U (en) | A kind of anti-transfer expansion bolt of gasket-type | |
CN202023808U (en) | Internally-mounted bolt type expansion screw | |
CN105781127B (en) | Twisting type dry wall installs vertical adjustment diagonal brace | |
CN207296272U (en) | Pre-embedded bolt device | |
CN201416737Y (en) | Installation column of household flat-plate television set | |
JPH0240355Y2 (en) | ||
CN204590466U (en) | A kind of combined water proof railing | |
CN204487451U (en) | Quick doornail driver-extractor | |
CN206386364U (en) | Segmented screw rod | |
KR20210046877A (en) | Insulated Anchor Support with Drill Attatched by Magnets and Anchor Bolt Structure using It | |
CN109340234B (en) | Embossing type anti-drop expansion bolt | |
CN205078578U (en) | Oiling bolt | |
KR102460931B1 (en) | Precast-concrete structure fixed full thread bolt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 314300 Qinshan Street Industrial Park, Haiyan County, Jiaxing City, Zhejiang Province Applicant after: Jiaxing Yufeng Auto Parts Co.,Ltd. Address before: 314300 Qinshan Street Industrial Park, Haiyan County, Jiaxing City, Zhejiang Province Applicant before: JIAXING YUFENG CAR PARTS Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |