CN109322319A - 混凝土预制桩与桩基承台的连接机构 - Google Patents

混凝土预制桩与桩基承台的连接机构 Download PDF

Info

Publication number
CN109322319A
CN109322319A CN201811329464.1A CN201811329464A CN109322319A CN 109322319 A CN109322319 A CN 109322319A CN 201811329464 A CN201811329464 A CN 201811329464A CN 109322319 A CN109322319 A CN 109322319A
Authority
CN
China
Prior art keywords
pile
end plate
support table
foundation support
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811329464.1A
Other languages
English (en)
Inventor
章朝根
申洋
穆保岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longxing Construction Engineering Co Ltd
Original Assignee
Jiangsu Longxing Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Longxing Construction Engineering Co Ltd filed Critical Jiangsu Longxing Construction Engineering Co Ltd
Priority to CN201811329464.1A priority Critical patent/CN109322319A/zh
Publication of CN109322319A publication Critical patent/CN109322319A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种混凝土预制桩与桩基承台的连接机构,包括端板,所述端板设在预制桩顶部,所述端板上设置有锚筋孔,所述端板一侧连接有套筒,所述套筒内壁设置有螺纹,所述预制桩的空心部分设置有钢筋笼。本发明与桩基承台连接稳定,操作方便,有效防止填芯被拔出,套筒直接焊接在端板上桩芯一侧,受力合理,操作简单,不需要重制端板模具,仅需在预制桩端板上开设数个锚筋孔。

Description

混凝土预制桩与桩基承台的连接机构
技术领域
本发明涉及建筑工程桩,具体涉及一种混凝土预制桩与桩基承台的连接机构。
背景技术
混凝土预制空心桩在实际工程中作为抗拔桩应用越来越广泛,但预制桩与承台的连接仍有问题存在。现施工多采用混凝土填芯,通过填芯混凝土将承台所受浮力传递到混凝土预制桩上。但由于现场施工环境等因素,导致混凝土填芯质量难以保证,存在填芯被拔出的危险。
此外,预制桩与承台的连接还有使用套筒同时连接预制桩主筋和承台锚固筋的方法,该方法将预制桩主筋设在套筒中,不利于对预应力混凝土预制桩施加预应力。且预制桩制桩过程中,由于主筋较长,将主筋设在套筒中的施工较困难。
发明内容
发明目的:本发明的目的是提供一种混凝土预制桩与桩基承台的连接机构,解决现有预制桩与桩基承台连接不便,容易造成填芯被拔出,施工困难的问题。
技术方案:本发明所述的混凝土预制桩与桩基承台的连接机构,包括端板,所述端板设在预制桩顶部,所述端板上设置有锚筋孔和主筋孔,所述端板一侧连接有套筒,所述套筒内壁设置有螺纹,所述预制桩空心部分设置有钢筋笼。
有效降低填芯混凝土被拔出的风险,所述套筒螺旋连接有锚固钢筋,所述锚固钢筋穿过锚筋孔与桩基承台连接。
方便传递上拔力和施工,所述钢筋笼包括填芯主筋、填芯箍筋和填芯底板,所述填芯主筋竖直设置在填芯底板上,所述填芯箍筋横向设置在填芯主筋之间。所述钢筋笼内浇筑有混凝土填芯。
为了将上部结构上拔力传递给混凝土填芯,所述填芯主筋一端伸出预制桩锚固于桩基承台中。
为了操作简单方便,所述套筒对准锚筋孔焊接在端板靠桩身一侧。
有益效果:本发明与桩基承台连接稳定,操作方便,有效防止填芯被拔出,套筒直接焊接在端板上桩芯一侧,受力合理,操作简单,不需要重制端板模具,仅需在预制桩端板上开设数个锚筋孔。
附图说明
图1为连接结构示意图;
图2为方形端板示意图;
图3为圆形端板示意图;
图4为钢筋套筒剖面图。
具体实施方式
下面结合附图对本发明进行进一步说明。
如图1-4所示,混凝土预制桩与桩基承台的连接机构包括混凝土预制空心桩1,混凝土预制空心桩1顶部设有端板3,端板3在桩芯一侧焊接有套筒4,端板3上开有锚筋孔31和主筋孔32,桩基承台2中预埋锚固钢筋5,锚固钢筋5穿过锚筋孔31与套筒4螺旋连接,混凝土预制空心桩1的空心部分设置有钢筋笼6并浇筑混凝土填芯7,钢筋笼6包括填芯主筋61、填芯箍筋62和填芯底板63。其中,套筒内壁为螺纹结构,锚固钢筋为螺纹钢筋。
在使用本发明时,首先,在端板预开锚筋孔并在端板的桩芯一侧焊接套筒,当桩基施工完成后,将包括填芯底板的钢筋笼置入空心桩空心部分处,再向空心桩空心部分浇筑填芯混凝土,在填芯混凝土强度提升时间内,将与桩基承台连接用的锚固钢筋连接到混凝土预制桩端板上预埋的套筒内,以实现部分承台钢筋与预制桩的连接,待填芯混凝土达到一定强度后,浇筑桩基承台,最终实现混凝土预制桩与桩基承台的连接。

Claims (5)

1.一种混凝土预制桩与桩基承台的连接机构,其特征在于,包括端板(3),所述端板(3)设在预制桩(1)顶部,所述端板(3)上设置有锚筋孔(31)和主筋孔(32),所述端板(3)一侧连接有套筒(4),所述套筒(4)内壁设置有螺纹,所述预制桩(1)空心部分设置有钢筋笼(6)。
2.根据权利要求1所述的混凝土预制桩与桩基承台的连接机构,其特征在于,所述套筒(4)螺旋连接有锚固钢筋(5),所述锚固钢筋(5)穿过锚筋孔(31)与桩基承台(2)连接。
3.根据权利要求1所述的混凝土预制桩与桩基承台的连接机构,其特征在于,所述钢筋笼(6)包括填芯主筋(61)、填芯箍筋(62)和填芯底板(63),所述填芯主筋(61)竖直设置在填芯底板(63)上,所述填芯箍筋(62)横向设置在填芯主筋(61)之间,所述钢筋笼(6)内浇筑有填芯混凝土(7)。
4.根据权利要求3所述的混凝土预制桩与桩基承台的连接机构,其特征在于,所述填芯主筋(61)一端伸出预制桩(1)锚固于桩基承台(2)中。
5.根据权利要求1所述的混凝土预制桩与桩基承台的连接机构,其特征在于,所述套筒(4)对准锚筋孔(31)焊接在端板(3)靠桩身一侧。
CN201811329464.1A 2018-11-08 2018-11-08 混凝土预制桩与桩基承台的连接机构 Pending CN109322319A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811329464.1A CN109322319A (zh) 2018-11-08 2018-11-08 混凝土预制桩与桩基承台的连接机构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811329464.1A CN109322319A (zh) 2018-11-08 2018-11-08 混凝土预制桩与桩基承台的连接机构

Publications (1)

Publication Number Publication Date
CN109322319A true CN109322319A (zh) 2019-02-12

Family

ID=65261036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811329464.1A Pending CN109322319A (zh) 2018-11-08 2018-11-08 混凝土预制桩与桩基承台的连接机构

Country Status (1)

Country Link
CN (1) CN109322319A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158484A (zh) * 2019-07-03 2019-08-23 中铁上海工程局集团有限公司 一种高速铁路装配式桥梁预制拼装结构及施工方法
CN114657975A (zh) * 2021-11-05 2022-06-24 俞敏芳 一种预制桩镦头锚固筋连接装置
CN114775349A (zh) * 2022-03-23 2022-07-22 中铁七局集团第二工程有限公司 一种预制uhpc管约束混凝土顶置路基桩板结构及施工工艺
CN115404900A (zh) * 2022-10-14 2022-11-29 国网河南省电力公司经济技术研究院 一种输电线路的杆塔桩基础及其施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013253378A (ja) * 2012-06-05 2013-12-19 Toyo Asano Found Co Ltd 杭頭部空間形成補助具、それを備えた中空既製杭、該中空既製杭を用いた杭頭処理方法と杭頭部空間の形成方法
CN103590414A (zh) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 一种混凝土管桩与承台的连接结构
CN203701125U (zh) * 2014-01-24 2014-07-09 陈家冬 一种预制桩与承台的连接结构及其送桩器
CN204112354U (zh) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 混凝土预制桩与桩基承台的连接结构
CN105464073A (zh) * 2015-12-25 2016-04-06 苏州汤始建华管桩有限公司 一种增强型实心预制桩结构及其与基础连接固定方法
CN205475298U (zh) * 2016-01-28 2016-08-17 建华建材投资有限公司 一种用于光伏工程的预制混凝土柱
JP2017095888A (ja) * 2015-11-19 2017-06-01 大成建設株式会社 鋼製柱と杭の接合部構造
CN207194000U (zh) * 2017-09-14 2018-04-06 国家电网公司 一种输电线路预制管桩承台锚固装置
CN209243750U (zh) * 2018-11-08 2019-08-13 江苏隆兴建设工程有限公司 混凝土预制桩与桩基承台的连接机构

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013253378A (ja) * 2012-06-05 2013-12-19 Toyo Asano Found Co Ltd 杭頭部空間形成補助具、それを備えた中空既製杭、該中空既製杭を用いた杭頭処理方法と杭頭部空間の形成方法
CN103590414A (zh) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 一种混凝土管桩与承台的连接结构
CN204112354U (zh) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 混凝土预制桩与桩基承台的连接结构
CN203701125U (zh) * 2014-01-24 2014-07-09 陈家冬 一种预制桩与承台的连接结构及其送桩器
JP2017095888A (ja) * 2015-11-19 2017-06-01 大成建設株式会社 鋼製柱と杭の接合部構造
CN105464073A (zh) * 2015-12-25 2016-04-06 苏州汤始建华管桩有限公司 一种增强型实心预制桩结构及其与基础连接固定方法
CN205475298U (zh) * 2016-01-28 2016-08-17 建华建材投资有限公司 一种用于光伏工程的预制混凝土柱
CN207194000U (zh) * 2017-09-14 2018-04-06 国家电网公司 一种输电线路预制管桩承台锚固装置
CN209243750U (zh) * 2018-11-08 2019-08-13 江苏隆兴建设工程有限公司 混凝土预制桩与桩基承台的连接机构

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158484A (zh) * 2019-07-03 2019-08-23 中铁上海工程局集团有限公司 一种高速铁路装配式桥梁预制拼装结构及施工方法
CN114657975A (zh) * 2021-11-05 2022-06-24 俞敏芳 一种预制桩镦头锚固筋连接装置
CN114775349A (zh) * 2022-03-23 2022-07-22 中铁七局集团第二工程有限公司 一种预制uhpc管约束混凝土顶置路基桩板结构及施工工艺
CN115404900A (zh) * 2022-10-14 2022-11-29 国网河南省电力公司经济技术研究院 一种输电线路的杆塔桩基础及其施工方法

Similar Documents

Publication Publication Date Title
CN109322319A (zh) 混凝土预制桩与桩基承台的连接机构
CN105113389B (zh) 装配式钢‑混凝土组合结构桥墩柱构件
CN107905363B (zh) 一种基于耗能与抗剪的全装配式砼节点连接器及连接方法
CN205894313U (zh) 一种全预制装配式钢管约束框架节点
CN203569582U (zh) 一种混凝土管桩与承台的连接结构
CN106284655A (zh) 预制混凝土梁柱栓接连接节点及连接方法
CN103590414A (zh) 一种混凝土管桩与承台的连接结构
CN108678218A (zh) 基于多用途薄壁钢管的装配式混凝土剪力墙及其建造方法
CN209243750U (zh) 混凝土预制桩与桩基承台的连接机构
CN109208825A (zh) 一种便于对接和灌浆的装配式建筑结构
CN208701729U (zh) 一种采用预制承台的海上风电高桩承台基础
CN208136903U (zh) 一种预制预应力式地下连续墙
CN206844315U (zh) 一种装配式混凝土框架空心柱节点构造
CN210151599U (zh) 一种空心板梁
CN203701125U (zh) 一种预制桩与承台的连接结构及其送桩器
CN108060789A (zh) 一种既有砌体结构隔震加固的墙体托换方法
CN108316513A (zh) 一种快速施工装配式剪力墙结构及其施工方法
CN205531016U (zh) 一种预制混凝土柱构件及连接节点
CN208121795U (zh) 一种架空输电线路phc管桩基础基桩与承台的连接结构
CN209114733U (zh) 一种便于对接和灌浆的装配式建筑结构
CN105951987A (zh) 次框架外置永久性铝板外模后浇节点及施工方法
CN211974074U (zh) 一种新型预制剪力墙竖向钢筋连接结构
CN213952209U (zh) 一种psb精轧螺纹钢管桩预应力抗浮桩结构
CN107724384A (zh) 一种桩与桩连接结构及其施工方法
CN209670191U (zh) 装配式预制柱的连接结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination