CN109296191A - A kind of automatic climbing platform for head tower construction - Google Patents
A kind of automatic climbing platform for head tower construction Download PDFInfo
- Publication number
- CN109296191A CN109296191A CN201811126721.1A CN201811126721A CN109296191A CN 109296191 A CN109296191 A CN 109296191A CN 201811126721 A CN201811126721 A CN 201811126721A CN 109296191 A CN109296191 A CN 109296191A
- Authority
- CN
- China
- Prior art keywords
- bracket
- climbs
- support
- load
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G2005/008—Hoisting devices specially adapted as part of a scaffold system
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a kind of automatic climbing platforms for head tower construction, load truss is fixed on head tower operation platform climbing device, head tower operation platform climbing device includes for the fixed bracket that climbs of head tower operation platform installation, can drive the jacking apparatus and the load-bearing support for being securable to construct in steel tower segment that bracket climbs that climb, jacking apparatus is removably fixed on load-bearing support, be connected on the bracket that climbs fixed with jacking apparatus, can be along the jacking apparatus lifting system that the bracket that climbs moves up and down.With the installation foundation that bracket is artificial operation platform that climbs, bracket movement is climbed by jacking apparatus driving to realize climbing for artificial construction's platform, promotion to jacking apparatus after the bracket that climbs climbs is realized by jacking apparatus lifting system again, it prepares for platform lifting next time, the platform lifting operation being gradually completing in entire head tower work progress, manual operation platform is scalable simultaneously, avoids artificial dismantlement work repeatedly, reduces manual labor amount.
Description
Technical field
The present invention relates to head tower technical field of construction equipment, flat in particular to a kind of automatic climbing for head tower construction
Platform.
Background technique
Head tower construction is conventional to carry out applying for standard segment based on one-shot job platform using setting up bracket or install
Work.When head tower standard section assembling is carried out in a manner of bracket to set up, need to put into ultra-large type mechanical equipment, qualified installation person and
A large amount of construction steel etc., not only involve great expense, and effect is very low, live working security is poor.One-shot job platform is installed
When being constructed, needs to carry out constantly peace by lifting equipment and tear profession open, effect is lower, and practicability is not also strong, and high-altitude
Wind resistance is also very poor.
Summary of the invention
The purpose of the present invention is to solve the deficiency of the above background technology, provides one kind without peace repeatedly and tears construction operation open
Platform, the automatic climbing platform for head tower construction that automatic climbing can be achieved.
In order to achieve this, the automatic climbing platform designed by the present invention for head tower construction, including head tower construction are flat
Platform, the head tower operation platform include load truss and the artificial mobile holder that is fixed on the load truss, and feature exists
In: the load truss is fixed on head tower operation platform climbing device, the head tower operation platform climbing device include for
The fixed bracket that climbs of head tower operation platform installation can drive the jacking apparatus and be securable to apply that bracket climbs that climb
Load-bearing support in work steel tower segment, the jacking apparatus are removably fixed on the load-bearing support, are connected on the bracket that climbs
Be connected to fixed with jacking apparatus, can be along the jacking apparatus lifting system that the bracket that climbs moves up and down.
Further, the artificial mobile holder is that can stretch to the inner or outer side of the steel tower segment of having constructed is mobile
Bracket comprising be fixed on fixed platform on the load truss and can be relative to the sliding branch of the fixed bracket slide
Frame, the fixed bracket are equipped with sliding rail, and the bottom of the sliding support is fixedly connected with the extensible canopy with sliding rail cooperation,
The extensible canopy is set in the sliding rail, can be fixed by pin shaft between the sliding rail and the extensible canopy.
Further, the bracket that climbs is equipped with guide plate close to the side of the load-bearing support, on the load-bearing support
It is provided with the guide groove to climb with the bracket stable that climbs described in guide plate cooperation, auxiliary.
Further, being hingedly connected at the top of the bracket that climbs can assist the guide plate to enter the guide groove
Interior guide type shoe, the guide type shoe include two blocks of guiding side plates and the fixed company being articulated and connected in the cradle top that climbs
It is connected between two pieces of guiding side plate, the auxiliary guide plate with guide groove cooperation.
Further, the guide plate in face of the load-bearing support a side surface and the load-bearing support between be equipped with can
The guide plate is positioned at the locking positioning device in the load-bearing support.
Further, the locking positioning device includes one for being fixedly connected on the guide plate and facing the load-bearing support
On side surface, the support hook that Open Side Down, the support hook is set in the load-bearing support, the support hook and institute
It states and is fixedly connected by bearing pin with split pin between load-bearing support, the bearing pin is set to opening for the support hook
In mouthful;The locking pin shaft that the support hook moves upwards can be limited by being equipped with above the bearing pin, and the locking pin shaft can
Disassembly is fixed on the load-bearing support.
Preferably, the jacking apparatus is jack-up hydraulic ram, and the housing bottom of the jack-up hydraulic ram is detachably solid
Fixed (such as pin shaft is fixed) on the load-bearing support, between the piston rod part of the jack-up hydraulic ram and the bracket that climbs
It is fixedly connected by jacking bearing structure.
Further, the jacking bearing structure includes being fixedly connected on described to climb bracket close to the load-bearing support
On one side surface, the support hook that Open Side Down and the jacking bearing fixed with the piston rod, the jacking bearing with it is described
It is fixed between support hook by jacking pin shaft and split pin, the jacking pin shaft is set in the opening of the support hook.
Further, the bracket that climbs is equipped with far from its axial direction of a lateral edge of the load-bearing support promotes track,
The jacking apparatus lifting system includes lifting bracket, and the lifting bracket is equipped with to be rolled with the promotion of the promotion track cooperation
Wheel, the jacking apparatus are fixed on the lifting bracket.
Further, it is described climb bracket far from the load-bearing support side be equipped with can be with the head tower operation platform
Fixed stage+module support;Catching device is connected at the top of the bracket that climbs;The bottom of the bracket that climbs is connected with auxiliary
The lower support for helping the bracket stable that climbs to climb, the lower support include being fixed on climb bracket lower part, axis and the institute
State the vertical support rod of axis for the bracket that climbs and be connected to the support rod close to the steel tower segment of having constructed one end, can edge
The back-up roller wheel of the surface scrolls of the steel tower segment of having constructed.
The beneficial effects of the present invention are: the present invention passes through jacking with the installation foundation that bracket is artificial operation platform that climbs
Device driving climbs bracket movement to realize climbing for artificial construction's platform, then is climbed by the realization of jacking apparatus lifting system
Promotion to jacking apparatus after bracket climbs prepares for platform lifting next time, is gradually completing entire head tower work progress
In platform lifting operation, while manual operation platform is scalable, avoids artificial dismantlement work repeatedly, reduces artificial labor
Momentum.Track and operation platform can realize synchronize climb, reduce operating procedure, reduce the overall weight of climbing device, apply
The work period is short, and construction efficiency is high.
Detailed description of the invention
Fig. 1 is automatic climbing stage+module in the present invention in the main view in steel tower segment of having constructed;
Fig. 2 is automatic climbing stage+module in the present invention in the top view in steel tower segment of having constructed;
Fig. 3 is the top view of artificial mobile holder in the present invention;
Fig. 4 is the main view of artificial mobile holder in the present invention;
Fig. 5 is the left view of artificial mobile holder in the present invention;
Fig. 6 is that climbing device is installed on the main view constructed in steel tower segment in the present invention;
Fig. 7 is the main view that guide plate and load-bearing support are fixed in the present invention;
Fig. 8 is the cross-sectional view of A-A in Fig. 7;
Fig. 9 is the bracket main view fixed with jacking bearing that climb in the present invention;
Figure 10 is the cross-sectional view of B-B in Fig. 9;
Figure 11 is the main view of jacking apparatus lifting system in the present invention;
Figure 12 is the bottom view of jacking apparatus lifting system in the present invention;
Figure 13 is the main view of bracket of climbing in the present invention;
Figure 14 is the main view of guide type shoe in the present invention;
Figure 15 is the work step figure one of automatic climbing platform in the present invention;
Figure 16 is the work step figure two of automatic climbing platform in the present invention;
Figure 17 is the work step figure three of automatic climbing platform in the present invention;
Wherein, 1- climbs bracket, and 2- has constructed steel tower segment, 3- load-bearing support, 4- guide plate, 5- guide groove, 6- guiding branch
Seat (6.1- is oriented to side plate, and 6.2- assists guide plate), 7- support hook, 8- bearing pin, 9- split pin, 10- lock pin shaft,
11- jack-up hydraulic ram, 12- piston rod, 13- embedded anchor bar, 14- jacking bearing, 15- jack pin shaft, and 16- promotes track, 17-
Lifting bracket, 18- elevator wheel, 19- stage+module support, 20- catching device, 21- support rod, 22- back-up roller wheel, 23- oil cylinder
Fixed link, 24- oil cylinder hold-down support, 25- load truss, the artificial mobile holder of 26- (the fixed bracket of 26.1-, 26.2- sliding branch
Frame), 27- sliding rail, 28- extensible canopy, the artificial aisle 29-, 30- safety barrier, 31- safety guard net, 32- manhole, 33- ladder, 34-
Control system, 35- connecting plate.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
Automatic climbing platform for head tower construction as shown in Figs. 1-2, including head tower operation platform, head tower operation platform
Including load truss 25 and the artificial mobile holder 26 being fixed on load truss 25, artificial mobile holder 26 is equipped with manually to walk
The structures such as road 29, safety barrier 30, safety guard net 31, manhole 32, ladder 33 and control system 34.Load truss 25 is fixed on steel
On tower operation platform climbing device, head tower operation platform climbing device includes the climb branch fixed for the installation of head tower operation platform
Frame 1 can drive the jacking apparatus and the load-bearing support 3 for being securable to construct in steel tower segment 2 that bracket 1 climbs that climb, and jack liquid
Compressing cylinder is removably fixed on load-bearing support 3 by pin shaft, be connected on the bracket 1 that climbs fixed with jacking apparatus, can be along climbing
The jacking apparatus lifting system that ascending branch frame 1 moves up and down.
As in Figure 3-5, artificial mobile holder 26 is the flexible branch that can be moved to the inner or outer side for steel tower segment 2 of having constructed
Frame comprising the fixed platform 26.1 being fixed on load truss 25 and the sliding support that can be slided relative to fixed bracket 26.1
26.2, fixed bracket 26.1 is equipped with sliding rail 27, and the bottom of sliding support 26.2 is fixedly connected with by connecting plate 35 and sliding rail
The extensible canopy 28 of 27 cooperations, extensible canopy 28 are set in sliding rail 27, can be fixed by pin shaft between sliding rail 27 and extensible canopy 28.
The climbing device of head tower operation platform as shown in Fig. 6-14, including being climbed for the installation of head tower operation platform is fixed
Ascending branch frame 1 drives the jack-up hydraulic ram 11 and be fixed on the load-bearing support 3 constructed in steel tower segment 2 that bracket 1 climbs that climb,
Jack-up hydraulic ram 11 is removably fixed on load-bearing support 3 by pin shaft, is connected on the bracket 1 that climbs and jack-up hydraulic ram
The jacking apparatus lifting system that bracket 1 moves up and down that 11 is fixed, edge is climbed.The bracket 1 that climbs is equipped with far from the side of load-bearing support 3
The stage+module support 19 that can be fixed with head tower operation platform, load truss 24 are fixed on stage+module support 19;It climbs branch
The top of frame 1 is connected with catching device 20, and bottom is connected with lower support, lower support include be fixed on 1 lower part of bracket of climbing, axis with
Climb bracket 1 the vertical support rod 21 of axis and be connected to support rod 21 close to steel tower segment 2 of having constructed one end, can be along having applied
The back-up roller wheel 22 of the surface scrolls of work steel tower segment 2.Lower support auxiliary climbs bracket 1 in the surface temperature of steel tower segment 2 of having constructed
It climbs.
As Figure 7-8, the bracket 1 that climbs close to the side of load-bearing support 3 is equipped with guide plate 4, be provided on load-bearing support 3 with
The cooperation of guide plate 4 assists the stable guide groove 5 to climb of bracket 1 that climbs.As illustrated in figs. 13-14, climb bracket 1 top it is hinged
It is connected with the guide type shoe 6 that guide plate 4 can be assisted to enter in guide groove 5, guide type shoe 6 includes articulated connection in the bracket 1 that climbs
Two blocks of guiding side plates 6.1 at top and the auxiliary guiding for being fixedly connected between two blocks of guiding side plates 6.1, cooperating with guide groove 5
Plate 6.2.Rotary steering support 6 makes that guide plate 6.2 is assisted to enter in guide groove 5, to facilitate the guide plate 4 for the bracket 1 that climbs to enter
Guide groove 5.
As Figure 7-8, guide plate 4 is equipped between a side surface and load-bearing support 3 for load-bearing support 3 and can will be oriented to
Plate 4 is positioned at the locking positioning device in load-bearing support 3.Locking positioning device includes being fixedly connected on guide plate 4 in face of load-bearing
On one side surface of support 3, the support hook 7 that Open Side Down, and above bearing pin 8, can to limit support hook 7 upward
The locking pin shaft 10 of movement, locking pin shaft 10 are removably fixed on load-bearing support 3.Support hook 7 is set to load-bearing support 3
It is interior, it is fixedly connected between support hook 7 and load-bearing support 3 by bearing pin 8 and split pin 9, bearing pin 8 is set to support
In the opening of hook 7.
As shown in figs. 9-10, the housing bottom of jack-up hydraulic ram 11, jack-up hydraulic ram 11 is removably fixed in load-bearing
On support 3,12 top of piston rod of jack-up hydraulic ram 11 is fixedly connected between the bracket 1 that climbs by jacking bearing structure.
Jacking bearing structure includes being fixedly connected on to climb bracket 1 on a side surface of load-bearing support 3, the branch support that Open Side Down
Hook 7 and the jacking bearing 14 fixed with piston rod 12, pass through jacking pin shaft 15 and opening between jacking bearing 14 and support hook 7
Pin 9 is fixed, and jacking pin shaft 15 is set in the opening of support hook 7.
As depicted in figs. 11-12, the bracket 1 that climbs is equipped with far from its axial direction of a lateral edge of load-bearing support 3 promotes track 16,
Jacking apparatus lifting system includes lifting bracket 17, and lifting bracket 17 is equipped with the elevator wheel 18 cooperated with promotion track 16,
Jacking apparatus is fixed on lifting bracket 17.The two sides of the bottom for promoting track 16 are spherical shape, and elevator wheel 18 includes and lifting rail
The idler wheel that 16 two sides of the bottom spherical shape of road cooperates and the idler wheel with the surface engagement of two sides promotion track 16, the structure of three idler wheels are protected
It has demonstrate,proved lifting bracket 17 and has promoted the cooperation of track 16.The front and rear housings of jack-up hydraulic ram 11 is individually fixed in oil cylinder fixed link
It on 23, is fixedly connected between oil cylinder fixed link 23 and oil cylinder hold-down support 24 by pin shaft, thus adjustable jack-up hydraulic ram
23 vertical position, it is ensured that jack-up hydraulic ram 23 stablizes the jacking for the bracket 1 that climbs.
As seen in figs. 15-17, load truss 25 is installed on flat the course of work of automatic climbing platform designed by the present invention
On platform erection support 19, with climbing, bracket 1 climbs.Release the limitation of locking pin shaft 10 and bearing pin 8 to the bracket 1 that climbs, top
It rises hydraulic cylinder 11 and drives jacking bearing 14, the bracket 1 that climbs is driven to climb upwards, when the bracket 1 that climbs rises to next segment,
Locked by the load-bearing support 3 of the next segment bracket 1 that will climb, remove at this time jack-up hydraulic ram 11 and load-bearing support 3 and
Connection between jack-up hydraulic ram 11 and jacking bearing 14, lifting bracket 17 are moved along track 16 is promoted, and drive jacking hydraulic
Oil cylinder 11 is fixed to the load-bearing support 3 of next segment and next segment, and piston rod 12 and jacking bearing 14 and the bracket 1 that climbs are connected
It connects.When the bracket 1 that climbs rises to next segment position, the bracket 1 that will climb of catching device 20 lock onto and has constructed in steel tower segment 2, uses
In the second protection of whole system, prevent from falling;Load-bearing support 3, in high tower surface, is used for by 13 systematic anchorage of embedded anchor bar
Platform construction is connect with carrying effect when climbing, jacking bearing 14 with jack-up hydraulic ram 11 and promotion track 16, passes through top
Rising hydraulic cylinder 11 drives jacking bearing 14 to realize climbing for the bracket 1 that climbs.Load-bearing support 3 can be torn open after the bracket 1 that climbs climbs
It removes, Reusability, utilization efficiency is high, at low cost.
The above described is only a preferred embodiment of the present invention, not being done in any form to structure of the invention
Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention,
In the range of still falling within technical solution of the present invention.
Claims (10)
1. a kind of automatic climbing platform for head tower construction, including head tower operation platform, the head tower operation platform includes holding
The artificial mobile holder (26) for carrying truss (25) and being fixed on the load truss (25), it is characterised in that: the carrying purlin
Frame (25) is fixed on head tower operation platform climbing device, and the head tower operation platform climbing device includes flat for head tower construction
The fixed bracket that climbs (1) of platform installation can drive the jacking apparatus and be securable to construction steel that bracket (1) climbs that climb
Load-bearing support (3) in tower section (2), the jacking apparatus are removably fixed on the load-bearing support (3), the bracket that climbs
(1) be connected on fixed with jacking apparatus, can be along the jacking apparatus lifting system that the bracket that climbs (1) moves up and down.
2. the automatic climbing platform for head tower construction as described in claim 1, it is characterised in that: the artificial mobile holder
(26) being can be to the telescope support of the inner or outer side of the steel tower segment of having constructed (2) movement comprising is fixed on the carrying
Fixed platform (26.1) on truss (25) and can be relative to the sliding support (26.2) of fixed bracket (26.1) sliding, institute
Fixed bracket (26.1) are stated equipped with sliding rail (27), the bottom of the sliding support (26.2) is fixedly connected with and the sliding rail
(27) extensible canopy (28) cooperated, the extensible canopy (28) are set in the sliding rail (27), and the sliding rail (27) is stretched with described
Contracting beam can be fixed between (28) by pin shaft.
3. the automatic climbing platform for head tower construction as described in claim 1, it is characterised in that: the bracket that climbs (1)
Guide plate (4) are equipped with close to the side of the load-bearing support (3), is provided on the load-bearing support (3) and matches with the guide plate (4)
It closes, climb bracket (1) stable guide groove (5) to climb described in auxiliary.
4. the automatic climbing platform for head tower construction as claimed in claim 3, it is characterised in that: the bracket that climbs (1)
Top be hingedly connected with can assist the guide plate (4) enter the guide groove (5) in guide type shoe (6), the guiding
Support (6) includes two piece guiding side plates (6.1) of the articulated connection at the top of the bracket that climbs (1) and is fixedly connected on described two
The auxiliary guide plate (6.2) that block is oriented between side plate (6.1), cooperates with the guide groove (5).
5. the automatic climbing platform for head tower construction as claimed in claim 3, it is characterised in that: guide plate (4) face
The guide plate (4) can be positioned at institute to being equipped between the side surface and the load-bearing support (3) of the load-bearing support (3)
State the locking positioning device in load-bearing support (3).
6. the automatic climbing platform for head tower construction as claimed in claim 5, it is characterised in that: the locking positioning device
Including being fixedly connected on the guide plate (4) on a side surface of the load-bearing support (3), the support hook that Open Side Down
(7), the support hook (7) is set in the load-bearing support (3), the support hook (7) and the load-bearing support (3) it
Between be fixedly connected with split pin (9) by bearing pin (8), the bearing pin (8) is set to opening for the support hook (7)
In mouthful;The locking pin shaft (10) that the support hook (7) moves upwards can be limited by being equipped with above the bearing pin (8), described
Locking pin shaft (10) is removably fixed on the load-bearing support (3).
7. the automatic climbing platform for head tower construction as described in claim 1, it is characterised in that: the jacking apparatus is top
It rises hydraulic cylinder (11), the housing bottom of the jack-up hydraulic ram (11) is removably fixed on the load-bearing support (3), institute
It states and connects between the bracket that climbs (1) by the way that jacking bearing structure is fixed at the top of the piston rod (12) of jack-up hydraulic ram (11)
It connects.
8. the automatic climbing platform for head tower construction as claimed in claim 7, it is characterised in that: the jacking bearing structure
Including being fixedly connected on climb bracket (1) on a side surface of the load-bearing support (3), the branch support that Open Side Down
Hook (7) and the jacking bearing (14) fixed with the piston rod (12), the jacking bearing (14) and the support hook (7) it
Between, the opening that jacks pin shaft (15) be set to the support hook (7) fixed by jacking pin shaft (15) and split pin (9)
It is interior.
9. the automatic climbing platform for head tower construction as described in claim 1, it is characterised in that: the bracket that climbs (1)
Its axial direction of a lateral edge far from the load-bearing support (3), which is equipped with, promotes track (16), the jacking apparatus lifting system packet
It includes lifting bracket (17), the lifting bracket (17) is equipped with the elevator wheel (18) with promotion track (16) cooperation, institute
Jacking apparatus is stated to be fixed on the lifting bracket (17).
10. the automatic climbing platform for head tower construction as claimed in claim 9, it is characterised in that: the bracket that climbs (1)
Side far from the load-bearing support (3) is equipped with stage+module support (19) that can be fixed with the head tower operation platform;It is described
It climbs and is connected with catching device (20) at the top of bracket (1);The bottom of the bracket that climbs (1) is connected with the bracket that climbs described in auxiliary
(1) stablize the lower support climbed, the lower support includes being fixed on described bracket (1) lower part of climbing, axis and the branch of climbing
It the vertical support rod (21) of the axis of frame (1) and is connected to the support rod (21) and has constructed the one of steel tower segment (2) close to described
End, can be along the back-up roller wheel (22) of the surface scrolls of the steel tower segment of having constructed (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811126721.1A CN109296191A (en) | 2018-09-26 | 2018-09-26 | A kind of automatic climbing platform for head tower construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811126721.1A CN109296191A (en) | 2018-09-26 | 2018-09-26 | A kind of automatic climbing platform for head tower construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109296191A true CN109296191A (en) | 2019-02-01 |
Family
ID=65164480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811126721.1A Pending CN109296191A (en) | 2018-09-26 | 2018-09-26 | A kind of automatic climbing platform for head tower construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109296191A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004834A (en) * | 2019-04-19 | 2019-07-12 | 中交第二航务工程局有限公司 | A kind of automatic climbing platform for hanging cable construction |
CN110644375A (en) * | 2019-10-14 | 2020-01-03 | 中交武汉港湾工程设计研究院有限公司 | Multifunctional integrated intelligent tower building device |
CN111827650A (en) * | 2020-07-25 | 2020-10-27 | 中铁十九局集团广州工程有限公司 | Detection platform of support connection point for construction |
CN112160243A (en) * | 2020-09-04 | 2021-01-01 | 中交路桥华南工程有限公司 | Steel tower lifting installation method |
CN113073839A (en) * | 2021-03-04 | 2021-07-06 | 北京卓良工程有限公司 | Heavy-load self-climbing construction device and climbing method thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2801959Y (en) * | 2005-06-21 | 2006-08-02 | 北京中建柏利工程技术发展有限公司 | Lift type multipurpose platform |
CN201148725Y (en) * | 2008-01-10 | 2008-11-12 | 湖南省第五工程公司 | Trolley type inclining-proof device adhering to elevating scaffold |
CN101360872A (en) * | 2006-06-06 | 2009-02-04 | 多卡工业有限公司 | Guide shoe and climbing system for use in the building sector |
CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
CN204754171U (en) * | 2015-05-18 | 2015-11-11 | 四川建筑职业技术学院 | Attaching scaffold anti -falling anti -roll device |
CN205857667U (en) * | 2016-07-07 | 2017-01-04 | 中煤第三建设(集团)有限责任公司 | Attached lifting scaffold guides anti-tilting apparatus |
CN106437126A (en) * | 2016-08-24 | 2017-02-22 | 江苏乐创建筑科技有限公司 | Guiding and force bearing device of floor type hydraulic lifting scaffold and detaching method |
CN207499385U (en) * | 2017-09-29 | 2018-06-15 | 中国建筑第八工程局有限公司 | Plug-in tower crane supporting beam, which has bad luck installation and climbs, uses operating platform |
CN207513130U (en) * | 2017-11-28 | 2018-06-19 | 宁夏回族自治区通信产业服务有限公司 | A kind of communication iron tower repair hoistable platform |
CN209082956U (en) * | 2018-09-26 | 2019-07-09 | 中交武汉港湾工程设计研究院有限公司 | A kind of automatic climbing platform for head tower construction |
-
2018
- 2018-09-26 CN CN201811126721.1A patent/CN109296191A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2801959Y (en) * | 2005-06-21 | 2006-08-02 | 北京中建柏利工程技术发展有限公司 | Lift type multipurpose platform |
CN101360872A (en) * | 2006-06-06 | 2009-02-04 | 多卡工业有限公司 | Guide shoe and climbing system for use in the building sector |
CN201148725Y (en) * | 2008-01-10 | 2008-11-12 | 湖南省第五工程公司 | Trolley type inclining-proof device adhering to elevating scaffold |
CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
CN204754171U (en) * | 2015-05-18 | 2015-11-11 | 四川建筑职业技术学院 | Attaching scaffold anti -falling anti -roll device |
CN205857667U (en) * | 2016-07-07 | 2017-01-04 | 中煤第三建设(集团)有限责任公司 | Attached lifting scaffold guides anti-tilting apparatus |
CN106437126A (en) * | 2016-08-24 | 2017-02-22 | 江苏乐创建筑科技有限公司 | Guiding and force bearing device of floor type hydraulic lifting scaffold and detaching method |
CN207499385U (en) * | 2017-09-29 | 2018-06-15 | 中国建筑第八工程局有限公司 | Plug-in tower crane supporting beam, which has bad luck installation and climbs, uses operating platform |
CN207513130U (en) * | 2017-11-28 | 2018-06-19 | 宁夏回族自治区通信产业服务有限公司 | A kind of communication iron tower repair hoistable platform |
CN209082956U (en) * | 2018-09-26 | 2019-07-09 | 中交武汉港湾工程设计研究院有限公司 | A kind of automatic climbing platform for head tower construction |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004834A (en) * | 2019-04-19 | 2019-07-12 | 中交第二航务工程局有限公司 | A kind of automatic climbing platform for hanging cable construction |
CN110004834B (en) * | 2019-04-19 | 2024-01-19 | 中交第二航务工程局有限公司 | Automatic climbing platform for hanging cable construction |
CN110644375A (en) * | 2019-10-14 | 2020-01-03 | 中交武汉港湾工程设计研究院有限公司 | Multifunctional integrated intelligent tower building device |
CN111827650A (en) * | 2020-07-25 | 2020-10-27 | 中铁十九局集团广州工程有限公司 | Detection platform of support connection point for construction |
CN112160243A (en) * | 2020-09-04 | 2021-01-01 | 中交路桥华南工程有限公司 | Steel tower lifting installation method |
CN112160243B (en) * | 2020-09-04 | 2022-02-11 | 中交路桥华南工程有限公司 | Steel tower lifting installation method |
CN113073839A (en) * | 2021-03-04 | 2021-07-06 | 北京卓良工程有限公司 | Heavy-load self-climbing construction device and climbing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109296191A (en) | A kind of automatic climbing platform for head tower construction | |
US11028602B2 (en) | Suspended scaffolding system | |
CN110004834B (en) | Automatic climbing platform for hanging cable construction | |
CN209082956U (en) | A kind of automatic climbing platform for head tower construction | |
CN110820579A (en) | Construction method based on movable steel box girder road-crossing construction working platform | |
CN110878647B (en) | Construction method for quickly dismantling building components | |
CN115465822A (en) | Tunnel maintenance operation vehicle set and operation method thereof | |
CN209082955U (en) | A kind of climbing device of head tower operation platform | |
CN110714611A (en) | Light climbing formwork steel frame system | |
CN109296190A (en) | A kind of climbing device of head tower operation platform | |
DE3526105A1 (en) | Scaffolding for repair work on façades and eaves | |
CN115637859A (en) | Intelligent building integrated platform and using method | |
US7493737B2 (en) | Roofing apparatus | |
CA2524128A1 (en) | Scaffolding structure | |
CN214272911U (en) | Hydraulic jacking protection frame for assembly type building | |
CN211171666U (en) | Arch bridge obliquely-climbing hanging basket walking device | |
CN112681144B (en) | Self-climbing installation method of steel cable tower | |
DE102016004348A1 (en) | Mobile crane device and method for temporarily mounting such a crane device | |
CN219472110U (en) | Shaft formwork sliding formwork | |
CN1097666C (en) | Up-push-able expanding table device for moveable work-table | |
CN205369946U (en) | Self -propelled modularization subway station roofing steel structure installation support frame | |
CN220889362U (en) | Height-adjustable supporting platform | |
CN218969806U (en) | Protective trolley for pavement slab and railing dismantling construction | |
CN218371653U (en) | Self-propelled climbing frame convenient to side slope anchor rod construction | |
CN218320410U (en) | Lifting and jacking integrated self-climbing crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |