CN109295972A - Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology - Google Patents
Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology Download PDFInfo
- Publication number
- CN109295972A CN109295972A CN201811091450.0A CN201811091450A CN109295972A CN 109295972 A CN109295972 A CN 109295972A CN 201811091450 A CN201811091450 A CN 201811091450A CN 109295972 A CN109295972 A CN 109295972A
- Authority
- CN
- China
- Prior art keywords
- prefabricated pile
- pile
- mortar
- full
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D11/00—Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/08—Sinking workpieces into water or soil inasmuch as not provided for elsewhere
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Invention " full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology " is suitable for foundation and field of ocean engineering, background technique is at present in foundation and field of ocean engineering, for cast-in-situ bored pile in rivers,lakes and seas due to building the links such as island in cofferdam, the period is long, and cost is high.The present invention can significantly improve the above deficiency, to the effect that by after full-sleeve engineering method pore-forming, promote casing grout injection or mortar into drilling simultaneously, prevent underwater drilling collapse hole, before cement slurry or mortar do not solidify, the prefabricated pile made according to design requirement beaten into (heavy) using piling machine enter drilling and to designed elevation or after pore-forming prefabricated pile is directly put into bottom hole by casing, grout injection or mortar, it is then lifted out casing, simultaneously using the reserved Grouting Pipe in prefabricated pile to stake bottom slip casting around pile, slurries can be cement slurry, mortar and chemical pulp, prefabricated pile and drilling surrounding formation is finally set closely cementing to be fixed together.
Description
Technical field:
Foundation and ocean engineering technology
Background technique:
The pile foundation in foundation and field of ocean engineering, rivers,lakes and seas is mostly cast-in-situ bored pile at present,
Arrangement and method for construction and method are most commonly that cofferdam is built island or completed using steel pile casting, these arrangement and method for construction and method are deposited at present
In the high feature of long construction period and project cost, how to shorten construction period, reduces project cost, be still current needs
It solves the problems, such as.
Summary of the invention:
The present invention " full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology " be it is a kind of about full-sleeve engineering method and
Prefabricated pile application technology method technical solution and method new after improving eliminate cofferdam and build island or using the construction ring such as steel pile casting
Section, direct pile can solve rivers,lakes and seas pile foundation in water plinth long construction period, the high problem of cost.This method is easy to operate,
It is practical, to the effect that: after full-sleeve engineering method pore-forming, promoting casing grout injection or sand into drilling simultaneously
Slurry, it is therefore an objective to prevent underwater drilling collapse hole, before cement slurry or mortar do not solidify, will be made according to design requirement using piling machine
Good prefabricated pile, which beats (heavy) and enters to drill, is directly put into bottom hole by casing for prefabricated pile to designed elevation or after pore-forming, then
Casing is promoted, while finally making prefabricated pile and drilling peripherally to stake bottom slip casting around pile using the reserved Grouting Pipe in prefabricated pile
Layer is closely cementing to be fixed together to form prefabricated pile basis.New full-sleeve engineering method prefabricated pile basis arrangement and method for construction and method are direct
Pile can be such that the pile foundation construction period in rivers,lakes and seas (ocean engineering) water is obviously shortened, and project cost significantly reduces.
Specific embodiment:
1. this is a kind of new simple full-sleeve engineering method prefabricated pile basis construction technical schemes and method.In rivers,lakes and seas
It constructs on the water surface, first, in accordance with engineering design requirements by pile driving barge in corresponding stake position full-sleeve engineering method pore-forming to designed elevation.
2. after pore-forming to design hole depth after promote casing, while according to design requirement into drilling grout injection or sand
Slurry, is prevented underwater drilling collapse hole, before cement slurry or mortar do not solidify, will be made according to design requirement using piling machine pre-
Stake processed beats (heavy) and enters drilling to designed elevation or before pore-forming rear sleeve is not promoted, and prefabricated pile is directly put into hole by casing
Bottom, grout injection or mortar, are then lifted out casing, while using the reserved Grouting Pipe in prefabricated pile to stake bottom slip casting around pile,
Slurries can be cement slurry, mortar and chemical pulp according to design requirement, finally make prefabricated pile and drilling surrounding formation closely cementing
It is fixed together to form prefabricated pile basis.
3. this new arrangement and method for construction and method apply in general to the various engineerings in rivers,lakes and seas, especially ocean work
Pile foundation engineering in journey, and it is suitable for various stratum.
Claims (3)
1. invention " full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology " is a kind of about full-sleeve engineering method and prefabricated
Stake application technology method technical solution and method new after improving, refer to during construction of prefabricated piles, first pass through a full set of plumber
Method pore-forming is then lifted out casing, while grout injection or mortar into drilling, before cement slurry or mortar do not solidify, utilizes
Piling machine by the prefabricated pile made according to design requirement beat (heavy) enter drilling directly will be pre- to designed elevation or after pore-forming
Stake processed is put into bottom hole by casing, is then lifted out casing, while using the reserved Grouting Pipe in prefabricated pile to stake bottom slip casting around pile,
Finally make prefabricated pile and drilling surrounding formation is close cementing is fixed together to form the arrangement and method for construction and method of prefabricated pile basis.
2. invention " full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology ", wherein by full-sleeve engineering method pore-forming, so
After promote casing, while grout injection or mortar into drilling will be by using piling machine before cement slurry or mortar do not solidify
(heavy) is beaten according to the prefabricated pile that design requirement is made to enter to drill to designed elevation, or prefabricated pile is directly passed through into set after pore-forming
Pipe is put into bottom hole, is then lifted out casing, while using the reserved Grouting Pipe in prefabricated pile to stake bottom slip casting around pile, and slurries are according to setting
Meter requires to can be cement slurry, mortar and chemical pulp, and prefabricated pile and drilling surrounding formation is finally made closely cementing to be fixed together
Form two features that prefabricated pile basis is this invention.
3. as described in above-mentioned 2. sections, invention " full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology ", wherein by complete
Prefabricated pile is directly put into bottom hole, grout injection or mortar by casing after pore-forming, is then lifted out set by casing engineering method pore-forming
Pipe, while using the reserved Grouting Pipe in prefabricated pile to stake bottom slip casting around pile, slurries can be cement slurry, sand according to design requirement
Slurry and chemical pulp finally make prefabricated pile and drilling surrounding formation are close cementing is fixed together that form prefabricated pile basis be this hair
One of bright feature.
Priority Applications (11)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811091450.0A CN109295972A (en) | 2018-09-25 | 2018-09-25 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
JP2021515169A JP2022502586A (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method of ready-made piles guided by all-casing excavation, and the ready-made piles |
PCT/CN2019/091230 WO2020062940A1 (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
US17/277,860 US20210348355A1 (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
CN201980000859.3A CN110896644B (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full-casing drilling guide precast pile |
EP19865349.5A EP3839149A4 (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
SG11202102769TA SG11202102769TA (en) | 2018-09-25 | 2019-06-14 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
KR1020217010783A KR20210058901A (en) | 2018-09-25 | 2019-06-14 | Full casing drilling guide grouting and consolidation method of prefabricated pile and its prefabricated pile |
BR112021004781-6A BR112021004781A2 (en) | 2018-09-25 | 2019-06-14 | GROUTING CONSOLIDATION METHOD FOR PREFABRICATED POLE OF FULL ENVELOPE WELL GUIDE AND PREFABRICATED POLE FOR THE SAME |
CONC2021/0003362A CO2021003362A2 (en) | 2018-09-25 | 2021-03-15 | Grout consolidation method for precast pile with full hole casing guide and precast pile for it |
PH12021550571A PH12021550571A1 (en) | 2018-09-25 | 2021-03-15 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811091450.0A CN109295972A (en) | 2018-09-25 | 2018-09-25 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109295972A true CN109295972A (en) | 2019-02-01 |
Family
ID=65163301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811091450.0A Withdrawn CN109295972A (en) | 2018-09-25 | 2018-09-25 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
Country Status (10)
Country | Link |
---|---|
US (1) | US20210348355A1 (en) |
EP (1) | EP3839149A4 (en) |
JP (1) | JP2022502586A (en) |
KR (1) | KR20210058901A (en) |
CN (1) | CN109295972A (en) |
BR (1) | BR112021004781A2 (en) |
CO (1) | CO2021003362A2 (en) |
PH (1) | PH12021550571A1 (en) |
SG (1) | SG11202102769TA (en) |
WO (1) | WO2020062940A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565639A (en) * | 2019-09-11 | 2019-12-13 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN110896644A (en) * | 2018-09-25 | 2020-03-20 | 高永光 | Grouting consolidation method for full-casing drilling guide precast pile and precast pile thereof |
WO2020062940A1 (en) * | 2018-09-25 | 2020-04-02 | 高永光 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
CN114753376A (en) * | 2022-03-28 | 2022-07-15 | 中电建十一局工程有限公司 | Method for excavating supporting slurry for deep foundation pit in gravel stratum |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111997620A (en) * | 2020-07-28 | 2020-11-27 | 中铁第四勘察设计院集团有限公司 | Grouting construction system and method for karst collapse area |
CN113250238A (en) * | 2021-05-19 | 2021-08-13 | 中交第三航务工程局有限公司 | Rock-socketed construction method of marine ultra-large-diameter single pile based on loosening ring theory |
CN113309089A (en) * | 2021-06-11 | 2021-08-27 | 河北省水利规划设计研究院有限公司 | Prefabricated hollow pile and construction method for taking soil and planting pile |
CN114562328B (en) * | 2022-04-02 | 2022-12-02 | 中国矿业大学 | Method for controlling surface subsidence by grouting and filling unconsolidated layer of bedrock top boundary |
CN115075238A (en) * | 2022-06-13 | 2022-09-20 | 陕西正诚路桥工程研究院有限公司 | Reinforcing method in bored pile construction based on overwater operation platform |
CN115288212B (en) * | 2022-07-05 | 2023-05-16 | 湖北工业大学 | Optical fiber implantation device and implantation method for existing pile wall |
CN115233685B (en) * | 2022-08-01 | 2023-07-14 | 中交四航工程研究院有限公司 | Recyclable grouting device for maintaining horizontal rigidity of pile foundation and construction method thereof |
CN115323999B (en) * | 2022-09-14 | 2024-02-27 | 赤峰中色白音诺尔矿业有限公司 | Sectional grouting construction device for culvert pipes of tailing pond and construction method thereof |
KR102602249B1 (en) | 2023-02-14 | 2023-11-16 | 우창건설 주식회사 | Apparatus for guiding the casing and construction method using the same |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1865652A (en) * | 1929-09-20 | 1932-07-05 | Raymond Concrete Pile Co | Method and apparatus for placing concrete in piles |
JPH05132930A (en) * | 1991-11-07 | 1993-05-28 | Jiototsupu:Kk | Developing method of foundation pile with drain layer |
NL9301176A (en) * | 1993-07-05 | 1995-02-01 | Verstraeten Beheersmij Bv | Method for forming a foundation pile in the ground using a prefabricated pile shaft. |
JPH1171758A (en) * | 1997-08-27 | 1999-03-16 | Nippon Steel Corp | Method for driving pile to rock mass |
JP2000129669A (en) * | 1998-10-22 | 2000-05-09 | Asahi Chem Ind Co Ltd | Connecting method of prefabricated pile |
JP2000257062A (en) * | 1999-03-05 | 2000-09-19 | Taisei Corp | Steel pipe pile pitching method |
JP2002155531A (en) * | 2000-11-21 | 2002-05-31 | Yoshitada Miyake | Pile burial method |
US20050019104A1 (en) * | 2003-07-23 | 2005-01-27 | Derald Christians | Soil stabilization and pile formation method |
JP4667479B2 (en) * | 2008-03-03 | 2011-04-13 | 中国電力株式会社 | Pile attachment / detachment structure and pile construction method |
KR100964796B1 (en) | 2010-02-26 | 2010-06-21 | 송기용 | Method for constructing the steel pipe-concrete composite pile structurized of burying and unifying into the bedrock, and a pile construction |
CN102002945B (en) * | 2010-03-25 | 2013-12-25 | 中国京冶工程技术有限公司 | Capsule type anti-corrosion device with pile shoe and anti-corrosion pile using same and construction method |
EP2527539B1 (en) | 2011-05-27 | 2013-09-11 | BAUER Maschinen GmbH | Submarine drilling assembly and method for inserting a foundation element into the soil of a body of water |
PL2650446T3 (en) | 2012-04-12 | 2015-03-31 | Herrenknecht Ag | Method of creating a foundation for a offshore structure |
CN102691296B (en) * | 2012-05-22 | 2015-02-11 | 广州市建筑科学研究院有限公司 | Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof |
JP6260931B2 (en) * | 2013-12-04 | 2018-01-17 | 株式会社大林組 | Steel pipe pile and its embedding method |
DK2930275T3 (en) | 2014-04-08 | 2018-04-03 | Herrenknecht Ag | System and method for making a foundation for a building in water |
CN105442594A (en) * | 2015-12-04 | 2016-03-30 | 荣盛建设工程有限公司 | Hole reaming mud-jacking construction technology for prestress hollow square pile with built-in mud-jacking pipe |
CN107794925A (en) * | 2017-10-31 | 2018-03-13 | 浙江大学城市学院 | The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline |
CN109295972A (en) * | 2018-09-25 | 2019-02-01 | 高永光 | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology |
-
2018
- 2018-09-25 CN CN201811091450.0A patent/CN109295972A/en not_active Withdrawn
-
2019
- 2019-06-14 BR BR112021004781-6A patent/BR112021004781A2/en not_active IP Right Cessation
- 2019-06-14 KR KR1020217010783A patent/KR20210058901A/en not_active Application Discontinuation
- 2019-06-14 EP EP19865349.5A patent/EP3839149A4/en not_active Withdrawn
- 2019-06-14 US US17/277,860 patent/US20210348355A1/en not_active Abandoned
- 2019-06-14 WO PCT/CN2019/091230 patent/WO2020062940A1/en active Application Filing
- 2019-06-14 JP JP2021515169A patent/JP2022502586A/en active Pending
- 2019-06-14 SG SG11202102769TA patent/SG11202102769TA/en unknown
-
2021
- 2021-03-15 PH PH12021550571A patent/PH12021550571A1/en unknown
- 2021-03-15 CO CONC2021/0003362A patent/CO2021003362A2/en unknown
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110896644A (en) * | 2018-09-25 | 2020-03-20 | 高永光 | Grouting consolidation method for full-casing drilling guide precast pile and precast pile thereof |
WO2020062940A1 (en) * | 2018-09-25 | 2020-04-02 | 高永光 | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor |
CN110896644B (en) * | 2018-09-25 | 2021-04-09 | 高永光 | Grouting consolidation method for full-casing drilling guide precast pile |
CN110565639A (en) * | 2019-09-11 | 2019-12-13 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN110565639B (en) * | 2019-09-11 | 2021-03-23 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN114753376A (en) * | 2022-03-28 | 2022-07-15 | 中电建十一局工程有限公司 | Method for excavating supporting slurry for deep foundation pit in gravel stratum |
Also Published As
Publication number | Publication date |
---|---|
SG11202102769TA (en) | 2021-04-29 |
EP3839149A1 (en) | 2021-06-23 |
WO2020062940A1 (en) | 2020-04-02 |
EP3839149A4 (en) | 2022-04-20 |
KR20210058901A (en) | 2021-05-24 |
US20210348355A1 (en) | 2021-11-11 |
JP2022502586A (en) | 2022-01-11 |
PH12021550571A1 (en) | 2021-10-25 |
CO2021003362A2 (en) | 2021-07-19 |
BR112021004781A2 (en) | 2021-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109295972A (en) | Full-sleeve engineering method prefabricated pile perfusion slurry and grouting behind shaft or drift lining concretion technology | |
CN103967031B (en) | A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof | |
CN101962958B (en) | Bridge composite foundation consisting of open caisson and pile and construction method | |
CN101591914B (en) | Construction method for foundation pit supporting structure occluded by filling piles and stirring piles | |
CN104499479B (en) | It is a kind of to pass through the dug pile construction method that sand gravel backfills layer | |
CN105442623B (en) | A kind of on-water bridge pile foundation and construction method without trestle | |
CN101130991A (en) | Caisson cofferdam based on prepacked foundation bed | |
WO2015135471A1 (en) | Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same | |
CN203213136U (en) | Caisson and pile combined foundation of consolidated subsoil | |
CN107514006A (en) | It is a kind of to build island operation construction method for shallow sea or shallow river bridge foundation | |
CN107386285A (en) | A kind of novel steel tube pile foundation rock borehole anchorage method | |
CN101260664A (en) | Soft soil foundation large scale steel float lock head construction method | |
CN103911993B (en) | A kind of PHA anchor pole and construction method thereof | |
CN105714748A (en) | Excavating construction method for surge shaft in gravel and sandy soil layer | |
CN204311435U (en) | One is revolved and is dug occlusion steel concrete impervious wall | |
CN102002945A (en) | Capsule type anti-corrosion device with pile shoe and anti-corrosion and construction method using device | |
CN107338790A (en) | The compound pile construction method of jet mixing | |
CN108360542A (en) | Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method | |
CN201459749U (en) | Stable structure for construction platform of deep water steel pipe pile | |
CN106192987B (en) | It is a kind of to be crushed the construction method that geology is reinforced to stake periphery | |
CN104563100A (en) | Cement mixing pile later embedding press-grouting pile support structure and construction method | |
CN105040705A (en) | Ground foundation treatment construction technology under multi-karst-cave geological conditions | |
CN211113714U (en) | Thin-wall full-surrounding embedded foundation suitable for rock foundation | |
CN110424441A (en) | A kind of thin-walled suitable for rock foundation encloses embedded basis and its construction method entirely | |
CN216664152U (en) | Water sealing structure for anchorage support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
CB02 | Change of applicant information |
Address after: 102600 Beijing Daxing District Kangzhuang Road No. 9 Central Railway Fifth Courtyard District B Building 703 Applicant after: Gao Yongguang Applicant after: Gao Yunfei Address before: 100012 Huayu City, Tiejian, China 9-1-302, Shuiban South Street, Chaoyang District, Beijing Applicant before: Gao Yongguang Applicant before: Gao Yunfei |
|
CB02 | Change of applicant information | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190201 |
|
WW01 | Invention patent application withdrawn after publication |