CN109286153A - Phase conductor hoisting tool and method in shaft tower upgrading use - Google Patents

Phase conductor hoisting tool and method in shaft tower upgrading use Download PDF

Info

Publication number
CN109286153A
CN109286153A CN201811314145.3A CN201811314145A CN109286153A CN 109286153 A CN109286153 A CN 109286153A CN 201811314145 A CN201811314145 A CN 201811314145A CN 109286153 A CN109286153 A CN 109286153A
Authority
CN
China
Prior art keywords
phase conductor
shaft tower
tool
tool body
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811314145.3A
Other languages
Chinese (zh)
Other versions
CN109286153B (en
Inventor
岳红刚
自帅
张申前
司涛
王正运
兰积进
高滨
张鑫
吕滨
王文峰
刘良春
王福天
王建
赵峰印
王思贤
张效伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811314145.3A priority Critical patent/CN109286153B/en
Publication of CN109286153A publication Critical patent/CN109286153A/en
Application granted granted Critical
Publication of CN109286153B publication Critical patent/CN109286153B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses phase conductor hoisting tool and methods in shaft tower upgrading use, it solve in the prior art cement shaft tower transformation in exist in phase conductor be not easy to be promoted, it is not easy the problem of being transformed, it is simple with structure, it is easy to carry, the beneficial effect of the promotion work of phase conductor in capable of efficiently completing, its scheme is as follows: phase conductor hoisting tool in shaft tower upgrading use, including tool body, tool body is equipped with the groove for phase conductor in accommodating, and tool body is provided with opening, tool body is equipped with connecting hole, so as to the connection of tool body and cross arm of tower.

Description

Phase conductor hoisting tool and method in shaft tower upgrading use
Technical field
The present invention relates to shaft tower transformations, more particularly to phase conductor hoisting tool and method in shaft tower upgrading use.
Background technique
The cement straight line pole now run comes into operation, and the time is more long-range, and design standard at that time is lower, and conducting wire is over the ground Apart from relative close.For the development for adapting to economic society, the project of upgrading and rebuilding of straight cement pole tower is extremely urgent.At this stage, Cement shaft tower is generally substituted using more stable perfect angle steel tower, during transformation and upgrade, two sides conducting wire is easy to extract, and Middle phase conductor is set to the lower section of cross-arm between two cement shaft towers, and the promotion of middle phase conductor is the key point of work, restricts The progress of entire engineering, there are the following problems for existing method for improving:
1) it without dedicated hoisting tool, is mainly promoted by complicated self-made tool, it is at high cost, it is not easy to It carries;
2) hoisting tool stability is poor, needs the cooperation of other equipment, is easy to appear inadvertently falls off in use Situation, safety are lower.
Therefore, it is necessary to shaft tower upgrading, phase conductor hoisting tool carries out new researching and designing in.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides phase conductor hoisting tool in shaft tower upgrading use, knots Structure simply, conveniently, can not only facilitate the promotion of conducting wire, and facilitate middle phase conductor and the temporary fixation of cross-arm.
The concrete scheme of phase conductor hoisting tool is as follows in shaft tower upgrading use:
Phase conductor hoisting tool in shaft tower upgrading use, including tool body, tool body are equipped with for phase in accommodating The groove of conducting wire, tool body are provided with connecting hole, so as to the connection of tool body and cross arm of tower.
Above-mentioned hoisting tool facilitates phase conductor in promotion by the setting of groove, and middle phase conductor is in groove, with Can by bolt, the fixation of implementation tool ontology and cross-arm, without during cutting off cross-arm all the time by loop wheel machine or Phase conductor in being supported by manpower, it is simple and convenient.
Further, the tool body includes the first L-type plate, is opened in side to the middle section of the first L-type plate, first After L-type plate is provided with opening in order to fix tool body and cross-arm, cross-arm is cut off, opening is by cutting in the first L-type plate To be formed, transverse slat of the first L-type plate opening side setting for phase conductor in therefrom phase conductor supported underneath passes through for section part The setting of transverse slat support from below in phase conductor, to temporarily middle phase conductor is set between tool body and cross-arm, by the The short slab and transverse slat of one L-type plate form the groove, and transverse slat is set to the middle and lower sections of the first L-type plate, and the height of groove is big In the height of cross-arm, accordingly even when the middle phase conductor can also be accommodated after tool body and cross-arm are fixed.
Further, the short slab interval set distance of the transverse slat and the first L-type plate is arranged, transverse slat and the first L-type The short slab of plate is arranged in parallel, and space between the two is able to achieve the receiving of middle phase conductor, and facilitates tool body and cross-arm Fixation.
Further, the first L-type plate is provided with the connecting hole.Stablize in order to which the first L-type plate is arranged, described first The two sides of L-type plate are equipped with the connecting hole, in this way from the top of cross-arm and side difference implementation tool ontology and cross-arm Connection, the connecting hole of the first L-type plate setting is for the connection with cross-arm.
In another program, tool body include two sections interval set distance setting the second L-type plates, two second L-type plates it Between form the opening, and two second L-type plates realize connection by support plate, described in two second L-type plates and support plate are formed Groove, the second L-type plate is provided with the connecting hole, and support plate is set to the bottom of the second L-type plate.
For overcome the deficiencies in the prior art, the present invention also provides shaft tower upgrading use in phase conductor method for improving, Using phase conductor hoisting tool in the shaft tower upgrading use.
Further, the specific steps are as follows:
Extract the insulator connecting with middle phase conductor;
Middle phase conductor is promoted at cross-arm by the lower section of tool body therefrom phase conductor;
Tool body and cross-arm are fixed, cross-arm is cut off by the opening of tool body;
When cross-arm cuts off completion, the phase conductor from tool body proposition, i.e., phase conductor promotes work in realization.
Compared with prior art, the beneficial effects of the present invention are:
1) hoisting tool provided by the invention, it is highly-safe, not only facilitate promoted early period, but also facilitate later period and cross-arm When connecting, while also cross-arm being facilitated to cut off, the phase conductor from being proposed in groove.
2) setting of the invention for passing through tool body groove, the convenient promotion to conducting wire, and convenient final middle phase conductor Proposition.
3) overall structure of the present invention is simple, at low cost, easy to carry, and the promotion for disposably successfully completing middle phase conductor is made Industry has good Social benefit and economic benefit during cement shaft tower upgrading.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is 1 structural schematic diagram of the embodiment of the present invention;
Fig. 2 is 2 structural schematic diagram of the embodiment of the present invention;
Fig. 3 is the use state of the embodiment of the present invention 1 with reference to figure;
Wherein, 1. connecting hole, 2. cross-arms, 3. transverse slats, 4. first L-type plates, 5. support plates, 6. openings, 7. second L-type plates, Phase conductor in 8..
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As background technique is introduced, the deficiencies in the prior art, in order to solve technical problem as above, this Shen It please propose phase conductor hoisting tool in shaft tower upgrading use.
In a kind of typical embodiment of the application, as shown in Figure 1, phase conductor promotes work in shaft tower upgrading use Tool, including tool body, tool body are equipped with the groove for phase conductor in accommodating, and tool body is provided with connecting hole 1, so as to work Has the connection of ontology and cross arm of tower.
Above-mentioned hoisting tool facilitates phase conductor in promotion by the setting of groove, and middle phase conductor is in groove, with Can by bolt, the fixation of implementation tool ontology and cross-arm, without during cutting off cross-arm all the time by loop wheel machine or Phase conductor in being supported by manpower, it is simple and convenient.
Tool body includes the first L-type plate 4, and opening 6 is opened in side to the middle section of the first L-type plate 4, and the first L-type plate 4 is provided with After opening is in order to fix tool body with cross-arm 2, cross-arm 2, the middle section parts that opening 6 passes through the first L-type plate 4 of cutting are cut off To be formed, transverse slat 3 of the first L-type plate 4 opening side setting for phase conductor in therefrom 8 supported underneath of phase conductor passes through cross The setting of plate 3 support from below in phase conductor 8, to temporarily middle phase conductor is set between tool body and cross-arm 2, by the The short slab (in use, above) and transverse slat 3 of one L-type plate form the groove, and transverse slat 3 is set in the first L-type plate 4 The height of lower section, groove is greater than the sum of 2 height of cross-arm and neutral wire diameter, accordingly even when after tool body and cross-arm are fixed, The middle phase conductor can also be accommodated.
The short slab interval set distance of transverse slat 3 and the first L-type plate 4 is arranged, the short slab phase of transverse slat 3 and the first L-type plate 4 It is mutually arranged in parallel, space between the two is able to achieve the receiving of middle phase conductor, and facilitates the fixation of tool body and cross-arm.
First L-type plate 4 is provided with the connecting hole 1.Stablize in order to which the first L-type plate is arranged, the two sides of the first L-type plate are all provided with There are the connecting hole 1, the in this way connection from the top of cross-arm 2 and side difference implementation tool ontology and cross-arm 2, the first L-type The connecting hole 1 of plate setting is for the connection with cross-arm 2.
For overcome the deficiencies in the prior art, the present invention also provides shaft tower upgrading use in phase conductor method for improving, Using phase conductor hoisting tool in the shaft tower upgrading use.
Further, the specific steps are as follows:
Extract the insulator connecting with middle phase conductor 8;
Middle phase conductor 8 is promoted at cross-arm 2 by the lower section of tool body therefrom phase conductor 8;
Tool body and cross-arm 2 is fixed, it is cut off by 6 pairs of cross-arms 2 of opening of tool body;
When cross-arm cuts off completion, middle phase conductor 8 is not limited by cross-arm, the phase conductor from tool body proposition, i.e., in fact Phase conductor promotes work in existing
Embodiment 2
The present embodiment and the difference of embodiment 1 are as follows:
As shown in Fig. 2, tool body include two sections interval set distance setting the second L-type plates 7, two second L-type plates 7 it Between form the opening 6, and two second L-type plates 7 realize connection, two second L-type plates and the formation of support plate 5 by support plate 5 The groove, the second L-type plate 7 are provided with the connecting hole 1, and support plate 5 is set to the bottom of the second L-type plate 7, same 2nd L Template 7 realized by connecting hole 1 and cross-arm and connected, by the lower section of tool body therefrom phase conductor by mutually leading in opening supports Middle phase conductor is promoted at cross-arm by line, is realized the second L-type plate and cross-arm by bolt and is connected, cuts cross-arm from opening 6 It is disconnected, so that middle phase conductor be proposed.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (9)

1. phase conductor hoisting tool in shaft tower upgrading use, which is characterized in that including tool body, tool body is equipped with and is used for The groove of phase conductor in receiving, and tool body is provided with opening, tool body is equipped with connecting hole, so that tool body and shaft tower are horizontal The connection of load.
2. phase conductor hoisting tool in shaft tower upgrading use according to claim 1, which is characterized in that the tool sheet Body includes the first L-type plate, described to open in side to the middle section of the first L-type plate, the first L-type plate be open side be arranged for from The transverse slat of phase conductor in middle phase conductor supported underneath, forms the groove by the first L-type plate and transverse slat, and transverse slat is set to described The middle and lower sections of first L-type plate.
3. shaft tower upgrading according to claim 2 use in phase conductor hoisting tool, which is characterized in that the transverse slat with The short slab interval set distance of the first L-type plate is arranged.
4. phase conductor hoisting tool in shaft tower upgrading use according to claim 1, which is characterized in that the tool sheet Body includes the second L-type plate of two sections of interval set distance settings, forms the opening, and two the 2nd L between two second L-type plates Template realizes by support plate and connects that two second L-type plates and support plate form the groove.
5. phase conductor hoisting tool in shaft tower upgrading use according to claim 2, which is characterized in that the first L Template is provided with the connecting hole.
6. phase conductor hoisting tool in shaft tower upgrading use according to claim 4, which is characterized in that the 2nd L Template is provided with the connecting hole.
7. phase conductor hoisting tool in shaft tower upgrading use according to claim 4, which is characterized in that the support plate Set on the bottom of the second L-type plate.
8. phase conductor method for improving in shaft tower upgrading use, which is characterized in that using of any of claims 1-7 Phase conductor hoisting tool in shaft tower upgrading use.
9. phase conductor method for improving in shaft tower upgrading use according to claim 8, which is characterized in that specific steps are such as Under:
Extract the insulator connecting with middle phase conductor;
Middle phase conductor is promoted at cross-arm by the lower section of tool body therefrom phase conductor;
Tool body and cross-arm are fixed, cross-arm is cut off by the opening of tool body;
When cross-arm cuts off completion, the phase conductor from tool body proposition, i.e., phase conductor promotes work in realization.
CN201811314145.3A 2018-11-06 2018-11-06 Medium-phase conductor lifting tool and medium-phase conductor lifting method for upgrading and reforming pole tower Active CN109286153B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811314145.3A CN109286153B (en) 2018-11-06 2018-11-06 Medium-phase conductor lifting tool and medium-phase conductor lifting method for upgrading and reforming pole tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811314145.3A CN109286153B (en) 2018-11-06 2018-11-06 Medium-phase conductor lifting tool and medium-phase conductor lifting method for upgrading and reforming pole tower

Publications (2)

Publication Number Publication Date
CN109286153A true CN109286153A (en) 2019-01-29
CN109286153B CN109286153B (en) 2024-02-06

Family

ID=65174529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811314145.3A Active CN109286153B (en) 2018-11-06 2018-11-06 Medium-phase conductor lifting tool and medium-phase conductor lifting method for upgrading and reforming pole tower

Country Status (1)

Country Link
CN (1) CN109286153B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201927936U (en) * 2009-12-14 2011-08-10 江苏省电力公司泰兴市供电公司 Bracket for lifting wire
JP2011188659A (en) * 2010-03-10 2011-09-22 Chugoku Electric Power Co Inc:The Fixture for overhead wire ladder
JP2012115064A (en) * 2010-11-25 2012-06-14 Kansai Electric Power Co Inc:The Suspension tool for wire inspection device
CN202927423U (en) * 2012-10-08 2013-05-08 河南省电力公司平顶山供电公司 Hanging and fixing device universally used for overhead line structure cross arm angle iron
CN203113878U (en) * 2012-12-26 2013-08-07 诸城市供电公司 Wire heightening cross arm device
EP2631395A1 (en) * 2012-02-27 2013-08-28 Norvento Energia Distribuida, S.L. Advanced system to improve the installation of wire-climbing lifting devices on hollow towers
CN106129650A (en) * 2016-08-31 2016-11-16 班戈设备***(苏州)有限公司 A kind of electric force pole tower using I-shaped tower grounding line
CN106329389A (en) * 2016-10-27 2017-01-11 国网浙江省电力公司绍兴供电公司 Hoisting device for large-tonnage live wire
CN208986492U (en) * 2018-11-06 2019-06-14 国网山东省电力公司枣庄供电公司 Phase conductor hoisting tool in shaft tower upgrading use

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201927936U (en) * 2009-12-14 2011-08-10 江苏省电力公司泰兴市供电公司 Bracket for lifting wire
JP2011188659A (en) * 2010-03-10 2011-09-22 Chugoku Electric Power Co Inc:The Fixture for overhead wire ladder
JP2012115064A (en) * 2010-11-25 2012-06-14 Kansai Electric Power Co Inc:The Suspension tool for wire inspection device
EP2631395A1 (en) * 2012-02-27 2013-08-28 Norvento Energia Distribuida, S.L. Advanced system to improve the installation of wire-climbing lifting devices on hollow towers
CN202927423U (en) * 2012-10-08 2013-05-08 河南省电力公司平顶山供电公司 Hanging and fixing device universally used for overhead line structure cross arm angle iron
CN203113878U (en) * 2012-12-26 2013-08-07 诸城市供电公司 Wire heightening cross arm device
CN106129650A (en) * 2016-08-31 2016-11-16 班戈设备***(苏州)有限公司 A kind of electric force pole tower using I-shaped tower grounding line
CN106329389A (en) * 2016-10-27 2017-01-11 国网浙江省电力公司绍兴供电公司 Hoisting device for large-tonnage live wire
CN208986492U (en) * 2018-11-06 2019-06-14 国网山东省电力公司枣庄供电公司 Phase conductor hoisting tool in shaft tower upgrading use

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
KAHO SUGIMOTO ET AL.: "Synthesis and charge delocalization property of multimetallic molecular wires with diethynylthiophene bridgesMT", 《 JOURNAL OF ORGANOMETALLIC CHEMISTRY》, vol. 847, no. 2017, pages 121 - 131, XP085188708, DOI: 10.1016/j.jorganchem.2017.02.033 *
严绍兴;: "直线双杆改造中解决中相导线提升困难的问题", 广东科技, no. 16, pages 92 - 93 *
纳锋;: "330kV输电线路不落导线更换ZM塔施工技术", 宁夏电力, no. 03, pages 23 - 27 *

Also Published As

Publication number Publication date
CN109286153B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN205231660U (en) Fixing device of pre -buried electric terminal box of wall body
CN208986492U (en) Phase conductor hoisting tool in shaft tower upgrading use
CN104695979A (en) Method for integrally and transversely moving high and large formwork through high and large trolley
CN105016220B (en) A kind of pole guide support adding device
CN202957493U (en) Transformer rack overall installation device
CN109286153A (en) Phase conductor hoisting tool and method in shaft tower upgrading use
CN205296966U (en) Transmission line iron tower
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN102623927A (en) Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line
CN204732751U (en) On-load tap-changer of transformer service kit
CN103726449B (en) Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof
CN205772893U (en) A kind of king-tower function at most lifting traction apparatus
CN108005684A (en) Separated steel mould trolley and its construction method
CN104045014A (en) Pole arraying frame for pole welding
CN103825222A (en) Tool for changing 220kV narrow base tower strain insulator string with charges
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
CN202754719U (en) Cart electric conduction frame used on crane
CN202322137U (en) Telescopic hanger
CN101701498A (en) Construction method of spanning steel tube of the existing railway route to sheath protection shed
CN204645645U (en) A kind of fire wall steel form push rod draws anchor support system
CN204237337U (en) A kind of reclaimer power cable device
CN205077341U (en) Clearance adjustment device of magnetic levitation track section of track
CN204389761U (en) Lightguide cable link emergency maintenance lift rack
CN108899833A (en) A kind of AS vehicle vehicle terminated line case and rail vehicle
CN104389270B (en) A kind of construction method of large-scale strip-type bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant