CN109281704A - A kind of construction ventilation of tunnel gas flexibility starting monitoring device - Google Patents

A kind of construction ventilation of tunnel gas flexibility starting monitoring device Download PDF

Info

Publication number
CN109281704A
CN109281704A CN201811423822.5A CN201811423822A CN109281704A CN 109281704 A CN109281704 A CN 109281704A CN 201811423822 A CN201811423822 A CN 201811423822A CN 109281704 A CN109281704 A CN 109281704A
Authority
CN
China
Prior art keywords
fixedly connected
sleeve
tunnel
chassis
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811423822.5A
Other languages
Chinese (zh)
Other versions
CN109281704B (en
Inventor
王中华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811423822.5A priority Critical patent/CN109281704B/en
Publication of CN109281704A publication Critical patent/CN109281704A/en
Application granted granted Critical
Publication of CN109281704B publication Critical patent/CN109281704B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Ventilation (AREA)

Abstract

The invention belongs to technical field of tunnel construction, especially a kind of construction ventilation of tunnel gas flexibility starts monitoring device, it is not easy to adjust for monitor head in the prior art, influence monitoring effect, tunnel cannot be supported at any time, and it can not be handled when gas density is excessively high, now propose following solution: including chassis and top plate, the tray bottom is fixedly connected there are two first sleeve, level is fixedly connected there are two partition between two first sleeves, balance weight is slidably connected between two partitions, the first sleeve inner screw sheath is equipped with column, the column bottom is fixedly connected with pressing plate below first sleeve, the chassis top vertical is fixedly connected there are two baffle, transverse slat is connected between two baffles, two opposite sides of the baffle are fixedly connected to several exhaust wind Machine.Monitoring effect of the present invention is good, can be supported to tunnel, accelerates gas circulation, reduces security risk.

Description

A kind of construction ventilation of tunnel gas flexibility starting monitoring device
Technical field
The present invention relates to technical field of tunnel construction more particularly to a kind of construction ventilation of tunnel gas flexibility starting monitoring dresses It sets.
Background technique
Tunnel is to be built in underground or underwater and place an iron railway and move the building of vehicle pass-through for locomotive, in place according to its institute Mountain tunnel, submerged tunnel and city tunnel three categories can be divided by setting, for shorten distance and avoid steep gradient and from the mountain ridge or mound That passes through under mound is known as mountain tunnel, is river crossing or straits under river or what seabed passed through is known as submerged tunnel, is suitable Railway is answered to need to be known as city tunnel what Urban Underground passed through by metropolitan, building in these three types of tunnels most is Mountain tunnel is monitored gas currently, needing to use gas monitor device during constructing tunnel.
But the height of monitor head and direction are not easy to adjust in existing monitoring device, influence monitoring effect, cannot be right at any time Tunnel is supported, and can not be handled when gas density is excessively high, has certain security risk.
Summary of the invention
A kind of construction ventilation of tunnel gas flexibility proposed by the present invention starts monitoring device, and it is unstable to solve mobile and lifting Fixed, video camera shaking amplitude is big, not readily portable problem.
To achieve the goals above, present invention employs following technical solutions:
A kind of construction ventilation of tunnel gas flexibility starting monitoring device, including chassis and top plate, the top plate are positioned horizontally in Above chassis, the tray bottom two sides are symmetrically fixedly connected with supporting leg, and the supporting leg bottom is equipped with movable pulley, described Tray bottom is fixedly connected there are two first sleeve, and level is fixedly connected there are two partition between two first sleeves, and two Slidably connect balance weight between a partition, the first sleeve inner screw sheath is equipped with column, and the column bottom is in the It is fixedly connected with pressing plate below one sleeve, the chassis top vertical is fixedly connected there are two baffle, between two baffles It is connected with transverse slat, two opposite sides of the baffle are fixedly connected to several air exhausters, the transverse slat two sides It is fixedly connected to sliding block, offers the sliding slot to match with sliding block on the baffle vertically, is erected between the transverse slat and chassis It is directly fixedly connected with electric pushrod, the electric pushrod is located between two baffles, and the baffle front surface is fixedly connected with company Ring is connect, runs through between two connection rings and holding rod is installed, two sides are fixedly connected to support plate at the top of the transverse slat, described Top plate bottom is fixedly connected with the connection frame to match with support plate, and it is slow that several are fixedly connected at the top of the connection frame inner wall Rush spring, in being fixedly connected in connection frame with several buffer spring bottoms at the top of the support plate, two support plates it Before be fixedly connected with console and display screen, the console is located at below display screen, the air exhauster and electric pushrod point It is not electrically connected with console, several rubber mat plates is fixedly connected at the top of the top plate, the top plate two sides of the bottom are perpendicular Directly it is fixedly connected with screw rod, the external thread of screw is arranged with adjusting sleeve pipe, and the adjusting sleeve pipe front surface is fixedly connected with watt This concentration monitor head, the console and display screen are electrically connected with gas concentration monitoring head respectively, and the chassis two sides are solid Surely it is connected with the second sleeve to match with screw rod, the second sleeve bottom offers screw hole, the screw hole internal screw thread vertically It is connected with bolt, damping spring is arranged in the second sleeve, screw hole is run through at the top of the bolt in fixed in second sleeve It is connected with cushion block, the stud base is fixedly connected with button lid below second sleeve.
Preferably, the transverse slat two sides of the bottom are fixedly connected to rack, and the rack inner horizontal is fixedly connected There is parcel shelf.
Preferably, it is fixedly connected to slide bar at the top and bottom of the balance weight, level is offered and slided on the partition The logical rail that bar matches.
Preferably, two opposite sides of the baffle are fixedly connected to tilt prop, the tilt prop bottom and chassis It is fixedly connected, and tilt prop is located at below transverse slat.
Preferably, the rubber mat plate is four, and four rubber mat plates are evenly distributed on top plate.
Preferably, first bumper post is six, and six the first bumper post annular arrays are distributed in two first gear Between plate.
Preferably, the holding rod outer surface is arranged with Anti-slip cover, and holding rod both ends are mounted on limit plate.
Preferably, LED illumination fluorescent tube is fixedly connected between two connection frames.
Compared with prior art, the beneficial effects of the present invention are:
1, rotating come the height of control gas concentration monitor head and direction by the adjusting sleeve pipe on screw rod in the present invention, Monitoring region is conveniently adjusted, and monitoring effect is good;
2, it is bonded pressing plate and ground by turning column in the present invention, then controls electric pushrod and rises top plate, allow top The top surface of rubber mat plate and tunnel internal on plate is bonded, and realizes supporting role, reduces security risk, improves staff's work The safety of work;
3, it console can be used to open multiple air exhausters after showing gas density by display screen in the present invention, accelerate The circulation of gas in tunnel, prevents gas density excessively high.
Monitoring effect of the present invention is good, can be supported to tunnel, accelerates gas circulation, reduces security risk.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that a kind of construction ventilation of tunnel gas flexibility proposed by the present invention starts monitoring device;
Fig. 2 is the side view that a kind of construction ventilation of tunnel gas flexibility proposed by the present invention starts monitoring device;
Fig. 3 is that a kind of construction ventilation of tunnel gas flexibility proposed by the present invention starts enlarged drawing at the A of monitoring device;
Fig. 4 is the structural representation that a kind of construction ventilation of tunnel gas flexibility proposed by the present invention starts top plate in monitoring device Figure.
In figure: 1 chassis, 2 top plates, 3 supporting legs, 4 movable pulleys, 5 first sleeves, 6 partitions, 7 balance weights, 8 columns, 9 pressing plates, 10 baffles, 11 transverse slats, 12 air exhausters, 13 sliding blocks, 14 sliding slots, 15 electric pushrods, 16 connection rings, 17 holding rods, 18 support plates, 19 Connection frame, 20 buffer springs, 21 consoles, 22 display screens, 23 rubber mat plates, 24 screw rods, 25 adjusting sleeve pipes, 26 gas densities prison Gauge head, 27 second sleeves, 28 screw holes, 29 bolts, 30 damping springs, 31 cushion blocks, 32 button lids.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-4, a kind of construction ventilation of tunnel gas flexibility starts monitoring device, including chassis 1 and top plate 2, top plate 2 It is positioned horizontally in 1 top of chassis, 1 two sides of the bottom of chassis are symmetrically fixedly connected with supporting leg 3, and 3 bottom of supporting leg is equipped with movable pulley 4,1 bottom of chassis is fixedly connected there are two first sleeve 5, and level is fixedly connected there are two partition 6 between two first sleeves 5, Balance weight 7 is slidably connected between two partitions 6,5 inner screw sheath of first sleeve is equipped with column 8, and 8 bottom of column is in first sleeve 5 lower sections are fixedly connected with pressing plate 9, and 1 top vertical of chassis is fixedly connected there are two baffle 10, are flexibly connected between two baffles 10 There is transverse slat 11, two opposite sides of baffle 10 are fixedly connected to several air exhausters 12, open multiple air exhausters 12, The circulation that can accelerate gas in tunnel prevents gas density excessively high, and 11 two sides of transverse slat are fixedly connected to sliding block 13, baffle 10 On offer the sliding slot 14 to match with sliding block 13 vertically, electric pushrod 15 is fixedly connected between transverse slat 11 and chassis 1 vertically, Electric pushrod 15 is located between two baffles 10, and 10 front surface of baffle is fixedly connected with connection ring 16, between two connection rings 16 Through holding rod 17 is equipped with, 11 top two sides of transverse slat are fixedly connected to support plate 18, and 2 bottom of top plate is fixedly connected with and supports The connection frame 19 that plate 18 matches, 19 inner wall of connection frame top are fixedly connected with several buffer springs 20,18 top of support plate In being fixedly connected in connection frame 19 with several 20 bottoms of buffer spring, console 21 is fixedly connected with before two support plates 18 With display screen 22, console 21 is located at 22 lower section of display screen, and air exhauster 12 and electric pushrod 15 are electrical with console 21 respectively It connects, several rubber mat plates 23 is fixedly connected at the top of top plate 2, rotation column 8 is bonded pressing plate 9 and ground, then controls Electric pushrod 15 allows the top surface fitting of rubber mat plate 23 and tunnel internal on top plate 2, allows device to be supported tunnel, reduces Security risk improves the safety of staff's work, and 2 two sides of the bottom of top plate are fixedly connected with screw rod 24, screw rod 24 vertically External thread sleeve is equipped with adjusting sleeve pipe 25, and 25 front surface of adjusting sleeve pipe is fixedly connected with gas concentration monitoring head 26, by turning spiral shell Adjusting sleeve pipe 25 on bar 24 comes height and the direction of control gas concentration monitor head 26, and monitoring region is conveniently adjusted, monitoring effect Fruit is good, and console 21 and display screen 22 are electrically connected with gas concentration monitoring head 26 respectively, 1 two sides of chassis be fixedly connected to The second sleeve 27 that screw rod 24 matches, 27 bottom of second sleeve offer screw hole 28 vertically, and 28 internal screw thread of screw hole is connected with spiral shell Bolt 29 is arranged with damping spring 30 in second sleeve 27, is fixedly connected through screw hole 28 in second sleeve 27 at the top of bolt 29 There is cushion block 31,29 bottom of bolt is fixedly connected with button lid 32 below second sleeve 27.
11 two sides of the bottom of transverse slat are fixedly connected to rack, and rack inner horizontal is fixedly connected with parcel shelf, balance Slide bar is fixedly connected at the top and bottom of block 7, level offers the logical rail to match with slide bar, two baffles 10 on partition 6 Opposite side is fixedly connected to tilt prop, and tilt prop bottom is fixedly connected with chassis 1, and tilt prop is located under transverse slat 11 Side, rubber mat plate 23 is four, and four rubber mat plates 23 are evenly distributed on top plate 2, and 17 outer surface of holding rod is arranged with anti-skidding Set, and 17 both ends of holding rod are mounted on limit plate, two opposite sides of partition 6 are equipped with graduated scale, two connection frames 19 Between be fixedly connected with LED illumination fluorescent tube.
Working principle: staff when in use, turns the column 8 in first sleeve 5 first, makes pressing plate 9 and ground face paste It closes, then controls electric pushrod 15 and rise top plate 2, allow the top surface fitting of rubber mat plate 23 and tunnel internal on top plate 2, at this moment The bolt 29 in second sleeve 27 is tightened, screw rod 24 is limited, device is allowed to carry out Auxiliary support to tunnel, it is hidden to reduce safety Suffer from, improve the safety of staff's work, by the adjusting sleeve pipe 25 on rotation screw rod 24 come control gas concentration monitor head 26 height and direction, monitoring region are conveniently adjusted, and monitoring effect is good, and data are transmitted to display screen by gas concentration monitoring head 26 22, for display screen 22 after showing gas density, staff observes numerical value to choose whether to open using console 21 and be vented Blower 12 can accelerate the circulation of gas in tunnel after air exhauster 12 is opened, prevent gas density excessively high.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. a kind of construction ventilation of tunnel gas flexibility starts monitoring device, including chassis (1) and top plate (2), which is characterized in that institute It states top plate (2) to be positioned horizontally in above chassis (1), chassis (1) two sides of the bottom are symmetrically fixedly connected with supporting leg (3), described Supporting leg (3) bottom is equipped with movable pulley (4), and chassis (1) bottom is fixedly connected there are two first sleeve (5), two institutes It states level between first sleeve (5) to be fixedly connected there are two partition (6), slidably connects balance between two partitions (6) Block (7), first sleeve (5) inner screw sheath are equipped with column (8), and column (8) bottom is fixed below first sleeve (5) It is connected with pressing plate (9), chassis (1) top vertical is fixedly connected there are two baffle (10), between two baffles (10) It being connected with transverse slat (11), two opposite sides of the baffle (10) are fixedly connected to several air exhausters (12), Transverse slat (11) two sides are fixedly connected to sliding block (13), are offered on the baffle (10) and are matched with sliding block (13) vertically Sliding slot (14), be fixedly connected with electric pushrod (15), the electric pushrod vertically between the transverse slat (11) and chassis (1) (15) it is located between two baffles (10), baffle (10) front surface is fixedly connected with connection ring (16), two connections Through being equipped with holding rod (17) between ring (16), two sides are fixedly connected to support plate (18) at the top of the transverse slat (11), described Top plate (2) bottom is fixedly connected with the connection frame (19) to match with support plate (18), and connection frame (19) the inner wall top is solid Surely several buffer springs (20) are connected with, at the top of the support plate (18) in connection frame (19) and several buffer springs (20) bottom is fixedly connected, and is fixedly connected with console (21) and display screen (22) before two support plates (18), described Console (21) is located at below display screen (22), and the air exhauster (12) and electric pushrod (15) are electric with console (21) respectively Property connection, be fixedly connected with several rubber mat plates (23) at the top of the top plate (2), top plate (2) two sides of the bottom are vertical It is fixedly connected with screw rod (24), screw rod (24) external thread sleeve is equipped with adjusting sleeve pipe (25), table before the adjusting sleeve pipe (25) Face is fixedly connected with gas concentration monitoring head (26), the console (21) and display screen (22) respectively with gas concentration monitoring head (26) it being electrically connected, chassis (1) two sides are fixedly connected to the second sleeve (27) to match with screw rod (24), and described the Two sleeves (27) bottom offers screw hole (28) vertically, and screw hole (28) internal screw thread is connected with bolt (29), and described second set It is arranged with damping spring (30) in cylinder (27), connects through screw hole (28) in fixed in second sleeve (27) at the top of the bolt (29) It is connected to cushion block (31), bolt (29) bottom is fixedly connected with button lid (32) below second sleeve (27).
2. a kind of construction ventilation of tunnel gas flexibility according to claim 1 starts monitoring device, which is characterized in that described Transverse slat (11) two sides of the bottom are fixedly connected to rack, and the rack inner horizontal is fixedly connected with parcel shelf.
3. a kind of construction ventilation of tunnel gas flexibility according to claim 2 starts monitoring device, which is characterized in that described Slide bar is fixedly connected at the top and bottom of balance weight (7), horizontal offer is led to what slide bar matched on the partition (6) Rail.
4. a kind of construction ventilation of tunnel gas flexibility according to claim 2 starts monitoring device, which is characterized in that two The opposite side of the baffle (10) is fixedly connected to tilt prop, and the tilt prop bottom is fixedly connected with chassis (1), and tiltedly Fagging is located at below transverse slat (11).
5. a kind of construction ventilation of tunnel gas flexibility according to claim 3 starts monitoring device, which is characterized in that described Rubber mat plate (23) is four, and four rubber mat plates (23) are evenly distributed on top plate (2).
6. a kind of construction ventilation of tunnel gas flexibility according to claim 5 starts monitoring device, which is characterized in that described Holding rod (17) outer surface is arranged with Anti-slip cover, and holding rod (17) both ends are mounted on limit plate.
7. a kind of construction ventilation of tunnel gas flexibility according to claim 1 starts monitoring device, which is characterized in that two The opposite side of the partition (6) is equipped with graduated scale.
8. a kind of construction ventilation of tunnel gas flexibility according to claim 1 starts monitoring device, which is characterized in that two LED illumination fluorescent tube is fixedly connected between the connection frame (19).
CN201811423822.5A 2018-11-27 2018-11-27 Tunnel construction ventilation gas flexible start monitoring devices Expired - Fee Related CN109281704B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811423822.5A CN109281704B (en) 2018-11-27 2018-11-27 Tunnel construction ventilation gas flexible start monitoring devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811423822.5A CN109281704B (en) 2018-11-27 2018-11-27 Tunnel construction ventilation gas flexible start monitoring devices

Publications (2)

Publication Number Publication Date
CN109281704A true CN109281704A (en) 2019-01-29
CN109281704B CN109281704B (en) 2020-03-24

Family

ID=65172851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811423822.5A Expired - Fee Related CN109281704B (en) 2018-11-27 2018-11-27 Tunnel construction ventilation gas flexible start monitoring devices

Country Status (1)

Country Link
CN (1) CN109281704B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114979586A (en) * 2022-07-05 2022-08-30 中煤科工集团重庆研究院有限公司 Tunnel whitewashing auxiliary observation system
CN115749880A (en) * 2022-12-09 2023-03-07 湖南省通泰工程有限公司 Tunnel construction strutting arrangement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1559207A1 (en) * 1988-01-04 1990-04-23 Кузбасский Политехнический Институт Method of degassing an excavated space
SU1681023A1 (en) * 1989-06-13 1991-09-30 Центральный научно-исследовательский геологоразведочный институт цветных и благородных металлов Automatic air distribution system for mines and pits
CN106640106A (en) * 2017-02-23 2017-05-10 淮南矿业(集团)有限责任公司 Mining whole-section hard rock tunneling machine and circulative tunneling method
CN206158777U (en) * 2016-08-31 2017-05-10 包头市北工机械有限公司 Tunnel ventilation system of discharging fume

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1559207A1 (en) * 1988-01-04 1990-04-23 Кузбасский Политехнический Институт Method of degassing an excavated space
SU1681023A1 (en) * 1989-06-13 1991-09-30 Центральный научно-исследовательский геологоразведочный институт цветных и благородных металлов Automatic air distribution system for mines and pits
CN206158777U (en) * 2016-08-31 2017-05-10 包头市北工机械有限公司 Tunnel ventilation system of discharging fume
CN106640106A (en) * 2017-02-23 2017-05-10 淮南矿业(集团)有限责任公司 Mining whole-section hard rock tunneling machine and circulative tunneling method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114979586A (en) * 2022-07-05 2022-08-30 中煤科工集团重庆研究院有限公司 Tunnel whitewashing auxiliary observation system
CN115749880A (en) * 2022-12-09 2023-03-07 湖南省通泰工程有限公司 Tunnel construction strutting arrangement

Also Published As

Publication number Publication date
CN109281704B (en) 2020-03-24

Similar Documents

Publication Publication Date Title
CN109281704A (en) A kind of construction ventilation of tunnel gas flexibility starting monitoring device
CN207814324U (en) A kind of noise insulation equipment damping
ATE489583T1 (en) HEAT TRANSFER TUBE PANEL MODULE AND METHOD OF MAKING A RESOLUTION BOILER USING THE MODULE
CN107915158A (en) A kind of inner climbing type tower crane is from climbing adhering supporter and its construction method
CN107782611A (en) A kind of experimental rig suitable for the experiment of multi-angle anchor rod drawing
CN208072418U (en) Public piping lane foundation pit supporting construction
CN108639993A (en) A kind of hanging basket for building with auto-alarm function
CN204266260U (en) A kind of experimental rig pile foundation being applied to load obliquely on centrifuge
CN206618553U (en) A kind of house anti-soft impulse experimental rig of exhaust duct
CN104964817B (en) The multi-functional detection machine of parallel pushout sliding friction stay hinge
CN207633729U (en) A kind of safety device of working drawing review
CN109856670A (en) A kind of geophysical exploration manually seismic source apparatus
CN115266382A (en) Concrete strength detection equipment for engineering construction and use method thereof
CN210268379U (en) Explosive test device
CN213842234U (en) A monitoring devices for ecological environment administers
CN208092089U (en) A kind of electromagnetic wave radiation detection instrument detection support
CN207484284U (en) A kind of bridge and facade wall maintenance device
CN207177315U (en) A kind of build concrete hollow brick masonry device
CN216305358U (en) Attached protective net for scaffold
CN218885412U (en) Building climbing frame net wind pressure resistance performance detection device
CN108058986A (en) Give birth to loading machine
CN216046398U (en) Wisdom building structure on-line monitoring system
CN219799106U (en) Brick water absorption rate detection device
CN116295657B (en) Building structure health monitoring device and application method thereof
CN117905952B (en) Supporting device for mounting heating pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200324

Termination date: 20201127