CN109281438A - Multilayer prefabricated post and construction method of the one-pass molding with bracket - Google Patents

Multilayer prefabricated post and construction method of the one-pass molding with bracket Download PDF

Info

Publication number
CN109281438A
CN109281438A CN201811186536.1A CN201811186536A CN109281438A CN 109281438 A CN109281438 A CN 109281438A CN 201811186536 A CN201811186536 A CN 201811186536A CN 109281438 A CN109281438 A CN 109281438A
Authority
CN
China
Prior art keywords
muscle
bracket
column
concrete
prefabricated post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811186536.1A
Other languages
Chinese (zh)
Inventor
季兆桐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji Long Prefabricated Architectural Design Changzhou Co Ltd
Original Assignee
Ji Long Prefabricated Architectural Design Changzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ji Long Prefabricated Architectural Design Changzhou Co Ltd filed Critical Ji Long Prefabricated Architectural Design Changzhou Co Ltd
Priority to CN201811186536.1A priority Critical patent/CN109281438A/en
Publication of CN109281438A publication Critical patent/CN109281438A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention belongs to prefabricated construction design and construction fields, it is related to a kind of prefabricated assembled multilayer prefabricated post and construction method of the one-pass molding with bracket built in note, pass through the multilayer prefabricated post of prefabricated band bracket, reduce the joint connection in site number between prefabricated post, reached by the load that the concrete bracket of precast bears to transmit on precast beam and be not required to that setting support, speed of application is fast and scene is succinct, convenient for the purpose of operation.

Description

Multilayer prefabricated post and construction method of the one-pass molding with bracket
Technical field
The present invention relates to the one-pass moldings in a kind of prefabrication with the multilayer prefabricated post of bracket and its preparation Method and construction method belong to prefabricated construction design and construction field.
Background technique
Currently, there are two kinds of forms of construction work for reinforced beam, column: traditional cast-in-place and prefabrication and assembly construction.Energetically with country Building industrialization is advocated, this form of construction work of prefabrication and assembly construction is increasingly taken seriously.There is construction in traditional cast-in-place construction mode Long in time limit, the disadvantages of construction quality is poor, environmental is high.And at present in prefabrication, multilayer prefabricated post is usual It is formed by connecting using multiple single layer prefabricated posts, requires to connect using grout sleeve layer by layer or slurry anchor overlaps, and these connection sides Formula is likely to bring the problems such as grouting is not firm, be not able to satisfy high-precision requirement of constructing, construction period is relatively long.And And current prefabricated assembly structural is generally used and the cast-in-place identical arrangement and method for construction for having support system of tradition, so not only It substantially prolongs the construction period and increases a large amount of support expense.Therefore a kind of disadvantages mentioned above is overcome it is necessary to design Prefabricated beam-column connection and construction method.
Summary of the invention
To achieve the goals above, the present invention provides the multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and applies Work method is that a kind of upper and lower level column connect reliable multilayer prefabricated post with column, and passes through bracket in bean column node construction Setting realizes that speed of application is fast and scene is succinct, without Construction of Supporting convenient for operation.
To realize the above-mentioned technical purpose, the specific technical solution that the present invention takes are as follows:
A kind of multilayer prefabricated post of the one-pass molding with bracket, the multilayer prefabricated post include several columns indulge muscle, several column tie-bars with And several concrete columns;Be parallel to each other laid out in parallel between the vertical muscle of several columns;The column tie-bar, which is fixed on column, to be indulged on muscle, And column tie-bar is indulged muscle with column and is arranged in a mutually vertical manner;The concrete column casting is coated on the outside that column indulges muscle and column tie-bar, and It arranges between concrete column and concrete column in gap, the gap between adjacent two concrete column forms installation vacancy; Installation is planted at least one external precast beam in the installation vacancy;It further include at least a pair of of concrete bracket;Each pair of concrete Bracket is symmetrically distributed in concrete column upper end and is used to support cylinder upper end two sides;Each pair of concrete bracket includes several oxen Leg indulges muscle, several bracket stirrups, spacer bar and concrete bodies;The bracket indulges muscle along concrete bracket genesis analysis, ox Leg cuff muscle, which is fixed on bracket, to be indulged on muscle;The concrete bodies casting is coated on the outside that bracket indulges muscle and bracket stirrup;It is described fixed Position reinforcing bar is symmetrical double L-shaped structure, and it is flat that the short side of the spacer bar of double L-shaped structure is fixed on its long side in concrete bodies Row extends upwardly to outside concrete bodies in concrete column length direction;The concrete bodies, concrete column are disposable Moulding by casting;The precast beam both ends are equipped with keyway, and the bottom surface of the keyway is equipped with beam-ends location hole;Precast beam is pacified by keyway It is placed in installation vacancy, and is positioned by spacer bar and beam-ends location hole.
A kind of multilayer prefabricated post of the one-pass molding with bracket is constructed using following steps:
Step 1: pour at the construction field (site) be poured in basis or lower floor's post of having constructed after, the multilayer prefabricated post of hanging belt bracket will be with ox The multilayer prefabricated post of leg is installed in basis or lower floor's post, and using temporary support fixing belt bracket simultaneously in two directions Multilayer prefabricated post;
Step 2: basis or lower floor's post and the multilayer prefabricated post with bracket are connected using grouting process casting;
Step 3: precast beam is shelved on concrete bracket, what guarantee spacer bar can be arranged at precast beam keyway determines Position hole;
Step 4: the keyway slot bottom in precast beam places beam bottom additional muscle, guarantee beam bottom additional muscle through installation vacancy;
Step 5: interting back on the top of precast beam indulges muscle, and it is empty to guarantee that beam bottom additional muscle and the vertical muscle of back run through installation Position;
Step 6: using core space column tie-bar be secured across installation hole location at beam bottom additional muscle, back indulge muscle, column indulge muscle and Column tie-bar is mutually lapped realization from the opposite two sides insertion of pillar using two U-shaped steel muscle simultaneously while fixed beam bottom is additional Muscle, back indulge muscle, column indulges muscle and column tie-bar;
Step 7: back indulge muscle it is fixed after pour part back stirrup, and back is indulged into muscle with after by the way of cast-in-place note and is poured Part back stirrup cladding.
Working principle: by prefabricated band bracket multilayer skewered column, the joint connection in site number of column and column is reduced, is held by bracket Achieved the purpose that be not required to setting support by the load transmitted on precast beam.
The invention has the advantages that:
(1) multilayer prefabricated post keeps its connection reliable, not easily broken because it uses two sections or the three segmented columns technique integral prefabricated in factory It is good to split separation, anti-seismic performance, because of prefabricated components error when being substantially shorter construction time and traditional single-unit multilayer prefabricated post connection And it is difficult to the problem of connecting, and link cost can be reduced,
(2) setting of bracket can save a large amount of support in multilayer prefabricated post, and more safe and reliable, to save support expense And accelerate speed of application and scene succinctly, convenient for operation.It preferably embodies prefabricated assembled build and infuses energy-saving and environmental protection, efficient etc. Advantage.
(3) when precast beam lifting construction, any support that no setting is required under beam slab.
Detailed description of the invention
A kind of main view diagrammatic cross-section of multilayer prefabricated post of the one-pass molding of the invention of attached drawing 1 with bracket;
A kind of left view floor map of multilayer prefabricated post of the one-pass molding of the invention of attached drawing 2 with bracket;
Diagrammatic cross-section at a kind of A-A of the one-pass molding of the invention of attached drawing 3 with the multilayer prefabricated post of bracket;
Diagrammatic cross-section at a kind of B-B of the one-pass molding of the invention of attached drawing 4 with the multilayer prefabricated post of bracket;
A kind of multilayer prefabricated post concrete bracket structural schematic diagram of the one-pass molding of the invention of attached drawing 5 with bracket;
A kind of one-pass molding of the invention of attached drawing 6 is with the multilayer prefabricated post of bracket and the scheme of installation of precast beam;
Other side schematic diagram after a kind of multilayer prefabricated post of the one-pass molding of the invention of attached drawing 7 with bracket and precast beam installation;
In figure: 1, column indulges muscle;2, multilayer prefabricated post;3, concrete bracket;4, column tie-bar;5, core space column tie-bar;6, steel is positioned Muscle;7, bracket stirrup;8, bracket indulges muscle;9, back indulges muscle;10, beam bottom indulges muscle;11, beam bottom additional muscle;12, precast beam;13, key Slot;14, pre-embedded bolt hole;15, location hole;16, steel corbel.
Specific embodiment
To keep purpose and the technical solution of the embodiment of the present invention clearer, below in conjunction with the attached of the embodiment of the present invention Figure, is clearly and completely described the technical solution of the embodiment of the present invention.Obviously, described embodiment is of the invention A part of the embodiment, instead of all the embodiments.Based on described the embodiment of the present invention, those of ordinary skill in the art Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of being not necessarily to creative work.
Embodiment 1
A kind of multilayer prefabricated post of the one-pass molding with bracket, the multilayer prefabricated post include that several columns indulge muscle 1, several column tie-bars 4 And several concrete columns;Be parallel to each other laid out in parallel between the vertical muscle 1 of several columns;It is vertical that the column tie-bar 4 is fixed on column On muscle 1, and column tie-bar 4 is indulged muscle 1 with column and is arranged in a mutually vertical manner;The concrete column casting is coated on column and indulges muscle 1 and column tie-bar 4 Outside, and arrange between concrete column and concrete column in gap, the gap between adjacent two concrete column is formed Vacancy is installed;Installation is planted at least one external precast beam 12 in the installation vacancy;It further include at least a pair of of concrete bracket 3;Each pair of concrete bracket 3 is symmetrically distributed in concrete column upper end and is used to support cylinder upper end two sides;Each pair of concrete Bracket 3 includes that several brackets indulge muscle 8, several bracket stirrups 7, spacer bar 6 and concrete bodies;The bracket indulges muscle 8 along mixed Solidifying 3 genesis analysis of clay ox leg, bracket stirrup 7, which is fixed on bracket, to be indulged on muscle 8;The concrete bodies casting is coated on bracket and indulges muscle 8 With the outside of bracket stirrup 7;The spacer bar 6 be symmetrical double L-shaped structure, the spacer bar 6 of double L-shaped structure it is short While being fixed on its long side in concrete bodies is parallel to concrete column length direction, and extend upwardly to outside concrete bodies;It is described Concrete bodies, concrete column are disposal pouring molding.
Multilayer prefabricated post of the one-pass molding with bracket, is prepared using following steps:
Step 1: several columns are indulged muscle 1 and the binding of column tie-bar 4 into the frame knot of multilayer prefabricated post 2 in factory or construction site Structure, i.e., be parallel to each other between the vertical muscle 1 of guarantee column laid out in parallel during binding, and column tie-bar 4, which is fixed on column, to be indulged on muscle 1, and column Stirrup 4 is indulged muscle 1 with column and is arranged in a mutually vertical manner;Its center pillar is vertical, and muscle 1 is elongated is set to the prefabricated shaft of entire multilayer;
It is fixed on by the shape of bracket in the frame structure of multilayer prefabricated post 2 Step 2: bracket is indulged muscle 8 and bracket stirrup 7, together When spacer bar 6 be fixed on bracket indulge and obtain total frame between muscle 8 and bracket stirrup 7;
It is greater than in the multilayer prefabricated post casting mold of total lengths of frame Step 3: total frame to be placed in the length made, Disposal molding is smash and guaranteed to disturbing concrete in module, when concrete setting when meeting demoulding strength to being demoulded to obtain band The multilayer prefabricated post 2 of concrete bracket.
For the ease of the installation of precast beam 12,12 both ends of precast beam are equipped with keyway 13, and the bottom surface of the keyway 13 is set There is beam-ends location hole 15;Precast beam 12 is placed in installation vacancy by keyway 13, and passes through spacer bar 6 and beam-ends location hole 15 It is positioned.
A kind of multilayer prefabricated post 2 of the one-pass molding with bracket is constructed using following steps:
Step 1: pour at the construction field (site) be poured in basis or lower floor's post of having constructed after, the multilayer prefabricated post 2 of hanging belt bracket, by band The multilayer prefabricated post 2 of bracket is installed in basis or lower floor's post, and uses temporary support in two directions while fixing belt ox The multilayer prefabricated post 2 of leg;
Step 2: basis or lower floor's post are connected with the multilayer prefabricated post 2 with bracket using grouting process casting, increase stability So that precast beam 12 can be directly rested on concrete bracket 3 in step 3;
Step 3: precast beam 12 is shelved on concrete bracket 3, guarantee that spacer bar 6 can pass through at 12 keyway 13 of precast beam The location hole 15 of setting;Guarantee that in subsequent construction technique, the precast beam 12 is not required to any support and can directly construct;
Step 4: 13 slot bottom of keyway in precast beam 12 places beam bottom additional muscle 11, guarantee that beam bottom additional muscle 11 is empty through installation Position;
Step 5: interting back on the top of precast beam 12 indulges muscle 9, and guarantee that beam bottom additional muscle 11 is indulged muscle 9 with back and run through Vacancy is installed;
Step 6: using core space column tie-bar 5 be secured across installation hole location at beam bottom additional muscle 11, back indulge muscle 9, column indulge muscle 1 and column tie-bar 4, i.e., realization fixed beam simultaneously is mutually lapped from the opposite two sides insertion of pillar using two U-shaped steel muscle simultaneously Bottom additional muscle 11, back indulge muscle 9, column indulges muscle 1 and column tie-bar 4;
Part back stirrup is poured Step 7: indulging after muscle 9 is fixed in back, and back is indulged into muscle 9 with after by the way of cast-in-place note Pour part back stirrup cladding.
Such form is suitable for the case where bearing larger load on 2 bracket of multilayer prefabricated post.
Embodiment 2
The difference from embodiment 1 is that the one-pass molding is with the more of bracket for the ease of the construction application of multilayer prefabricated post 2 Layer prefabricated post 2 further includes several pairs of steel corbels 16, and each pair of steel corbel 16 is symmetrically distributed in concrete column and is used to support one end Two sides and with 3 vertical distribution of concrete bracket.
Specific construction step are as follows:
Step 1: in factory or construction site, column indulged to muscle 1(is elongated to be set to the prefabricated shaft of entire multilayer) and column tie-bar 4 press Design requirement binds the frame structure at multilayer prefabricated post 2;
It is fixed on by the shape of bracket in the frame structure of multilayer prefabricated post 2 Step 2: bracket is indulged muscle 8 and bracket stirrup 7, together When spacer bar 6 be fixed on bracket indulge and obtain total frame between muscle 8 and bracket stirrup 7;
Step 3: 16 connection pre-embedded bolt hole 14 of steel corbel to be fixed on to two sections or three sections for being placed in and making after total frame In 2 mold of multilayer prefabricated post of pillar, disturbing concrete, one-pass molding, when concrete is stand-by to demoulding when meeting demoulding strength;
Step 4: at the construction field (site), steel corbel 16 first can be fixed by bolts in (steel corbel in pre-embedded bolt hole 14 before lifting 16 and the bearing capacity of bolt can be sized according to the beam load that upper part is shelved), then carry out lifting and subsequent job, The lifting for first carrying out multilayer prefabricated post 2 carries out the processes such as lifting and the casting of cast-in-place part of subsequent precast beam 12 later, subsequent to apply It does not need that any support is arranged under work central sill yet.
Step 5: when the node casting complete that precast beam 12 is connect with multilayer prefabricated post 2 and after reach design strength, steel ox Leg 16 is dismountable and reusable.
Such form is suitable for the case where bearing on 2 bracket of multilayer prefabricated post compared with small load.
The above is only embodiments of the present invention, and the description thereof is more specific and detailed, and but it cannot be understood as right The limitation of the invention patent range.It should be pointed out that for those of ordinary skill in the art, not departing from the present invention Under the premise of design, various modifications and improvements can be made, these are all belonged to the scope of protection of the present invention.

Claims (2)

1. a kind of multilayer prefabricated post of one-pass molding with bracket, the multilayer prefabricated post includes that several columns indulge muscle, several column tie-bars And several concrete columns;Be parallel to each other laid out in parallel between the vertical muscle of several columns;The column tie-bar, which is fixed on column, indulges muscle On, and column tie-bar is indulged muscle with column and is arranged in a mutually vertical manner;The concrete column casting is coated on the outside that column indulges muscle and column tie-bar, And arrange between concrete column and concrete column in gap, it is empty that the gap between adjacent two concrete column forms installation Position;Installation is planted at least one external precast beam in the installation vacancy;It is characterized in that, further including at least a pair of of coagulation clay ox Leg;Each pair of concrete bracket is symmetrically distributed in concrete column upper end and is used to support cylinder upper end two sides;Each pair of concrete Bracket includes that several brackets indulge muscle, several bracket stirrups, spacer bar and concrete bodies;The bracket indulges muscle along coagulation clay ox The longitudinal direction of leg is distributed, and bracket stirrup, which is fixed on bracket, to be indulged on muscle;The concrete bodies casting is coated on bracket and indulges muscle and ox The outside of leg cuff muscle;The spacer bar is symmetrical double L-shaped structure, and the short side of the spacer bar of double L-shaped structure is fixed In in concrete bodies, long side is parallel to concrete column length direction, and extends upwardly to outside concrete bodies;The concrete Body, concrete column are disposal pouring molding;The precast beam both ends are equipped with keyway, and the bottom surface of the keyway is fixed equipped with beam-ends Position hole;Precast beam is placed in installation vacancy by keyway, and is positioned by spacer bar and beam-ends location hole.
2. a kind of multilayer prefabricated post of the one-pass molding according to claim 1 with bracket, which is characterized in that be using as follows What step was constructed:
Step 1: pour at the construction field (site) be poured in basis or lower floor's post of having constructed after, the multilayer prefabricated post of hanging belt bracket will be with ox The multilayer prefabricated post of leg is installed in basis or lower floor's post, and using temporary support fixing belt bracket simultaneously in two directions Multilayer prefabricated post;
Step 2: basis or lower floor's post and the multilayer prefabricated post with bracket are connected using grouting process casting;
Step 3: precast beam is shelved on concrete bracket, what guarantee spacer bar can be arranged at precast beam keyway determines Position hole;
Step 4: the keyway slot bottom in precast beam places beam bottom additional muscle, guarantee beam bottom additional muscle through installation vacancy;
Step 5: interting back on the top of precast beam indulges muscle, and it is empty to guarantee that beam bottom additional muscle and the vertical muscle of back run through installation Position;
Step 6: using core space column tie-bar be secured across installation hole location at beam bottom additional muscle, back indulge muscle, column indulge muscle and Column tie-bar is mutually lapped realization from the opposite two sides insertion of pillar using two U-shaped steel muscle simultaneously while fixed beam bottom is additional Muscle, back indulge muscle, column indulges muscle and column tie-bar;
Step 7: back indulge muscle it is fixed after pour part back stirrup, and back is indulged into muscle with after by the way of cast-in-place note and is poured Part back stirrup cladding.
CN201811186536.1A 2016-10-21 2016-10-21 Multilayer prefabricated post and construction method of the one-pass molding with bracket Pending CN109281438A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811186536.1A CN109281438A (en) 2016-10-21 2016-10-21 Multilayer prefabricated post and construction method of the one-pass molding with bracket

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610919890.5A CN106437031B (en) 2016-10-21 2016-10-21 The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method
CN201811186536.1A CN109281438A (en) 2016-10-21 2016-10-21 Multilayer prefabricated post and construction method of the one-pass molding with bracket

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610919890.5A Division CN106437031B (en) 2016-10-21 2016-10-21 The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method

Publications (1)

Publication Number Publication Date
CN109281438A true CN109281438A (en) 2019-01-29

Family

ID=58176533

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201811186536.1A Pending CN109281438A (en) 2016-10-21 2016-10-21 Multilayer prefabricated post and construction method of the one-pass molding with bracket
CN201610919890.5A Active CN106437031B (en) 2016-10-21 2016-10-21 The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610919890.5A Active CN106437031B (en) 2016-10-21 2016-10-21 The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method

Country Status (1)

Country Link
CN (2) CN109281438A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115095014A (en) * 2022-07-07 2022-09-23 中建八局西北建设有限公司 Column bracket structure for mounting precast beam

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057046A (en) * 2018-07-09 2018-12-21 常州市规划设计院 The assembled integral beam-column node structure and construction method of additional closure connection reinforcing bar
CN108775083A (en) * 2018-07-09 2018-11-09 东南大学 The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region
CN108775086A (en) * 2018-07-09 2018-11-09 东南大学 The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar
CN109057159A (en) * 2018-09-07 2018-12-21 三筑工科技有限公司 Prefabricated laminated superposed column, assembled architecture body and assembled architecture body method of construction
CN111502118A (en) * 2020-04-14 2020-08-07 中铁第四勘察设计院集团有限公司 Assembled combination beam and beam slab node
CN114855876A (en) * 2022-06-08 2022-08-05 青岛中科坤泰装配建筑科技有限公司 Prefabricated double-layer integrated column for underground structure and construction method thereof
CN114875965A (en) * 2022-06-08 2022-08-09 青岛中科坤泰装配建筑科技有限公司 Assembly integral type subway station structure
CN114809086A (en) * 2022-06-08 2022-07-29 青岛中科坤泰装配建筑科技有限公司 Integral subway station structure of assembly of annular reinforcing bar overlap joint

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336747A (en) * 1999-05-31 2000-12-05 Kajima Corp Execution method of beam-column connection
JP2005139811A (en) * 2003-11-10 2005-06-02 Kawada Construction Co Ltd Joining structure of precast concrete member
CN201381558Y (en) * 2009-04-20 2010-01-13 贵阳铝镁设计研究院 Insulated connection structure of steel-reinforced concrete column and steel-reinforced concrete connecting beam
CN103774755A (en) * 2014-01-07 2014-05-07 同济大学 Prestressed prefabricated ECC-RC combination beam column joint component
CN204098219U (en) * 2014-10-15 2015-01-14 昆明营造工程设计有限公司 Bracket steel bar concrete frame connecting pin contact assembled architecture
CN104727440A (en) * 2014-11-17 2015-06-24 马恒忠 Novel industrialized production efficiently-assembled type building frame column beam and manufacturing method
CN204738452U (en) * 2015-06-01 2015-11-04 夏伟 Prefabricated stand

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6119425A (en) * 1995-12-01 2000-09-19 Shimonohara; Takeshige Structure members and a method of jointing the same
CN2900666Y (en) * 2006-05-24 2007-05-16 贵阳铝镁设计研究院 Concrete upright colume with concrete bracket and capable of rear placing steel bracket
CN101487291A (en) * 2009-02-09 2009-07-22 刘馨裕 Assembly node and construction method of prefabricated hollow beam and column
CN201865206U (en) * 2010-10-26 2011-06-15 沈阳铝镁设计研究院有限公司 Connection node structure of edge beam and reinforced concrete prefabricated column bracket
CN203393848U (en) * 2013-08-09 2014-01-15 鸿鑫建设集团有限公司 Connection node structure of reinforced concrete column and steel I-beam
CN104594560A (en) * 2015-01-30 2015-05-06 柳忠东 Prefabricated frame column
CN104695626B (en) * 2015-03-11 2016-09-07 济南轨道交通集团有限公司 A kind of separate type prefabricated reinforced concrete bracket column and construction method
CN206512923U (en) * 2016-10-21 2017-09-22 季氏预制装配建筑设计常州有限公司 Multilayer prefabricated post of the one-shot forming with bracket

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336747A (en) * 1999-05-31 2000-12-05 Kajima Corp Execution method of beam-column connection
JP2005139811A (en) * 2003-11-10 2005-06-02 Kawada Construction Co Ltd Joining structure of precast concrete member
CN201381558Y (en) * 2009-04-20 2010-01-13 贵阳铝镁设计研究院 Insulated connection structure of steel-reinforced concrete column and steel-reinforced concrete connecting beam
CN103774755A (en) * 2014-01-07 2014-05-07 同济大学 Prestressed prefabricated ECC-RC combination beam column joint component
CN204098219U (en) * 2014-10-15 2015-01-14 昆明营造工程设计有限公司 Bracket steel bar concrete frame connecting pin contact assembled architecture
CN104727440A (en) * 2014-11-17 2015-06-24 马恒忠 Novel industrialized production efficiently-assembled type building frame column beam and manufacturing method
CN204738452U (en) * 2015-06-01 2015-11-04 夏伟 Prefabricated stand

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115095014A (en) * 2022-07-07 2022-09-23 中建八局西北建设有限公司 Column bracket structure for mounting precast beam

Also Published As

Publication number Publication date
CN106437031B (en) 2019-02-05
CN106437031A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106437031B (en) The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method
CN105625568B (en) Assembly concrete orthogonal spatial space lattice boxlike tube-in-tube structure
CN101736832B (en) Confined masonry structure and making method thereof
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN105926771B (en) A kind of the interior joint connection structure and its construction method of prefabricated integral frame column beam
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN213174446U (en) Assembled UHPC superimposed sheet shear force wall prefabricated construction with mandrel
KR101196874B1 (en) Girder making methos for precast end seggement using end mold and girder therewith
CN110206229A (en) A kind of concrete column splicing structure and its construction method
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN206512923U (en) Multilayer prefabricated post of the one-shot forming with bracket
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN110005053A (en) One kernel texture assembly assembling frame structure and its method of construction
CN201722813U (en) Confined masonry structure
CN109208823A (en) It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology
CN101899875A (en) Thin-wall internal-mould large-thickness hollow floor plate
CN212656384U (en) High-strength concrete connecting piece, high-strength concrete post-cast assembled frame system and support frame
CN206053079U (en) Assembled beam slab integrated composite floor
CN105946099B (en) Fill the method for construction of core assembly concrete beam
CN201424729Y (en) Big-thickness hollow floorslab of thin-wall inner module
CN104005475A (en) Hollow column assembling type frame system easy to mount and construction method
CN115126140A (en) Hollow floor light solid box body assembly and hollow floor structure thereof
CN214061940U (en) Precast concrete assembled structure with rib mold structure
CN205591349U (en) Strong prestressing tendons's precast concrete beam post node in adoption
CN105019349A (en) Pi-shaped precast beam and preparation method thereof as well as mounting and construction method of precast beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190129