CN109281422A - Prefabricated concrete structure wall-column all steel key connection structure and assembling method - Google Patents

Prefabricated concrete structure wall-column all steel key connection structure and assembling method Download PDF

Info

Publication number
CN109281422A
CN109281422A CN201811329141.2A CN201811329141A CN109281422A CN 109281422 A CN109281422 A CN 109281422A CN 201811329141 A CN201811329141 A CN 201811329141A CN 109281422 A CN109281422 A CN 109281422A
Authority
CN
China
Prior art keywords
wall
prefabricated
prefabricated post
shear wall
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811329141.2A
Other languages
Chinese (zh)
Inventor
李明
唐元昊
魏大勇
史永彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201811329141.2A priority Critical patent/CN109281422A/en
Publication of CN109281422A publication Critical patent/CN109281422A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4107Longitudinal elements having an open profile, with the opening parallel to the concrete or masonry surface, i.e. anchoring rails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • E04B2/66Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete characterised by special cross-section of the elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B2001/4192Connecting devices specially adapted for embedding in concrete or masonry attached to concrete reinforcing elements, e.g. rods or wires

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention relates to prefabricated assembled concrete structural construction field, specially a kind of prefabricated concrete structure wall-column all steel key connection structure and assembling method.The structure includes prefabricated post-wall built-in fitting, prefabricated post, precast shear wall, precast shear wall is located between two prefabricated posts, prefabricated post-wall built-in fitting between prefabricated post and precast shear wall is corresponding, passes through I-shaped column-wall connection key connection between the prefabricated post being oppositely arranged-wall built-in fitting.Prefabricated post of the present invention and precast shear wall complete the transmitting of wall-intercolumniation coupling part shearing, further enhance the globality of structure, anti-seismic performance is more preferable by the way that built-in fitting and I-steel shear key is arranged in precast shear wall and prefabricated post coupling part.The present invention does not include the processes such as scene grouting or concreting, and whole processes are all the in-site installation connections of prefabricated components, does not need wet construction, greatly shortens the time required for building-site is constructed, can greatly improve speed of application.

Description

Prefabricated concrete structure wall-column all steel key connection structure and assembling method
[technical field]
The present invention relates to prefabricated assembled concrete structural construction field, specially a kind of prefabricated concrete structure wall- Column all steel is keyed structure and assembling method.
[background technique]
Prefabricated concrete structure has many advantages, such as that fast speed of application, energy conservation and environmental protection, on-site wet operation amount are small, exists in recent years The country is grown rapidly.Concrete frame-shear wall structure (abbreviation frame-shear structure) is the primary structure that China applies at present One of form.Therefore, connection frame-shear structure how is split, forming assembled system becomes important the asking of civil engineer's concern Topic.Previous related wall-column connection, it is main that the then method in junction casting concrete or grouting material is connected using reinforcing bar, it applies Work needs wet construction, and construction technology is cumbersome, and speed of application is slow, and the quality of connecting portion is not easy to guarantee.For this purpose, before inventor Invention " a kind of assembled frame-shear structure curved scissors type combination keyway connection structure " and a kind of " assembly concrete frame-shear wall key Slot connection structure ", and authorized.Above-mentioned two patent is connected using grouting, is needed in piece between handling component Wet construction, and wall-column junction, the ability that both limitations disengage are weaker.For this purpose, proposing prefabricated concrete structure wall-column All steel is keyed structure and assembling method.
[summary of the invention]
The purpose of the present invention is to provide a kind of prefabricated concrete structure wall-column all steel key connection structure and assembly sides Method, under the premise of being connected between guaranteeing various precast concretes, completely without wet construction, greatly improve speed of application and Construction quality.
Technical solution of the present invention:
A kind of prefabricated concrete structure wall-column all steel is keyed structure, including prefabricated post-wall built-in fitting, prefabricated post, pre- Shear wall processed, precast shear wall are located between two prefabricated posts, prefabricated post-wall built-in fitting between prefabricated post and precast shear wall It is corresponding, pass through I-shaped column-wall connection key connection between the prefabricated post being oppositely arranged-wall built-in fitting, in which:
(1) prefabricated post-wall built-in fitting is made of ribbed steel and circular hole, and the side of ribbed steel is arranged in parallel transversal up and down Face is the floor of L-type, and circular hole, circular hole parallel arrangement are arranged on monolith ribbed steel, and the lateral stressed muscle of shear wall passes through circular hole, rib Plate forms groove with the side of ribbed steel respectively, and upper and lower two grooves are opposite;
(2) prefabricated post is poured mixed by longitudinal stress muscle, prefabricated column tie-bar, vertical reinforcement sleeve and ribbed steel in prefabricated post Local soil type is coagulated at longitudinal stress muscle connects to form frame structure by prefabricated column tie-bar in four prefabricated posts of the arrangement that is square, often The bottom of longitudinal stress muscle is set with vertical reinforcement sleeve in a prefabricated post, and the one side of the frame structure is uniformly set from top to bottom Prefabricated post-wall built-in fitting is set, concreting is in frame structure inner side and outer side;
(3) precast shear wall includes framework of steel reinforcement, prefabricated post-wall built-in fitting and concrete, the two sides difference of framework of steel reinforcement Prefabricated post-wall built-in fitting is set, and concreting is in framework of steel reinforcement inner side and outer side;Framework of steel reinforcement is shear wall longitudinal stress The lateral stressed muscle of muscle, shear wall, shear wall confined boundary member stirrup and shearing wall lacing wire composition, two rows of shear wall longitudinal stresses Muscle is oppositely arranged in parallel, and by the lateral stressed muscle connection of shear wall between every row's shear wall longitudinal stress muscle, what is be oppositely arranged is cut It is connected between power wall longitudinal stress muscle by shearing wall lacing wire, outside is flat up and down between the edge of two rows of shear wall longitudinal stress muscle Row setting shear wall confined boundary member stirrup.
The prefabricated concrete structure wall-column all steel is keyed structure, I-shaped column-wall connecting key 4 by vertical plate, Level board, convex ribs composition, the level board setting up and down of vertical plate are in I-shaped structure, both ends one at the top of superposed level board Parallel convex ribs are arranged in body, are wholely set parallel convex ribs, I-shaped column-wall connecting key positioned at the level board bottom both ends of lower part 4 two sides are connect with prefabricated post-wall built-in fitting respectively, I-shaped column-wall connecting key by upper and lower two convex ribs respectively with it is prefabricated The two groove inserting cooperations up and down of column-wall built-in fitting.
The prefabricated concrete structure wall-column all steel is keyed structure, interconnecting piece between prefabricated post and precast shear wall Cover board is arranged in position outside, and cover board includes cover board cross direction profiles muscle, cover board genesis analysis muscle and billet, the parallel opposite lid of a row Plate cross direction profiles muscle and the parallel opposite cover board genesis analysis muscle of a row form steel reinforcement net.
The prefabricated concrete structure wall-column all steel is keyed structure, and billet is welded on certain in steel reinforcement net Between two adjacent cover board cross direction profiles muscle, specific link position corresponds to fill benzene plate center between prefabricated post and precast shear wall.
The prefabricated concrete structure wall-column all steel key connection structure assembling method, includes the following steps:
(1) lifting of prefabricated post and precast shear wall first lifts two prefabricated posts and a precast shear wall in place, in advance Shear wall processed is located between two prefabricated posts;
(2) the corresponding insertion work between prefabricated post-wall built-in fitting and prefabricated post in precast shear wall-wall built-in fitting in prefabricated post Font column-wall connecting key makes prefabricated post-wall built-in fitting and I-shaped in prefabricated post in prefabricated post-wall built-in fitting and precast shear wall Type column-wall connecting key is in close contact, and is then welded, and the connection of connecting key between prefabricated post and precast shear wall is completed;
(3) between prefabricated post-is inserted into prefabricated post-wall in gap between wall built-in fitting and prefabricated post and precast shear wall with the shape Filling benzene plate, then correspondence installs the I-shaped column in I-shaped column-wall connecting key side-wall connecting key filling benzene with the shape Plate completes the connection of vacant position benzene plate in prefabricated post and precast shear wall connecting portion;
(4) connecting portion between prefabricated post and shear wall is installed outside prefabricated post and precast shear wall connecting portion corresponding position Connecting portion balustrade deching between prefabricated post and precast shear wall is first placed on connecting portion and corresponds to vacant locations by balustrade deching, Then sequentially passed through between former and later two corresponding prefabricated posts and precast shear wall on connecting portion balustrade deching with interspersed reinforcing bar Billet, then the both ends of interspersed reinforcing bar are secured with nuts, complete the fixed installation of connecting portion balustrade deching between column and shear wall;
(5) the billet recess between the column and shear wall after all completions are fixedly mounted on connecting portion balustrade deching Gypsum is smeared, keeps recess smooth, completes the connection between prefabricated post and precast shear wall.
The assembling method of the prefabricated concrete structure wall-column all steel key connection structure in step (4), interts steel Distance adds two sides between the length of muscle should be the billet outer surface between the shear wall of correspondence on connecting portion balustrade deching The thickness of corresponding fixture nut.
The prefabricated concrete structure wall-column all steel key connection structure assembling method, the manufacturing process of prefabricated post Are as follows:
(1) vertical reinforcement sleeve is inserted into the lower end of longitudinal stress muscle in prefabricated post, then binds prefabricated column tie-bar, complete Steel bar arrangement in prefabricated post;
(2) upper end of longitudinal stress muscle should reserve a part in prefabricated post, and it is perpendicular that the length of reserved part should be prefabricated post To the half of reinforced bar sleeve height;
(3) prefabricated post-wall built-in fitting is passed through into hole fixation with steel wire on prefabricated column tie-bar, prefabricated post-wall built-in fitting It is uniformly distributed along prefabricated post short transverse;
(4) the reinforcing bar outer support template in prefabricated post, casting concrete, concrete should pour in template to prefabricated Column-wall built-in fitting outer surface, form removal after concrete setting complete the production of prefabricated post.
The prefabricated concrete structure wall-column all steel key connection structure assembling method, the production of precast shear wall Process are as follows:
(1) shear wall longitudinal stress muscle and shear wall confined boundary member stirrup are bound, confined boundary member reinforcing bar is formed, Then remaining shear wall longitudinal stress muscle and the lateral stressed muscle 9 of shear wall are bound, finally binding shearing wall lacing wire, forms prefabricated cut The reinforcing bar of power within the walls;
(2) prefabricated post-wall built-in fitting is that shear wall side is fixed on by metal binding wire, and metal binding wire passes through prefabricated Reserved circular hole above column-wall built-in fitting is bound in precast shear wall on confined boundary member stirrup, and wall is laterally homogeneous It is distributed in two side areas;
(3) formwork supporting plate on the outside of framework of steel reinforcement, casting concrete, concrete should be poured in template to column wall built-in fitting Outer surface;Form removal after concrete setting completes the production of precast shear wall.
The invention has the advantages and beneficial effects that:
1. master operation of the invention does not include that processes, whole processes such as scene grouting or concreting are all prefabricated structures The in-site installation of part connects, and does not need wet construction, greatly shortens the time required for building-site is constructed, can greatly improve Speed of application, save the cost.
2. prefabricated post of the present invention and precast shear wall, by the way that built-in fitting is arranged in precast shear wall and prefabricated post coupling part With I-steel shear key, the transmitting of wall-intercolumniation coupling part shearing is completed, the globality of structure, anti-seismic performance are further enhanced More preferably.
3. the high part of present invention production required precision, including prefabricated post, precast shear wall and prefabricated post-wall are pre-buried The production of part, I-steel shear key, is completed in factory.The difficulty of on-site consolidation is of less demanding, can save construction personnel Learning cost, increase substantially construction efficiency.
4. the power transmission between component of the present invention relies on weld seam force transferring structure more than single by the occlusion and welding of built-in fitting Add reliable.
5. the present invention uses a large amount of assembling work, greatly reduces than original cast-in-place operation, meet energy conservation and environmental protection and economy The advantages of prefabricated concrete structures such as the Green Architectural Development requirement of safety.
Detailed description of the invention
Fig. 1 is the three-dimensional figure of vertical reinforcement sleeve.
Fig. 2 is prefabricated post-wall built-in fitting three-dimensional figure.
Fig. 3 is I-shaped column-wall connecting key three-dimensional figure.
Fig. 4 is the steel bar arrangement three-dimensional figure in prefabricated post.
Fig. 5 is that the three-dimensional figure finished is welded in reinforcing bar binding in prefabricated post-wall built-in fitting and prefabricated post.
Fig. 6 is the three-dimensional figure with prefabricated post-wall built-in fitting prefabricated post.
Fig. 7 is the steel bar arrangement three-dimensional figure in precast shear wall.
Fig. 8 is that the three-dimensional figure finished is welded in reinforcing bar binding in prefabricated post-wall built-in fitting and precast shear wall.
Fig. 9 is the three-dimensional figure with prefabricated post-wall built-in fitting precast shear wall.
Figure 10 is cutting with prefabricated post-wall built-in fitting prefabricated post with prefabricated post-the prefabricated of wall built-in fitting after rigging out Power wall constitutional diagram.
Figure 11 is that prefabricated post-wall for being installed on I-shaped column-wall connecting key between prefabricated post and precast shear wall is pre-buried Installation process three-dimensional figure between part.
Figure 12 is three-dimensional figure when I-shaped column-wall connecting key is completed between prefabricated post and precast shear wall.
Figure 13 is filling benzene plate in gap between prefabricated post and precast shear wall.
Figure 14 is I-steel side-facing depressions gap filling benzene plate.
Figure 15 is the process three-dimensional figure that Figure 13 is installed on Figure 12.
Figure 16 is the process three-dimensional figure that Figure 14 is installed on Figure 12.
Figure 17 is the three-dimensional figure filling benzene plate between prefabricated post and precast shear wall and installing.
Figure 18 is the steel bar arrangement three-dimensional figure of cover board.
Figure 19 is the three-dimensional figure that cover board completes.
Figure 20 is the three-dimensional figure of cover board installation process.
Figure 21 is the three-dimensional figure that cover board is installed.
Figure 22 is that the three-dimensional figure after gypsum completes is smeared at cover plate bolt hole.
In figure, 1 vertical reinforcement sleeve;2 ribbed steels;3 circular holes;4 I-shaped columns-wall connecting key;5 reinforcing bar future insufficiencies;6 Longitudinal stress muscle in prefabricated post;7 prefabricated column tie-bars;8 shear wall longitudinal stress muscle;The lateral stressed muscle of 9 shear walls;10 shear walls are about Beam edge member stirrup;11 shearing wall lacing wires;Benzene plate is used in filling between 12 prefabricated posts-wall;13 I-shaped columns-wall connecting key filling is used Benzene plate;14 billets;15 cover board genesis analysis muscle;16 cover board cross direction profiles muscle;17 cover boards;18 prefabricated posts;19 precast shear walls; 20 floors;21 vertical plates;22 level boards;23 convex ribs.
Specific embodiment
As shown in Fig. 1-Figure 22, prefabricated concrete structure wall of the present invention-column all steel is keyed structure, mainly includes prefabricated Column-wall built-in fitting, prefabricated post, precast shear wall, prefabricated connecting portion cover board, and for being connected between above-mentioned component and filling I-shaped column-wall connecting key and benzene plate etc., prefabricated post-wall built-in fitting between prefabricated post and precast shear wall is corresponding, relatively Pass through I-shaped column-wall connection key connection between the prefabricated post of setting-wall built-in fitting.
(1) as shown in Fig. 2, prefabricated post-wall built-in fitting specific structure and manufacturing process are as follows:
(1) prefabricated post-wall built-in fitting is made of ribbed steel 2 and circular hole 3, and the side of ribbed steel 2 is arranged in parallel up and down Cross section is the floor 20 of L-type, circular hole 3 is arranged on monolith ribbed steel, floor 20 forms with the side of ribbed steel 2 recessed respectively Slot, upper and lower two grooves are opposite.
As shown in Fig. 3, Figure 11 and Figure 12, I-shaped column-wall connecting key 4 is by vertical plate 21, level board 22,23 groups of convex ribs At the level board setting up and down 22 of vertical plate 21 is in I-shaped structure, and superposed 22 top both ends of level board are wholely set Parallel convex ribs 23 are wholely set parallel convex ribs, I-shaped column-wall connecting key 4 positioned at the level board bottom both ends of lower part Two sides are connect with prefabricated post-wall built-in fitting respectively, I-shaped column-wall connecting key 4 by upper and lower two convex ribs respectively with prefabricated post- Two groove inserting cooperations up and down of wall built-in fitting.In addition, the two sides upper and lower side of vertical plate 21 opens up reinforcing bar future insufficiency respectively 5, after I-shaped column-wall connecting key 4 assembles, reinforcing bar can be worn into reinforcing bar future insufficiency 5.
(2) number of circular hole 3 is 4 groups 8, parallel arrangement.The diameter of circular hole 3 be 20mm, with guarantee shear wall laterally by Power muscle 9 can pass through circular hole 3.
(3) width of ribbed steel 2 needs the width than prefabricated post 18 (Fig. 6) and precast shear wall 19 (Fig. 9) 20mm small, The requirement for preventing junction steel plate from corroding.
(4) shearing that the shear wall and intercolumniation that I-shaped column-wall connecting key 4 (Fig. 3) quantity is connected according to it transmit Calculate determination.
(2) as shown in Fig. 1, fig. 4 to fig. 6, specific structure and the manufacturing process difference of prefabricated post are as follows:
(1) prefabricated post 18 is by longitudinal stress muscle 6, prefabricated column tie-bar 7, vertical reinforcement sleeve 1 and ribbed steel 2 in prefabricated post Casting concrete forms, and longitudinal stress muscle 6 forms frame by the connection of prefabricated column tie-bar 7 in four prefabricated posts of the arrangement that is square Structure, the bottom of longitudinal stress muscle 6 is set with vertical reinforcement sleeve 1 in each prefabricated post, and the one side of the frame structure is from upper Prefabricated post-wall built-in fitting is uniformly arranged under and, concreting is in frame structure inner side and outer side.
(2) manufacturing process of prefabricated post 18 are as follows: firstly, vertical reinforcement is inserted into the lower end of longitudinal stress muscle 6 in prefabricated post Then sleeve 1 binds prefabricated column tie-bar 7, complete the steel bar arrangement in prefabricated post.
The upper end of longitudinal stress muscle 6 should reserve a part in prefabricated post, and it is vertical that the length of reserved part should be prefabricated post The half of 1 height of reinforced bar sleeve.
By prefabricated post-wall built-in fitting through hole fixation with steel wire on prefabricated column tie-bar 7, prefabricated post-wall built-in fitting Number is determining according to the shear force calculation for needing to transmit between precast shear wall 19 and prefabricated post 18, and along 18 short transverse of prefabricated post It is uniformly distributed.
Reinforcing bar outer support template in prefabricated post 18, casting concrete, concrete should pour in template to prefabricated post- The outer surface of wall built-in fitting, form removal after concrete setting complete the production of prefabricated post.
(3) as shown in Figure 7 to 9, the specific structure of precast shear wall 19 and manufacturing process difference are as follows:
(1) precast shear wall 19 mainly include framework of steel reinforcement, prefabricated post-wall built-in fitting and concrete, the two of framework of steel reinforcement Prefabricated post-wall built-in fitting is respectively set in side, and concreting is in framework of steel reinforcement inner side and outer side;Framework of steel reinforcement is that shear wall is longitudinal The lateral stressed muscle 9 of principal rod 8, shear wall, shear wall confined boundary member stirrup 10 and shearing wall lacing wire 11 form, two rows shearing Wall longitudinal stress muscle 8 is oppositely arranged in parallel, and is connected between every row's shear wall longitudinal stress muscle 8 by the lateral stressed muscle 9 of shear wall, It is connected between the shear wall longitudinal stress muscle 8 being oppositely arranged by shearing wall lacing wire 11, the side of two rows of shear wall longitudinal stress muscle 8 Shear wall confined boundary member stirrup 10 is arranged in parallel in outside up and down between edge.
(2) manufacturing process of precast shear wall are as follows: binding shear wall longitudinal stress muscle 8 and shear wall constrained edge structure first Part stirrup 10 forms confined boundary member reinforcing bar, then binds remaining shear wall longitudinal stress muscle and the lateral stressed muscle of shear wall 9, finally binding shearing wall lacing wire 11, forms the reinforcing bar in precast shear wall.
Prefabricated post-wall built-in fitting is that shear wall side is fixed on by metal binding wire, and metal binding wire passes through prefabricated post-wall Reserved circular hole above built-in fitting is bound in precast shear wall on confined boundary member stirrup, wall it is laterally uniform Two side areas.
The formwork supporting plate on the outside of framework of steel reinforcement, casting concrete, concrete should be poured in template to outside column wall built-in fitting Side surface.Form removal after concrete setting completes the production of precast shear wall.
(4) as shown in Figure 18 to Figure 19, the specific structure of connecting portion balustrade deching and production between prefabricated post and shear wall Process is as follows:
(1) cover board 17 is set on the outside of connecting portion between prefabricated post 18 and precast shear wall 19, and cover board 17 includes that cover board is lateral Distributing reinforcement 16, cover board genesis analysis muscle 15 and billet 14, the parallel opposite cover board cross direction profiles muscle 16 of a row are parallel with a row Opposite cover board genesis analysis muscle 15 forms steel reinforcement net.And billet 14 is then welded to certain two phase in steel reinforcement net Between adjacent cover board cross direction profiles muscle 16, specific link position corresponds to fill benzene plate center between prefabricated post 18 and precast shear wall 19.
(2) between prefabricated post 18 and precast shear wall 19 connecting portion balustrade deching manufacturing process are as follows: first binding cover board Cross direction profiles muscle 16, cover board genesis analysis muscle 15 form steel reinforcement net, billet 14 are then welded, on the outside of steel reinforcement net Formwork supporting plate, casting concrete, concrete should be poured in template to steel reinforcement net outer surface.Mould is removed after concrete setting Plate completes the production of connecting portion balustrade deching between prefabricated post and shear wall.
The prefabricated completion in factory of above-mentioned prefabricated components, then transports to construction site and assembles, and specific hoisting process is as follows:
(1) as shown in Figure 10, the lifting of prefabricated post and precast shear wall first prefabricated cuts two prefabricated posts 18 with one Power wall 19 lifts in place, and precast shear wall 19 is located between two prefabricated posts 18.
(2) as shown in Figure 11 to Figure 12, prefabricated post-wall built-in fitting and prefabricated post-in precast shear wall in prefabricated post 18 It is corresponding between wall built-in fitting to be inserted into I-shaped column-wall connecting key 4, make in prefabricated post in prefabricated post-wall built-in fitting and precast shear wall Prefabricated post-wall built-in fitting and I-shaped column-wall connecting key 4 are in close contact, and are then welded, and are completed prefabricated post 18 and are cut with prefabricated The connection of connecting key between power wall 19.
(3) empty between wall built-in fitting and prefabricated post 18 and precast shear wall 19 in prefabricated post-as shown in Figure 13 to Figure 17 Filling benzene plate 12 between prefabricated post-wall is inserted into gap with the shape, then correspondence installs I-shaped column -4 side of wall connecting key with the shape I-shaped column-wall connecting key filling benzene plate 13, completes vacant position benzene in prefabricated post 18 and 19 connecting portion of precast shear wall The connection of plate.
(4) it installs outside 19 connecting portion corresponding position of prefabricated post 18 and precast shear wall and connects between prefabricated post and shear wall Connecting portion balustrade deching between prefabricated post 18 and precast shear wall 19 is first placed on connecting portion pair by socket part position balustrade deching 17 Vacant locations are answered, then sequentially pass through interconnecting piece between former and later two corresponding prefabricated posts 18 and precast shear wall 19 with interspersed reinforcing bar Billet 14 on the balustrade deching of position, then the both ends of interspersed reinforcing bar are secured with nuts, it completes between column and shear wall outside connecting portion The fixed installation of side cover plate 17.Wherein, the length for interting reinforcing bar should be connecting portion balustrade deching between the shear wall of correspondence On 14 outer surface of billet between distance add two sides to correspond to the thickness of fixture nut.
(5) as shown in Figure 18 to Figure 22, the connecting portion outboard cover between the column and shear wall after all completions are fixedly mounted 14 recess of billet on plate 17 smears gypsum, keeps recess smooth, completes the connection between prefabricated post and precast shear wall.
It includes the processes such as scene grouting or concreting, whole works that result of implementation, which shows master operation of the invention not, Sequence is all the in-site installation connection of prefabricated components, does not need wet construction, greatly shortens time required for building-site is constructed, energy It is enough greatly to improve speed of application, save the cost.Prefabricated post and precast shear wall, by being connected in precast shear wall with prefabricated post Part setting prefabricated post-wall built-in fitting and I-shaped column-wall connecting key complete the transmitting of wall-intercolumniation coupling part shearing, into one The globality of enhancing structure is walked, anti-seismic performance is more preferable.Make the high part of required precision, including prefabricated post, precast shear wall with And the production of prefabricated post-wall built-in fitting, I-steel shear key, completed in factory.The difficulty of on-site consolidation is of less demanding, energy The learning cost for enough saving construction personnel, increases substantially construction efficiency.Power transmission between component of the present invention, by stinging for built-in fitting It closes and welds, it is more relatively reliable by weld seam force transferring structure than single.Using a large amount of assembling work, significantly than original cast-in-place operation Reduce, the advantages of meeting the prefabricated concrete structures such as the Green Architectural Development requirement of energy conservation and environmental protection and economic security, have compared with Good future in engineering applications.

Claims (8)

1. a kind of prefabricated concrete structure wall-column all steel is keyed structure, which is characterized in that including prefabricated post-wall built-in fitting, Prefabricated post, precast shear wall, precast shear wall is located between two prefabricated posts, prefabricated between prefabricated post and precast shear wall Column-wall built-in fitting is corresponding, is keyed between the prefabricated post being oppositely arranged-wall built-in fitting by I-shaped column-wall connection, In:
(1) prefabricated post-wall built-in fitting is made of ribbed steel and circular hole, and the side of ribbed steel is arranged in parallel cross section up and down and is The floor of L-type, circular hole, circular hole parallel arrangement are arranged on monolith ribbed steel, and the lateral stressed muscle of shear wall passes through circular hole, floor point Groove is not formed with the side of ribbed steel, upper and lower two grooves are opposite;
(2) prefabricated post is by longitudinal stress muscle, prefabricated column tie-bar, vertical reinforcement sleeve and ribbed steel casting concrete in prefabricated post It forms, longitudinal stress muscle connects to form frame structure by prefabricated column tie-bar in four prefabricated posts of the arrangement that is square, each pre- The bottom of longitudinal stress muscle is set with vertical reinforcement sleeve in column processed, and the one side of the frame structure is uniformly arranged pre- from top to bottom Column processed-wall built-in fitting, concreting is in frame structure inner side and outer side;
(3) precast shear wall includes that framework of steel reinforcement, prefabricated post-wall built-in fitting and concrete, the two sides of framework of steel reinforcement are respectively set Prefabricated post-wall built-in fitting, concreting is in framework of steel reinforcement inner side and outer side;Framework of steel reinforcement is shear wall longitudinal stress muscle, cuts The lateral stressed muscle of power wall, shear wall confined boundary member stirrup and shearing wall lacing wire composition, two rows of shear wall longitudinal stress muscle are flat Row is oppositely arranged, by the lateral stressed muscle connection of shear wall between every row's shear wall longitudinal stress muscle, the shear wall being oppositely arranged It is connected between longitudinal stress muscle by shearing wall lacing wire, outside is set in parallel up and down between the edge of two rows of shear wall longitudinal stress muscle Set shear wall confined boundary member stirrup.
2. prefabricated concrete structure wall described in accordance with the claim 1-column all steel is keyed structure, which is characterized in that I-shaped Type column-wall connecting key 4 is made of vertical plate, level board, convex ribs, and the level board setting up and down of vertical plate is in I-shaped structure, position Both ends are wholely set parallel convex ribs at the top of the level board on top, and the level board bottom both ends positioned at lower part are wholely set in parallel Convex ribs, I-shaped column-wall connecting key 4 two sides connect with prefabricated post-wall built-in fitting respectively, and I-shaped column-wall connecting key is logical Crossing two convex ribs up and down, two groove insertings cooperate up and down with prefabricated post-wall built-in fitting respectively.
3. prefabricated concrete structure wall described in accordance with the claim 1-column all steel is keyed structure, which is characterized in that prefabricated Cover board is set on the outside of connecting portion between column and precast shear wall, cover board include cover board cross direction profiles muscle, cover board genesis analysis muscle and Billet, the parallel opposite cover board genesis analysis muscle of a row parallel opposite cover board cross direction profiles muscle and a row form framework of steel reinforcement Net.
4. prefabricated concrete structure wall described in accordance with the claim 3-column all steel is keyed structure, which is characterized in that steel pad Plate is welded in steel reinforcement net between certain two adjacent cover board cross direction profiles muscle, specific link position correspond to prefabricated post with it is prefabricated Benzene plate center is filled between shear wall.
5. prefabricated concrete structure wall described in a kind of one of Claims 1-4-column all steel key connection structure assembly side Method, which comprises the steps of:
(1) lifting of prefabricated post and precast shear wall first lifts two prefabricated posts and a precast shear wall in place, prefabricated to cut Power wall is located between two prefabricated posts;
(2) corresponding insertion is I-shaped between prefabricated post-wall built-in fitting and prefabricated post in precast shear wall-wall built-in fitting in prefabricated post Column-wall connecting key makes prefabricated post-wall built-in fitting and I-shaped column-in prefabricated post in prefabricated post-wall built-in fitting and precast shear wall Wall connecting key is in close contact, and is then welded, and the connection of connecting key between prefabricated post and precast shear wall is completed;
(3) it is filled between prefabricated post-is inserted into prefabricated post-wall in gap between wall built-in fitting and prefabricated post and precast shear wall with the shape With benzene plate, then correspondence installs the I-shaped column in I-shaped column-wall connecting key side-wall connecting key filling benzene plate with the shape, complete At the connection of vacant position benzene plate in prefabricated post and precast shear wall connecting portion;
(4) it is installed outside prefabricated post and precast shear wall connecting portion corresponding position between prefabricated post and shear wall on the outside of connecting portion Connecting portion balustrade deching between prefabricated post and precast shear wall is first placed on connecting portion and corresponds to vacant locations, then by cover board The steel pad between former and later two corresponding prefabricated posts and precast shear wall on connecting portion balustrade deching is sequentially passed through with interspersed reinforcing bar Plate, then the both ends of interspersed reinforcing bar are secured with nuts, complete the fixed installation of connecting portion balustrade deching between column and shear wall;
(5) the billet recess between the column and shear wall after all completions are fixedly mounted on connecting portion balustrade deching smears stone Cream keeps recess smooth, completes the connection between prefabricated post and precast shear wall.
6. prefabricated concrete structure wall-column all steel key connection structure assembling method according to claim 5, feature It is, in step (4), the length of interspersed reinforcing bar should be the billet between the shear wall of correspondence on connecting portion balustrade deching Distance adds two sides to correspond to the thickness of fixture nut between outer surface.
7. prefabricated concrete structure wall-column all steel key connection structure assembling method according to claim 5, feature It is, the manufacturing process of prefabricated post are as follows:
(1) vertical reinforcement sleeve is inserted into the lower end of longitudinal stress muscle in prefabricated post, then binds prefabricated column tie-bar, complete prefabricated Steel bar arrangement in column;
(2) upper end of longitudinal stress muscle should reserve a part in prefabricated post, and the length of reserved part should be prefabricated post vertical steel The half of muscle sleeve height;
(3) prefabricated post-wall built-in fitting is passed through into hole fixation with steel wire on prefabricated column tie-bar, prefabricated post-wall built-in fitting is along pre- Column short transverse processed is uniformly distributed;
(4) the reinforcing bar outer support template in prefabricated post, casting concrete, concrete should be poured in template to prefabricated post-wall The outer surface of built-in fitting, form removal after concrete setting complete the production of prefabricated post.
8. prefabricated concrete structure wall-column all steel key connection structure assembling method according to claim 5, feature It is, the manufacturing process of precast shear wall are as follows:
(1) shear wall longitudinal stress muscle and shear wall confined boundary member stirrup are bound, forms confined boundary member reinforcing bar, then Remaining shear wall longitudinal stress muscle and the lateral stressed muscle 9 of shear wall are bound, finally binding shearing wall lacing wire, forms precast shear wall Interior reinforcing bar;
(2) prefabricated post-wall built-in fitting is that shear wall side is fixed on by metal binding wire, and metal binding wire passes through prefabricated post-wall Reserved circular hole above built-in fitting is bound in precast shear wall on confined boundary member stirrup, wall it is laterally uniform Two side areas;
(3) formwork supporting plate on the outside of framework of steel reinforcement, casting concrete, concrete should be poured in template to the outside of column wall built-in fitting Surface;Form removal after concrete setting completes the production of precast shear wall.
CN201811329141.2A 2018-11-09 2018-11-09 Prefabricated concrete structure wall-column all steel key connection structure and assembling method Pending CN109281422A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811329141.2A CN109281422A (en) 2018-11-09 2018-11-09 Prefabricated concrete structure wall-column all steel key connection structure and assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811329141.2A CN109281422A (en) 2018-11-09 2018-11-09 Prefabricated concrete structure wall-column all steel key connection structure and assembling method

Publications (1)

Publication Number Publication Date
CN109281422A true CN109281422A (en) 2019-01-29

Family

ID=65175367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811329141.2A Pending CN109281422A (en) 2018-11-09 2018-11-09 Prefabricated concrete structure wall-column all steel key connection structure and assembling method

Country Status (1)

Country Link
CN (1) CN109281422A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335467A (en) * 2020-03-20 2020-06-26 哈尔滨工业大学 Self-resetting node connecting structure and assembling method for beam column of assembled concrete frame
CN111335466A (en) * 2020-03-20 2020-06-26 哈尔滨工业大学 Fabricated concrete self-resetting beam-column joint connecting structure and assembling method
CN112695926A (en) * 2021-01-07 2021-04-23 中铁建设集团有限公司 Connect precast concrete composite window wall based on PBL

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762731A (en) * 1993-08-27 1995-03-07 Okumura Corp Joining method of pillar and beam
CN104727467A (en) * 2015-03-23 2015-06-24 河北联合大学 Assembly type concrete filled steel tube shear wall splitting and assembling connection structure and assembling connection method
CN207260378U (en) * 2017-09-30 2018-04-20 沈阳建筑大学 A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN107989231A (en) * 2018-01-12 2018-05-04 新疆大学 A kind of Prefabricated concrete-filled steel tube frame-shear wall and its construction method
CN108086488A (en) * 2017-12-01 2018-05-29 沈阳建筑大学 Assembled frame-shear structure wall splitlevel connection structure and assembling method
CN209227836U (en) * 2018-11-09 2019-08-09 沈阳建筑大学 Prefabricated concrete structure wall-column all steel is keyed structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762731A (en) * 1993-08-27 1995-03-07 Okumura Corp Joining method of pillar and beam
CN104727467A (en) * 2015-03-23 2015-06-24 河北联合大学 Assembly type concrete filled steel tube shear wall splitting and assembling connection structure and assembling connection method
CN207260378U (en) * 2017-09-30 2018-04-20 沈阳建筑大学 A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN108086488A (en) * 2017-12-01 2018-05-29 沈阳建筑大学 Assembled frame-shear structure wall splitlevel connection structure and assembling method
CN107989231A (en) * 2018-01-12 2018-05-04 新疆大学 A kind of Prefabricated concrete-filled steel tube frame-shear wall and its construction method
CN209227836U (en) * 2018-11-09 2019-08-09 沈阳建筑大学 Prefabricated concrete structure wall-column all steel is keyed structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335467A (en) * 2020-03-20 2020-06-26 哈尔滨工业大学 Self-resetting node connecting structure and assembling method for beam column of assembled concrete frame
CN111335466A (en) * 2020-03-20 2020-06-26 哈尔滨工业大学 Fabricated concrete self-resetting beam-column joint connecting structure and assembling method
CN112695926A (en) * 2021-01-07 2021-04-23 中铁建设集团有限公司 Connect precast concrete composite window wall based on PBL
CN112695926B (en) * 2021-01-07 2024-04-30 中铁建设集团有限公司 PBL-based connection precast concrete composite window wall

Similar Documents

Publication Publication Date Title
CN108951870B (en) Construction method of low-rise fully-assembled concrete shear wall structure system
CN107245934A (en) A kind of assembled steel profiled sheet concrete combined board small box girder
CN104264786A (en) Steel bar connection mode of precast concrete components and application thereof
CN105317137A (en) Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard
CN106639093A (en) Close splicing seam-type laminated slab
CN209227836U (en) Prefabricated concrete structure wall-column all steel is keyed structure
CN206707124U (en) Prefabricated assembling type reinforced concrete component with joint of steel structure
CN204059601U (en) A kind of steel bar connecting structure of prefabricated concrete element
CN108086488B (en) Assembled frame shear structure wall staggered connection structure and assembling method
KR100731593B1 (en) A pre-fabricating forms for concrete-structure and the construction method thereof
CN207660136U (en) A kind of assembly concrete frame-shear wall keyway connection structure
CN109281422A (en) Prefabricated concrete structure wall-column all steel key connection structure and assembling method
CN106481023A (en) Assembled steel reinforced concrete bondbeam structure and its implementation
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN113653235A (en) Laminated slab, connecting structure of laminated slab and combination beam and construction method
CN110748077A (en) Prestressed truss wallboard, wall body manufactured by using wallboard and manufacturing method of wall body
CN110761443A (en) Assembled concrete structure wall-column concrete filled steel tube key connection structure and assembling method thereof
CN107514083B (en) Side-hung reinforced bar concrete composite floor slab structure with shear key and connecting method
CN114319977B (en) Steel pipe concrete row column type connection precast shear wall structure and construction method
CN111502080A (en) Steel-concrete composite structure frame-cast-in-place concrete shear wall structure system
CN108104310B (en) Assembled frame shear structure column staggered connection structure and assembling method
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN111648411B (en) Down-turned post-pouring belt support changing structure, construction method and post-pouring belt construction method
CN212453065U (en) Assembled building frame structure member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190129